Good morning, everyone, and thank you for joining us today. A warm welcome to those here in Madrid and to everyone joining via the webcast. We have an exciting day today. We start with our results in the first nine months, followed by our usual quarterly Q&A. Joining me are our Corporate General Manager, Ángel García Altozano, and our Chief Financial Officer, Emilio Grande. After a short break, we will begin our Capital Markets Day at 11:00 A.M. We will update everyone on the group's strategic priorities and the key drivers of long-term growth and value creation.
We will also reflect on our progress in recent years, showcase the strength of our integrated platform, and outline our vision for the future. We will close with another Q&A session, and if you are joining remotely, please submit your questions online. We will read them here in the room. Let us start with our first slide.
ACS will deliver an outstanding performance in the first nine months of 2026. We saw accelerating growth in profits, cash flows and new orders. Operational net profit reached EUR 789 million. That is an increase of close to 36% adjusted for currency movements, and we are tracking the top end of our recently raised guidance for 2026. Profit before tax grew 28.6% on an FX-adjusted basis, with margin expanding by 42 basis points. This was supported by strong operational performance at Turner and Engineering and Construction. Cash generation remains another key highlight. Net operating cash flow pre-factoring over the last 12 months reached EUR 2.3 billion. For the first nine months, operating cash flow before factoring improved by EUR 237 million year on year. On a pre-factoring basis, net operating cash flow has grown at a compound annual rate of more than 36% over the past five years.
Net debt stood at EUR 908 million at the end of September. That is an improvement of EUR 1.3 billion year on year and reflects outstanding net operating cash flow and disciplined capital allocation. Investment came up to EUR 2.2 billion in the first nine months. That was EUR 1.6 billion net of divestments. Our strategic investments included more than EUR 600 million in data center projects, half a billion to increase our stake in HOCHTIEF and capture value creation, EUR 700 million to buy out the Thiess minority shareholders, and about EUR 300 million in M&A and other infrastructure net investments. The recent accelerated bookbuild raised EUR 1.7 billion, providing further support for our investment strategy. We also allocated EUR 900 million to shareholder remuneration over the last 12 months. Market momentum also accelerated. New orders reached EUR 56.2 billion, up 30% FX adjusted.
This took our backlog to a record EUR 111 billion, up approximately 27% on a comparable basis. Our book-to-bill ratio over the last 12 months was 1.4 x. That provides more than two years of backlog visibility. Data centers remain a major contributor to this growth. Backlog reached approximately EUR 26 billion, up 94% year on year. Other strategic growth sectors such as critical minerals and energy, water, and industrial, including nuclear, showed strong backlog growth of approximately 76%. This strong performance supports our recently raised guidance for 2026, which we reiterate today. We expect operational net profit of up to EUR 1,155 million, or 35% growth. We are scaling our capabilities across high growth, critical end-to-end markets, including the bolt-on acquisition of Autmatec and Bolton. We continue to make progress in data center development, and commercialization remains on track.
This includes key milestones as our project in Ohio, Coravel, and our small data center initiatives. We will discuss the broader strategy and long-term opportunities in more detail at today's Capital Markets Day. Let us now take a closer look at the group's financial performance. Sales grew by around 14% on an FX-adjusted basis in the first nine months. EBITDA reached EUR 2.5 billion, up 13%, and this was driven by strong growth and margin expansion at Turner and Engineering and Construction. On a comparable basis, profit before tax grew just above 32%, and margin expanded by 48 basis points. Operational net profit reached EUR 789 million, up approximately 36% adjusted for currency movements. These results show a strong operating momentum and continued improvement in profitability across the group. Additionally, backlog grew by 27% on a comparable basis.
Turning to performance by segments, growth in operational net profit was again led by Turner, supported by very positive contributions from CIMIC and Engineering and Construction. Turner's attributable operational net profit increased by 49.5% on an FX-adjusted basis. This was driven by accelerating digital infrastructure activity and continued margin expansion. CIMIC contributed EUR 157 million, up 22.1% year-on-year on a comparable basis. This reflects the accretive impact of the Thiess transaction. Engineering and Construction also performed strongly. Attributable operational net profit increased by 23% FX adjusted. This reflects a higher contribution from FlatironDragados and solid results at HOCHTIEF Europe. During the period, we recorded EUR 25 million of restructuring costs. This relates to efficiency initiatives aimed at streamlining operations and unlocking synergies. Slide five shows the continued strength of the group's cash generation. Net operating cash flow over the last 12 months reached EUR 2.4 billion.
This was supported by robust EBITDA performance and outstanding level of cash conversion. Importantly, cash generation accelerated during the third quarter. Operating cash flow for the first nine months improved by EUR 237 million year-on-year on a pre-factoring basis. Before factoring, net- operating cash flow over the last 12 months reached EUR 2.3 billion. This represents compound annual growth of more than 36% over the past five years. Overall, this continuous strong cash performance reflects the quality of our earnings and provides significant capacity to fund both investment and shareholder remuneration. Let us now look at the group's financial position. We closed September with net debt of EUR 908 million. That is an improvement of EUR 1.3 billion year-on-year. This reflects our strong cash generation and the EUR 1.7 billion accelerated bookbuild completed in May.
It also reflects EUR 900 million of investment in data centers alone over the last 12 months. This includes Coravel, Ohio project, and our ACS Digital & Energy assets. Looking specifically at the nine-month period, financial investment amounted to EUR 2.2 billion, or EUR 1.6 billion net of the investments. They include EUR 644 million in data- center projects, EUR 727 million for the acquisition of the remaining minority interest in Thiess, and EUR 524 million invested to increase our stake in HOCHTIEF and capture additional future value creation. There were also EUR 276 million of additional net investments in M&A and infrastructure. Shareholder remuneration totaled EUR 890 million over the last 12 months. And our strong cash generation and financial position give us significant flexibility to invest while we remain disciplined in how we allocate capital. Turning to slide seven.
Our backlog reached an all-time high of EUR 111 billion at the end of September. That's an increase of 27% on a comparable basis. New orders reached EUR 56.2 billion, up 30% FX adjusted. Our book-to-bill ratio over the last 12 months was 1.4x . This provides more than 24 months of backlog visibility. As you can see in the pie chart, we're refining our backlog breakdown by end market to better reflect our capabilities and key strategic priorities. As we will explain in full detail later today, we have established the energy, water and industrial vertical to capture the significant growth opportunities we see across these markets, leveraging the strong capabilities we have built across the group in power generation, grids, water and specialized MEP. We expect this to become an important growth vector for the group while providing critical capabilities that support our other high-growth verticals.
We're also providing a more detailed breakdown of our former general building category by giving greater visibility to large, complex sports and entertainment facilities, whose order intake has grown 56% year on year adjusted for FX. Artificial intelligence, digital, and tech stands out. Backlog increased by 94% year on year and now represents 25% of the total backlog. The backlog of other growth sectors, such as critical minerals and energy, water, and industrial, including nuclear, increased by approximately 76% year on year. This provides a strong and increasingly diversified foundation for continued growth. Our backlog performance reflects continued success in securing high-quality projects across our strategic growth markets. The following slides provide a selection of recent awards across our key markets. We'll explore these markets and our strategic positioning in more depth at the presentation later today. For now, I will highlight a few key developments.
Starting with AI, digital, and tech, we continue to expand in the rapidly growing data center market. Surging demand for AI computing and cloud services is driving substantial investments. That investment extends across data centers and the broader digital infrastructure value chain. Our integrated operating model supports this growth. It combines scale innovation with supply chain expertise and industrialized construction capabilities. This competitive advantage, alongside our focus on talent development, allows us to expand capacity while maintaining execution certainty. We work closely with our clients, predominantly blue-chip hyperscalers, to standardize design and delivery models. This improves productivity and expands our execution capacity. In the first nine months, we secured approximately EUR 27 billion in data center orders. That's more than double the EUR 13 billion recorded in the first half.
Recent awards include our participation in the expansion of Meta's Richland Parish Data Center campus in Louisiana from 2 to 5 GW of IT capacity. A 36 MW facility for NTT in Berlin, valued at several hundred million euros. The project brings together HOCHTIEF Infrastructure and Turner's Dornan in an integrated team. New data center projects across Asia, including India, Malaysia, Hong Kong, Thailand and Indonesia. Beyond data centers, we secured approximately $1.2 billion in semiconductor-related orders during the first nine months. This spanned the U.S., Europe, and Southeast Asia. In transportation, aviation and sustainable mobility, recent awards include the Kwinana Freeway upgrade in Western Australia, an expansion project delivering the significant increases in capacity, safety, and network efficiency. The multi-billion dollar Roberts Bank Terminal 2 expansion in Vancouver, Canada.
In Sweden, we secured the EUR 900 million East Link Rail project, covering 26 km section near Stockholm. We also secured the EUR 1.23 million joint venture contract for the next phase of Prague Metro Line D in the Czech Republic. In Virginia, Turner was selected for the Dulles International Airport tier 2 Concourse. Energy, water, and industrial is a key long-term growth market. Rising investment in power generation, grids, water, and waste management, and energy security supports this opportunity. We continue to scale our specialist capabilities across power networks, generation, and nuclear infrastructure. In the fourth quarter, we completed the acquisition of power transmission specialist Autmatec. It serves major network operators with end-to-end services across the overhead transmission line value chain. This strengthens our position in Germany's transmission grid market. Investment there is accelerating to support electrification, renewables, and energy security.
A key recent award is Clean Energy Link in Western Australia. The project expands Western Power's transmission network to connect renewable energy sources and strengthen grid reliability. Together with Amentum, we have a construction management role in the global delivery team for the Rolls-Royce SMR nuclear program. This supports the deployment of small nuclear modular reactors in the U.K. and in Europe. At Sellafield, we secured a second framework contract worth up to GBP 1.5 billion. It supports the operation, maintenance, and development of Sellafield in the U.K. In Northern California, U.S.A., the Anderson Dam project involves modernization to improve seismic safety and water infrastructure.
In nuclear fusion, we're strengthening our position in the European nuclear fusion market, having already secured an initial engineering service contract from Proxima at the Gundremmingen nuclear power plant site, while also contributing engineering expertise to a project in Biblis NPP site intended for later usage by Focused Energy. This engagement provides valuable experience and positions the group to pursue significant upcoming opportunities. Furthermore, our participation in the Alpha Alliance and Focused Energy's partner network reinforces its industry relationship and supports access to future projects in this emerging market. Turning to biopharma, health, and education. Turner was recently named the leading healthcare construction manager in the United States for the 25th time. Recent projects include University of Kentucky Central Utility Plant, the Quantum Institute in Princeton, and the Baptist Health Hospital in Sunrise, Florida.
In Germany, we've been selected for the design, construction, and three-year operation of the Max Rubner Institute. In biopharma, Dornan is delivering several projects in Ireland. These awards further diversify the group's backlog across complex building and social infrastructure markets. Security and defense offers a growing opportunity across our key markets. We're drawing on our established local execution and civil engineering expertise, together with our industrial delivery capabilities. We were recently selected as one of the contractors for the US Military FARM III program. Earlier this year, awards included the modernization of Čáslav Military Airport in the Czech Republic. They also include a major contract for the German Armed Forces in Hamburg and the Redevelopment Program in Australia. This includes the modernization and expansion of the Australian Defence Force capabilities.
In security, we are project manager for the Townsville Correction Centre Capacity Uplift Project in Queensland, Australia, adding 400 beds across 200 new cells. Our growing exposure to defense builds on our existing civil engineering capabilities and established presence in these markets. Critical minerals and natural resources is another attractive long-term growth market. Demand is supported by electrification, digital infrastructure, and defense. Through Sedgman and Thiess, we have built strong capabilities in minerals processing and sustainable mining services. Recent awards include the Colossus Rare Earth Project in Minas Gerais, Brazil, with an engineering, procurement and construction management role in developing a major ionic adsorption clay rare earth project. In lithium, front-end engineering design for Savannah Resources Barroso Lithium Project in Portugal. In copper, delivery of a processing plant for the Jervois Copper Project in Australia's Northern Territory.
Also in Australia, an agreement with Yilgarn Iron supports the revival of iron ore production in the Koolyanobbing district, 400 km east of Perth, Western Australia. We have recently completed the acquisition of the remaining 40% of Thiess. This strengthens our position in the market and gives us full ownership of the mining services business. With that, let us move to the performance of main reporting segments. Starting with Turner, performance remains outstanding. The business continues to be a major driver of the group's growth. Sales increased by approximately 24% on an FX-adjusted basis, driven mainly by data centers and supported by solid trends in aviation, security and defense, and pharma. Operational PBT margin increased by 62 basis points to 4%. Data center activity and Turner's end-to-end strategy supported this improvement. That is where they add value through supply chain, modularization, and increased self-performing capabilities.
We will speak more about this at the Capital Markets Day later today. Operational profit before tax reached EUR 891 million, increasing by approximately 47% on an FX-adjusted basis. New orders increased by 39.4% FX adjusted to EUR 31.5 billion. This took backlog to a record EUR 48.9 billion, up 42% year-on-year. Data center backlog grew by 84%, while other market segments grew by 12%. This performance supports Turner's full year 2026 operational PBT guidance of up to $1.460 million, or 40% growth. Turning to CIMIC now. Performance remained solid. The business also continued to rebalance its portfolio toward more strategic growth markets. Sales reached EUR 8.2 billion, with rising contributions from strategic growth markets, particularly data centers, energy, and defense. Operational profit before tax increased by 12.3% year-on-year to EUR 355 million. Portfolio rebalancing supported an 11 basis points margin improvement.
Operational attributable net profit rose by 22.1% on a comparable basis, reflecting the accretive impact of the Thiess transaction. New orders reached EUR 9.8 billion, with a book-to-bill ratio of 1.1x over the last 12 months. Backlogs stood at EUR 2.4 billion. That is up 13.2% year-on-year after adjusting for the divestments of the UGL Transport stake. Turning now to Engineering & Construction, the segment continues to deliver strong growth. This was supported by improving activity and higher margins. Sales increased by 9.5% on an FX-adjusted basis, supported by new projects across security and defense and energy, water, and industrial. EBITDA margin increased by 81 basis points to 6.4%, reflecting strong improvements at FlatironDragados and HOCHTIEF E&C. Operational profit before tax reached EUR 263 million, up 18.8% FX adjusted. Operational net profit increased by 26.4%, also on an FX-adjusted basis.
Order intake reached EUR 12.9 billion, taking backlog to EUR 34.7 billion. The book-to-bill ratio over the last 12 months was a strong 1.5 x. This provides very good visibility into the continued development of the business. Moving on to infrastructure segment. Abertis EBITDA was up by 5%, supported by traffic and inflation-linked tariff increases. Abertis paid a dividend of approximately EUR 600 million in April, of which ACS received EUR 297 million. Iridium's profit before tax reached EUR 35 million. At ACS Digital & Energy, results reflect the equity accounting of data center joint venture and increased investment in data center developments. We now turn to a more detailed review of Abertis. Revenues increased by 4% and EBITDA by 5%, supported by traffic performance and inflation-linked tariff increases. Overall, traffic growth remains slightly positive. Heavy vehicle traffic was particularly resilient, increasing by 1.7%.
Abertis also continued to advance its portfolio strategy. Acquiring the remaining 48.8% of Atlandes strengthens its position in France. In Mexico, the 19.5-year extension of FARAC takes the concession through to 2067. This helps increase the average life of the portfolio to approximately 15 years. Strong liquidity continues to support the balance sheet. At the end of September, net debt stood at EUR 23.1 billion. Total equity was EUR 8 billion, covering debt maturities through 2028. Abertis continued to access capital markets successfully. It issued EUR 2.2 billion of bonds to partially refinance its 2027 and 2028 maturities. Slide 20 provides the usual detailed breakdown of Abertis' key operating and financial figures by geography. Overall, the business continues to combine resilient operating performance with disciplined portfolio management and a strong liquidity position. Let me close with the key takeaways from the first nine months of 2026.
ACS delivered another strong set of results. We saw accelerating profit growth, solid cash generation, and a strong market momentum. Sales reached EUR 41.3 billion, up approximately 14% on FX-adjusted basis. Operational net profit reached EUR 789 million, up 35% year-on-year, or 35.9% FX-adjusted. Net operating cash flow over the last 12 months reached EUR 2.4 billion, up EUR 411 million year-on-year. New orders reached EUR 56.2 billion, up 30% FX-adjusted, with a strong book-to-bill ratio of 1.4x . This took backlog to a record EUR 111 billion, providing more than two years of visibility. Data centers remain a major source of growth. Backlog reached EUR 26 billion, up 94% year-on-year. New orders reached EUR 27 billion. That's more than double the EUR 13 billion recorded in the first half.
Looking ahead, we'll explore strategic highlights and long-term view in more detail shortly at today's Capital Markets Day. For now, let me briefly touch on a few of them. We're building a dedicated global nuclear platform, leveraging more than 50 years of nuclear expertise and ACS's end-to-end capabilities. Our focus is on integrated delivery, advanced industrial engineering, and modular assembly, particularly for the emerging SMR fleet opportunity. We're establishing an energy, water, and industrial vertical. This will scale our MEP and specialized self-perform capabilities across power generation and storage, transmission and grid infrastructure, water, and industrial installations. It will also act as a key enabler for other high-growth verticals. In data centers, commercialization remains on track, with continued progress across ACS Digital & Energy, Coravel, and our small-scale data center initiatives.
Overall, the strong performance achieved during the first nine months supports our confidence in the outlook for the remainder of the year. We therefore reiterate our 2026 operational net profit guidance of up to EUR 1,155 million, or 35% growth. At the Capital Markets Day that follows shortly, we will take a closer look at our strategic priorities, long-term opportunities, and value creation framework. Thank you again for joining us today. We will now take your questions on the quarterly results before moving on to our Capital Markets Day. Thank you so much.
Hello. Yeah, they hear me. Luis Prieto from Kepler. Thanks a million for today and taking our questions. It is difficult to ask, given that we are going to ask a lot more in the CMD later on, but I just wanted to ask you about the deltas built into HOCHTIEF and ACS's full-year guidance ranges. I am aware that you have reiterated the guidance, but there was an acceleration of earnings growth in Q3. So my question is, if there is any type of upside risk to the top ends of these ranges, again, for 2026?
Yeah, thank you, Luis. We are looking at the high end of the guidance, as you can imagine. In terms of future growth, as you rightly said, we are going to discuss a lot in our Capital Markets Day, so we will give you a good outline of what follows in 2027 - 2030. But for now, we are certainly looking at the high end of the guidance.
Thank you. Elodie Rall from J.P. Morgan. First, on CIMIC, I was wondering if you could elaborate a little bit on the margin weakness in Q3. What drove that, and if we should expect the same development into Q4? Second, on U.S. Managed Lanes, the legal actions that you have taken on the I-24, could you give us some color what you are trying to achieve there? Is it financial compensation or forced retender? Generally, do you think the bidding environment in the U.S. Managed Lanes is getting tougher, and what are the implications for the next bids? Thank you.
Yeah, thank you. Starting with CIMIC. It comes from the mix of projects. Some projects are more capital-intensive, so therefore, the EBITDA increases, but at the end of the day, amortization and depreciation adjust for the PBT. Other projects are less capital-intensive, so EBITDA comes down, but the PBT remains stable. So if you focus on the PBT, the company continues growing strongly. When you look at the EBITDA, it depends on the project and the mix. Sometimes it is difficult to analyze in construction firms the EBITDA for what I just explained, but it is just about the mix, right? As tunneling projects come to an end, which are typically very heavy on capital, then EBITDA has come down, new projects will come in, and that will adjust, and EBITDA will come up again, right? So, it comes to that.
On the U.S. legal actions, at this stage, what we are trying is to get information. We are trying to understand the proposal, what has happened, and then make a decision. So, at this first stage, we are just trying to gather the information on the Tennessee project. Once we get that information, we will make a decision on what further steps to follow. In terms of the competitive environment in the U.S., it is difficult to know without understanding and having information, right? Two things can happen. The first one is, we put our best foot forward, and in doing that, we were not very competitive, or we were very competitive, and however, other groups were even more. If we have not been competitive enough, then we will learn from it towards the next ones, right?
That is why we need to understand, because our understanding was that the RFP, it was asking for a payment during the construction period, and that is what the form said. Either form or the RFP was not saying that, then we will have clarity for the next one. So, whatever is the detail will inform us for the next one.
Yes, hi. Good morning, Miguel, from JB Capital Markets. This might be a question that you prefer to answer later, but this quarter, you spent EUR 500 million in acquiring HOCHTIEF shares in the market. You mentioned in your speech that this is to capture future value creation. So, does it mean that you could continue acquiring shares in the secondary market at these levels, or was it something opportunistic? Could you please confirm your stake in HOCHTIEF currently?
As you rightly said, we are being opportunistic. HOCHTIEF shares continue being accretive for us, especially when we see the share coming down. It is very accretive when you look at the numbers. From that perspective, we thought that it was a good idea. Are we willing to continue at this rate? We will see. We have not made a decision, as we communicated at the beginning of this week. There is no clear decision. It is just opportunism. In terms of the percentage of HOCHTIEF, we are 79.35%, and if you exclude treasury shares, we are at 81.95% ownership of HOCHTIEF at the end of September.
Yeah, hi. It is Katie Hearne from Barclays. I was wondering if you can elaborate a bit on two points, I guess, with Turner and also the wider data center platform. There has obviously been a lot of conversation in the market, both prior to and exacerbated since the U.S. midterms results, about a potential slowdown or tougher constraints around building data centers. Do you see any risks, both for your customers at Turner, but also for your own platform? Then secondly, on, I guess, sort of the flip side of that, any constraints in the Turner business? Obviously, the backlog continues to grow, but will you have to pull back in any of the sort of lower growth segments in order to capitalize on that growth? Thank you.
Starting with the midterms. When you look at our backlog, our backlog continues being very strong, and our current backlog has no risk. All those data centers have the permits, and we will continue building them. We always refer to two buckets, right? Or three buckets. The first one, which are all those projects that were under construction, and they are not going to be stopped. Those jobs, that they have the permitting and we are going through engineering, and we believe that we are comfortable with those, and then we have the planning efforts. The three states that have changed color have been Ohio, Georgia and Texas. But if you listen at the words of the governor of Texas, they are not against data centers, but they want to make sure that they are sustainable, they analyze them, and they do the best for their citizens.
We do not believe that data centers are going to be canceled, although there could be a little bit of permitting or restrictions that could delay some of them. Right now, because we sit down together with our clients to plan for them, it is not so much where data centers are going to happen or not, it is where and are they going to happen. That is one of our fortes, right? The more complex, the more planning they require, because there is a shift in location that needs to be addressed, and therefore, we need to be analyzing different sites at the same time, and also the complexity of additional source of energy, that benefits us. We remain comfortable with the current situation. Again, we do not see the new governors against data centers.
They want to make sure that they go through the audit, reach their own conclusions, and do their best in terms of sustainable digital expansion. In terms of Turner, that is the reason why we continue being very bullish on Turner. We are going to spend a lot of time later today going through the projections of Turner in the different sectors, including data centers. I will not expand a lot, but in summary, we were quite strong. We see a strong pipeline, and we are very bullish in margin with Turner, not only with our market share, but with our growth and expansion in margins. That will be one of the highlights of today. And there was a third question? Okay, thanks.
Thank you, Juan. This is José Manuel Arroyas from Santander. I wanted to ask you about the Coravel platforms and the data centers the platform is developing in Spain, and I have two questions. The first one is on the Alcalá de Henares data center, which you showed on the slides earlier. I had come to believe that this would be the first data center to be commissioned. I think last year you highlighted that it would be in operation this year. Has that changed, or does the deadline still remain valid? Second, and more broadly, what is your opinion about the other data centers in Spain that the platform had? Do they have power connection at this point? Do you see this changing on the back of this royal decree that is in the making? Thank you.
Thank you so much. Coravel. Coravel has 1.2 GW IT under development, and the commercialization, it is going very well, and it is going faster than what we thought. In fact, if you add the 1.2 GW IT from Coravel, and the additional 1 GW approx of the ACS Digital & Energy platform, we are talking about 2.1 GW IT. We believe that for next year, we could have around 1.3 GW commercialized, right? Which is much faster than what we thought. Things are accelerating. We are quite comfortable with our pipeline. On Alcalá, you are right, that will be the first one to be commissioned. Commercialization is going quite fast. We are in advanced conversations, and we believe we can close that one within the next months. Other data centers in Spain.
The royal decree is no different from other audits or permitting going on in different countries or states in the U.S. Everyone wants to make sure that these data centers are sustainable, and basically that means two things. The first one, the additional power they need do not increase the bill for the normal and regular consumer, number one. Number two, they take as much renewable energy as possible, and less from the grid. That is basic what every royal decree and every new regulation is writing. When you look at the royal decree and many others, at the end of the day, it is an increase of cost.
When everyone is trying to bring, or in this particular case in Spain, the royal decree, a correlation of 80% of renewable energy at any given hours during the day and night, that can be structured through financial PPAs, pretty much they are all feasible. You just need to make sure that you increase the cost, and you have a financial PPA for it. The same thing if it is connected to a renewable plant, you need to make sure that it is at least, according to the last draft, less than five years old. Are they feasible? They are all feasible. Are they more expensive? They are more expensive. The key question is, how expensive are they versus other countries? Because at the end of the day, it is a competition, it is a race. They are still competitive, all right? Because energy price in Spain is still low.
We are comfortable with our platform in Spain, and I said before, we will continue commercializing towards the next months, and it is going faster than we thought.
Juan, a follow-up question from me, Luis Prieto again. I was just wondering, if you look at the last 18 months, for example, of order intake in data centers, I was wondering if you can conceptualize or at least give us an idea of how you see your market share versus competition. I am talking about data center construction. Is there anybody that worries you in terms of your same type of offering? Could your market share go down in relative terms?
One of the things that you will see in our presentation today, because there is two things. There is demand, and there is market share, basically, and then obviously our work and margins to that work. Let us start with the market. We have analyzed different curves of demand over the next years. The most bullish ones, they are talking about 300 GW by 2030. The base case is around 240, I would say, gigawatts for 2030. The worst case, or the more pessimist, they are talking about 180 GW, versus the 100 GW approx that we are today.
That means 80 GW globally for data centers. All what you will see later has been based in the stress case scenario. We are assuming, we are taking the worst-case scenario, and that is the one we have used for our forecast. First thing. Second thing, we have kept our market share in our forecast.
During the Capital Markets Day, you will see stress case, same market share. Do we have reasons to believe that we can increase market share? Yes. Why? More complexity, larger projects, location shifting, more regulations, need for power of grid or behind the meter. All of that is good news for us. On the other side, we are increasing our self-performing capabilities in MEP and modularization, which was key as well to make sure that we keep our market share in the smaller ones. Also, to increase our margins. We are going to spend a lot of time in both things. Answering your question, do I think that we can increase our market share? Yes, I do think so, but we are not taking that into account in our forecast.
Just a follow-up as well on the Spanish elections. I was wondering if you see any specific risk for your businesses. I mean, we talk a bit about Coravel, but is there anything to be aware of, or what could be the outcome and the impact?
On the midterms in—
Yes.
—in the U.S.?
No, sorry, on Spanish elections.
The Spanish election. No, we are not seeing any risk. If anything, infrastructure is a new super cycle. A big part of our CMD will be about the super cycle that is coming and our positioning. Spain is no different when it comes to infrastructure needs. Aging infrastructure, new need for infrastructure, data centers, a lot of industrial new capabilities because of electrification of vehicles. There is biopharma labs, there is semiconductor programs, and all Europe. Europe traditionally goes very slow. We have been looking forward for opportunities across Europe for a number of years, and they are going to happen. We will see them, and we are going to start seeing them within the next year, especially in Germany, Northern Europe, and Eastern Europe, and then Spain will follow. That will happen no matter who is elected in Spain. No more questions?
I look forward to seeing you in our Capital Markets Day. Thank you so much.