Good morning, ladies and gentlemen, and welcome to the 2026 Annual General Meeting of Wagners Holding Company Limited. My name is Denis Wagner, and I am the Chairman of Wagners. On behalf of the board and staff of the company, it is my absolute pleasure to welcome all our shareholders attending the meeting today, both those here in person, so welcome, and those joining through the Computershare online platform. This allows shareholders, proxies, and guests to attend the meeting virtually. All attendees can watch a live webcast of the meeting, and shareholders and proxies have the ability to ask questions and submit votes. Pursuant to Rule 16.7B of the company's constitution, I am advised that a quorum for a general meeting is present, so I now declare the Annual General Meeting open. Let me begin by introducing my fellow non-executive directors, John Wagner, Ross Walker, and Allan Brackin.
I would also like to introduce our Managing Director, Cameron Coleman, Fergus Hume, our Chief Financial Officer, and Karen Brown, our Company Secretary and General Counsel. Also joining us online is BDO, the company's auditors, represented by Damian Wright, Matt Renouf, and Jake Knight, and McCullough Robertson, the company's legal advisors, represented by Rhys Walker. Representatives from Computershare are also here to assist with any voting or registration requirements. Today's meeting is being held as a hybrid meeting, both in person and online via the Computershare meeting platform. This allows shareholders, proxies, and guests to attend the meeting virtually. All attendees can watch a live webcast of the meeting, in addition to shareholders and proxies having the ability to ask questions and submit votes.
Please note that while you can submit questions at any time from now on, I will not address them until the relevant time in the meeting. Also note that your questions may be moderated, summarized, or if we receive multiple questions on one topic, amalgamated together. To ask a verbal question, please follow the instructions written below the broadcast. In the event that we run out of time to answer all the questions, we will respond to you separately after the meeting. Voting today will be conducted by way of a poll on all items of business. I will shortly open all voting for all resolutions. If you are eligible to vote, once voting opens, press the vote icon, and all the resolutions will be activated with voting options. To cast your vote, simply select one of the options.
If there is any person here at the meeting in person who believes they are entitled to vote but is not registered to vote or is unable to vote through the online platform, please step outside to the registration desk, and Computershare will be able to assist you. We have hard copy voting cards available for those shareholders that are unable to vote online. Proxies have been received from 113 shareholders representing 83,608,422 ordinary shares, being 41.64% of the company's issued share capital. I will advise you of the proxy votes for each resolution as each individual resolution is being discussed. If you appointed me as your proxy, I will vote the proxy according to the directions on the proxy form. As Chairman of the meeting, I will vote all undirected proxies in favor of each resolution.
Welcome again to our shareholders and guests, both here with us today and those online. Thank you for your continued support of Wagners throughout the year. Financial year FY 2026 was a positive year for Wagners, delivering strong results and improved performance on prior periods. The result reflects both improving conditions across many of our key sectors and the progress we have made in strengthening the business. Over the year, we have built a solid platform from which to pursue significant opportunities ahead. As a Queensland-based company with deep foundations in construction and infrastructure, we continue to benefit from the strong fundamentals of Southeast Queensland and, increasingly, the state more broadly. Southeast Queensland's population has now passed 4 million and is growing faster than the national average. It is expected to reach around 4.5 million by 2032 and approach 6 million by 2046.
We expect this growth to drive sustained demand for housing, transport, utilities, and community infrastructure, therefore increasing demand for construction materials and the services which are core to our business. Adding to these fundamentals is the unprecedented investment linked to the Brisbane 2032 Olympic and Paralympic Games. The Queensland and Australian governments have committed AUD 7.1 billion to a program of 17 new and upgraded venues. These include the Brisbane Stadium at Victoria Park, the National Aquatic Centre, athletes' villages, and community infrastructure to service the games program. Early works at Victoria Park have begun, the main construction due to start in 2027. The games are also a catalyst for a much broader transformation. The 2026-2027 Queensland budget sets out a record four-year capital works program.
It includes Logan and the Gold Coast Faster Rail, the Wave on the Sunshine Coast, the Coomera Connector, and the AUD 9 billion Bruce Highway Safety Program, all built to serve a growing population well beyond 2032. Construction Skills Queensland estimates around AUD 11 billion of games venue and village construction will be delivered by 2032, with workforce demand peaking at nearly 8,000 in 2030, 2031. Most of this work in Southeast Queensland will need significant volumes of concrete, quarry materials, transport services, and specialized infrastructure solutions. For Wagners, this is a generational opportunity. Our vertically integrated model, resource base, manufacturing capability, and market position place us well to participate. We continue to invest in our people, assets, and capability as these projects move from planning into delivery. The start of FY 2027 has been encouraging, with strong performance across the group. Demand for construction materials and services remains healthy.
Composite Fibre Technologies continues to penetrate markets both domestically and internationally. Our investment in people, property, and manufacturing capability, both in Australia and in the U.S., not only provides a good platform going forward, but is also driving profitable growth. Our project services division has secured a number of projects that will deliver improved earnings. Given the scale of the infrastructure pipeline, we are extremely confident in the long-term prospects of this division. To ensure the business remains well-positioned to service the increasing demand for our products and services, we will continue to invest in capacity and efficiencies across the group. This will include upgrades to our Pinkenba cement plant, development of concrete plants and quarries, increased manufacturing capacity in our Composite Fibre Technologies business, both in Australia and the U.S. Queensland is entering a period of sustained infrastructure investment unlike anything we have seen.
We believe Wagners is exceptionally well-positioned to benefit from this growth, and in turn, will create long-term value for you, our shareholders. Thank you once again to all our staff, our shareholders, customers, and other stakeholders for your ongoing support. We look forward to a prosperous future. I will now hand over to Cameron to take you through the business performance and the outlook in more detail. Thank you.
Well, good morning, ladies and gentlemen, and thank you for joining us at our AGM today. Today provides us with a great platform to share some of the detail on our business performance and some of the opportunities that lie ahead. As Denis has mentioned, FY 2026 was an extremely positive year for Wagners. Group revenue passed AUD 500 million, operating EBIT rose 60% to AUD 67 million, and net profit after tax grew 79% to AUD 40.6 million. That result came from strong demand, disciplined pricing, and real gains in efficiency right across the group. It also came from our people, many of whom are either here in person today or joining us via the live stream. I particularly thank you for your effort and commitment to working safely throughout this very busy period.
The strong cash flow generated from improved earnings let us reduce our net debt while still investing for growth. The board declared a full-year dividend of AUD 0.05 per share, returning around AUD 10 million to our shareholders in October this year. Our construction materials revenue increased 28% to AUD 328 million. Cement volumes and pricing improved, and our concrete business delivered record volumes as market demand increased and new plants were commissioned. Each new plant strengthens the value of our vertically integrated model. Demand for quarry materials also increased, as did earnings, with increased capacity and efficiencies from prior period investments that we had made. Our project services business delivered AUD 82 million in revenue and an improved EBIT of AUD 8.1 million.
Our bulk haulage business secured long-term contracts during the period that will deliver predictable earnings in the years ahead. Composite Fibre Technologies delivered a great result compared to the prior years, which was pleasing to see given the investment that has been made into the business.
In FY 2026, revenue grew 36% to AUD 93.4 million, or an AUD 25 million increase on the previous year, with improvement across all areas of the business, crossarms, utility poles, and pedestrian infrastructure projects. There was also significant improvement in the CFT USA business, with a 97% increase in revenue and the business delivering a positive full-year operating EBIT result. The strong activity we experienced late in FY 2026 has continued into FY 2027. The first quarter has been a busy one right across the entire group. In construction materials, demand for cement, concrete, and quarry products has remained robust as many projects in Southeast Queensland move from planning into delivery, along with general increased construction activity across all sectors. Wet weather late in October did have an impact on volumes. However, the demand returned quickly as soon as the weather improved.
We have completed construction of a new concrete plant at Capalaba, and it is now in the final stages of commissioning. We also secured another three sites during the period, which will now move to the planning and approval stage for future development. These investments will ensure we are well-placed to serve the demand expected as the infrastructure spend ramps up in Southeast Queensland, as Denis mentioned. In Composite Fibre Technologies, order activity has been strong, led by crossarms and utility poles from electricity networks across Australia and New Zealand. We also dispatched poles to Northern Ireland during the quarter and were shortlisted to supply poles under a long-term panel arrangement in the Republic of Ireland. Project services has also started FY 2027 on a positive note.
We recently mobilized to Harmony's Eva Copper project in North Queensland, supplying concrete to Bechtel from our mobile concrete plants for the project's enabling infrastructure and copper processing plant. It has been some time since Wagners secured a project in the global services space, so I am excited to announce that we have recently been issued a letter of intent from the JGC-Hyundai joint venture, headquartered in Japan, for the supply of aggregates and concrete to the PNG LNG project in Papua New Guinea. The project does remain subject to final investment decision, which is expected in mid-December 2026. Wagners' scope for the project is valued between $50 million and $55 million to be delivered over a two-and-a-half-year period. We are anticipating mobilizing to the project early in 2027, with the first supply of aggregate materials in April and concrete supply to follow in mid-2028.
This is familiar ground for Wagners. Between 2010 and 2014, we supplied around 215,000 cubic meters of concrete to the original PNG LNG project, operating on-site concrete plants near Port Moresby and also in the highlands at the Hides gas fields. We have also supplied other large-scale LNG projects across Australia and in Russia. That track record of delivering to the demanding specification of world-class LNG projects in remote locations is why we were chosen again. It is a strong vote of confidence in Wagners and a valuable new source of earnings for the group that we have not seen for some time. Our outlook is very positive. Demand across our key markets remains strong. Our businesses are performing well, and our pipeline of opportunity has never looked better. Over the next three years, we will deliver a significant capital investment program to expand the capacity and improve our efficiency.
The majority of the benefits we build progressively beyond FY 2027, but by investing ahead of demand, we are setting Wagners up for sustained growth, not just for the 2032 Olympic infrastructure requirements, but well beyond that. We continue to invest in our concrete plant network. We now have 10 operational sites with an additional five sites either secured or working through the planning and approval processes. The demand for concrete among Wagners' customers has been reasonably balanced across all sectors, those being residential, commercial, infrastructure, and high-rise. We do anticipate the balance will shift in favor of infrastructure and large project work, given the pipeline infrastructure demand facing Southeast Queensland. We also have three greenfield quarry sites at various stages of investigation, planning, and approval.
We see a looming shortage of quarry materials in the Southeast Queensland market and are working hard to establish ourselves as a larger quarry materials supplier. Once established, additional quarries will add significant value to our vertically integrated construction materials business, bringing the aggregates required to produce concrete into our internal supply chain. In our composites business, increasing capacity and operational efficiencies has been a major focus. We have commissioned a new pultrusion machine at Wellcamp in the last quarter to manufacture utility poles, and our second pultrusion machine is in the final stages of commissioning in Texas, giving us the ability to produce utility poles in addition to the pedestrian infrastructure products we already produce in the U.S. We will then move to further increase manufacturing capacity by installing our eighth pultrusion machine at our manufacturing facility here in Toowoomba.
We are keeping a close watch on the demand for our products in the U.S. and will further increase the production capability as required. As we have made clear previously, despite this positive market we are operating in, we also need to be realistic about some of the challenges. In our cement business, we expect increases in the cost of imported clinker along with higher shipping costs associated with its importation. The size of these increases is not yet certain given the volatility, particularly in shipping markets. However, it could be up to AUD 5 million. We are watching this closely and working on pricing with both our suppliers and our cement customers to minimize the impact as much as possible. We do also expect to see the usual seasonal reduction in volumes in the second half compared to the first half.
This is anticipated to have up to a AUD 3 million impact in the second half. Our earnings guidance takes this into consideration. As we saw last year, we also anticipate a softening of demand for utility poles in the second half of FY 2027, as some customers curtail their ordering patterns due to high levels of inventory. This, along with the investment increased capacity, does present some opportunity. Our focus is now growing our customer base among the networks across Australia that already purchase our crossarms and have not been able to adopt our poles given our production capacity constraints. A number of successful field trials with utility networks have recently been completed, and more field trials are underway across Australia, New Zealand, the U.K., and Europe.
The growing level of interest in our composite poles provides us with a level of confidence that this customer base will increase rapidly and position us as a key supplier to utility networks globally. We believe Southeast Queensland is entering one of its most significant construction periods in its history, and Brisbane 2032 sits at its center. For a construction materials business, the impact is direct. Every stadium, road, rail line, and building starts with some form of construction materials, which we are well-positioned to deliver to. The games also sit on top of a region already experiencing strong population growth, demanding increased levels of construction materials over a long period of time. Southeast Queensland is providing plenty of opportunity.
Our established footprint, our integrated cement, concrete, and quarry network, innovative Composite Fibre Technologies products, and our strategically located sites puts Wagners in an excellent position to support our customers through this cycle and beyond. Based on the level of activity we are experiencing across both construction materials and Composite Fibre Technologies, and the secured contracts we now have in place for our project services business, we expect earnings for the first half of FY 2027 to be in the range of AUD 40 million-AUD 42 million. On a full-year basis, we expect earnings to be in the range of AUD 72 million-AUD 76 million, compared to our full-year FY 2026 operating EBIT of AUD 67 million.
This guidance assumes current market conditions continue as we have experienced in the first quarter of FY 2027, and it also takes into account the headwinds I referred to earlier in the cement and CFT businesses.
In summary, FY 2026 was certainly a step change for the group, and pleasingly, FY 2027 has started just as strong. We have the people, the assets, and the market position to make the most of the opportunities that lie ahead, not just in Southeast Queensland, but globally. Thank you to our customers, our employees, and to you, our shareholders, for your continued support. We look forward to sharing more of Wagners' success with you in the year ahead. Thanks also to my fellow directors for your contribution and support throughout the year. Thanks.
Thanks, Cam, and it is always good to hear a good story. We will now move to the formal business of the meeting. As the notice of meeting and explanatory memorandum have been circulated previously, and unless there is an objection, I propose to take them as read. The notice of meeting also sets out the voting restrictions for each resolution. The Corporations Act requires that the annual report of the directors, the auditor's report, and the financial report be laid before the AGM. Those reports were circulated and dated 18th of August, 2026. Neither the Corporations Act nor the company's constitution requires a vote of shareholders at the AGM on the financial statements and reports. However, I now invite shareholders to comment or to ask questions on the financial reports or the report of the directors and auditors from the floor.
Welcome, Eunice.
Your board has to be congratulated.
Eunice, would you mind using the mic so the online people.
Eunice Turner from the Melon Capital. The board has to be congratulated on their good work. It is not so long ago we have been questioning, and I was asking for patience that trains all things. If the shareholders look at page 27 of the annual report, they will see how this board has progressed so well, and in early days, it was very, very difficult for them. I am also pleased that they are looking after their workers, and I am a bit concerned that AI may affect these workers. If you look to page 27 of your annual report, it tells us our income has gone up substantially. It says here in 2022, 111, and it has gone up to 477, the share price. Their basic earnings has gone from 4.1 in 2022 to 20.5. What a great job.
I hope you can keep on going, especially for the shareholders that paid AUD 5 a share on the market, that they get a return of 3.25% that was in the prospectus. That is what I believe I read. No, great work. Great, great work. I think your shares were AUD 4.99 yesterday. Thank you.
Thanks, Eunice. Do you have a question, though? Thanks for those comments, Eunice. I agree with everything you said. The board is actually doing a great job. Is there any other questions from the floor? Karen, is there any questions online?
There are, Denis. Apologies to our shareholders online. We did lose sound partway through your address, Denis, so hopefully everything is back working now. I do have a question here from Stephen Mayne, a shareholder. "Congratulations on reaching a market cap of more than AUD 1 billion for the first time this week. No offense to BDO, but now that we are a member of the AUD 1 billion club, is it not time that we move to having a Big Four audit firm? Have we run a competitive tender for the audit during BDO's 10 years, or the 10+ year run? If not, when are we next planning to run a competitive tender for the audit?
Thanks for the question, Stephen. I will start and then hand over to Cam. The way I see it, as chair of this company, is that BDO are independent, and they do a reasonable job. We will sort of judge them on their performance. I do not see it is necessary to go to one of the Big Four. We do use other accounting firms for tax advice and other advice, but we will continue to judge BDO on their performance. If they are delivering for us as a company and for you as shareholders, we will continue to use them.
I guess the only other thing I would add to that, Denis, is we did do a very robust review of audit fees about 12 months ago when we were looking to introduce the auditing of our sustainability report. So, we have had a very, very robust review of our auditing costs, not more than about 18 months ago.
Karen, any further questions?
Not in relation to that item, Denis.
We'll move on. Resolution 1, adoption of the Director's Remuneration Report. The purpose of Resolution 1 is to seek shareholder approval for the adoption of the remuneration report contained in the company's 2026 annual report, which was released to the market on the 19th of August, 2026. Resolution 1 asks shareholders to consider, and if in favor, to pass the resolution under Section 250R(2) of the Corporations Act, that the remuneration report be adopted. This resolution is required, is a requirement of the Corporations Act, and requires that the company members vote on whether or not the remuneration report should be adopted. However, this vote is advisory only and not binding on the Directors or the company. The Directors abstain, in the interests of good corporate governance, from making a recommendation in relation to this resolution. Proxies received in relation to this are displayed on the screen.
I remind shareholders that the company will disregard votes cast by key management personnel and their closely related parties, as set out in the notice of meeting and the explanatory memorandum. Are there any comments or questions in relation to the remuneration report or resolution from the floor? Karen Brown, are there any comments or questions in relation to this resolution from our shareholders online?
There is, Denis. I have another question from Stephen Mayne, a shareholder. "Thank you for running a best practice hybrid this year, utilizing the excellent Computershare online AGMs platform." One of the questions is, "Will you continue to do that going forward? Also in future years, could you please include the proxy votes with the formal addresses lodged with the ASX?" Also, "Were there any protests on any of today's eight resolutions, including this remuneration report item?
Thanks again, Stephen, for your question. We do intend to continue to run the meetings as we have done since we listed in 2017. I think it is beneficial and fruitful to be able to come and talk to the shareholders, those ones that wish to attend here in person. So, we thank you for that. It also gives the opportunity for those shareholders that are not local and do need to travel to join us online. So, the intention is to continue the same process for our meetings going forward. The second part of the question?
It was, "Were there any protests on any of today's eight resolutions, including this remuneration report item?
I don't think there was protests as such. I think you're talking someone out in the street marching, or you're talking people voted against it. There was a few people voted against some of the resolutions, but their reasons for that, I can't explain. No other questions?
No, that's it. Thanks, Denis.
We'll now move to resolution 2. Resolution 2, approval of the re-election of Mr. John Wagner. Resolution 2 seeks approval that Mr. John Wagner, who retires in accordance with Listing Rule 14.4 and Rule 19.3B of the company's constitution, and being eligible, be re-elected as a Director of the company. Rule 19.3B of the constitution provides that no Director who is not a Managing Director may hold office without re-election beyond the third AGM. Following the meeting at which the Director was last elected or re-elected, Listing Rule 14.4 also provides that a Director, other than the Managing Director, must not hold office past the third annual general meeting following the Director's appointment, or three years, whichever is longer. John Wagner last stood for re-election at the company's 2023 annual general meeting.
Accordingly, he will retire from office under Listing Rule 14.4 and Rule 19.3B of the constitution and stand for re-election. John is one of my fellow co-founders of Wagners and has been involved in the business since its inception, bringing over 40 years, almost, experience in the construction materials industry. John is a member of the Audit and Risk Committee. Proxies received in relation to this item are displayed on the screen. As set out in the notice of meeting, the Directors, other than John, who will abstain from making a recommendation on this resolution, recommend you vote in favor of resolution 2. Are there any comments or questions on this resolution from the floor? Karen, are there any comments or questions on this resolution from the shareholders online?
No, nothing online.
We will now move to resolution 3. Resolution 3 is the approval of re-election of Mr. Ross Walker. Resolution 3 seeks approval that Mr. Ross Walker, who retires in accordance with Listing Rule 14.4 and Rule 19.3B of the company's constitution, and being eligible, be re-elected as a Director of the company. Ross Walker last stood for re-election at the company's 2023 annual general meeting. Accordingly, he will retire from office under Listing Rule 14.4 and Rule 19.3B of the constitution and stand for re-election. Ross is a chartered accountant with more than 30 years corporate and accounting experience, a former Managing Partner of accounting and consulting firm Pitcher Partners Brisbane. Ross is Chair of the Audit and Risk Committee, a member of the Remuneration Committee, and a member of the Nomination Committee. Proxies received in relation to this item are displayed on the screen.
As set out in the notice of meeting, the Directors, other than Ross, who will abstain from making a recommendation on this resolution, recommend that you vote in favor of resolution 3. Are there any comments or questions on this resolution from the floor? Are there any comments or questions in relation to this resolution from shareholders?
No, Denis, nothing online.
Looks like you are both back in. Well done, guys. Now move to resolution 4, approval of the Omnibus Incentive Plan. Resolution 4 seeks approval that for the purpose of Listing Rule 7.2, exception 13, sections 200B and 200E of the Corporations Act, and for all other purposes, the company hereby approves the renewal of the company's Omnibus Incentive Plan, the terms and conditions of which are summarized in the explanatory memorandum. ASX Listing Rule 7.1 allows the company to issue a maximum of 15% of its capital in any 12-month period without requiring shareholder approval. Pursuant to Listing Rule 7.2, exception 13, an issue under an employee incentive plan will not count towards the company's 15% limit, provided the plan was approved by shareholders within three years before the date of the securities being issued.
The Omnibus Incentive Plan was last approved by shareholders at the company's 2023 annual general meeting, and approval is therefore sought for this purpose. In addition, the Corporations Act provides that the company may only give a person a benefit in connection with their ceasing to hold a managerial or executive office in the company if it is approved by shareholders or an exemption applies. Shareholders are therefore also being asked to approve the ability for the board to be able to exercise certain discretions under the Omnibus Incentive Plan in relation to the treatment of unvested or unexercisable awards that may have been granted to persons who hold a managerial or executive office in the company who cease employment. Proxies received in relation to this item are displayed on the screen.
The directors abstain in the interest of corporate governance from making a recommendation in relation to this resolution. Are there any comments or questions on this resolution from the floor? Karen, are there any comments or questions on this resolution from the shareholders online?
No, nothing online, Denis.
We will now move to resolution 5, approval of the Executive STI Plan. Resolution 5 seeks approval that for the purpose of Listing Rule 7.2, exception 13, and for all other purposes, the company hereby approves the renewal of the company's Executive STI Plan, the terms and conditions of which are summarized in the explanatory memorandum. As with the Omnibus Incentive Plan, approval is sought in respect of the Executive STI Plan for the purposes of Listing Rule 7.2, exception 13. Pursuant to that rule, an issue under an employee incentive plan will not count towards the company's 15% limit under Listing Rule 7.1, provided the plan was approved by shareholders within three years before the date of the securities being issued. The Executive STI Plan was last approved by shareholders at the company's annual general meeting in 2023, and approval is therefore sought for this purpose.
Proxies received in relation to this item are displayed on the screen. The directors abstain in the interest of corporate governance from making a recommendation in relation to this resolution. Are there any comments or questions on this resolution from the floor? Karen, are there any comments or questions on this resolution from our shareholders online?
No, nothing online.
We will now move to resolution 6. Resolution 6, approval of a broad-based employee share plan. Resolution 6 seeks approval that for the purpose of Listing Rule 7.2, exception 13, and for all other purposes, the company hereby approves the renewal of the company's broad-based employee share plan, the terms and condition of which are summarized in the explanatory memorandum. As with the other incentive plans, approval is sought in respect of the broad-based employee share plan for the purposes of Listing Rule 7.2, exception 13. Pursuant to that rule, an issue under an employee incentive plan will not count towards the company's 15% limit under Listing Rule 7.1, provided the plan was approved by shareholders within three years before the date of the securities being issued.
The broad-based employee share plan was last approved by shareholders at the company's annual general meeting in 2023, and approval is therefore sought for this purpose. Proxies received in relation to this item are displayed on the screen. The directors abstain in the interest of corporate governance from making a recommendation in relation to this resolution. Are there any comments or questions from the floor in relation to this? Karen, are there any questions or comments from our shareholders online?
No, there's not, Denis.
We'll move on to resolution 7. Resolution 7 is the renewal of proportional takeover approval provisions. Resolution 7 seeks approval that the proportional takeover approval provisions contained in Rule 15 of the company's constitution be granted with effect for a further three years, effective on the day in which this resolution was passed. Rule 15 of the company's constitution includes proportional takeover approval provision, which enable the company to refuse to register securities acquired under proportional takeover bid unless a resolution is passed by shareholders in a general meeting approving the offer. Under the Corporations Act, proportional takeover provisions expire after three years from the adoption of renewal that may be removed. The company is seeking a shareholder approval to renew these provisions under the Corporations Act. Proxies received in relation to this item are displayed on the screen.
As set out in the notice of meeting, the directors recommend that you vote in favor of resolution 7. Are there any comments or questions on this resolution from the floor? Karen, are there any comments or questions on this resolution from the shareholders online?
No, nothing online.
We will now move to resolution 8, and a reminder that I will close the poll at the end of the questions for the next resolution. Resolution 8 is approval of participation in Omnibus Incentive Plan grant of options to a related party, Mr. Cameron Coleman. Resolution 8 seeks approval that for the purposes of Section 208 of the Corporations Act, Listing Rule 10.14, and all other purposes, approval be given to the issue of 84,954 options to Mr. Cameron Coleman, a related party of the company, by virtue of him being Managing Director of the company on terms described in the explanatory memorandum accompanying the notice of meeting.
Listing Rule 10.14 provides that a company listed must not permit a Director of the company, an associate of the Director, or a person whose relationship with the company, the Director, or the Director's associate is such that, in the ASX's opinion, the acquisition should be approved by security holders to acquire securities in the company under an employee incentive scheme unless it obtains approval from shareholders. Similarly, Section 208 of the Corporations Act provides that for a public company to give financial benefit to a related party of the company, approval must be obtained by shareholders. Proxies received in relation to this item are displayed on the screen. As set out in the notice of meeting, the Directors, with Cameron abstaining, unanimously recommend that you vote in favor of this resolution. Are there any comments or questions in relation to this resolution from the floor?
Just a reminder that I will close the poll at the end of questions for this resolution. Karen, are there any comments or questions in relation to this resolution from the shareholders online?
No, nothing online, Denis.
Given this is our last resolution to be considered, I will close the poll. If you have not yet voted or wish to change your vote, having had the opportunity to hear the questions, not that there was too many, and in response to those questions, please do so now. That concludes the formal business of the meeting, and I now declare the poll has closed. There being no further business, I also now declare the annual general meeting for 2026 closed. Based on the proxies received prior to the meeting and displayed throughout the meeting, it would appear that all eight resolutions will pass. Once the votes have been counted, the final results of the poll will be released to the ASX and published on our website.
I will give anyone here present the opportunity to ask any questions about the business and what is happening within the business, if anyone would like to ask a question.
Not quite a question, but it is almost. It would be helpful to me, at any rate, if in the display of resolutions, percent of eligible votes was included. Just so that two things, it gives a general indication of interest in that resolution, and secondly, it gives an indication of the impact of the local voting.
Right, a very valid point. Thanks, Ray. We will note that for the next meeting. Thank you. Up the front here, James. Oh, sorry, Eunice.
Stephen Mayne, he suggested you go to, he believed, more powerful, I will use the terminology. I think your accountants are doing an excellent job, and if you are happy, like a lot of these big businesses, they have been in more strife than Flash Gordon, some of them. So why would you go to them? I think you stick to where you are. Thank you.
Well said, Eunice, and I will draw an analogy, actually. There are four big concrete and cement producers in Australia, and we are number five, and we seem to do all right. We operate a whole lot more efficiently than those big guys, and I am assuming that BDO will do the same, so.
Given the very optimistic outlook, and everything does look quite optimistic, given your experience over many decades, what sort of worries you, or what do you think could go wrong, or what sort of keeps you up at night?
Well, generally, if I do not have enough red wine, it keeps me up. It looks pretty rosy, but there is always the chance of something going pear-shaped. I will ask Cameron to comment on this as well. From my perspective, though, the economy is strong. The forward infrastructure planning and build is very strong, and I think we have got a pretty good runway for 10 years, probably 10+ years is the way I see it. Unless there is a sort of a global economic crash or something like that. Even if there is a hiccup in the global economy, I think with the Olympics coming, there is infrastructure that needs to be built with an end date that we will gain some significant benefit from. I think generally things are looking pretty good, but there is always the chance of something coming out of left field.
What it is, I do not know.
Mr. Chairman, what about sovereign risk with Russia and Papua New Guinea? What about sovereign risk with Russia, Papua New Guinea, and international people that you are dealing with? How risky is this?
Eunice, we have previously worked in Russia. We are not in Russia at the moment, and with a name like Wagners in Russia, it would not be much fun right at the moment. Papua New Guinea, we are not working, we are actually, the project is a project for ExxonMobil. We are working for two large and well-respected Japanese construction companies. We are fairly confident in their ability to deliver, our ability to deliver, and the fact that ExxonMobil are the principal there. But Cam is probably closer to that, so he may comment on that as well.
Thanks, Denis. Victor, I guess we worry about what is around the corner all the time, to finish answering your first question. For that reason, we are very, very open in our communication today about what we see the risks ahead for the business are, and they really lie with increased shipping costs due to the global unrest out there and the Strait of Hormuz not being able to get ships through. We have really, as a leadership team, spent a lot of time thinking about what could go wrong. Then we have gone to great lengths to communicate that to our shareholders over the last 12 months. Apart from the reasons Denis called out, I think we have done a pretty good analysis across the business, and the opportunities look pretty rosy, as you say.
We want to make sure people are aware that things out of our control, like increased shipping costs, are front of mind for us, and we are working hard to minimize those and to pass those costs on wherever possible. Apart from those things we have called out, I think we are in for a pretty good run. Then further to that, I think, Denis, you have pretty well summed up the sovereign risk question. We have worked in PNG before. We have got a client in the Japan Gasoline Company, JGC, that we have worked for in many different areas. The last project we did for them was the Darwin LNG job. Their money is never late, and they are very, very prompt payers, and we have not had any issues at all securing payment from them in the 20-odd years we have worked with them.
The Taroom Trough, what do you think the prospects are, and has Wagners any interest in that?
Certainly, we have interest in it. The current reports and discussions with government is that it will proceed and progress. It is really in our wheelhouse, and it is in our backyard, so it is likely to be a repeat of what we saw with the coal seam gas back in the early 2010s, so some real opportunity there. However, the government is now saying that it is still four or five years away, so it is not imminent, but it will build up over the course of that. I think we will be sitting here in the early 2030s and talking about it, I hope. Great opportunity for us and great opportunity for Queensland, and a great opportunity for this country.
Denis, I have one question online here. It might be more for Cam. If fuel prices continue to stay high, what impact do you envisage the impact could be?
Well, that is a very good question, and they are certainly high at the moment. We have our concrete, and all our businesses have worked very hard to get a fuel levy introduced into our regular invoicing pattern, if you like, and we are able to recover the fuel spikes that we are seeing out of our customer base now. The guidance that we have provided today assumes that we will continue to be able to introduce those fuel levies and reclaim the costs from our customer base. We do, as I said, we have quite a robust system in place where we review fuel pricing every week, and then our levy changes either up or down, depending on what the terminal gate price for diesel is doing.
One of the areas where we use a lot of fuel is in our bulk haulage business up in the Northwest Minerals Province, and on the majority of those jobs, all of our fuel is free- issued by the client. That is one area where we have really not a lot of exposure to fuel. But here in Southeast Queensland, we do have to go through that administration process to pass it on each week.
Nothing else. No further questions. Ladies and gentlemen, thanks for coming along today. It is actually good to be able to interact with shareholders on a personal note. Please stay, enjoy the hospitality, have a sandwich, a cup of coffee, and thanks again for your support over the last 12 months. Thank you.