FY2025/26 recorded AUD 29m profit before tax and impairments, but a AUD 30.2m net loss after Koolan impairments. Focus shifts to Central Tanami development and resource work, while cash is retained pending project funding estimates.

Simon Bird
Lead Independent Director, MGX Resources

Good morning, ladies and gentlemen, and welcome to the 2026 Annual General Meeting of MGX Resources Limited. My name's Simon Bird, Lead Independent Director on the board of MGX Resources. Our Chairman, Brett Smith, is unable to join us today, so I'll be your chair for this meeting. I'd like to acknowledge the Traditional Owners of the lands on which we meet and operate, and pay respects to elders past and present. I'd also like to introduce my fellow directors and members of the executive team that are present today. Evian Delfabbro, waving down the end, Alan Jones, Professor Paul Dougas, Peter Kerr, our Chief Executive, Jill Dobson, our CFO, and David Stokes, Company Secretary.

I'd ask that all shareholders please ensure that they've registered with Computershare on the way in, and if you could please make sure that your mobile phones are either turned off or in silent mode. A copy of the minutes of last year's AGM are available for inspection at the desk, at the front desk, and I propose to take the notice of meeting as read. I'm also advised that there's a quorum of shareholders present, and therefore formally declare the meeting open. Today's meeting is being held both in person and through a live webcast. The webcast provides a facility for people to submit questions, but doesn't enable voting and doesn't count towards a quorum. We'll first proceed with the Chairman's address, followed by the formal business of the meeting, and we'll then have a presentation on the business from our CEO, Peter Kerr.

I'll now deliver the Chairman's address. The 2025/2026 financial year was an important one for MGX as we transition from bulk materials to precious metals. This shift, initiated in February 2026 with the acquisition of a 50% interest in a 2.8 million ounce gold deposit in Central Tanami Project in the Northern Territory. We believe this project to be a significant asset with potential to become a substantial long-life gold producer. Since completing the acquisition, MGX has worked closely with our joint venture partner, Tanami Gold, to advance the project, and I'm pleased to report substantial progress, in particular with the engagement of Macmahon for the construction of the underground exploration decline going into the 1.2 million ounce Groundrush gold deposit.

The decline is a critical piece of infrastructure that'll enable infill drilling from underground to improve the classification of our mineral resource estimate while facilitating early advancement of the mine's underground workings. Surface works at Groundrush commenced in August this year, with twin central and ventilation portals being blasted in October and November. Over the next 14 months, this decline will be extended laterally over 3.5 km and down some 350 meters. Underground drilling is expected to commence in the latter part of this decline construction. In parallel, the joint venture continues to progress other key work streams, including resource definition drilling within the Jim's gold deposit, process plant engineering and design, updates to the mineral resource estimates, while progressing approval pathways and improvements to site infrastructure and utilities to support the growing manning and activity levels.

All of this work's been completed with a strong safety record and is designed to accelerate the project to a development decision within the next 12 months. Peter will elaborate further on the progress at the Tanami joint venture as part of his presentation later this morning. I just wanted to acknowledge the hard work of all the personnel involved in the project to date. MGX's transition to gold has been reinforced by the safe conclusion of our iron ore operation on Koolan Island following the main pit rockfall last year. The low-grade shipping program funded the necessary rehabilitation and ramp-down activities, enabling Koolan Island to generate a small positive cash flow for the year.

The sale agreement for MGX's Koolan Island entities to logistics group Crestlink was announced at the end of the financial year, and rehabilitation activities under the sale agreement are well advanced ahead of the final settlement expected soon. This final transaction is worth some AUD 50 million to MGX, comprising staged cash payments of at least AUD 20 million, plus Crestlink assuming the site's remaining rehabilitation obligations of circa AUD 30 million. Peter will elaborate on the closure activities at Koolan in his presentation, but I'd like to acknowledge the contribution and efforts of the MGX and Koolan Island teams in getting us to this stage on what's been an extraordinary project over its lifetime. On the financials, MGX reported a profit before tax and impairments of AUD 29 million for the 2025/2026 financial year.

After cash impairments, non-cash impairments relating to the rockfall at Koolan Island, we booked a AUD 30.2 million net loss after tax. Importantly, though, MGX maintains a strong balance sheet and robust cash and investment reserves of over AUD 400 million at the end of the September quarter just completed. MGX is therefore in a rare position of being a self-funded prospective gold producer. As we move from the Kimberley into the new environment in Central Tanami, MGX is committed to continuing our long-standing focus on safety and people's well-being. This is a commitment that we've demonstrated across all our WA operations over the last two decades. Peter will provide more color on the closing phases of the Koolan project and the commencement of activities in Central Tanami, Northern Territory.

All that's left in closing is to thank my fellow directors, the management team, employees, and consultants for all their hard work and contributions over the past year. Finally, and most importantly, you, our shareholders, to thank you for your continued support as we embark on building a new Australian gold producer. Thank you. That concludes the Chairman's address. Turning now to the formal part of the meeting, which comprises the financial reports and resolutions one to four, as set out in the notice of meeting. Shareholders attending in person will have an opportunity to ask questions, together with questions submitted through the webcast facility. These questions will be addressed after all the resolutions have been put to the meeting. As the webcast doesn't provide a voting facility, only shareholders and proxy holders attending in person and entitled to vote may vote during the meeting.

All resolutions are going to be decided by poll, and the results will be announced to the ASX after the meeting. Rod Somes, at the back from Computershare, will be acting as our returning officer. As I said, those attending in person will be entitled to vote, and they should have been provided with a green admission card, and the voting is on the back of that card. If you have previously lodged proxies and are happy with that vote, there is no need to vote. If you have not been issued with a voting paper and believe you are entitled to receive one, please put your hand up and alert the Computershare team. Please mark your voting paper for each resolution, print your name where indicated. Proxy holders should vote in accordance with any directed instructions in their proxy summary. Any open votes may be cast as the proxy holder decides.

Please retain your voting paper until asked for it to be collected by the Computershare representatives. I am confirming that I intend to vote all available undirected proxies in favor of resolutions one to four. Any directed proxies not voted by the appointed proxy will default to the chair and must be voted as directed. That covers the conduct of the meeting. I will now move to the first item, which is the financial reports, including the Director's Report and the Auditor's Report for the year ending 30 June 2026. These are included in the company's 2026 annual report and are available on the company's website. No shareholder vote is required. However, shareholders have the opportunity to ask questions and comment on the reports, which we will do after the resolutions have been tabled.

Jemma Newton of Ernst & Young is present and available to answer any questions related to the audit or the financial statements. Thanks, Jemma. Turning now to the four resolutions that are being put before this meeting. The first concerns the re-election of Mr. Alan Jones. Alan retires by rotation in accordance with the constitution and ASX Listing Rule 14.4, and being eligible, offers himself for re-election. The board, with Mr. Jones abstaining, recommends that shareholders vote in favor of resolution one. I therefore put the motion to the meeting and note the proxy votes are displayed on the screen. Thanks, David. Takes us to the second resolution, which concerns the re-election of Ms. Evian Delfabbro. Evian retires by rotation in accordance with the constitution and ASX Listing Rule 14.4, and being eligible, offers herself for re-election.

The board, with Evian abstaining, recommends that the board vote in favor of resolution two. I put the motion to the meeting and note that the proxy votes are displayed on the screen behind me. Brings us to the third resolution, which is a non-binding resolution to adopt the company's remuneration report for the year ended 30 June 2026. The vote is advisory only and does not bind the company or the directors. Voting exclusions apply as described in the notice, and I intend to vote available undirected proxies in favor of resolution 3 under the express authority of the proxy form. The board recommends that eligible shareholders vote in favor of resolution 3 . I put the motion to the meeting and note the proxy votes that are displayed on the screen behind me.

Fourth and last resolution for today's meeting is a special resolution to amend the company's constitution by reinserting the proportional takeover approval provisions set out in schedule one of the notice of meeting. If passed, the provisions enable shareholders to determine whether a proportional takeover bid for the company should proceed before transfers of shares acquired under that bid may be registered. The provisions are designed to ensure shareholders have an opportunity to approve proportional takeover bid and to provide additional protection where an offer is made for only part of each shareholder's holding. As this is a special resolution, we require at least 75% of votes to be cast in favor of this resolution. Board recommends that shareholders vote in favor of resolution 4, and I therefore put the motion to the meeting and note the proxy votes as displayed on the screen behind me. Thank you.

That concludes the tabling of the resolutions. I now invite questions or comments on either the financial reports of management or on the four resolutions that I've just tabled. I will point out there will be ample opportunity to ask questions about the business and the activities of the company during and after Peter Kerr's presentation. But if there are any questions David, have any come in from webcast?

David Stokes
Company Secretary, MGX Resources

No, nothing from webcast.

Simon Bird
Lead Independent Director, MGX Resources

We have a question from the floor. Thanks, David.

Speaker 3

Can I just ask, why is the Chairman. Because it is very, very unusual, obviously, for the Chairman. It is unusual, extremely unusual, obviously, for the Chairman not to be attending this meeting. I assume, I do not know, perhaps you could just explain why he is not here. And obviously, with Alan Jones' vote, you can see that we have got 21% of the votes already tabled against Alan Jones' reinstatement. So, I guess maybe he could speak to that, or you could explain why he is suddenly so unpopular.

Simon Bird
Lead Independent Director, MGX Resources

Well, if I can, I will have a crack at the first one first. Sorry to disappoint you, but as a second prize. But yes, it would have been ideal for our Chairman to have been here. He was unfortunately called away on other business at short notice. But it is an important event, and he is very apologetic for not being here. But thank you for that question. It is unfortunate. On the second one, yes, Mr. Jones, there has been some concern from not proxy. We do not subscribe to.

David Stokes
Company Secretary, MGX Resources

Proxy advice.

Simon Bird
Lead Independent Director, MGX Resources

proxy-

David Stokes
Company Secretary, MGX Resources

It is a proxy.

Simon Bird
Lead Independent Director, MGX Resources

proxy advice. It has come from a proxy advisor, where they have pretty well a black and white rule book, where someone who has been on a board for a certain length of time is no longer independent. There is a concern in that respect, and I believe that is partly what is being reflected in the votes against Mr. Jones' reinstatement. But the board have no concerns as far as his independence is concerned, because certainly in my time on the board, Alan Jones has always acted very much as an independent Director. There are no concerns there whatsoever, and we do not believe that his term on the board has impeded that independence.

If that helps answer your question. Are there any other questions from the floor? As I said, when we get to the more interesting part of the meeting, I am sure there will be questions for Peter Kerr on the project, particularly the new project in Northern Territory that we are very excited about. Thank you for those. Nothing else online?

David Stokes
Company Secretary, MGX Resources

Nothing. Oh, hang on. Sorry. Just one last minute. Okay. Several years ago, this management team committed substantial shareholder capital and drew down our cash reserves to rebuild Koolan Island. After years of operational risk, high capital expenditure, and eventual premature closure following the rockfall, the company has essentially only managed to rebuild its cash balance back to roughly where it started, delivering virtually zero net capital growth for long-term shareholders.

Given that track record of capital allocation and project execution, why should shareholders believe this same management team has the right capabilities, technical expertise, and discipline to successfully deliver the Central Tanami Project rather than repeating the same cycle? I want the board to answer this question, please. Thank you.

Simon Bird
Lead Independent Director, MGX Resources

I am happy to address that. That Koolan project has delivered substantial dividends over its term. It has left us with a fantastic balance sheet to go onto our adventure in precious metals. The management team that not only operated it, but rebuilt it after the seawall failure, have done an extraordinary job, and I do not share that view at all. But I am happy, Peter, if you wanted to add anything to that.

Peter Kerr
CEO, MGX Resources

Sure. The main issue, I think, is that we did invest substantial capital along the way. Koolan was always a high sustaining cost, and as an open pit, it required substantial waste movement. We had set the mine up to be in a position where, for the last 12 months of its life, so this is outside the low-grade material, we were aiming for a much lower waste movement and a much higher iron ore movement, high-grade iron ore. The returns in that last 12 months that we were expecting were substantial. That would have actually added at least AUD 100, possibly a couple of hundred million dollars to the cash kitty of the company. That was the objective of the mine plan.

Unfortunately, in October last year, just over a year ago, we had that rockfall high up on the footwall in the eastern end of the pit. We looked at multiple ways of trying to deal with that in terms of repairing it, making it safe, trying to do workarounds to get through it so we could access the high-grade iron ore and pull out that last piece in the eastern end of that pit. That is on top of substantial and capital invested, that is correct, in ground support, but that was what we chose to do based on the expert advice. In the end, we actually made the judgment call that we were not safe with it. We were not prepared to put people on the floor of the pit underneath that rock that had failed.

As it turned out, very shortly after we made that call, another large piece of rock, and by large, I mean 50 by 100 meters, fell off that wall, and that would have created a serious issue as well. In the end, we felt that that was the safest thing to do. So it is unfortunate. I think it is unfair to criticize the operational and management team for capital that may have been misinvested. It was very clearly stated what we were trying to do, and the gains were there to be achieved. But in the end, for the reasons I described, it just was not possible. We have worked hard to maintain the cash in our company. We have worked very hard to realize value from the low-grade stockpiles and monetize and make sure that cash is not drained and drawn with all the closure costs of Koolan Island.

I think in the end, it has been a reasonable outcome with some great operating work on the island to achieve that. We are in a position now where we have transacted Koolan Island, which I will talk about in my presentation. We hope to settle that sale shortly, and that will enable us to have the cash in the business to go forward with the project that we need. It is the board's call as to whether management is doing an acceptable or not acceptable job. Not going to comment on that, but we make it very clear what our production plan is and what we are trying to do with our cash invested, and we are conservative with it.

Simon Bird
Lead Independent Director, MGX Resources

Thanks, Peter. Moving on to the completion of the poll. Please complete your voting papers for resolutions one to four. Once you have finished, please raise your hand so the Computershare team can collect those. Yeah, thank you. Thanks, Rod. If that is all done, thank you. I therefore Are we waiting for Wayne? Really?

No, thanks very much. If that's all done, then I declare the poll closed and reiterate that the results will be announced on the ASX once they have been verified. There being no more formal business, I declare the 2026 Annual General Meeting of MGX Resources closed. Glad to see nobody is moving because the interesting part of the meeting is coming up. Peter Kerr, our CEO, is going to give a presentation as an update of the business. Thank you.

Peter Kerr
CEO, MGX Resources

Yeah, I will go. Thanks so much. Okay. Good morning, all. Thanks very much for coming along. What I would like to do is spend a few minutes taking you through a presentation describing where we are now and what we are trying to achieve with both the divestment of Koolan Island and then the investment in the CTP, Central Tanami Project joint venture. This presentation was put onto the ASX earlier this morning, so it has the usual disclaimer. Overall, from a company perspective, we are a clean company. We have no debt. We are well-funded cash-wise from what we have done with the iron ore operations, and obviously, we are looking to transition from iron ore to the gold project in the Northern Territory. The Central Tanami Project joint venture, or CTP, as I will refer to it, is a large beast of a project.

It is isolated, it has many moving components, but it has a large gold endowment sitting in resources at the moment, indicated and inferred. That is important for us to now go forward and spend the next couple of years in our joint venture with our partner, Tanami Gold, to work through and prove that resource up. I will talk to you about the various components we are doing for that now. For Koolan Island, we are seeking to push to try and close the transaction with Crestlink, which is an Australian logistics group, but funded with British and U.S. money. We are seeking to close that transaction sometime later this year. The actual terms of the deal can take us through to 31 March next year, but we want to try and do it sooner if we can. That is what we are working for now.

Corporately, very little has changed in terms of share capital. The obvious standout point there is we are trading at a negative enterprise value, and by that I mean below cash backing. That is something that we will seek to address through the news flow associated with the Koolan Island settlement and what we are doing in the Central Tanami Project with our partner there. In terms of the board of directors, on the right-hand side, it is unchanged. Management team is changing. There are moves, obviously, as we move from iron ore to gold, but we have a core small team where we would love to keep people involved because they have performed and done a fantastic job for the company over many years. That is operationally, project-wise, and finance and commercial aspects as well.

In terms of our shareholder structure, APAC Resources in Hong Kong, a company that is now fully re-domiciled into Hong Kong and is listed there in its own right, has 38% of MGX. Former iron ore customer, Shougang Fushan, another Hong Kong-listed entity, has just under 14%. Shougang Fushan, we will see what they want to do in due course, but they sit there on the register and are supportive for our activities. Otherwise, we have been putting quite a bit of effort into increasing the number of Australian institutions on our register. Thanks to some of the people in the room today, we have been able to market and tell the story of what we are doing, and we have lifted that now. In Australia, it is 16% or 17%. In the U.S. or overseas, there is another few percent.

We are trying to get above 20% institutionally owned, which would be a great outcome, remembering that the two Chinese groups effectively control half of the business anyway. We are trying to deal with that to set up the share register for stability and recognition of the value that we have. We will continue to market to retail investor conferences, mining conferences, and the like to explain our story. As we set out what we are doing in the joint venture in the Northern Territory, that will be important to explain what that production profile, what costs, and what margins potentially look like. We are not at that position yet, but it is going to be an important part for us.

Our share price has obviously come off since we were heading towards 50 cents, and that has reflected the gold price reduction, but also probably some of the issues associated with Koolan Island and what we are doing in the startup phase of the joint venture now in the Northern Territory. I will come into that in more detail. That is a picture from the air of the Central Tanami Project taken last year, and actually it might have been earlier this year, just showing some of the old plant area and the old camp area, which is now in the central zone that is being repaired and refurbished for our activities going forward. The map on the right-hand side shows the area just to the right-hand side of the WA-NT border, which is on the left-hand side of that map. The tenement colors are the joint venture in green.

Solid green are granted leases or mining leases and exploration licenses, and transparent green are applications. The blue colors are wholly owned by MGX, so they sit outside the joint venture. Obviously, at some stage, if we are successful in looking at exploration and finding something on those tenements, vast prospective areas, not really been looked at in a lot of detail in the past, then the place for that to be processed will be the CTP project. That is something that does not sit as the immediate priority, although we are starting to do some analysis work using government and other data there. The resource is the key part of the project, 2.8 million ounces at a reasonable grade overall, 2.8 grams per ton.

Comprises a number of projects, the core of which is the Groundrush deposit, which was mined by Newmont in the early 2000s, so over 20 years ago now, and it produced 600,000 ounces at 4 grams per ton from a relatively low strip ratio open pit. That deposit continues underneath that open pit, and I'll show you some pictures as to how it looks now. The underground workings we are building are coming out of the wall of that open pit and into that deposit. It's a large project. It's one that will require quite a bit of focus over the next couple of years as we build the exploration decline and drill out an inferred resource component that sits in part of the mineral resource estimate for Groundrush to give us then the detail for confirming our mine design.

It also gives us the head start with the underground development workings. In terms of the infrastructure there's an old airstrip. We need to build a new airstrip. At the moment, it's not suitable for larger volumes of people on site, which will happen in due course. The camp and the plant obviously undergoing a whole series of investigations. On the plant side, that plant last operated in 2005. It's been run down and scavenged since that time. It's not really suitable for what we have. If we were to try and refurbish it wouldn't really service what we think we will have out of the open pits and underground. It'd be a bit of a Frankenstein. We don't really want that, so rather, we would aim to use the real estate area and build a modern processing plant capable of expansion in due course.

That's engineering work that's undergoing studies right now. In terms of other infrastructure, there's plenty there that requires updated permitting and approvals, hence relationships that have been formed by joint venture and MGX personnel with the Traditional Owners through the Central Land Council and the NT government. It's a big permitting task over the next two years to get everything updated and put in place for what's required. If I just take you back to that map, if you imagined you were at the bottom right-hand corner of that map, and we took a slice or a cut through the earth, and you can see there the black dot in the middle on the Tanami Road is the process plant site. The hollow dot down the bottom is what's known as the Jim's Open Pit.

That was mined many years ago in the 1990s, and our drilling is actually proving that there are multiple stacked lodes of gold that sit there, and it could well be a larger open pit opportunity for us. On the top right-hand side is the Groundrush gold deposit and some other areas around it that might be other associated pits as well in the future. If you imagine a slice through there, then that's what you get. This is a stylized long section through that zone. Groundrush on the right-hand end, Jim's on the left-hand end. Many of these deposits produced gold in the 1980s, 90s, and early 2000s.

Since then, the project has sat still in terms of mining, and there has been work with Northern Star and Tanami Gold in the joint venture over the last three or four years starting to drill out for modern assessment purposes, Groundrush and some of the open pits, and that is what we are continuing now. In the middle, there is a whole range of deposits. There are almost 50 in total that sit in the mineral resource estimate. Mineralization is right through the area, but what we want to do is concentrate our development focus on the key ones, Groundrush on the right, Jim's on the left, and potentially a small one called Ripcord, which is up on the right-hand side near Groundrush.

That, we think, based on indicative scoping work that has been done in the past and what we see now, could be sufficient, subject to the studies that we are doing now, for a mine life that is producing something for at least 10 years and then could extend on from there, of a scale of maybe 100,000-125,000 ounces a year, of that order, if you look at the numbers and the grade that could come through. We do not put those production profile forecasts out there formally at this point. A lot of people have that number in their mind. They have come from the historic scoping studies. But formally now, we need to clarify it through the feasibility work that we have underway. At Groundrush, there is an aerial shot on the left-hand side of the existing pit. That is the northern part of the Groundrush deposit.

There is water in it because that is the underground water level, the aquifer. What we have done is recommission, or sorry, I should say what the joint venture has done is recommission the haul road from the north and had a ramp down the left-hand side, and from there, we have now punched in two portals, which I will show you in a minute. There is a picture of the drilling into one of those portal headings on the bottom left. This is the core of the project, 1.2 million ounces, 3.3 grams per ton in terms of the mineral resource. We have engaged Macmahon or Macmahon Underground, so it is part of the Macmahon Contracting Group, to actually do the exploration decline for us. That decline, if I now then take a long section through the deposit. Maybe not. Excuse, guys. Suddenly, there we go. Okay. Long section through the deposit.

You are looking here, it is about 1.5 km wide or long on the top of that existing open pit in brown. The gray shapes underneath are the indicative mine design that the joint venture team has created around the mineral resource estimate that we know today. Roughly half-half, a little bit more than half is inferred, the rest is indicated. Our task is now to drill the inferred material, gain greater confidence in it, and get more detailed information for mine planning purposes. Excuse me, guys. What we will do is the decline itself is aimed to go down or designed to go down 350 meters. The length of the decline in total, when it comes back. Have I trodden on something? There we go, we are back. The length of the decline is about 3.5 km.

At the moment, we are in about 30 to 40 meters on each of the two decline headings. One of those is a ventilation tunnel, so ultimately it will be designed to circulate air through the mine workings, and the other one is the main access tunnel in the central part of the deposit, so we call it the central decline. The colors you can see on that I'll keep talking, these guys sort it out. The colors you can see on that chart are the stages of development through that decline, and that's what we're building now, and we'll have continuous reports on that. I'll move on. Maybe it was that picture it didn't like.

Macmahon is there, as we say, that's a jumbo drilling first cut into the main or the central portal there, and that's now 30 or 40 meters in, and we're finding the ground conditions at this early stage pretty good. If I take an aerial shot out of, up from a drone into the open pit, you can see the two declines that we've started there. All of this work is about giving us a head start in development activity because we're convinced this is a viable mining operation, plus enabling us to more cheaply drill out from underground and give us the confidence for that inferred resource component, which totals about 400,000 ounces.

It means that when we reach the point of permitting and approvals within the next couple of years is our target, we've actually got some serious advance already underway, and so the mining extraction of gold-bearing ore from here will be fairly prompt after that. Go down the other end of the deposits and to Jim's. It was called Jim's Find originally. It was an old prospect. The mining was here in the 1990s. About 100 or so thousand ounces came out of two small open pits. One of them has been backfilled, and one of them's still open. The work we've done is to, and in the joint venture, has been to drill the western and northern extents of that deposit, as it's known, and that's produced a series of intercepts which we've been able to wireframe, and then we're now going through the process of collating results.

We'll have some results to announce soon from the reverse circulation, RC drilling program, to demonstrate what we've seen. We've also just completed in the last couple of days a diamond core drilling program, and the joint venture team are assembling those core samples and getting them off for assay as well, and that helps with some of the metallurgical test work. We see a potential for this deposit to be supplementing the Groundrush deposit material for that 10-year period and be basically the first core deposits for mining within this project. In relation to other activities, there's a list here. This is what we're focusing on at the minute. Some of it people will go, "Ho-hum, okay, what? You need to do it.

It is really important, and methodically working through it is critical, but you can see there is a range of things from the decline I have talked about, resource definition drilling, metallurgical studies, process plant reviews for what we think will be something around a 1.5 million ton per annum plant or thereabouts, but with the real estate and the design around it to ensure that we have the ability to add things and make that larger going forward. Plenty of activity in the existing infrastructure as well, and that will ultimately involve, we think, construction of a new airstrip so we can fly directly, like we did at Koolan Island, into this project area. Otherwise, it is a long FIFO journey for Australia, and we need to attract and retain people in a good team on site with good conditions for this project. It is going to be a long one.

Traditional owner engagement has been good. The joint venture team and GM there have a very good relationship with the Warlpiri people, they are called, represented by the Central Land Council, and we have inherited a lot of historic agreements that we are working our way through. Some will need finessing. It takes time, but the feedback from the traditional owners has been very positive. They want to see activity here. Then just to finish up and touch on Koolan Island as we leave Koolan, that is a photo from earlier this year. We had finished mining in the main pit, so it was starting to fill naturally with groundwater. But what we have done in the last six months is work through the rehabilitation activities. You can see from just one shot there as an example, a lot of earth reprofiling with a small team and a small amount of equipment on site.

It has been handled well by the site-based team, and the site looks really good. Largely profiling the earth, ripping and seeding the topsoil, and then waiting for now the wet season. We are already starting to see growth on some areas. This work has enabled us to then leave a positive legacy in a site where there are three key pieces of infrastructure that we knew would be of interest to another group, and that is the Crestlink Logistics Group. That is the port facilities, the camp facilities, and the airstrip. Some of the other components MGX retained and were not part of the sale, and we have been able to use some of those items of plant and equipment at the Central Tanami Project, so that has been a cheap move into that joint venture. We have also then sold some as well. But the idea here is that we will settle this transaction.

It will mean, importantly, we have done our piece of the rehab work. We are not leaving a problem. Iron ore rehabilitation is benign in hematite operations in any case. It is all about making sure landforms are stable and not going to be eroded by heavy rains in the future. Hence, you can see that work there. So Crestlink, assuming we can settle this transaction, which we are targeting before Christmas, will take on about AUD 30 million of the rehab that we would otherwise have to incur, and will also pay us a series of milestone payments. AUD 5 million upfront, AUD 5 million on some approvals or two years, and then another AUD 10 million based on a confirmed or minimum amount of a royalty obligation they have from there. Plus beyond that, another potential AUD 5 million.

There is a series of staggered payments, but the main game is a good, clean exit which has Traditional Owner support, which we do. Then just a couple of pictures to show you what the team did. That was the team preparing for one of the final blasts of the cut in the seaside wall, not the sea wall that we built, but the seaside wall in hard rock, and that has enabled, in a small channel, in a controlled way, for the high tides there to flood that pit. We have now returned that pit to an equilibrium state. The government is very happy with it. Crestlink also will take this on. It was one of the key conditions in our transaction with Crestlink. Clearly, that will be a much safer environment rather than a big void. With that is the end of my briefing.

Final picture there is a visitor to our airstrip in the Central Tanami Project a little while ago. There are wild camels and dingoes and other things in the area. Thank you. Happy to answer any questions from the floor or tea and coffee afterwards, whatever people would prefer. Are there any queries? Yep.

Speaker 3

To cashing out Koolan Island.

Peter Kerr
CEO, MGX Resources

Yep

Speaker 3

Have you thought of giving some money back to shareholders? Because basically, we invested in Koolan Island. We did not invest in a sort of in the future gold mine-

Peter Kerr
CEO, MGX Resources

Yep

Speaker 3

or coordination of all of others. Sort of strange. The second question, just with how I am just wondering how many people actually work for MGX at the moment. It sounds like, well, it sounds like you are only investing in the gold mine, but all the work is being done by other companies. It sounds like you are an investment company now rather than actually a mining company. Nothing is really going to happen for two years in terms of actually, you know, the actual physicality.

Peter Kerr
CEO, MGX Resources

Can I address that one first, please? The way the joint venture is set up is MGX has a team of people who were involved in operations and final stage of Koolan, but who provide services to the Central Tanami joint venture. The joint venture itself pays for those services. So in effect, MGX is paying them for half and recovering half the cost of those people. The joint venture is being established, though, as a standalone entity. So it has also its own engineering and project team, and on site, it has hired people from MGX roles at Koolan Island into the joint venture to do work on site. The mining work is being done by a contractor, that is Macmahon, and the drilling work on the site in the CTP is being done by two other drilling contractors that we have used.

So there is a mixture of contractors and people. MGX itself has made redundant the vast majority of its workforce. So we have got very few people left. At Koolan Island at the minute, there are about 20. Their roles will be made redundant when the Crestlink transaction settles, because Crestlink will take over that site. So they will disappear as well. There are a handful of people who we brought back into the corporate office to provide services to help close up Koolan and also with the CTP joint venture. When you say the next couple of years there will not be much activity, there will be plenty of activity on the ground within the joint venture, and MGX and Tanami will both be assisting with that.

But that activity, from a mining perspective, is limited to the underground decline at Groundrush, and from all other perspectives, it relates to drilling, process plant studies, pre-feasibility studies effectively, and infrastructure on the site. So it actually is quite active for the people. Operating personnel within MGX who are not involved in those type of aspects, well, their roles will disappear. So that is where the redundancies come in. But other personnel involved in commercial matters or project engineering or other aspects can certainly stay involved, because we would have to otherwise go and recruit them anyway, and we have got a good team of people. So we are trying to pick the most appropriate and most relevant for what we have, if that makes sense. Yep. Your first question is about cash. So the cash generated from the iron ore, and why does not some of that be returned to shareholders?

We have obviously paid historically dividends, but not recently. We did do a small share buyback for a period, and that had some money go out in terms of on-market buyback. The main reason now, and this is a board question as well, the main reason for the board to decide, "We will hold that cash," is we are working through the CTP aspects, and we do not yet fully know what the funding will cost for this project. We have not produced those PFS estimates to describe that. For the moment, we do not have any more franking credits, so they have effectively all been paid out. The cash sits in the business to be redeployed or returned, if that is the board's view, but redeployed in the CTP.

We are basically spending the next 12 months trying to ascertain, well, how much of that cash will be needed for the CTP aspects.

Speaker 3

Yeah. It is almost like a shareholder, we would like a redundancy payment too. Thank you.

Peter Kerr
CEO, MGX Resources

I get your point. I am a shareholder myself, right? Over many years I have been with the company, and I had bought my shares myself, so I understand the issues. But what I guess I see is, I am concerned about quantifying the CTP gold project development and understanding, well, what is the best then capital model for the cash in the business, and should some be returned? If it can, maybe there is a buyback or a capital return. Dividends can be awkward because if they are not franked, foreign shareholders do not like them, right? Because the franking credit aspect does not work for them. We are making sure we try and work for the benefit of all shareholders.

It's disappointing where the share price is, but that's our task now over the next six to 12 months, is to get that information flow out, settle Koolan, and keep hold of that cash as much as we can for future development. I don't know, board members might have another take on that if you

Simon Bird
Lead Independent Director, MGX Resources

It's a pretty good answer, I think.

Peter Kerr
CEO, MGX Resources

Okay.

Simon Bird
Lead Independent Director, MGX Resources

It's a pretty good question and a good question.

Peter Kerr
CEO, MGX Resources

Yeah.

Simon Bird
Lead Independent Director, MGX Resources

That's the one.