Good morning, and welcome to our Capital Markets Day 2026. It has been two years and a half since the last time we got together in our CMD 2024, in which we shared our vision, our strategy, and our figures for the period from 2024 to 2026. Today, we are planning to do the same with the period from 2027 to 2030. We will share again our vision, we will share again our strategy, and our numbers. You are going to get a lot of information, but there are five key messages I want or I would like everyone to take away. The first one is the supercycle that is coming. Infrastructure is the new gold. We are going to experience a supercycle in investments like never before.
Not only in the core infrastructure, transportation, but also in water, energy, nuclear, industrial, critical metals, defense, biopharma, and we are very well positioned to capture a big part of it. Second, it is not just about growth, it is about resiliency. We are so diversified between sectors and between geographies that we are in a very good position not just to grow, but to remain strong. We have a very, very robust balance sheet. 90% of our contracts are low risk. When you look at inflation over the last six years, we have accounted for around 6% CAGR inflation, 7% if you exclude China, and our [net profit] has been growing at a CAGR of 20%. That shows the resiliency we have. Third, very strong operational cash flows.
Very strong operational cash flows that not only will allow us to do very strong M&A operations to restrengthen our capabilities, but also to invest in greenfield projects and assets that will give us recurring EBITDA and dividends. Of course, with a very, very disciplined capital allocation. Four, we are going to be giving very, very ambitious targets, but they are credible, and we have been showing that track record and that credibility over the last five years. This is why, in addition to all those messages, I want to start talking about what we have delivered up to now, what has happened since our Capital Markets Day back in 2024. Let us start with that. Back in 2024, we gave a CAGR of 9% for our revenues, and we ended up achieving 14%. We said that we would achieve from EUR 43 billion- EUR 48 billion by 2026.
We ended up in EUR 56 billion approx, which is the figure that we are planning to provide more or less by the end of the year. If we focus on net profit, we were going to announce 14% CAGR. We ended up in 20%, EUR 1.16 billion approx by the end of this year, versus the EUR 850 million-EUR 1 billion that we promised. Net operating cash flow, we said that we would achieve an average between EUR 1.1 billion and EUR 1.3 billion. We are going to end up this year around EUR 2.3 billion. The backlog has increased 13% to EUR 111 billion. As I said before, solid, reliable, low risk, diversified across sectors and geographies. Let us get even deeper in some of the main achievements from the last four years. The first thing is about our leadership, our global leadership.
Turner has been the first contractor, the first engineering construction company in North America for the sixth consecutive years. Furthermore, Flatiron is the first heavy contractor, transportation contractor in the U.S. ACS Group has been appointed top number one international contractor for 12 years out of the last 14. We are the first construction company in Australia, and we are top three in Europe and Asia-Pacific. When you go by sectors, we have multiplied by four our backlog in artificial intelligence, digital and tech. We have won more than 600 projects across 30 critical minerals. We have multiplied by two our backlog in energy, in water, and industrial. Please be aware that we were under a non-compete in a lot of our geographies until beginning of 2025. We have EUR 2.5 billion backlog in nuclear and more than EUR 5 billion in defense and security.
In greenfield, we were awarded SR 400 in Georgia, which is one project out of more than 30 projects greenfield that we've been awarded in the last four years. 2.1 GW IT that are under development, and we expect to have commercialized 1.3 GW by next year. Much faster pace than what we thought at the beginning. Our small-scale data center platform under HOCHTIEF is going in the right track as well. We already commercialized and built two of them. There's four in progress with very advanced negotiations. We'll get into more detail later on those. Let's talk now about our brownfield, Abertis. Abertis has multiplied by 4.6 its EBITDA backlog, has increased by 50 years its EBITDA backlog, and has a multiple of 9.5x EBITDA backlog versus net debt. Remember, before 2022, that 9.5x number was 3.7x.
We have more than EUR 63 billion out of Abertis assets under management across more than 80 projects. Let's start with our portfolio. I said before, we are quite diversified across geographies and across sectors. This is the proof. EUR 65 billion in North America, EUR 22 billion in Europe, EUR 24 billion in Asia-Pacific. In which sectors? 25% data centers, 25% transportation, that includes sustainable mobility and aviation, and the rest through different high-growth areas. AI, digital, I mentioned, energy, water, and industrial. We're talking about EUR 6.5 billion, 6%, out of which EUR 2.5 billion are nuclear, 5% security and defense, general building 11%, sports 2%, biopharma 11%, critical minerals 8%. What's coming? What is coming is a wave of investments, no matter what asset class you look at.
EUR 6 trillion just in upgrading aging infrastructure, and that goes through rail, highways, airports, because the reality is that infrastructure is aging, and a big part of it has to be expanded or replaced. All those programs continue in place. AI, EUR 3 trillion. It's important to touch on this figure. We've been looking at the demand of data centers for the next few years, and there was a lot of different curves, a lot of different projections, right? Everyone was talking about 300 GW by 2030 versus the 100 GW approx right now globally. There's a little bit more conservative cases around the 240 GW by 2030, and there's more pessimistic and stress case scenarios of 180 GW.
The projections today you are going to be seeing is based on the stress case, assuming that only 180 GW will be achieved by 2030, and on the other side that we keep our market share. There are reasons to believe that we are going to be able to increase that market share for different reasons. First, more complex projects. The need for behind-the-meter solutions, off-grid energy solutions, location shifting, planning efforts, engineering, modularization, self-performance, more complex.
I would assume that we are in a very good position to increase that market share. We are not considering that approach. We are just focusing on our market share and the stress case of the curve. Then we have all the investment coming from the deglobalization. We are facing a series of challenges, geopolitically speaking. There is plenty of investment in defense, security, but also in the reshoring of industry back to Europe and North America.
These are our strategic priorities. The first thing to position ourselves across all these high-growth areas. We want to capture the next investment cycle. Second, expand our competitive advantage. There is going to be a series of presentations today in which we will explain how we are planning to increase our self-performance capabilities and modularization. Why? Because that will increase our margins. Three, scale of infra investments. I do not want to repeat myself because for the last four years, you always hear me talking about assets. Assets give stability. Assets give long-term EBITDA. Assets give long-term cash flows and dividends. That is why our main place to make sure that we take our positioning in infrastructure sector to invest in greenfield. How are we going to enable all of this? First, people, labor, number one challenge today. I am going to give you a few figures.
Just today, 2026, first nine months, we hired 22,000 people across our projects. How are we going through all those hire and training? We opened ACS University. We have more than 45,000 courses in the ACS University and active users. We have had more than 60 programs across all different sectors to train our people, and we have certified more than 10,000 blue collars recently to make sure that they were up to speed for our projects. That is the power of ACS, and that is one of our biggest advantages that we have. Then, of course, a disciplined capital allocation. Investment-grade rating. We are very committed to shareholder remuneration, but we do have a strong balance sheet that will allow us not only to remunerate our shareholders, but also to continue investing in assets. We have a unique model. It is a flywheel that feeds itself.
On one side, our internal capabilities, our ability to the greenfield, on the other side, investments. Let us start with the first of our verticals. We are going to have later today Mike Kuntz, our global sponsor, that is managing globally our artificial intelligence program, but also the Chairman of Coravel, our platform with GIP. Ben Kaplan, who is the Managing Directo r for data centers, our Turner. Jan Torka, our Managing Director for Leighton Asia, will join him to explain everything around data centers. At the back, you will see the three curves that I was referring before. We are planning for the stress case scenario, same market share. But I am going to make a reflection about demand, because there is a lot of conversations about demand. There are two things that right now become a challenge, potentially for AI. The first one is, what is the demand?
The second one is the markets. On the demand side, more than 50% is for emerging technologies, is for 6G, is for electric vehicles. The other one is for the ongoing migration, of course, AI computing and consumer AI adoption. I believe that the demand is solid. I believe that data centers occupancy is high. The key question is going to be the planning of all of that. It's going to be very related with the results, et cetera, et cetera. From our perspective, the visibility we do have with our clients, we believe that all that demand is there. We continue talking to hyperscalers. We continue talking to the big platforms. What we're seeing is an incredible speed up of investment.
In fact, in Q3, our new orders in data centers increased by 127% versus the 20% that we were seeing before that. That's a very strong sign. This is what we're planning to 2030, EUR 27 billion-EUR 30 billion in data center across the Group, EUR 24.5 billion in North America, up to EUR 3 billion in Europe, and up to EUR 2.5 billion in Asia-Pacific. We are positioning a lot of this demand through our strongest clients, hyperscalers. We do have a lot, long-term certainty. We believe that we're going to be able to increase margins. I'm going to change right now to the next high-growth area. We're going to spend a lot of time on this one. Why? Because it's one of our highlights. No one has any doubt here that we're strong in data centers and digital.
What most of you probably are not so familiar is what we are developing in this space, energy, water, industrial. We did sell our ACS Industrial division back in 2021. We had an noncompete clause until the beginning of 2025. Some areas within ACS could deliver some of these projects. Some others could not. We've been working very strongly to recover our capabilities. Why? Because all projects are connected. Very difficult to nowadays build data center without the power, without the energy. You cannot envision a future without nuclear. Very difficult to start talking about geopolitics without critical metals. They are all very important parts of the ecosystem, so we had to rebuild again our capabilities across sectors.
We've done it. We believe that from the EUR 4 billion backlog that we have today, we are very confident that we will be able to achieve between EUR 8.5 billion- EUR 9 billion by 2030. Later today, Theo Scherman is going to come to stage to explain and take all of us through this new sector. What I would like to show you right now is the experience and credentials that we have currently in ACS in this sector, including, of course, the one that we kept under HOCHTIEF and UGL, the organic growth that we've been able to replicate since the beginning of 2025, and the acquisitions that we've been doing since the beginning of 2025 to enforce our capabilities in North America, in Europe, and Asia-Pacific. All those dots and all those numbers are the credentials we submit to our clients for the new projects.
But the numbers, the 550 projects that you see on the screen, divided on the 110 in Asia-Pacific, 300 in Europe, and the 140 are the projects we have won in this space since the beginning of 2025. That shows the power of ACS. That shows the power of our platform. That takes me to the next high-growth area, which is nuclear. Ivan Baldwin, our Global Head for Nuclear, will explain more in detail our strategy. Through HOCHTIEF, we were one of the strongest players in the nuclear industries back in the 1950s, back in the 1960s. More than 70 years of experience. Throughout over the last 20, 30 years, basically we have been doing decommissioning, long life of nuclear plants. Three years ago, we decided to be part of the nuclear renaissance, and we started working it. One year and a half, EUR 2.5 billion, 140 projects.
SMR, large plants, fusion engineering, a little bit of everything. EUR 2.5 billion backlog that we expect to convert into EUR 8 billion-EUR 9 billion by 2030. Allow me to move on into the next one, security and defense. We have been working on infrastructure for defense clients for many years. Right now, we do have a backlog of EUR 5 billion. That has accelerated, obviously, a lot within the next years. I am going to invite later today Lieutenant General Michael Fenzel, who is the Head of ACS Defense and is planning for our defense strategy, will take us through defense strategy. At the end, we are leveraging our global platform and end-to-end capabilities for defense. At the end of the day, defense wants firms that understand all the different sectors. You cannot really build any resilient infrastructure without communications, without power, without site, without AI, digital components, et cetera, et cetera.
That is what puts us in a good spot for achieving the thresholds of backlog that we are projecting on the screen. I am moving to our next high-growth area, critical metals. In our Capital Markets Day, I introduced critical metals, and I introduced for two reasons. The first one, we were very much exposed with thermal coal. We thought that because of ESG, number one, and number two, because it was a market of the future, we had to jump into critical metals. We started announcing a lot of bolt-on acquisitions. Remember, Novopro, Prudentia, MinSol, et cetera, one after the other. They were very small, plenty of engineers that we are training and bringing to Sedgman and to Thiess. We wanted to go through all the commodities. Who doubts that the future is about copper with all the needs in the industry, or rare earths, lithium, uranium?
We started transforming ourselves, bringing those capabilities. What I am about to show you is a couple of things. The first one, our ambition to achieve a EUR 12 billion-EUR 13 billion backlog by 2030 through Thiess and Sedgman, but also what we have been able to achieve in terms of engineering in this space. The following map shows the projects won by ACS Group since 2024 in critical metals. Two years, more than 520 projects. At the right, you will see the critical metals. I will not read all of them. 55 copper, 47 lithium projects, 37 iron ore, 13 rare earths, three uranium. The full scale of worldwide critical metals, especially in Australia, U.S., Canada, but across Europe and South America.
In the previous ambition towards 2030, you would see that a lot of this engineering that comes under Sedgman represents a very small part of the backlog. The upside that is not in our figures is that these projects that represent a very small engineering amount could potentially become EPCMs. How many of these 520 projects will become EPCMs? We do not know. We are not guessing. We are not including. We leave that for an upside. Grant Fraser, Managing Director of Sedgman, and Michael Wright, CEO of Thiess, will join us later to take us through this strategy. With all what I have explained, what is the intrinsic value that we see in 2030 just for our end-to-end, excluding assets? If we normalize an EBITDA without the assets by 2030, we will be talking about a EUR 5.4 billion approx EBITDA versus the more than EUR 3 billion that we have right now.
If we take a multiple, let us say between 9x- 10.5x, it depends on where we come up with a multiple of turnover by 2030. We are moving in a range between 16x and 20x Turner. We would be looking for intrinsic value of the end-to-end solutions of EUR 52 billion-EUR 56 billion, just looking at EBITDA and with reasonable multiples. Let us jump into the assets. Two types of assets. Digital energy. Vicente Maraña, who is the CEO of ACS Digital & Energy, will take us through all the portfolio of digital and energy under ACS. Howard Boville, who is the CEO of Coravel, will do the same through all the assets within our Coravel platform. In transport and social infrastructure, two fronts. Nuria Haltiwanger, that will explain as CEO of IRIDIUM, our global greenfield asset portfolio.
José Aljaro and Martin D'Uva will represent Abertis and will take us through Abertis. I am going to touch a little bit on both sections. I will start with our large data center platform. We have 1.2 GW IT under Coravel. We have additional 1 GW under ACS. So we expect to have like 2.1 GW IT across both by 2030. It is going very well. We expect to have 1.3 GW commercialized next year. The first one has been Dallas-Fort Worth, but we are in a very advanced level of conversations in Australia, in Virginia, in the ones in Europe, and the one in Ohio. We are commissioning the one in Madrid, and that is following energization, and we are also in advanced conversations, and all those developments are going very well.
The value of this platform, just the platform we have, full operational by 2030, will reach around EUR 12.5 billion. That is basically coming out of the commercial discussions we are currently holding with our clients. But you will see the small-scale data centers. As we did last time in our CMD, and we mentioned that we had that in mind, we are not considering right now any of it.
Let me touch what it means. We have already commercialized and built two small data centers in Germany. We have commercialized them. Each one of them has an EBITDA of EUR 25 million. There are four under construction, very advanced negotiations. We believe we are going to be able to commercialize soon. So we will have six small data centers very soon, EUR 25 million EBITDA each one of them, EUR 150 million EBITDA. We are planning to have 30 of those by 2030. 30 multiplied by 25, it would be EUR 750 million EBITDA. What is the multiple? We do not know. That is why we are not including it. That is an upside that we will have in our valuation.
Let me touch on greenfield, on the transport and social infrastructure. We have a current portfolio of more than 80 projects, EUR 63 billion under management, but we are valuing that at EUR 3 billion, and this in line with the market consensus. We have 32 projects won, and that goes from highways to social infra, railway, or next-generation mobility. That includes more than 900 electric vehicle points. That includes all the projects from Skyports, that is becoming the first and leading worldwide vertiports organization. That includes a lot of the projects in our next-generation flightways. That includes pretty much everything that IRIDIUM, HOCHTIEF PPP, and Pacific Partnerships are developing.
We do have a current pipeline of around 80 projects with more than EUR 61 billion. That includes everything that is on the screen. Six managed lanes projects, 17 next-generation mobility, nine railroads, 26 social infrastructure, transmission lines, energy, everything. We are going to be selective because we do not want to make mistakes. We are not in a hurry. Capital allocation is key.
Let us talk about the intrinsic value of all of this. We believe that by 2030, if we go through the different asset classes, we are seeing data center platform at EUR 14 billion. We are seeing Abertis at EUR 6 billion, and I am going to touch on it right now. We are seeing the rest of the portfolio around EUR 5 billion-EUR 6 billion. We are expecting to get an intrinsic value, and let me talk about Abertis before, of EUR 25 billion, just in assets that you will need to add to the EUR 55 billion before. Let us talk about Abertis. Back in 2021, when we were getting together, Abertis was probably one of the major concerns from a big part of you. Very reasonable reasons.
How can you have a platform with EUR 24 billion debt that post-Sanef in France, you are forecasting an EBITDA of less than EUR 1 billion? What are you going to do with that platform? This is what we have done. The curve in gray was the EBITDA projected around 2018 to 2021, the blue one, 2024, with a lot of the organic growth and acquisitions, the yellow, the current one. What this means is that post-France, we will have an EBITDA per year of EUR 4.7 billion and growing up. What this means is our EBITDA backlog is EUR 226 billion. What this means is that the EBITDA backlog versus net debt is 9.5x , and that the average portfolio life is around 15 years. We are working on our two transactions that will reinforce even more these graphs.
All of this takes me to the, probably the summary of today's presentation, our targets. 2030, we expect to have revenues for EUR 84 billion-EUR 86 billion, CAGR of 10%, operational net profit of EUR 2.2 billion-EUR 2.4 billion. That means a CAGR of 18%-20%. Four-year cumulative net operating cash flow from EUR 9 billion- EUR 11 billion, and shareholder remuneration to up to EUR 4.9 per share versus the EUR 2.4 that we have currently right now. Obviously subject to capital allocation, investment opportunities, and doing the right thing for the shareholders and ACS. They are ambitious, but they are realistic.
And what are we going to do with the EUR 9 billion-EUR 11 billion net operating cash flow? EUR 4 billion, we are planning for shareholder remuneration, EUR 1 billion with the managed lanes. This is just the SR 400, because the next ones, whether managed lanes or PPPs, are not falling within that period. They are typically back-ended. EUR 1 billion additional investment in Abertis, EUR 1 billion for strategic M&A, EUR 2.8 billion for data centers development, and that allow us to have additional EUR 500 million and more for further consideration, right? We will be having additional opportunities. And what is going to be our value creation potential? The current market value of ACS is EUR 25 billion. The analyst consensus is right now between EUR 39 billion and EUR 42 billion.
But if we take the EUR 52 billion-EUR 56 billion of the end-to-end intrinsic valuation, and we take the EUR 25 billion, and again, EUR 25 billion of the assets we have now. We are not relying on new assets, we are not relying on forecasting new opportunities. This is just having our assets mature by 2030. And we use the intrinsic value of those assets, EUR 25 billion that are coming from the financial modeling that have gone through all the rating agencies and through all the financing, we get to the EUR 25 billion, and that comes up to EUR 77 billion-EUR 81 billion.
But those greenfield projects, those assets will continue growing. At that point, we will have additional assets, and the maturity of our current ones and the new ones, we could potentially get to a EUR 38 billion-EUR 40 billion intrinsic value just of our assets by 2035.
Let us talk about our agenda today. This is the way we are structuring everything. I mentioned that Michael, Ben, and Jan would take us through all the artificial intelligence. Strategy will take us through modularization, self-performance capability, the market, the growth, et cetera. Theo Scherman is going to give us a view of all our industrial strategy, touching on energy, touching on water, and the rest of the business. Ivan Baldwin will take us through our nuclear strategy. General Michael Fenzel will present our safety, defense, and security. Grant Fraser and Michael Wright will touch on critical metals and natural resources.
And then once we go through all the verticals and we understand the prospects, we will start going through the main three platforms that we report: Turner, E&C, and CIMIC. Peter Davoren, Chief Executive Officer of Turner, and Christa Andresky will present the company. Roberto Gallardo and Jason Spears will introduce CIMIC.
Santiago García, Peter Hingott, and Richard Grabinski will take us through engineering and construction. Then we will move into the assets with Vicente Maraña and Howard Boville on data center platforms, Nuria Haltiwanger, José Aljaro, and Martin D'Uva in transport infrastructure, and our Chief Financial Officer, Emilio Grande, will take us through the financial strategy, and I will join you at the end of the day for closing remarks. Having said that, I got to the end of my presentation. I wish you a very good Capital Markets Day. We are going to have a series of Q&A at the end of the session that you can ask anything that you would like. Thank you so much for attending. Means a lot to us, your ongoing support, and I look forward to the end of the session. Thank you so much.
Good morning. Juan, thank you. I think I speak for all of us, and I might be a little bit biased, but it is a great time to be at ACS. Incredible results, and most importantly, an incredible future. I am Michael Kuntz. I am an Executive Vice President with Turner Construction Company, and I am the Chairman of Coravel. With me on the stage today is Ben Kaplan, Managing Director at Turner Construction, and the Head of our data center business in the Americas. Jan Torka, Managing Director of Leighton Asia. We are going to spend the next 30 minutes going through the data center advanced technology world from a couple different angles. We are going to talk about demand, because simply put, it is not stopping. We feel that it is accelerating. We have high revenue certainty because of this demand and our position in it through 2030.
We are going to talk about how we need to change and evolve, and are changing and evolving our offerings to the marketplace to continue to expand our revenue on pace with the growth, and also to expand our margins on that revenue. What does partner of choice mean, right? I want to talk about our position in this strong market. What does that mean? Well, to me, it means you are a must-consider option. It means when a major hyperscaler thinks about a data center project, the first company that they think of is someone in the ACS Group. I think there is a benefit to that, and it is a huge benefit. What it does for us is it gives us a seat at the table.
That seat at the table provides us that insight, forward-looking, to be able to predict our outcome years in advance and be able to schedule our work, to move our capacity around to meet demand in a different region as it changes, as it does quite frequently. It allows us to sit down at a table with the major hyperscalers and talk about what their needs are, for them to have a conversation with us about where they need us, most importantly, and let us adapt to that. This is a huge advantage over everyone else, because quite frankly, in the data center world today, we do not usually compete for work. It is a transparent, open conversation that allows us to negotiate work based on the hyperscaler's need and where we can better fit. It is a unique position to be in. How did we get there?
How did we get there? Through performance, right? It always comes back to how you perform for a client. We got there because we earned it. We earned it because we have already built about 5.5 GW of capacity. On a global market of, what, 100 GW-120 GW in the entire world, we have already built 5% of that—o r excuse me, 5 GW. Most importantly, underway right now, it is about another 15 GW. So we have earned it through our performance, and that gives us this unique market performance. We feel very good about the backlog, as Juan went through. EUR 26 billion in backlog, or excuse me, EUR 26 billion in backlog as we stand here today. 65% of that, maybe a little bit more, is with the five major hyperscalers. So we feel very good about it. Translates into revenue.
In 2024, our data center revenue was EUR 4 billion. We doubled it again in 2025 to EUR 8 billion, and we will double it again this year, revenue on a yearly basis of EUR 17 billion-EUR 18 billion. Very strong position. It is spread across the globe. We have completed or have underway about 1,300 projects around the world. We have had a very good critical mass in the United States now for about 15 years, and we have completed 1,100 projects already and currently have 90 projects underway in the Americas. Europe has taken off, and we have taken advantage of that through increased capabilities with HOCHTIEF and DRAGADOS on the data center front, and our acquisition of Dornan two years ago. We have completed 50 projects, and we have 16 underway in Europe alone. Jan's group in Southeast Asia has completed 20 projects with 14 underway.
We had our hyperscaler in a conversation with Ben a couple weeks ago saying, "You are the only company I trust to build a data center for me on four continents." It is a pretty big statement. It is a great position to be in. It is global leadership in this sector. From using the sectors and the geography and looking at revenue, we see double-digit growth in each sector between now and 2030. Biggest growth will be in Europe, we feel, with a CAGR of 25% 2026 to 2030, almost 20% in Asia-Pacific, and of course, the steady growth that never seems to end in the Americas at 11%, I believe, CAGR 2026 to 2030. Each segment, each geographic segment has doubled the revenue 2024 to 2025 and then 2025 to 2026 as we forecast into the future.
Every geographic area is very, very, very strong, and we are taking advantage of it.
Mike, even as we doubled our revenue, we doubled our backlog in each of those regions as well.
That's a great point. We have that certainty again into the future. We feel very, very confident about it. We don't have a lot of doubt it's going to materialize. We feel like we're locking in the growth through the end of the decade. Why is that? Why do we have such certainty? The demand side is there. We don't have a doubt about that. Again, the signals we get from the hyperscalers and the investment-grade colos that we work for give us that strong buy signal. But we're sitting on about, group-wide, about EUR 60 billion in backlog and what we call high-probability work. You've seen the backlog of EUR 26 billion. Underpinning that is about another EUR 36 billion-EUR 40 billion of work that we consider high probability.
Our trend that will continue is that we convert about 80% of that work into secured backlog. We look into the future, we think we're sitting on about EUR60 billion of real work, line of sight, just in the next couple years. In 2027 and 2028, 90% of the revenues for 2027 and 2028, we feel, are pretty much secured, either through already in the backlog numbers or in the high-probability work that our track record suggests and our relationships suggest we will convert. When you look at our graphic in the middle, the pie chart, 67% of our work comes from hyperscalers. In our backlog right now, 67% from the blue-chip hyperscalers. There's a great certainty in that. Another 30% comes from investment-grade colocation companies who consequently are building for the hyperscalers. It gives us a great deal of confidence.
Only about 2% of that, as we sit here today in our backlog, is for our own development efforts. It's a very, very strong position to be in, thanks to the efforts of Ben and Jan and their respective teams around the globe. As Juan said earlier, there's 100 GW, 120 GW of capacity in the market right now online. There's projections that take it as much as 300 GW by the end of the decade. There's another consensus that has it somewhere in the middle at 240 GW. As we put our projections together, we chose to take a very, very conservative path because we have the line of sight, we have the relationships with the hyperscalers and the major colocation companies that allow us that line of sight with a great degree of certainty moving forward to 2030. Where's the demand coming from? Juan touched on it.
The 20% of the global data volume in the world today is in the cloud. By 2030, that more than triples to 70%. 50% of the data center demand and capacity today is for non-AI workloads. You could stop AI today, and you really can't, but you could just put it down for a minute, and the demand for computing power, the demand for supply of that computing power is still incredibly strong. The market carries itself through 2030. Again, incredibly strong market. Incredibly strong market. Incredibly strong blue-chip owners. Everyone bets on them. We should too. Incredibly strong position for the ACS Group within that marketplace. Ben's going to talk a little bit about how we're going to change our offering to, again, keep pace with the revenue growth and also increase our margins on the same revenue.
Jan will help Ben out and talk a lot about AI as we do make that transfer from training to inference and how that will impact the market. Fellas?
It's probably helpful to take a closer look at the demand growth that Juan laid out and then Mike just explained a little bit more. Again, we see current demand at about 100 GW-120 GW, and our conservative case of rising to 180 GW. When you look beyond just the top- line number and really how that's made up, break it down into kind of pieces, and sort of big pieces, we're oversimplifying a little bit. Today, about 60% of that demand is going to the training of AI models. About 40% of that is for inference and also cloud and the other. What's important about that, and this is why we feel so strong about the demand signal that we get, the 60% you see there today, that's the investment that our clients are making. The 40% today, which we believe becomes 60% or 80%, is revenue.
Right now, they're making the investment. As we move through the next three or four years, that will transfer to revenue generation. What we're seeing is, not only is the pie getting bigger, the portion of that pie that actually generates capital to fund and to continue the development of the infrastructure will increase.
Yeah. Maybe, can I just come in—
Sure.
—with a little bit of APAC perspective on this? The figures that Mike presented before on APAC for us is Australia and Asia, excluding China. Those figures really represent an inference story, just cloud and compute. In our area, we haven't seen much contribution from AI training so far to date. But even without that training, we've been achieving similar growth rates like in the U.S., basically doubling our revenue year-on-year over the last two years. And more importantly, we don't see a slowdown. Our clients come to us at the moment and are asking us to secure the capacity that we have for their future growth. So our revenue and our growth is not so much dictated by the demand, it's more the capacity that we can provide to our clients to deliver to the standards of the Group.
In addition to that, we've got opportunities emerging in Australia at the moment to develop large-scale AI infrastructure. We are in discussion with several developers over there, but consistent with the conservative approach that Mike and Juan mentioned before, we haven't included that in our forecast. So if that comes, that will be an additional upside in the APAC region.
Yeah. As you can see, our clients believe that too. The forecast is that today, well, today, our clients will invest over EUR 700 billion in this marketplace. That grows to over EUR 1.1 trillion by 2030. And as we've talked to our clients, as Mike mentioned, the signal of the last months, weeks, and with some of the interesting things that have happened in the United States recently, days, that demand signal is strong, and it's only increasing. That's the demand side. On the supply side, as we look at our revenue projections going forward, we feel very strongly about that too. Some of the constraints that might affect the supply and our ability to deliver are not new. We've been hearing about this for a while, working with our clients. We've been planning for that.
We've been looking at the quality of the projects, that are they responsible developments? Will they go forward? And we feel very strongly that the backlog that we have for 2027 and 2028 in particular are very, very strong. Some of those constraints may affect, and Juan mentioned this, how those projects go forward in the future. So we believe that there could be some timing shift in how projects move forward, but that they will move forward. There may be also some location shift, and that's one of the really, really great things about part of the ACS Group. The strength of our platform across the United States, if a project is going to move, maybe the timing is off in one location, but that capacity is needed, we can move with our clients to a new location.
If that capacity were to shift from the U.S. to Europe or from Europe to Asia, the ACS Group can move with our clients. As Mike said, it's pretty powerful when we have clients, and there are multiple clients that we are currently working with on multiple continents. The fact that we can add value to them by giving them a predictable product, a predictable process for delivering to their demand is critically important. That really drives to how do we create value for our clients? First of all, what they see as value is our ability to deliver at speed. In today's world, when the business signal is go for a project, you have to start delivering capacity in 12- 24 months. The next part of that is you have to be predictable. There has to be delivery certainty. That certainty is in schedule.
A lot happens after we get finished to spin up a data center. Our clients need to be able to be prepared with the resources that they have to deploy. The product we deliver has to be operationally excellent and repeatable. They get the same result every time, no matter where in the world they work with the ACS Group. The other thing that's happening, and as you look at the scale of their investment, our clients are finding it more and more difficult to keep up with supporting their own demand. That's a fantastic opportunity for us to bring our end-to-end solutions to the table. We can take on more and more of the load that they need to deliver. We can provide value in that process, and we can capture that value in the form of margin for our shareholders. So what's our strategy?
There's really four key elements to it. First, we're going to leverage the pole position that we have in the U.S. in this market across the entire ACS platform and the entire world. That's what's starting to happen more and more. As our clients look globally, we go with them. Second thing is we really have to maintain and enhance the partnership that we have with the hyperscalers and the other key players in the market. Mike said it really well. We have a tremendous relationship. We have transparency. We know not just what they're working on today, we know what their plans are for tomorrow. They bring us into the tent with them to help plan and orchestrate what goes next. Our strategy really hinges on our ability to maintain and grow and enhance those relationships.
The next thing we're going to talk about, and you're going to hear about this as my colleagues, as our colleagues get up here and talk about all of the market verticals that we're in, is the deployment of end-to-end services. How do we do more for our clients, create value for our clients, and then participate in that value? A key part of that, and the fourth element of the strategy, is to scale our modular delivery. In order to deliver with speed, in order to deliver with consistency, and then to go at the scale and the locations that our clients need us to be, we need to provide more and more of a modular delivery approach, because that's what allows us to deliver. We're going to go a little bit deeper into this. When we talk about end-to-end, what do we mean?
The first is really turnkey development. You will hear more of that from our colleagues at ACS Digital & Energy and Coravel. They will talk through that end-to-end turnkey development. As you break down deeper into it, is there site selection? We get there with our clients when they are trying to decide where to go, and then once they select the site, using our civil resources, and as Juan mentioned, with FlatironDragados being in the U.S., for instance, being the largest civil contractor in the U.S., we can actually do that site development for them. The next area is design.
Design is critical for us, mostly because in order to bring the value of that end-to-end solution and bring all of the resources of the ACS Group to the table for the benefit of our clients, we can design into the supply chain and the delivery processes that we are going to utilize to be successful. That is a critical aspect, and that is really what makes this an end-to-end solution. Within that is the supply chain, and you will hear more about this as we talk about SourceBlue and our ability to procure billions of dollars across the world and create value for our clients there. The next is the modular delivery. Our designs and our end-to-end approach is based on the modular delivery process that we intend to implement. We are not reverse engineering into prefabrication. We are designing into our modular delivery process.
From there, we will do field execution, which is kind of the bread and butter of the ACS Group in terms of deployment and of the projects. We will commission them, and then we can be there for the operation of the project. So we are literally there from when it is a piece of dirt through the entire lifecycle of that asset. Again, one of the unique things about the ACS Group is our ability to repeat this globally. With the resources and facilities we have across the world, we can deploy that design, we can deploy that modular delivery model. The other thing that makes this really powerful and why it is important that you will hear about end-to-end across the conversations today is that unique to us, I believe, is the fact that we are not stuck in just one key market.
It is not just about data centers, although data centers are critically important to us. It is about leveraging this end-to-end approach and this modular delivery model in pharma, in semiconductor, in industrial advanced manufacturing, in aviation. You are going to see some really exciting stuff when Peter and Christa get up here and talk about what we are doing in aviation, in energy, in healthcare, and in security and defense. We can leverage and amortize this approach across all of those segments and all of those verticals.
Okay. Let me build on what Ben has just explained to tell you why the end-to-end delivery model is important for us. It is our aim to get involved as early as possible, particularly in the design, to be able to create value both for our customers and for the Group itself. The earlier we get involved, the more we can bring together an integrated solution with the capabilities and services of the Group. That allows us to engage much broader than just being a contract manager or construction manager, and it allows us to go deep into the value chain of our projects, all the way from site selection down to commissioning and operations. That is where we create value for our clients and the Group. Just to give you some examples, SourceBlue was mentioned.
We bring SourceBlue in with the expertise in sourcing critical equipment and supply chain management. By controlling this critical equipment delivery, we are de-risking the project for us and for the clients. Field execution, we mentioned before, we can bring resources from the Group in as they add value. We can decide to self-perform, for instance, in Americas, the structural or civil works through FlatironDragados. We get Dornan in Europe or UGL in Australia, we are able to perform the mechanical and electrical works. For our clients, we are able to provide an integrated solution which takes away a lot of interfaces and gives delivery certainty. But the value for the Group is much more important. This strategy in operation allows us not only to increase the margin by doing more work in data centers.
The value is in getting more participation in the value chain, creating synergies, and earning the repeat customers. One important piece I have not mentioned yet, early involvement allows us to design for modular fabrication. Modular fabrication is not just a single product. It is basically a delivery strategy. We do it not for the sake of modernization, we do it where it is effective and where it adds value to the process. This is why we have different solutions in different stages. We can provide just simple kits and components, which we have factories to manufacture ourself. It goes on into prefabricated assemblies, which apply to all of our projects. But then going on, we can provide integrated subsystems and all the way up to volumetric modules, depending on the stage when we get involved. We can take this one step further and provide a fully modularized data center.
That is something that Ben will present in a minute. The benefits are very straightforward. As I mentioned before, for the client, it is a fully integrated solution, less interfaces, and delivery certainty. By bringing the construction into our workshops, we take away the risk and uncertainties of delivery on site, and we are able to take activities off the critical path to deliver faster. Standardization and repetition allow us to increase productivity. Basically, instead of building prototypes with ever-changing teams on site, we enter into industrial-style fabrication in our facilities. That allows us to enhance the delivery, increase our margin, and reduce the risk. We reduce the labor on site, we improve safety, and we take away the peaks of resources and delivery. This is particularly important in markets where there is pressure on critical resources or when we have to deliver to high speeds.
Let me take this back to Asia. This is just to prove what I am talking about here is not just an ambition for the future. We already live this and we model. In Asia, we have varying markets in terms of workforce skills and maturity of our supply chain. To be able to deliver to the standards, the global standards of the ACS Group that our customers need, we are working with dedicated prefabrication facilities, two of which you see here. We have them spread across the region. These facilities are not only used to fabricate the modules that we described earlier, we also use them to train our workforce, and we use them to upskill our supply chain. By doing this, we create the capacity that, as I mentioned earlier, creates the ability to grow controlled in the market.
The other elements that complement the modernization is digital construction. We have competence centers across the region where we build in 3D all our sites before anyone is allowed to go inside. Then a pool of commissioning managers across the region ensure the global standard of the Group is applied everywhere. Simple summary is we build the capacity off the critical path ahead of the workload to then scale with our customers when they come to the region. In closing, I hand over to Mike to show you how we can take it to the extreme.
Well, before Mike comes up, just to show you what this kind of scalability and investment looks like. What you are seeing here is we developed a proprietary 20 MW data center deployment. The 20 MW data halls can be configured in as any scale. We are currently working on deployments that could be as much as 200 MW each. What you see here is the actual modular data center being put together. This is, you will see, and as Jan said, we have the digital models. We start with the digital models. We move into true manufacturing, creating these modules, and can deploy at scale. We are pretty excited about how this is coming together.
It is wonderful. It is being built in a facility in Virginia, in the United States., as we speak. We had people down there this week, and I kept getting pictures. They were so proud that we have gotten to this point to build the full volumetric units. In closing, number one, I appreciate your time. Thank you for your attention, and thank you for having faith in the ACS Group. I think you will be well rewarded, and we are glad you are here. We are the partner of choice in the data center and advanced technology market on a global basis. We are the trusted partner, and it starts and ends with trust. We have high certainty into our backlog and into our revenue numbers through 2030, a great deal of confidence.
And we will always continue to evolve our model, our offerings to the marketplace, to not just keep pace, but to exceed the market, to accelerate the innovation and the development that's needed in this industry and all advanced technology industries. Thank you very much. Appreciate it.
Good afternoon, everybody. It is a real pleasure to be here, and it's an exciting day today. I want to start off with a statement. We are moving into a future where the foundations of the new world will be based on intelligence, energy, and water. I'm excited to share with you today and take you through our energy, water, and industry solutions, and how we're going to scale that through 2030. These three pillars underpin the global transformation already underway, and we are well-positioned to take advantage of this supercycle. Before I get into the detail, let me take you through just through a few highlights, and then I'll go into more detail. First, we have built a global end-to-end offering with global capabilities paired for a strong execution, which will give us a unique position in the market.
Second, we are capturing this multi-decade investment supercycle across seven distinct segments, not betting on just one single vertical. Third, because of this, the position we can be selective about the opportunities, which is the balanced risk approach, giving us higher margins in the future. It's a good balance that we want to build. At the core of the strategy, we have two things working together, giving us a competitive advantage. On one side, we have global engineering excellence covering specialized technologies and sector know-how, world-class design and capabilities, and a group procurement that gives us speed, scale that other players do not have. On the other side, we have local execution, which gives us certification, licenses, self-perform capabilities, and client relationships that only come from being on the ground.
This combines that with and that lets us compete credibly across the different market segments that you can see on the right-hand side there: energy networks, power generation and storage, water, oil, gas, and services, rail networks, and of course, industry plants. The question is, why do we see this supercycle now? What's driving the supercycle around the world? Firstly, we're seeing electrification of transportation, heat, and industry move into the grid. Two, we see changes of energy mix, the needs of more generation, more storage, and more network capacity to stay stable. And the numbers are incredible. Around EUR 1.4 trillion a year in global electricity generation and infrastructure investment, and the grid investment alone growing at more than 20% per year. Number three, we are seeing reindustrialization as the countries rebuild their sovereign industrial capacity, and the aging infrastructure also simply has to be renewed.
And what we are seeing there in greenfield investments in strategic sectors are up to 5x versus 2020. Significant growth and accelerating. Then we are also seeing EUR 6.5 trillion in water infrastructure investment needed globally by 2040. This structure resets just how important this whole world is being rebuilt around power and the foundations of energy. Critically, this happens across all three of the regions that we operate in. This is what gives ACS such a big advantage. Let me give you a few examples. In Europe, roughly about EUR 600 billion will be needed this decade in grid alone. In Americas, in excess of EUR 500 billion needed in water infrastructure and over 70,000 km of new high-voltage transmission lines planned over the next decade. We are seeing the same thing across APAC.
More than 215,000 km of new transmission lines planned for India, Indonesia, Australia, backed by more than EUR 140 billion in grid capacity. We are seeing the same structure demand across all our regions. This is not just theoretical, as Juan has said. Since 2025, we have already delivered 670 projects. A few examples that I will just highlight that is on the screen. In America, we have built and operated more than 1.44 GW of generational capacity and over 1.3 million cubic meters of water capacity per day. In Europe, we have delivered nearly 2,800 km of high- voltage and extra high- voltage lines, electrified and maintained over 3,700 km of railway, and installed and retrofitted more than 2,500 MW of power generation. In APAC, the story continues. We have built over 7,300 km of high- voltage lines, 300 substations, and we have delivered more than 100 water projects.
As Juan said, this is not theoretical. We are already delivering. We are just going to grow on top of that. Our capabilities have been strengthened through both. We are strengthening our capabilities through both organic growth and in strategic M&As. Water, rail electrification and tracks have always been the core for ACS, but we have significantly strengthened our global capabilities in energy networks, power generation and storage, telecom networks, oil, gas services, and industrial plants, where we have added more than 4,000 new specialized employees in key areas such as high-voltage lines, turbine installation, and operational plants. We have also done nine selective M&A acquisitions, like the announcement this week of Voltan Group. Our plan is very ambitious. We plan to scale the platform backlog from EUR 4.5 billion today to EUR 9 billion by 2030. That is 18% compounded annual growth.
We want to point out the number does not include nuclear, which you will hear after my session. We get there through two pillars. The one captures this investment cycle, as you have seen in the previous presentation. Then scaling transmission distribution from civil works into EPC and EPCM delivery, and growing power generation and storage, including gas and LNG, alongside water, rail, and telecom. Two, expand our competitive advantage by strengthening our end-to-end capability from engineering, through construction, through operations and maintenance, and staying selective, balancing growth and disciplined around risk. This discipline shows up in how we prioritize, and you can see our three regions on the screen there. Power generation and storage, transmission and distribution, water are our focus in every across all three our areas.
But beyond that, selective rail industry opportunities globally, continued telecom growth in APAC, and then targeted LNG offshore work where we are aware it makes sense. Our focus is to be strong everywhere in the segments that matter and selective everywhere else. Growth that erodes margin is not the growth that we are looking for. Profitability is key for us. It comes from three things. One, specialized, standardized, modular, end-to-end offering that is inherently more profitable than one-off commodity works. Two, a focused, high-value, multi-year programs where we self-perform the critical scopes rather than subcontracting them out. Then three, a selective approach where we work closely with our clients, prioritizing delivery certainty over chasing every opportunity. We offer our clients the delivery certainty in highly specialized projects. To close off, let me get back to where I started.
This is a multi-decade investment opportunity, not a cycle that we are timing. We are uniquely positioned to capture it with a platform, combines global capabilities, local execution across seven segments in three regions, and we are pursuing it with a strong ambition while staying disciplined enough to sustain strong profitability along the way. Thank you.
Good morning, or even good afternoon now. I am Ivan Baldwin. My background is rooted in leading strategy and commercial growth across highly regulated markets, with over 20 years in senior executive roles at Bechtel, BAE Systems, Da Vinci Group, and the U.K.'s National Nuclear Laboratory. Beyond operations, I have worked to shape the global nuclear sector, serving on the U.K. Nuclear Industry Council and presiding over Women in Nuclear UK, and advising the OECD on Japan's nuclear programs. Most importantly, for the past year, I have been focused on aligning ACS Group's immense capabilities with the massive structural tailwinds in global nuclear. Today, I will show you how we are uniquely positioned to capture this generational growth and drive predictable long-term value for our shareholders.
Our ambition is to become a tier one global delivery partner for utilities, OEMs, and governments in both large scale and SMRs, centering our strategy on a highly lucrative end-to-end lifecycle delivery model. Because nuclear assets' lifecycles span over 60 years, and that will position ACS across the entire continuum. From design right through to decommissioning, it unlocks deep, high-margin recurring revenue streams. To capture this opportunity, we are pairing a world-class nuclear EPCM platform with a highly capital-efficient localized model. We are integrating our nuclear capabilities in collaboration with our local entities. That means embedding specialized technical teams directly into advanced economies where ACS already holds a dominant position. This allows us to scale rapidly with minimal CapEx, leveraging deep existing client relationships. Crucially, this is not a future concept. We are translating decades of nuclear heritage into immediate commercial momentum through high-value strategic wins that we already have today.
Okay. Let's look at the macro drivers. The global market now recognizes that nuclear power is a non-negotiable prerequisite for energy security. As advanced economies rapidly electrify and build out advanced technology infrastructure, the grid demands a 24/7 weather-independent source of secure baseload power. Whilst intermittent renewables are growing, they fundamentally require a firm power foundation that will prevent system failure, and nuclear is the only scalable zero-carbon technology that fills this gap. This reality has forged unprecedented political alignment, and this was highlighted by the COP28 pledge, where over 25 countries committed to tripling nuclear capacity to 1,200 GW by 2050. Also, this has been supported by financing, with the World Bank lifting its ban on nuclear and unlocking multilateral funding. This is most important for us. The institutional capital barriers that previously constrained the sector are now being dismantled.
This brings me to today's nuclear core announcement. I'm really excited to share the launch of our dedicated global nuclear company, ACS Nuclear. Headquartered in the U.K., ACS Nuclear is the tip of our spear. It is a specialized vehicle engineered to concentrate scale and aggressively expand our nuclear capabilities, both organically and through targeted capability-led M&A. What makes ACS Nuclear unique is its scalable architecture. It combines a centralized EPCM platform with the ability to seamlessly draw upon our local delivery footprints in our operating companies, Turner, HOCHTIEF, FlatironDragados, CIMIC, that extensive footprint that we have. Modern nuclear rollouts require the exact heavy civil and technical expertise that already lives within ACS. What ACS Nuclear will do is act as the commercial accelerator, pulling these existing capabilities into highly lucrative new project pipelines across our tier one home markets in North America, Europe, and APAC.
ACS Nuclear is our bridge to securing enduring tier one strategic delivery roles across 60-year asset lifecycles. While ACS Nuclear marks a new chapter, we're not starting from scratch, as I've already mentioned. ACS Group has delivered over 3,000 high-complexity nuclear engineering projects globally for decades. Our operating companies bring an unparalleled heavy civil legacy, having constructed some of the most critical nuclear power plants across Europe, while supporting these utilities through ongoing operational support and complex decommissioning through that whole life that I mentioned earlier. What we're doing today is we're actively converting this multi-decade heritage into modern commercial momentum. We're already engineering small modular reactors, and we're forming delivery teams for the next generation large-scale plants, the gigawatt plants, and developing proprietary modular construction solutions, which is absolutely the future of the sector.
Our teams are already on the ground delivering the essential enabling infrastructure that will underpin the next generation of nuclear power in Europe, North America, and APAC. We have the track record, we have the capability, and we're executing right now. Let's transition to active project execution across our portfolio. Nuclear presents unique multi-decade commercial runways, as I've already described, and ACS is actively monetizing every stage of this asset lifecycle. We currently have over 140 projects active, which build up our EUR 2.5 billion backlog secured in Q3 2026. In the U.K., the U.K. government, backed Sellafield Ltd, has trusted us with two 15-year frameworks and partnerships to maintain and decommission one of the world's most complex nuclear sites. That's the definition of stable long-term asset stewardship. Concurrently, we're capturing the new build renaissance.
In early 2026, we were appointed to the global delivery partner team for the Rolls-Royce SMR program. The central role of the delivery partner spans integration, project governance, and core construction management, and module assembly for Europe's leading SMR technology. It is worth noting that Rolls-Royce SMR have three government-backed customers in three different countries to build multiple power plants, and we are working with them on that full program. Finally, we are at the forefront of energy technology, right at the frontier. Germany has backed a multi-billion euro fusion action plan, and we are collaborating, as Juan said earlier, with some of the pioneering developers, like Proxima Fusion, to engineer and construct advanced fusion technology facilities. Our ambition is to position ACS Nuclear as the definitive global delivery partner for OEMs, utilities, and governments. I wanted to repeat that.
Financially, our target is to scale our EUR 2.5 billion nuclear business to an EUR 8 billion-EUR 9 billion business, or backlog, by 2030. To bridge that gap, we are executing across four disciplined pillars. First, we will secure dominant positions on SMR and large-scale reactor projects across Europe and North America. Second, we are establishing enduring strategic supply chain partnerships, incredibly important partnerships, to match the exact delivery scale and regulatory rigor that our customers demand. Third, we are expanding our capture of the end-to-end value chain, scaling organic expertise and deploying capital for targeted high-synergy M&A to lock in high-margin tier one EPCM positions. Fourth, we are strictly aligned with modern project risk mitigation. We are actively avoiding the high-risk fixed-price contracts and instead pursuing the reimbursable target cost and alliance-based commercial frameworks now used by governments and nuclear utilities alike.
To meet the surging global capacity demands, developers and OEMs are fundamentally shifting away from what they look for in a partner. Success in this capital-intensive environment demands early integration, constructability-focused engineering, and highly standardized repeatable processes. Critically, it requires a non-negotiable nuclear safety grade culture, which we know all about, as we have been doing it for decades, alongside collaborative risk allocation. That is the absolute bedrock for rolling out rapid fleet deployments. ACS Nuclear is engineered to commercialize this exact customer need. By uniting the technical expertise across our wider organization, ACS Nuclear delivers an integrated multi-country proposition built for global fleet solutions. To meet that massive growth that I spoke about earlier in the market, it is fleet solutions that are required, no longer one-offs. Operationally, we are consolidating our specialist engineering capabilities into a single scalable platform.
That is backed by ACS's proven major project delivery engine and accelerated by targeted inorganic growth. We are building a world-leading nuclear EPCM proposition that will drive long-term predictable value. Let us look at the fundamental problem that ACS Nuclear has been created to solve. Reactor developers, governments face a massive global bottleneck, and what they do not need is transactional contractors. They require end-to-end delivery partners capable of reliable, scalable execution. The entire purpose of ACS Nuclear is to meet this exact market need through a single integrated interface. By seamlessly drawing upon the deep capabilities and localized execution footprints across our entire global organization, ACS Nuclear is uniquely positioned to provide multi-country fleet solutions. ACS Nuclear will target both commercial and federal programs. The latter provides highly sustainable, predictable revenue streams that allows us to systematically build and nurture our core capabilities.
It also includes nuclear defense programs, where in full alignment with our group defense vertical, we will combine our complementary expertise to deliver the critical infrastructure required to build and operate global nuclear deterrents. We have the multi-decade legacy, we have strategic partnerships, and with ACS Nuclear, we now have the perfect commercial vehicle to capture this massive investment cycle while strictly protecting shareholder capital. In closing, I want ACS Nuclear to leave you with three definitive takeaways that define our value proposition. First, ACS Nuclear acts as the ultimate integrator. It brings the full breadth of ACS's global nuclear capabilities into a single unified offering, simplifying client interfaces and maximizing commercial synergies. Second, we are positioned to become a dominant global EPCM leader. Unlike pure- play consulting or engineering firms, ACS Nuclear's management platform is backed by our own massive in-house heavy civil and construction capabilities.
This vertical integration drastically reduces execution risk and captures maximum value across the lifecycle. Third, and most importantly, this is an active revenue-generating reality. We have already established the heritage, the backlog, and now we have the immediate commercial momentum. Thank you.
I would like to share a quick story with everyone. On the 1st of March of this year, a single drone crossed the Eastern Mediterranean and struck the runway at a British airfield in Cyprus. No one was hurt. The damage was minor. But within just a few days, the United Kingdom sent a radar, air force fighters, and a navy destroyer to protect that base. No one knows where the drone originated. That is the world that our customers live in now, one of uncertainty. Being unprepared is no longer an option. The bases, ports, and power that protect people need to be hardened and need to become dramatically more resilient, and then kept ready for decades. That is the work that ACS does. Good afternoon, everyone. I am Michael Fenzel, Managing Director for Turner Defense and Global Coordinator of Defense for ACS Group.
I have spent over 37 years in defense. I understand our customers very well because I used to be a client. My job now is to connect the Group's companies in the defense arena so they will win and deliver together. Our defense vertical really is one group, one team in action. What is changing with security and defense is how we compete. Our next growth opportunity comes from combining our businesses to win work that no single company could pursue effectively alone, because for years, each of our operating companies bid for defense work on their own. But customers do not buy a building and walk away any longer. They want engineering, construction, and technology integration from one partner and for the life of that defense asset. You see the three messages on the screen behind me.
First, investment in defense infrastructure across our core markets is unprecedented, and it is going to last for a decade or more. There are significant tailwinds. Second, we already deliver, with over 600 projects completed or under contract. Third, we are becoming the end-to-end partner for governments, defense primes, and critical infrastructure owners as well. Put simply, ACS enables defense readiness. This is how we think about it and how we think about security and defense as a business. Our work protects people, preserves peace, and strengthens deterrence. We deliver it through engineering, construction, and technology integration. All of this enables armed forces, supports public safety, and sustains the essential functions of society. That definition gives us clear boundaries as well. We do not build tanks and we do not make munitions. We build the infrastructure that keeps our forces ready.
Our work sits inside those boundaries, the base, the port, the depot, and the power supply. Public safety belongs here too. We ensure that our first responders, police officers, and fire departments are all well prepared. Every pursuit we choose is tested against these boundaries. They reflect our deep and active concern for the people we serve and the societies where we build around the world. This discipline will keep our growth focused, compelling, and profitable. Two wars have changed what governments expect from their infrastructure. In Ukraine, cheap drones now reach hundreds of kilometers behind the front. Some have even crossed into Poland and the Baltic states. They have destroyed aircraft inside hardened shelters. Every winter, Russian missiles and drones attack the Ukrainian power grid. Since February, Iran has fired ballistic missiles and launched waves of attacks of drones against bases and infrastructure across the entirety of the Middle East.
Resilience has become a part of deterrence. Governments are taking action. Germany has made defense construction its highest priority. NATO committed EUR 27 billion to fuel infrastructure across Europe. The United States has ordered its first new navy shipyard in 80 years. In Canada, Prime Minister Carney put it in very plain terms. The days of sending 70 cents of every defense dollar to the United States are over. Spending on infrastructure in defense in our core markets grows from EUR 68 billion this year to as much as EUR 120 billion by 2030. And I want to be clear about this. Our strategy does not depend on NATO nations achieving 5% of its GDP defense spend. It rests on funding that has already been committed. If allies reach that 5% ambition, that is nothing but upside.
Every base we build carries an average sustainment tail of 40 years, and that is what we are positioning for, the long term. As I mentioned, we have completed or contracted more than 600 security and defense projects. In defense, trust is the hardest thing to earn. You cannot bid your way to it. Turner built the army hospital at Fort Belvoir, Virginia, where American soldiers are still being treated today. HOCHTIEF built the Munich barracks that now house German soldiers. CIMIC built the C-17 maintenance site in Australia that is the primary global repair hub for this strategic aircraft. We have that trust. We are shifting from single company wins to joint pursuits. Bremerton in the Pacific Northwest of the United States is a massive $13.4 billion dry dock program for nuclear submarines. It is our top American target, and it is going to be pursued jointly by FlatironDragados and Turner.
HOCHTIEF and DRAGADOS are bidding together on defense projects in the U.K. In Australia, CIMIC is pursuing the Osborne and Henderson shipyards with the help of our ACS Nuclear team. Pearl Harbor, Osborne, Henderson, and Bremerton serve nuclear submarines. All of them draw upon the ACS Nuclear team. Here, I will just say that there are few things that strengthen deterrence more than a nuclear submarine at sea. We are building momentum right now. Turner recently won two programs worth $2.9 billion at Arnold Air Force Base in Tennessee. We are also shortlisted for the $1.6 billion Survivable Airborne Operations Center Offutt Air Force Base in Omaha, Nebraska. This project includes three incredibly advanced tactical hangars. I happen to be on the capture team for this large defense project, and what I can report is that we are in a very good position.
Across the top of this slide is the full lifecycle of a defense asset. Most firms work in one of these boxes. Our company already works in four of them. The fifth box is protect, and it is in the early stages of product development. After Ukraine and the Middle East, protection cannot be an afterthought. We will integrate proven counter-drone, cyber, and resilience technology, and we will do that with well-established partners.
Looking at the lower half of the slide, the best example of coordination and collaboration in defense that I can offer you is at Pearl Harbor. Let me tell you about this dry dock because it is an impressive story. The dock that serves submarines at Pearl Harbor was built in 1942 originally. It could not hold, and it cannot hold, a Virginia-class nuclear submarine now, so the Navy ordered a new one, the first new dry dock in 80 years.
It is only part of a plan to rebuild the Navy's four public shipyards, and those projects will be up to $200 billion total. Bremerton is one of the other four, as I discussed a little bit earlier. Our dry dock at Pearl Harbor is a $4 billion project. FlatironDragados leads the work with Turner assistance. At any given time, we may have, and this is incredible, 160 divers working underwater, welding and pouring concrete. Just think about that for a minute. If you are there on the site, you are looking out over the water at the project site, and all the work is going on below the surface. This is the kind of engineering complexity and precision that ACS is delivering in defense. There is an old rule in real estate, neighborhood matters more than the house. In defense, the neighborhood is where governments are spending.
Turner and FlatironDragados in North America, CIMIC in Australia, HOCHTIEF and DRAGADOS in Europe. We are in the right neighborhood. Market growth is not going to double our backlog on its own. We are targeting EUR 10 billion-EUR 11 billion of backlog by 2030 from EUR 5 billion today. Two pillars get us there. The first pillar is to win the largest programs in those markets. The second is to move into adjacent services with recurring revenue and higher margins. Collaboration unlocks both of these pillars. Pearl Harbor was not luck. It is our model. We are bringing the whole group to large. We are going to be focusing on bringing the entire group to large projects. None of this asks us to become something that we are not. It asks us to do more of what we already do extremely well. Backlog leads revenue into this business, as you well know.
Defense programs run for years. Sustainment runs for decades. The backlog we win today will underwrite revenue and earnings well beyond 2030. There in the right column is one of the things I most want you to understand today. We call it adjacent services. It's an area of tremendous growth opportunity. A facility only becomes a defense capability once it's been integrated, secured, supported, and maintained. Construction gets us to the first of those, and adjacent service gets us through the rest. The need looks different in every one of our markets. In Australia, it's fuel and transport. CIMIC's UGL already keeps fuel flowing at 115 different defense sites across the country. Today, the customer buys these services through four separate budget holders. We intend to become one partner across all four. In Germany, it's vehicle maintenance and munition storage.
The threat from Russia is real, and Germany is moving very quickly to address the threat. The German vehicle fleet is growing from 40,000 to 110,000. These vehicles need repair depots and a company to run them. We're already exploring the partnerships to build these sites and then operate them as well. These services earn more than construction. A secure site demands credentials that not many firms have, so there are fewer bidders. I'll just add that long-term sustainment contracts are paid every year, and not just once at signing. The three tiers you see here are how we become a strategic partner to defense customers by 2030. Each step earns the next. A customer who trusts us with their runway will trust us with their fuel. A customer who trusts us with their fuel will trust us with their security.
We'll grow through partnerships first, then we'll make smart acquisitions when the conditions are right. The High North in Canada is another clear opportunity. In March, Prime Minister Carney announced CAD 35 billion for defense infrastructure in the Canadian Arctic. He named Yellowknife as one of those four sites. Yellowknife is where Clark Builders of Turner was founded. We're going to start with our roots and the trust we've already built in the regions where we're going to be pursuing defense work. Finance is another real advantage for us. Our companies already fund long-term effort, thorough public-private partnerships. The U.S. Department of Defense has just announced that they're seeking $150 billion in assistance from private investors to fill an infrastructure gap that they've identified.
We can bring finance with work, in much the same way that occurs with Pacific Partnerships of CIMIC Group, and as they're doing in Australia to the tune of EUR 37 billion to date. ACS Group also has IRIDIUM, one of the most experienced public-private partnership developers in the world. They financed major highways and public infrastructure for decades. That gives us considerable scale to draw upon, and that's one group, one team. The ultimate measure of defense strategy is the contribution to sustainable earnings and cash generation, alongside backlog growth, of course. Backlog shows that customers are choosing us. Earnings and cash show the choice is creating value. Defense runs on one group, one team. Our companies bring the engineering, the construction, and the reach. ACS Nuclear brings deep expertise. The result is a growth vertical in security defense that's being built on the strengths that we already have.
So, I began by telling you a story about a single drone hitting an obscure British airfield in Cyprus. My point is that governments have learned that being unprepared is no longer an option, regardless of where it is in the world. Our customers have learned the extraordinary importance of infrastructure resilience. They need partners who can protect their people, preserve the peace, and strengthen deterrence for decades, and ACS is that partner. Thank you very much.
Good afternoon, everyone. Very aware that we're the only things between you and lunch, so we'll try and make sure this presentation is compelling. As highlighted by Juan earlier, the section now covers one of ACS's significant growth opportunities, the critical minerals and natural resources sector, where ACS already has a proven growth platform, an extensive global presence and capability, strong EBITDAs and cash flows that underpin the growth opportunities we'll now expand on. Before we start, we'll introduce ourselves. I'm Michael Wright, CEO of Thiess. I've been with the Group for some 28 years in a range of leadership positions across Australia and overseas.
Yeah. Good afternoon, everybody. My name's Grant Fraser. I'm the Managing Director of Sedgman. Like Michael, I've been in the Group for some time now, just over 29 years, and spent a fair bit of that time working with Michael, so we know each other pretty well, and now both our companies know each other pretty well, as you'll see a bit later in the presentation today.
Okay. Over the next 20 minutes or so, we want to leave you with three key points. Globally, there's a structural demand shift happening for critical minerals, backed by government investment and private capital, leading to unprecedented growth and opportunities for the ACS Group. Critical minerals fuel the expanding and evolving energy sector, the EV demands, the data centers, the new wave of industrialization, as well as the defense sector growth being stimulated by the world we currently live in. ACS has a rare end-to-end offering to capture significant market share, from feasibility stage through engineering and processing, to operations, and ultimately to mine closure and rehabilitation. The ACS Group has a unique and relevant one-team approach to a technology-enabled engineering and operational delivery in the sector for our clients and for government alike.
With an established global presence in minerals, metals, and resources, the ACS Group has a strong platform for growth, backed by a resilient cash-generating core business and a strong and growing backlog of new projects across commodities, services, and jurisdictions. I will hand to Grant now to take us through the significant growth opportunities.
Yeah, thanks, Michael. As Michael said, we'll start with the market. The current resources cycle, it's not just another commodity boom. It's a global reindustrialization and a strategic resources supercycle, and that's been created by the convergence of electrification, artificial intelligence, defense expenditure, and national supply chain security. The next decade will be characterized by unusually strong and very broad demand for natural resources, in particular, critical and strategic minerals. Normal economic growth, urbanization, raising of living standards, they will remain the baseload. However, the demand is being amplified by four structural forces: the clean energy transition, the build-out of AI and digital infrastructure, defense rearmament, and government efforts to secure sovereign or allied supply chains from mine through processing and refining to advanced manufacturing. You can see some examples of the minerals that form part of those structural forces behind me.
The ACS Group has a strong track record and backlog in these minerals, including projects like Vulcan's Lionheart Lithium Project in Germany and Viridis' Colossus Rare Earth Project in Brazil. We're seeing unprecedented growth in mining and mineral processing. The group is well-positioned to capitalize on this growth. Minerals are now a matter of national security and sovereignty, so demand is underpinned by government policy and investment. Money is flowing into the geographies that we operate in, and the forecast is this will continue to gain momentum. About EUR 300 billion-EUR 340 billion of total investment is required in copper and lithium. In copper alone, that's EUR 240 billion-EUR 270 billion. Governments are actively de-risking projects like never before, and it's not just through policy. It's actually through offtake agreements, it's through mineral stockpiling, tax credits, and cheaper finance to unlock private capital.
Government support in new mining and mineral processing projects is unprecedented. This is enabling critical minerals projects to move into construction and long-term operation. Again, Vulcan's Lionheart Project is a good example of this. KfW is an equity investor alongside both HOCHTIEF and Siemens. The investment has been made through Germany's Raw Materials Fund, which is managed by KfW on behalf of the German federal government. You can see some examples behind me of where government funding programs are active in the regions that the Group has a strong presence in. We're well-positioned geographically to take advantage of this growth in natural resources and critical minerals investment.
You've seen this slide before. Juan took us through the immense growth opportunities and scale that we already have. I mean, across the ACS Group, we have that global scale, that capability, and credibility, importantly. As you've already heard, since 2024, we've secured more than 500 projects in studies, feasibilities, engineering, and processing in critical minerals. When you look at operations and other services, the Group has achieved more than 600 projects in that same timeframe. As you can see, a substantial number of these across Asia-Pacific, North and South America, and importantly, more recently, in Europe. Across all these jurisdictions, there's significant growth in copper, lithium, and critical minerals more broadly. In fact, of the projects secured since 2024, these are across more than 15 critical minerals, with more than 100 projects in copper and lithium alone.
These projects will continue to lead to further growth in the sectors, from studies and feasibilities, through to detailed engineering, EPCM contracts, long-term operations, and ultimately into rehabilitation. A recent example of this is the greenfield copper project called Eva Copper in Northern Australia, being delivered by Thiess and supported by Sedgman through an alliance with our client. The work on Australia's newest copper project started during feasibility stage, with Thiess commencing work with the client on concepts for the mine and the infrastructure, the workforce engagement strategies in this remote part of Australia, environmental considerations and approvals, First Nations engagements and strategies, and mine operational concepts. If you walk forward three years to today, Thiess are now delivering the mine infrastructure works, training local and indigenous workforces through the construction phases, and into mining, where we commence that next year.
All of these delivered under a collaborative alliance contract with our client. With an established and expanding global presence in critical minerals and natural resources, which started for Thiess some 80 years ago, and for Sedgman some 45 years ago, the ACS Group has a substantial competitive advantage in growing in the critical minerals sector. With more than 40 years internationally and 25 years in South America, we now operate in 13 countries around the world, a substantial global platform with a resilient cash-generating core backed by a really strong and growing backlog. We have a clear pathway to grow our backlog to between EUR 12 billion and EUR 13 billion by 2030, shifting towards higher value engineering and operations, and high-growth minerals across our global jurisdictions.
In this timeframe, our backlog will grow at a CAGR of 10% in line with our revenue growth, with Sedgman's backlog forecast to increase by some 300% over the same timeframe. This makes engineering-led EPCM and engineering the fastest-growing and highest-value part of the business. Thiess has strong profits and a recurring cash-generating core business, with substantial growth and diversification already achieved across commodities, services, and jurisdictions. We have a clear focus on growth in critical minerals through our four pillars, capturing the investment supercycle and expanding our competitive advantage. We are targeting the minerals with the strongest structural demand. We're expanding into new geographies. We're capturing the full lifecycle of the mining supply chain, and we're growing our operations using our scale, our technology, and automation, with a commitment to sustainable operations and decarbonization.
As one team, the ACS Group is using its global presence and capability to expand its current footprint with substantial growth opportunities coming from South America, U.S., Canada, Europe, and India.
The Group has a track record and a backlog across a balanced and very diversified commodity portfolio. This means we are able to leverage our specialist expertise and ACS' footprint across a broad range of critical and strategic minerals globally. We do this through engaging very early in the project lifecycle. We use this early engagement and our expertise and experience to convert our professional services engagements into integrated project delivery contracts and long-term operations. For copper, we are focusing on Chile, Peru, the U.S., and Australia. In lithium, we are active already in Europe, Canada, the U.S., and Australia, with a focus on moving into South America pretty soon. In rare earths, in Australia and the U.S., and as well as Brazil more recently. Precious and base metals, as well as bulk minerals, provide a strong and mature base for us.
This enables us to underpins our growth into the future. Feasibility study work and our process engineering expertise are the enablers to convert early engagements into integrated delivery or EPCM contracts. A good example of this is the Jervois Copper Project in Australia, where we have worked alongside our client through the development phases of that project for almost 10 years, becoming a trusted services provider to them before securing the full delivery contract for their copper concentrator. The wider group gives us a local presence from day one in many of those markets, in those regional markets, which is critical to our success as we move into new regions. Importantly, we are unique as a group in being able to provide end-to-end services for mining clients.
Thiess and Sedgman have been working together for over 30 years in Australia, and this full end-to-end service solution is now available to our clients globally and at scale. Sedgman brings early engagement in the project lifecycle, high-value add engineering and processing expertise delivered through an asset-light, low-risk EPCM model. We have built more than 250 plants globally. Thiess also brings early involvement through mine operations planning and strategy, as well as long-duration contracts, recurring revenue, strong EBITDA, and 100% cash conversion across more than 60 current operations worldwide. We can partner with mining clients from early studies right through the full lifecycle of a mine and into final rehabilitation. We design, we build, we operate, and we close mines and processing facilities, which is a truly unique and distinctive capability in the market.
Our service offering is strengthened by the ACS Group infrastructure capabilities, which are often adjunct requirements for mining clients. Access roads, power, and water infrastructure are often required by mining clients. This further enhances our unique capabilities in this sector. At Sedgman, we broadened our capabilities. Juan spoke a bit about that earlier. We acquired some companies over the last few years to actually give us a broader mineral processing capability, and we are now scaling these across our service offering. Our business model is turning early engagement in studies into FEED contracts and then into EPCM contracts, creating higher value with a lower risk profile. We provide project management services, including the delivery of Engineering, Procurement, Construction, and Commissioning, and also provide operation services for mineral processing plants.
Our engineering capabilities and experience is what we use to demonstrate value to our clients in the study phases of projects, de-risking those projects for them, while at the same time building trust and deepening our relationships. Our other differentiators are being a technology integrator, our mineral diversity, which covers a broad range of commodities, our structural cost advantage through our high-value engineering center, and importantly, working as one group. In addition to the unique offering that we have in combination with Thiess, ACS companies provide local execution and construction knowledge, turning Sedgman's early engineering position into a full lifecycle proposition.
Now to Thiess. Thiess is our resilient core that funds the growth in the sector, providing those recurring, inflation-protected, and highly cash-generative revenues. With strong EBITDA in excess of EUR 800 million and 100% cash conversion over the last five years, Thiess' market-leading global mining services business provides a scale and financial certainty to underpin the ACS Group's aspirations in the critical minerals sector. Within Thiess, we have a backlog of EUR 8 billion, more than 2.5x our annual revenues, and 95% of our revenues are under multi-year contracts, with about 88% coming from renewals and extensions with our existing clients, which generates and demonstrates trust. Importantly, 90% of our revenue is indexed or passed through, so the business is largely protected from inflation. We keep investing in growth and technology to differentiate in this expanding global market.
Thiess is a market leader in implementation of technology into mining operations, running both OEM and OEM-agnostic autonomy systems across haul trucks, drills, and dozers. Thiess is also leading decarbonization trials in its operations, with the potential to expand this globally. Thiess also uses AI technology in mine planning, in operations, and in maintenance to improve our safety, our production, our environmental performance for our clients. Thiess has evolved over the years to become a full lifecycle operational partner. As demonstrated before by the Eva Copper project, we get in early, and we help shape how the mine will be developed and operated to optimize our client and stakeholder outcomes. We deliver site establishment, infrastructure, and operational readiness, with core field services, maintenance, and asset management being the base of the business. Autonomy and operational technology are a differentiator that we offer to our clients.
Asset services and decarbonization supports the energy transition, and we've completed the design and execution of rehabilitation and post-operations transformation as a key pillar in our business. Every additional service we provide deepens the client relationships, provides enduring value, extends the contracts, and lifts the returns for the business. To summarize this exciting and growing sector, firstly, the demand for critical minerals is unprecedented and is backed by both government funding and private capital, with EUR 300 billion-EUR 340 billion of investment needed in copper and lithium alone to 2040. Secondly, the ACS Group has a unique and proven end-to-end critical minerals platform that spans studies, engineering, infrastructure delivery, field operations, with the resilience of more than 80 years of mining and minerals expertise now operating across 13 countries. The current cash flows and backlog are backing this growth.
Lastly, we have the global capability to scale and capture the opportunities that sit in front of us, with more than 600 projects won since 2024 and a pathway to more than EUR 12 billion of backlog by 2030. I hope you enjoyed this session as much as we're excited about the opportunity that sits in front of us. Enjoy your lunch. Thanks from Grant and myself.
Thank you. Thank you very much.
[Break]
Good afternoon. Before I start, I just wanted to thank Juan Santamaría for kicking us off this morning. A very exciting presentation about where we're going in life. I want to thank our colleagues showing all the verticals and the strategy for all the verticals. This afternoon, all the companies have to do all the work to make sure that the verticals work. So, we're going to be presenting to you today how we're going to operatively make sure that this works. Christa Andresky, Turner's Chief Financial Officer, is here with me, and I'm Peter Davoren, Chief Executive Officer of Turner. Thank you very much, and I appreciate you listening for a couple of minutes. So, let me bring you back to two years ago. We presented a strategic growth plan for Turner.
Today, we will report on our progress, share the opportunities ahead, and explain how we will continue creating value for the ACS shareholders. Over the past two years, we have grown our business, expanded our capabilities, strengthened our market position, and improved profitability. We have exceeded the expectations we set for ourselves.
That is right, Peter. We are now focusing on sustaining that momentum across sectors, geographies, expanding margin through specialized services and modular delivery, by doing our favorite, generating strong cash flow.
We are building on a position of leadership. Turner is the number one contractor in the United States, and we are proud of that. We are number one in healthcare, sports, and education. Collectively, we are ranked among the top five contractors in 18 of the 21 market sectors, as ranked by Engineering News-Record. We take tremendous pride in what we build. The projects we deliver make a long-lasting difference in our communities, and we want our people to feel like they are part of something extraordinary, the way we feel part of something extraordinary being with ACS. We take even greater pride in the people who do the work. The worker is more important than the work, and we are committed to creating an environment where every person can be at their best, be authentic, and be treated with respect and dignity.
That dedication is reflected in our recognition as one of America's best large employers and the number one employer for engineers in construction. Our ability to attract, develop, and retain talented people is fundamental to our success.
I'll repeat what Peter just said. People are our greatest asset. People deliver large, complex projects, and you see the results. Let me begin with the commitments we did two years ago. We talked 2025, a lot of talk, but did we walk the walk? Our revenue grew significantly. In 2023, we generated $18 billion. This year, we will exceed $35 billion in revenue. We have more than doubled our business in three years. Our backlog doubled as well. We were $27 billion in 2023, and today to a forecast of more than $55 billion at the end of this year. In 2024, we said our pre-tax profit margin would reach 3.5% in 2026. We even exceeded that expectation, Peter. We reached 3.6% in 2025, one year earlier, and through the third quarter of this year, our pre-tax profit margin stands at 4.1%.
Since the end of 2023, in net operating cash flow, including $ 1 billion in the first nine months of this year. Our ambition is to sustain strong growth, expand profitability, and generate cash flow through 2030. We have a clear strategy to achieve those objectives.
Our strategy focuses on growing our portfolio of work in diverse markets, expanding specialized services, and leveraging the global capabilities of ACS, as you heard very much this morning.
We are also expanding our portfolio of large, complex projects. As we enter 2027, we expect to be working on 42 projects valued at more than $ 1 billion, up from 13 in 2024. We expect the share of our revenue generated by these projects to double from 17% to 34%. In healthcare, aviation, sports, commercial, advanced manufacturing, we expect the number of billion-dollar projects to more than double from eight in 2024 to 17 as we enter 2027.
A recent example is our selection to head the construction of Oracle's new $4.5 billion global headquarters development in Nashville, Tennessee. Our capabilities make Turner a company clients must consider. That's what Mike said before, become the must-considered option when planning their largest and most complex projects.
Over decades, we have developed the systems, the relationships, and expertise required to deliver projects at that scale. Relatively few construction companies can bring all those capabilities together. Turner can. We can. We expect our backlog to grow to approximately $90 billion in the year 2030. We see continued investment in stadiums, arenas, convention centers, and entertainment districts, like this supercycle that Juan talked about before. Airports across North America are undertaking major programs to modernize aging infrastructure, expand capacity, and improve the passenger experience. In AI, as you heard this morning, AI, digital and tech, we expect continued strong demand for data centers and advanced technology facilities. We also expect significant growth across biopharma, healthcare, education, and high-tech laboratories. We also see opportunities in security and defense, commercial, energy, and sustainable mobility. All of these will contribute to our growing backlog.
Our objective is to exceed a pre-tax profit margin of 5% by 2030. I want you to just take a quick look again, 2023, 2.6%, 2030, 5% and beyond. That's what I call a margin expansion. We have four primary drivers of margin improvement: specialized services, operating efficiency, a favorable mix of projects, and the modular solution that improve productivity. Of these, our greatest opportunity is the expansion of specialized services. We are building a broader business, one that provides clients with engineering, procurement, self-perform, technical services, equipment, and offsite manufacturing. These capabilities enable us to take greater responsibility for critical aspects of project delivery and capture a larger share of the value on our project. We expect earnings from our end-to-end services businesses to grow approximately 29% annually through 2030.
By then, these businesses are expected to account for more than half of Turner's pre-tax profit. This presents a fundamental change in Turner's earnings model.
Let me give you a sense of the scale of these businesses and how we plan to grow them. Today, SourceBlue manages over $2.5 billion in annual equipment and material procurement, supported by over 1,300 supply partners globally. Our self-performed skilled workforce provides greater control over productivity, quality, schedule, and earnings. Today, we are among the largest concrete and drywall contractors in the United States. We are also growing First Equipment Company, Turner Technical Services, and the Turner Engineering Group. And through our xPL Offsite, we are investing in manufacturing capabilities that enable us to move substantial amounts of work from construction sites into controlled production environments.
Operating efficiency is another important contributor to margin improvement. As Turner grows, we are investing in technology, shared capabilities, efficient processes. Our objective is to support a much larger business without increasing overhead at the same pace as revenue. Another contributor to margin improvement is growing in markets where our expertise supports stronger returns.
As you heard earlier today, modularization is changing how we build, and it represents one of the most significant opportunities in our future. We are already seeing the benefits. At Dallas Fort Worth International Airport, six enormous sections of a new terminal were assembled remotely and moved into place, accelerating the construction while limiting disruption. They were built on the land side, brought to the air side. We are moving substantial amounts of work from construction sites into those controlled manufacturing environments. One example also is an industrial project for Panasonic. xPL Offsite shifted approximately 90,000 labor hours offsite in one trade.
In the past, much of our prefabrication work was designed for one individual project. As shown this morning, Ben, Mike, has shown that developing repeatable processes, standardized products can be adapted for different clients and manufacturing at scale. To support this strategy, xPL Offsite is tripling our production capacity for modular assemblies. As we standardize products and increase production, we expect to improve manufacturing efficiency, expand margin, and generate additional earnings.
The global reach of ACS gives us another important advantage. Here in Madrid, our teams have launched an effort to develop standardized data center building blocks. Our ambition is to manufacture these solutions in multiple locations and deliver them wherever our clients need them. By combining engineering, procurement, manufacturing, and construction capabilities from across ACS, we have the potential to develop a global platform for modular delivery.
As we look at our slide right now, our investments in specialized services, operating efficiency, and modular manufacturing supports our financial objectives for 2030. In dollars, we expect revenue to grow from over $35 billion this year to between $55 billion and $58 billion in 2030, representing an annual growth of 12%. We expect earnings to grow even faster. Expected is the EBITDA to increase between [$ 2.8 billion] and [$ 2.9 billion], while profit before tax is expected to reach $ 2.7 billion-$ 2.9 billion. Critically, we expect cash conversion to remain above 100% over the period, translating in profitable growth into strong cash generation. We like to get paid. We have a clear strategy to deliver these objectives, and we are confident in our ability to execute.
Let us look more closely at the market supporting that growth. The advanced technology market is a central part of that opportunity. Data centers have driven more of Turner's growth than any other market. In 2024, our data center revenue was approximately $4 billion. This year, we expect approximately $18 billion.
Now, one of the questions that I am asked most often is, how long can the demand for data centers continue? We see strong underlying demand continuing for years to come, as you heard from Juan and our folks from AI, digital. Data center occupancy has remained at approximately 99% for three consecutive years, and 95% of the capacity under construction is already committed to customers. We are seeing that demand reflected in our own business.
Total backlog in data centers stands at $26 billion. We have a strong pipeline of opportunities. We also recognize, as we heard before, and the questions we heard, that the environment for developing data center is changing. Power availability, water use, permitting requirements, community concerns are receiving greater attention, and we all heard about them. This is a trend we and our clients have been planning for weeks. Recent election may reinforce that trend, bringing greater scrutiny to future projects. That could influence where new data centers are built and when construction begins. But we also mean that developers will need to change and engage communities earlier, be transparent about local infrastructure needs, and demonstrate the benefit of these projects. Importantly, our active projects are progressing, and we remain confident in the quality of our backlog today.
I want to point out and reiterate that the conservative view of 180 GW is where our ambitions are going. So it's the more conservative of all of the areas. We are already planning procurement for projects that won't begin construction until 2028. As the development environment becomes more complex, our experience, geographic reach, and capabilities become increasingly valuable to clients. We have extensive experience engaging communities, developing local workforces, and creating opportunities for local businesses. These capabilities help clients build support for their projects, like the 10,000 people that we brought on recently. Our engineering, procurement, and supply chain capabilities also help clients manage complexity and improve delivery certainty. On a hyperscaler campus, SourceBlue helps secure critical electrical equipment for up to 20 weeks earlier than otherwise expected.
Today, together, these capabilities position us to help clients navigate a changing development environment and continue delivering the digital infrastructure that they need.
Semiconductor facilities, pharmaceutical plants, and other advanced industrial projects are an important component of our portfolio. In India, we're providing project management services for Micron's approximately $2.7 billion advanced packaging development. In New Jersey, we are building a specialized quantum research facility.
In pharmaceuticals and life sciences, companies are investing heavily in domestic manufacturing. Our pipeline includes new manufacturing facilities, expansions for leading pharmaceutical companies. Among the projects we are working on is a major expansion for Amgen and Agilent. At the University of California, Berkeley, we recently began work on a laboratory supporting genomics research.
In healthcare, Turner has been the number one builder in the U.S. for 16 consecutive years. Today, we have more than $7 billion in healthcare backlog, including nine projects valued at more than $1 billion each. Among them is approximately $2.2 billion Henry Ford hospital project in Michigan. At the Memorial Sloan Kettering in Manhattan, we are delivering cancer care centers while minimizing disruption to patients and hospital operations. Our aviation backlog has increased 71% in the past year from approximately $3.1 billion to $5.3 billion. We currently have major airport modernization projects underway, representing more than $15 billion in total project revenue. In San Diego Airport, California, Dulles Airport in Virginia, Turner and FlatironDragados are working together on major expansions, and we see opportunities to expand that collaboration in other areas of transportation infrastructure, including rail and transit systems.
Together, we can pursue broader range of opportunities and offer clients more comprehensive solutions.
In sports, Turner is ranked number one in the United States. Our experience was on display during this year's FIFA World Cup, with five stadiums built or modernized by Turner hosting 30 matches. This year, we completed the $2.1 billion Buffalo Bills stadium. We began work on the Cleveland Browns new stadium, valued at about $2.4 billion. For anyone that likes baseball, we secured a $1.7 billion Tampa Bay Rays stadium. We see a new way of investment in professional stadiums, arenas, and university athletics facilities. Increasingly, stadiums and arenas are becoming the center point and centerpieces of larger developments that create opportunity for Turner as well to participate in delivering the surrounding entertainment district.
Our position within ACS is an important part of how we will deliver our strategy. Turner brings strong clients, relationships, a leading position in the United States that specialized services in building construction. Other ACS companies bring equally important strengths. Together, we can pursue projects that would be difficult for any one company to address independently.
Another example is the Corredor del Henares data center development here in Spain, where Turner, DRAGADOS, Dornan, and SourceBlue are bringing together investment and development capabilities with expertise in construction, procurement, engineering, and manufacturing. In North America, FlatironDragados is delivering more than $6 billion of civil and site infrastructure work associated with Turner projects. Our work together includes projects in aviation, data centers, critical infrastructure in the U.S. and in Canada.
Our subsidiary, Dornan, is another example. Its mechanical and electrical expertise is especially valuable in data centers and advanced technology. Dornan's revenue and pre-tax profit are expected to double by 2030. In Germany, Dornan and HOCHTIEF are delivering a data center for NTT. This is what one group, one team with one future means in practice.
Let me close with this. We are building on our leadership in diverse markets. We are using the financial strength of our business to invest in specialized services and modular manufacturing. These capabilities will support higher margins, expand the markets we serve, and create new sources of sustainable earnings. We are bringing together the strengths of ACS, the breadth of ACS companies, to pursue work that none of us could address as effectively on our own. As our business evolves, our fundamentals remain. Our active caring culture and values of our people continue to define who we are. That culture is a powerful advantage. Turner is a special place, and what makes it is our people. They are the foundation of everything that we do, all of our successes, and they give us the confidence in our 2030 plan and the opportunities ahead for Turner and for ACS.
Thank you very much.
Thank you.
Good afternoon. My name is Roberto Gallardo. I am the President of CIMIC, and I am joined today here by my colleague, Jason Spears, Chief Executive Officer. What an exciting morning and what a positive message, Juan, you are delivering. Peter, congratulations, you are running an excellent company. It is an example to all of us. At CIMIC, we are going to present today, sorry, we are going to present today our plan, how CIMIC can support ACS in its ambitions. We think that we are in a great position to support those ambitions. Why? CIMIC is incredibly well-positioned to capture Asia-Pacific growth in all four key verticals. Why? We are already present in data centers, we are present in defense, we are present in critical minerals and natural resources, and we are a key player in the energy transition.
We happen to be in the region that is the fastest-growing economic region in the world. Asia-Pacific has been growing at 25% in the last combined GDP in the last five years, versus 15% in North America, 12% in the European Union. Our market is growing fast, and we are already established. We are also expanding our engineering capabilities across all verticals. We consider ourselves to be a diversified and solid group. We have 2,500 engineers, design engineers in Sedgman and UGL. We can deliver electromechanical, civil, natural resources projects, but we are also targeting what we are missing. If there is direct lithium extraction technology that is necessary for us to position Sedgman in the lithium space, we will go to Canada and get it, or we will develop it organically in India through our back office engineering services.
And we have improved profitability throughout the last four years. Since the last Capital Markets Day till today, we have been disciplined, we have been focused on governance and in delivering profit. What is CIMIC today? I am going to explain here in this presentation, Jason and myself, we will explain what CIMIC is today, what the market looks like, our strategy, and Jason will cover how to deliver on those market segments and what are the targets that we are going to show to you in 2030.
What is CIMIC today? CIMIC is a leader in the construction, engineering, design, funding, and mineral resources space. We are the leaders in the region. And we have got a very base and sound backlog. 78% of our backlog resides in Australia and New Zealand, and 21% is in Asia-Pacific, which is growing faster than Australia as we speak. But we have got something that is special. We have got our end-to-end capabilities to deliver major projects, mega projects. And I am going to give three examples.
In all of the verticals that we have mentioned before, I think data centers is being well covered, critical minerals and resources is also being well covered. But I will give you an example of a project that is in delivery as we speak, another one that we tendered two weeks ago, and another one that we are preparing ourselves to tender. And they are all of them over $10 billion. And I am mentioning this because we think that those capabilities of delivering major projects sets us apart in the ambition of ACS to be successful in the nuclear energy space. So, in the transport and infrastructure sector, we are delivering North East Link.
It is a AUD 12 billion project with tunneling, complex design, multi-year program with the right contract model, because it is an incentivized target cost model. In the energy space, we just tendered a couple of weeks ago, more than AUD 10 billion project, 350 km of a 500 kV transmission line with three substations in regional Australia. A very complex project. And as we speak, we are also, I must remind you that it is also with the right risk profile and incentivized target cost. And we are now getting ready with Michael Fenzel , our brothers of FlatironDragados, to prepare a competitive tender for the AUKUS program, which will be a nuclear submarine base, two nuclear submarine bases in Australia to host the Virginia-class submarines. Our results are proving that we are a company that is countercyclical.
We have gone through a period of volatility in the fuel space, and we are an energy-hungry company. We have gone through a period where iron ore has been under pressure or it has been doing well, but we have sustained growth, and we have increased our profitability. And that proves that we can be countercyclical and that we are very well-balanced as a company. Our profit has improved from AUD 494 million in 2023 to AUD 780 million in 2026, a CAGR of 16%. And that has only happened because we have been disciplined, we have been focused in simplifying our models, our structure, and in providing services to CIMIC in a consolidated way. What is our strategy? Our strategy is based on the same priorities that ACS strategy has been explaining throughout the session today.
We want to capture the next infra investment supercycle, and this is very, very patent and evident in the Australian market. We are expanding our critical minerals in Europe and America, so we are already an established player in the field, and we are being called by our clients to work for them and with them in their projects, South America, North America, Canada, and Europe. We are also capturing the big transformation in the electricity grid in Australia. Australia has moved from an energy matrix based on coal and gas to an energy matrix based on renewables and gas. It has also suffered a big change in the demand. Data centers scattered across the geography are changing from a heavily concentrated demand, and that is creating a big need for transformation in the grid, and we are capitalizing on that need to our companies.
We are also already a leading player in Southeast Asia in the data center space, and that has been covered very well by Turner and Jan Torka, the Managing Director for Leighton Asia. Similar to that capability was transferred from Turner into Europe, from Europe into Southeast Asia, we are now migrating to Australia, where the same clients that we are providing services for in North America and in Europe are really happy and pleased that they can engage with us knowing that we are going to provide certainty of delivery and safe outcomes.
We are also number one contractor in the defense space, and we want to continue being that. The amount of investment that is coming to the sector, mostly due to the relevant geopolitical position that Australia has got in the Pacific region, it is going to be critical for them to continue investing, supporting Western nations and the position of NATO in the region. We will be there supporting our governments. We are going to expand our competitive advantage, extending our end-to-end project scope. We are already very diversified, I just explained. We invest, we design, we deliver, we operate, and we maintain. If there is a technology or there is a new development or there is extension of the skills that we have got within the Group, we are not shy, and we either develop them organically or we acquire them.
We have been aggressive in deploying our prefabrication capabilities in India or setting up our workshop for off-site fabrication in Malaysia or acquiring copper technology in Arizona. We are going to scale our modularization construction. I just gave a couple of examples. We will drive operational efficiency. This is really, really important. We are a company of people and projects, and we only can be successful if we run our projects with discipline. Jason will cover, extend that a little bit further because it is relevant, it is very, very relevant, it is one of our core values as a company. We have got the advantage that from time to time, we call our parent company, and they allow us to deploy our capital when it is critical. We can unlock possibilities and opportunities to develop projects that require funding to be able to design, construct, operate, and deliver.
How is the market looking like? The market is looking very promising. We are very excited. We are already thinking where are we going to get those resources to deliver on those projects, because our baseline, which is transport, social infrastructure, and some of the mining projects that we have been delivering for a long time, remains stable, is growing as the economy 5%. It is a AUD 60 billion base with 5% expected growth year-on-year. It is sound. We know we are going to capture our markets there. We have got a footprint and we got a presence in the four sectors that are accelerating, that are growing incredibly fast, particularly in our sectors, in our markets. One is, as mentioned before, power generation and energy grids, AUD 100 billion of new projects to be built.
AI, doubling capacity in Australia because of its nature, it is a safe place to develop data centers with rule of law and an ally to the Western nations. Security and defense, again, for geopolitical reasons, our position in the Pacific region, we remain a critical spot to invest in defense, and we are going to capitalize on that. Critical minerals that are of the essence for all of the previous verticals. Copper will be needed for the power generation and grids. Lithium will be needed for those batteries that will stabilize the grid. Chrome, rare earths, magnets will be used in the defense space. Nothing can happen with all those critical minerals when we think we have got an excellent position. Now, Jason, if you are so kind to continue explaining how we do it.
Thanks, Roberto. As Roberto has touched on, there are a lot of key verticals where we already operate, and we expect a lot of growth in those key vertical areas. We have still got our core infrastructure, and that underpins our business and has for a long time. As you can see there, the market is still very, very strong in our core infrastructure in the region, and continues to grow. That is a key thing for us. We deliver a lot of mega projects, whether it is in rail, roads, airports, hospitals, social infrastructure, schools, et cetera. That will continue to grow. In those mega projects, it is where we develop our capability and our credentials. Delivering large-scale, multi-discipline projects is the proving ground for our people to be able to deliver, not just in our traditional markets, but also in our growing markets.
That is a key skill that we have in the region, having delivered such large projects and complex projects over the years. This core really will drive us going forward, not just in underpinning our existing businesses, but also growing in those new key verticals. Of course, making sure that we continue to remain disciplined in our project selection and our project execution is absolutely critical for us. Pleased to report that we have already won AUD 10 billion worth of work in recent times, which will underpin those core markets for the next four years during the period that we are all working towards. That is really, really important. The risk profiles of those projects are really good risk profiles, so that underpins our business moving forward. In the energy infrastructure market, we see a lot of growth there, as you can see.
Twice the capacity that is going to double in the coming years. This is where a lot of our growth will come from. It is really important to remember, when you look at our group of companies in CIMIC, in the energy infrastructure space, we already have a lot of projects and we already have a lot of capability. This is not a new thing for the CIMIC Group. Through our UGL brand, we have a long history of delivery in the energy infrastructure space. In the last three years, since 2023, we have grown that market already 2.6x what it was. We are not approaching this new market and the new growth in this market from a standing start. We are approaching it from a position of momentum. That really stands us in good stead. We have some key differentiators in this space.
We design, construct, commission the energy generation, whether it be a solar farm, a wind farm, a battery storage, gas-fired power. We do that. We have done that for years, and we will continue to do that. We also deliver transmission and substation work. Over 7,300 km of existing transmission that is either being delivered or in backlog. That really underpins our business, and it is also underpinned by our self-perform capability. This is not something that we subcontract out. This is something that we have in-house engineering, in-house procurement, and in-house delivery with our own self-perform crews from engineering right through to blue-collar workforce. That is a key differentiator for us in this market. This will support our group energy, water, and industrial vertical in the Asia-Pacific region over the period, the next four-year period, which is super important. Digital infrastructure.
I mean, you have heard today the digital infrastructure story, and that story is also happening in the Asia-Pacific region. Jan was up here on stage earlier, who is the Managing Director of our Leighton Asia business, and they have grown that data center business significantly over the last three years. Again, we are already ramping up in that space. We are a top three data center contractor in APAC already. With that growth moving forward, we are very well positioned to take full advantage of that. Again, once again, we deliver the power and electrical works, as Juan touched on earlier today. Data centers require power generation more and more, particularly in the coming years. In the previous slide where we talked about our energy infrastructure, we have that self-perform capability.
We have clients coming to us wanting to build new data centers, but they also need to bring power generation with that new data center construction. They need us to build them a battery. They need us to build them solar generation or even gas generation. Not only are we building the data center, we are designing and constructing and self-performing the energy needed to power that data center. That is a key differentiator for us as well. Then, of course, we have the broader Turner relationship and all the relationships that they bring with hyperscalers, it is engineering, end-to-end supply chains, and we have been able to call upon that expertise in all the work that we are currently doing in the Asia-Pacific region.
Not only are we doing it in our region, we are bringing world's best practice, and our clients are coming to us more and more because they want to tap into that capability. Not just what is happening in the local region, but what is the world's best practice and where can we get it from? That is where Turner has been a great help to us. Again, we are really strong in this space in the region. Critical minerals. I mean, you have heard Michael and Grant touch on that earlier. I mean, critical minerals in the Asia-Pacific region, I mean, that is our backyard. That is what we have been doing for years and years. There is obviously a huge market worldwide, and we are very well placed to capitalize on that.
The track record has been spoken about, with over 500 engineering processing projects since 2024, and that really gives us our base. Our strategy to expand that, not just in our region, but to take that globally, as you have heard earlier today, that is where we are, again, once again, going to create that growth. We have got the existing capability. We do it already. We do it really well in our region and in other areas around the world, but we are going to grow that into those other regions, and that is where our growth will come from. Together with Thiess and Sedgman, their ability across the full lifecycle, from FEED studies, engineering, mining, O&M, we really feel that there is a lot of growth for us in the coming years. Then defense. Again, similar story. We are currently the number one contractor in defense in Australia.
We have a long history and a track record of working with the Australian Department of Defence. With the growth that we are seeing in that sector, for all the reasons that people have spoken about, and the AUKUS nuclear submarine program that is coming to Australia, we are going to see even bigger growth. Because we are already there, we are that number one contractor, we can really, again, once again, really capitalize on that moving forward. It is not just in the construction, whether it be bases, airfields, ports, dry docks, et cetera. It is also in that O&M space, and Mike touched on it earlier around our fuel opportunities that UGL do in supplying our defense bases with fuel, logistics, O&M, and we can also bring those broader energy verticals to the defense bases.
They need energy as well as all the normal things that they have to build as part of those bases. Again, that will really anchor our security and defense growth in the coming four-year period as we move forward. What does all that mean? Obviously, it means that there is growth. There is absolute growth in our region. In our revenues, we have got a CAGR there of 5% between now and 2030. EBITDA growth, again, 5%, and a PBT growth there of 10%. How are we going to achieve that? We are going to achieve it through our core infrastructure, which underpins our business, and we are also going to achieve it through the growth in these verticals. This is growth, as I have said before, it is not just about new markets, new areas, et cetera.
These are existing verticals that we already operate in, and we have strong capability and self-perform capability. With that growth, our clients are coming to us, wanting us to really drive that growth going forward and take advantage of that growth in those markets. We are very, very confident in those targets. The key takeaways. We are positioned in the right markets. Our traditional markets, the growth verticals, we are absolutely well-positioned. These are markets that are not new to us. These are our core markets. With the absolute growth that is there, we are already in those markets, and we are going to rise with that growth. We have got proven end-to-end capabilities across every key vertical. When I say end-to-end capabilities, I mean self-perform capabilities, not subcontracting out, et cetera, et cetera, but self-perform capabilities.
When you have got growth in these markets, clients want to come to people who have a track record, who can deliver, who know what they are doing, and that is why they come to us. We are absolutely set for sustained growth, underpinned by our discipline and our contract models and project selections. Thank you very much.
Good afternoon, everyone. I am Santiago García, Chief Executive Officer for DRAGADOS. Here with me, Peter Hingott, Chief Executive Officer for HOCHTIEF Infrastructure, and Richard Grabinski, President for FlatironDragados USA. ACS Engineering and Construction is the local execution backbone of ACS in Europe and Americas. You know what we do. We specialize in the construction of large, complex projects where we can differentiate from others through our superior technical resources, skills, and know-how. We are going to give you today just three key messages. First of all, we have transformed the business in the last three years. You are going to see later that we are quite more profitable than three years ago, and this will continue. How? By de-risking our backlog. We are more selective. We are working in collaborative projects and not design and build projects anymore, and lowering the risks and the costs. Second, we are growing.
We are growing. Juan said we are in a supercycle, that a lot of investments take place, and we are working in this and capturing this growth. On the other hand, we are working in the verticals with the rest of the group, one group, one team. We capture all of this, so we are growing. Third, all of this is structural, so it is not something that is going to stop now. I mean, in the future, we are going to benefit from this, and we expect further margin expansion ahead. We work in engineering construction through our three main companies, FlatironDragados in North America, DRAGADOS in Europe and Latin America, and HOCHTIEF in Europe. Each of them are leaders in their local respective markets, and give the local capabilities for the ACS Group clients for deliver their projects on site.
If we take a look on the revenue of 2026, we focus on our markets. 56% is in North America, 41% in Europe, and just 3% from South America and others. Just what we do, you know, is mega projects, complex projects, all kind, roads, bridges, tunnels, buildings, rail. We rely on our engineering capabilities, our people, and our self-perform trade that give us control of the costs, of the schedules, important, and the quality even more of our projects. This graph represents the evolution in these last three years. We can see that we have grown, of course, in revenue from 2023 to 2026 in 9% CAGR. This is important, but even more important is if you see the evolution of the profit before tax, our margin. It has evolved in 32% CAGR in just three years.
In 2023, it was 1.8% of the revenue. Now, 2026, we are going to finish in 3.3%. How is this possible? We can explain it through four levers, four levers that are structural. We will continue with that. We have changed our model, and we will give more revenue in the future. First lever, the risk in the backlog. We are more selective. We are working collaboratively with our clients. We are not pursuing design and build and some projects anymore with the risk in our side. On the contrary, with an early involvement, we are studying the projects with our clients transparently so that we can de-risk these projects, and this is good for the clients and for us. So first lever, lower risks. Second, lower costs. We are simplifying our structure, our organization, and we have less o verhead costs. Clear example, FlatironDragados.
We came from Flatiron and DRAGADOS North America, and we simplified by merging them, and now we have FlatironDragados. We continue with this effort of looking for savings and efficiencies so that we can have more profit in the future. So first lever, it was lower risks. Second, lower costs. Third, through innovation, digitalization tools, and AI use, we are lifting or increasing our productivity on site, which is very important. So, more productivity on site. Fourth, diversifying. We are continue working, of course, in our infra markets, our traditional ones, but we are now with the rest of the group working in the verticals. These markets have higher margins in general. So, in the mix of the margins, we benefit, and we get a higher one. So, these four levers you see are structural. It is nothing coming one year and then disappear.
No, it is structural. We will continue doing so, and that is why we can foresee that we are going to be over 4% of margin by 2030. Regarding our strategy, of course, we are fully aligned with the ACS Group pillars that have been explained this morning. First of all, capturing growth in our infra markets. There are going to be a lot of investments and new assets, but existing aging ones and renewal. This is our market. We will continue capturing this growth. Second, continue supporting the Group in the development of the verticals. A lot of projects ongoing, and with our engineering and on-site capabilities, we can help. Third, extending our advantage in the end. I mean, our advantage is having the engineering capabilities, the design capabilities, and the self-perform capabilities. So we will strengthen them in order to make this advantage even higher.
And with this, I give pass to Peter.
Santiago, thank you. Engineering and construction grows on two engines, core infrastructure and support to the Group's high-growth verticals. Core infrastructure is our heartland, roads, bridges, tunnels, dams, airports and ports, rail, and hospitals and schools. We have seen impressive growth wave across these sectors, and we have a multi-decade, in some cases hundreds of years, of history delivering highly complex projects across our key regions. In the verticals, we provide the construction capability behind the Group's digital, energy, nuclear, minerals, and defense projects already presented today. In the next slides, I will focus on the first part, our core infrastructure sectors, providing an overview of the investments wave we are foreseeing, as well as a high-level view of our experience in each market.
Europe is entering a multi-year infrastructure upcycle, what Juan mentioned already before and many others before in their speeches, backed by approved national programs in all our core markets. In Western Europe, the priority is renewing aging roads, bridges, and tunnels. Central and Eastern Europe and the Nordics add new capacity. New metro and rail lines still to be tendered will drive underground works in major cities. Water security is becoming a driver in its own right. Reservoirs, dam safety, and flood protection. We are present in each of these markets with a track record across every segment. Airports and ports are expanding, largely funded by operators and private capital. Rail is the largest sector across regions. In general building, healthcare and education are supported by national and regional programs. Our European platforms are positioned where this investment will be deployed. Thank you. Richard, for America. Thank you.
Thank you, Peter. I will speak to the Americas. In the Americas, we also see a continued significant well-funded market in our core sectors. We also see collaborative contracts continuing in our market. A new generation of toll roads, bridges, and tunnels are coming to the market and are driving expansion. Water security. There is a driving need and new demand for new dams and reservoirs in Canada and the U.S. We have several recent successful projects that we built: Calaveras Dam, the Isabella Dam, and the power generating station in Site C. And this has grown our capabilities in this sector, where there is tremendous growth and very few competition. We are the leading North American civil contractor, and we are prepared to capture this new investment. We can afford to be selective, and we can take on only the contracts that we think are right. Lower risk, collaborative delivery.
In Latin America, we will target select opportunities in metro lines, concessions in Chile and Peru. Through DRAGADOS' experience in these sectors, we will grow our presence in a smart and measured way. In the U.S., airports need modernizing. New terminals, runways, and expansions are needed in major hubs, a market where we have a longstanding presence and a track record of success. Rail and transit continues to be a high-growth sector with federal funding in place, and we are even seeing high-speed rail now starting in Canada. Public schools, hospitals provide a large and steady base of building demand. In Latin America, we will also target select opportunities in rail, port, and airports, again, through DRAGADOS, using a disciplined approach. Our targets. The funding and investment in our core markets is clear. We have the platform to deliver.
In Europe, North America, and Latin America, we rely on project selectivity, low-risk contracts, and collaboration. We have the platform to deliver. We expect double-digit growth in revenue and EBITDA, and more than double PBT between 2026 and 2030. Our takeaways. E&C is the enabler for the Group's growth. Our core sectors are growing strongly, and this is underpinned by long-term funding on both sides of the Atlantic. Our capabilities and presence allow us to capture this growth as the end-to-end provider. Our profitability is on a new level. The drivers to sustain it are in place, and we will keep growing our margins. On behalf of E&C, of Santiago and Peter, thank you.
Thank you.
Good afternoon, everybody. I am Vicente Maraña. I am the CEO of ACS Digital & Energy, and I have the absolute pleasure to share the stage with Howard Boville, CEO of Coravel. Over the past three years, we have focused on becoming a world-class developer of digital infrastructure and energy assets. Today, we want to walk you through how far we have come, the potential that we have unlocked, and how we are adapting to an environment that is changing faster than ever before. In short, we are currently developing 2.1 GW of IT capacity, which means we have already reached our target for 2030. 1.2 GW of this capacity is sitting with Coravel, our partnership with GIP, BlackRock. Second, strong commercialization signals of today for the capacity that we can deliver in 2028 and 2029 make us confident that we will reach our commercialization target for 2027.
In response to market changes, we are expanding our definition of digital infrastructure, and we are placing energy and technology at the very center of our strategy. Let us have a look at the context of the market. Here are the five shifts that matter most to us. First, grid constraints and tighter rules. Regulatory changes translate to us into longer interconnection queues, new requirements on the type of energy that we use, and on the efficiency of the data centers that we develop. Curtailment is becoming the new norm in many of the jurisdictions where we operate. The path to energy is the absolute critical path for any single project. Second, community concerns around the use of power, water, land, and other impacts are taking center stage early in the development efforts. The community input will become even more prominent than it has been already.
Third, delivery windows are getting shorter. Clients want their capacity sooner, and they want it in a context of scarcity of equipment and skilled labor. Fourth, sovereignty. Geopolitical and regulatory concerns are driving greater reliance on domestic clouds and AI ecosystems. Governments around the world and regulated industries such as finance, healthcare, defense, increasingly want clarity on who can access their data and under what rules. They want resilience. They want to avoid dependence on foreign suppliers of technology. Last, the traditional lines between physical infrastructure and IT are blurring, but that is creating opportunities for us. To summarize, all these shifts point in the same direction. They actually favor an industrial developer like ACS, with superior maturity and credibility in the interconnection queues when compared with other competing applications.
With our ability to deliver our own behind-the-meter solutions, with a long history of working with local stakeholders on infrastructure projects that leave a lasting legacy for the community, with our ability to manage the supply chain and deploy industrialized solutions, including modular designs. Finally, sovereignty is creating a new pipeline for us under public sector mandates like the Gigafactory initiative of the European Union, and as our clients deploy their own sovereign clouds in different regions where they operate. In a market moving this fast, discipline matters. Five principles shape every investment that we make. First, fungible capacity. We develop sites and configurations with broad appeal for various tenants so that our assets stay liquid across different clients. Second, early de-risking. We invest in sites with a visible path to power and to zoning.
In addition to this, as a key differentiator from other players, the early involvement of the construction teams of ACS companies brings certainty around cost and schedule in the earlier stages of development. Third, we target investment-grade counterparties in our leases. Fourth principle, tenant diversification, so that no single client defines the performance of our portfolio. Last, predictable cash flows anchored on leases of 10 years of duration or more. Diversification applies to more than just our tenants. Let us have a look at our geographically diversified portfolio. First, in purple, our first generation of projects, seven assets: Virginia, Dallas-Fort Worth, Aragon, Madrid, Melbourne. Seven assets that were transferred to Coravel at the beginning of 2026.
And in yellow, in the same map, a second generation of development efforts that are taking place outside of Coravel and led by ACS companies, for a total of 0.9 GW of IT capacity. Together, Coravel and our own developments make up for the 2.1 GW figure that I have mentioned at the beginning of the presentation. And now, time for Coravel.
[Presentation]
Thank you, everybody, for your time today. My name is Howard Boville, and I lead the Coravel business. There are a few things that I want to go through, four things I'd like to cover in the presentation. First, to give you a clear and simple explanation as to what Coravel does, the market that we face into and serve, how we think about sensibly and judiciously deploying capital, and then the value that we create for our customers and for our shareholders. Coravel was founded in January of this year, but the idea of Coravel started in 2023. An important point about that is in 2023, a large hyperscale data center was 30 MW. Fast-forward three years, and 100 MW up to 1+ GW is the standard actual form factor that you provide to the hyperscalers.
In this business, the supercycle started three years ago and actually is starting to compound. You've seen that through all of the presentations that have been taking place previously. But there's a very important point to understand in terms of what that supercycle means. It is putting stresses and strains on every element of the supply chain in terms of what it is to go from land into power, into actual construction, and then into actual operations, all the way through the value chain. That is what Coravel addresses in terms of the capabilities that we have. We own the land, and we go through the power permitting process, working with energy companies, whether it's in front of the meter or behind the meter. We then go through the actual commercialization and financing, and then we get into the actual developments and operations.
And I'll give you more details on that when we go through. Despite the fact that Coravel was only founded in January of this year, we already have 140 MW under contract with a hyperscaler. All of the capacity that is coming online in the next three to four months, we're already in very deep, active negotiations with hyperscalers to take that capacity. As soon as it comes online, we can actually provide it to them. As the rest of the capacity comes through in terms of the additional 1.2 GW that we have, we will also be in a position where we lease that. We're also now looking diligently at 2.4 GW of additional pipeline to add to this going forward. The important point I want to make, however, is the next slide in terms of how you judiciously deploy capital.
Because it's very easy when a market is going through a supercycle to actually be not as detailed and judicious as to how you deploy capital, and that can burn you in five years or 10 years' time. The contracts that Coravel put in place are long, durable, 15-year contracts, and we need to ensure that we're looking to mitigate all of the risks that we go through. The projects that we advance on this basis means that every step in this process goes forward in a way that we want to meaningfully address. When we think about origination, we're very deliberate in the sites that we have. The reason why we have leased already the locations that we have is because of the good selection that we have and the ability to get power.
But here's another change in the marketplace because of this demand. Our customers, the hyperscalers, are now talking to us about land bank that they have bought in the past, because when they were building 30 MW data centers, they had sufficient human capital and capacity in their own organizations to actually process them through. They no longer have that in terms of their ability to actually meet the demand that is coming through at them. You've seen the numbers earlier in terms of the conservative estimate of being around 180 GW of power in five years' time, and the actual underpinnings of the CapEx expense of $1.2 trillion. But often what is missed is what was announced in the earnings calls that the hyperscalers did over the past two weeks.
The customers that we face off to, which essentially is five customers, four hyperscalers and one AI lab, have posted over $ 2 billion— sorry, $ 2 trillion of backlogged revenue. That's not revenue they're generating now. It's revenue that is currently backlogged, much of which requires data center capacity to be realized. Therefore, they're keen to ensure that they can compress time to actually get to the value that they need to quickly to release the potential for that revenue. So I've talked about the origination in terms of how we think about this, and we're operating in very large numbers, but what really matters is small details to ensure that you can actually process through the value chain to actually get to assets that are generating revenue for our customers and for ourselves quickly.
The other area I will touch upon within the time I have is then on the commercialization and the financing. Every element of this supply chain has constraint, and credit also is increasingly having constraint. The first thing that we think about in terms of when we think about a location is actually the financing of the actual deal. We have created a series of innovations in terms of creating a symmetry between the contracts that we put together based upon the great advice that we get from our financial partners to then face off to [instance] of the hyperscalers. We mitigate risks on both sides. The hyperscalers are also leaning into this model because they recognize that if they can compress the contractual time, the actual real kinetic work of building the site can also then actually have some contingency built within it.
We are seeing a degree of flexibility with the hyperscalers that we did not see six months ago, because they recognize they need to get time to revenue for that $2 trillion as quickly as possible. How does this manifest itself? I have got three locations on here of the seven campuses that Vicente mentioned, and you can actually see the kinetic work that is actually physically building assets to service the digital world. Each of these three sites are already either leased or will be leased in the next three to four months. These are the three sites that currently fall into what we call our sales window in terms of they will have power, so they actually fit within the actual capital budget schedule of the hyperscalers. But we are very deliberate in terms of what we do with these assets. Juan mentioned assets in his opening presentation.
We have diversity across all three of them. Each of these sites will be leased to those four hyperscalers and one of the AI labs that I have mentioned. But in addition to that, these three sites have different form factors. One of them will be for large language models, and the other two will be for cloud. We are diversifying the business models of our customers as well to ensure that we have a diverse business portfolio going forward. That is showing also the point that Mike Kuntz mentioned earlier in terms of there is only one company that these hyperscalers trust to operate in four continents, and that is ACS. I cannot underestimate the unbelievable pull that Coravel gets by having Turner, DRAGADOS, HOCHTIEF, and Leighton, CIMIC in the portfolio.
It just immediately gives credibility to our ability to deliver certainty on the actual build side, in addition to all of the work we do on the land origination, permitting, power, and so on. What value are we actually seeing in terms of developments going forward? Sorry, I probably asked one more. What to summarize I will go forward on is the four things is what this Coravel does. In the simplest sense, we compress time. We work through the acquisition of land, getting permits, the power, the development, the commercialization, the financing, the build, and then the operate. Then we turn that into a 15-year durable contract with the companies that have the highest credit rating on the planet, a real value as an asset for ACS.
But that compression of time is incredibly valued for the hyperscalers as well, because as soon as they can get a data center operating, the sooner they can start to burn down that $2 trillion of backlog revenue that they have. And that $2 trillion of backlog revenue is not the end of the story. In the earnings reports that they issued over the past two weeks, they posted mid-50% continued growth. Google actually posted 100% growth. So we're playing into a market where the supercycle has started, but it is compounding and it is underpinned by real revenue. The final point I'll make is in terms of despite all of this fluffiness in the market, we are very deliberate in terms of how we allocate capital.
We don't move forward to the next phase until we have evidence that we can actually de-risk that right through into the commercialization, as I've mentioned, and the financing. So I see Coravel meeting the needs within the actual overall business portfolio, and we can see already the accelerated pace beyond our original business plan in terms of the leasing of these facilities. Vicente.
Thank you, Howard. Let us now turn to our second generation of projects, which are the ones that ACS is developing outside of Coravel. Together, they target commercial operation of a total of almost 1 GW by 2030. In LATAM, we have activated a site for the first time, Santiago de Chile, a 24 MW project with land secured and zoning approved. In Europe, through our German and Spanish consortia, we will be responding to the EU call for tender to develop two of the European gigafactories that will be developed. And the most prominent of these projects is our site in Ohio, which we will look at next. And beyond these projects, we have an earlier stage pipeline of more than 3 GW of IT that is being under scrutiny.
Our site in Ohio is located 150 km east of Columbus and the New Albany data center cluster in a tier one adjacent market and close to established hyperscalers. We have secured 1.2 GW of grid capacity that has been granted by the utility AEP. This is equivalent to approximately 810 MW of IT capacity. Our initial investment of $ 400 million to date has allowed us to secure the energy and the land. We are now working on the master plan, preliminary design, placing orders for electromechanical equipment, and we are engaging with local stakeholders on the scope and nature of the community plan. We are targeting 2027 for the start of site works and 2028 to go vertical on construction. A number of hyperscalers have already expressed a strong interest in the site and in the capacity that we're planning to deliver in 2029 and 2030.
Let us turn now to an area that sets us apart in the current market, and has already been mentioned by some of my colleagues, our energy infrastructure capabilities. These capabilities are not just technical features. They are a vital commercial differentiator from the market, because they de-risk our developments by reducing our dependency on the grid. Our approach on energy will be based on three steps. First, we will continue securing grid access by working closely with major utilities, grid operators, and regulators. Second, when required, we will develop behind-the-meter solutions that work as a temporary or permanent source of power, reducing grid exposure. Third, moving forward, we will be assessing investment opportunities in the energy sector beyond data centers, our supercycle, from transmission lines to microgrids, from generation to storage, U.S., Europe, APAC, through public procurement or private initiatives.
Investments in energy projects will continue to support our DC expansion, but they will also have an investment thesis in their own merit. The data center stack has three fundamental layers. The first one, the foundation, is powered land. Layer two, directly above, is the physical building itself, including the shell, along with advanced cooling and power system. These first two layers are our core business, where our engineering, energy, infrastructure, and construction capabilities lie. Layer three, at the top, is the tech stack, comprising hardware, servers, bare metal infrastructure, and AI and cloud services. Traditionally, this layer remains entirely in the hands of our data center tenants. Today, if we focus just on the first two layers, that might not be enough to remain at the forefront of the industry.
Selectively, where it creates value for ACS and where it meets clients' demands and needs, we see an opportunity to start bringing parts of this top layer into our service offering. There are two main reasons for that. First, higher rack densities and liquid cooling mean that IT requirements now shape the building, the power design, and the cooling from the start, so the two can no longer be conceived separately. Second, many customers want computing capacity, not just data center space. They want computing capacity that is ready to use. They value speed, and they value a single accountable partner. Alongside the large-scale platform, we are also delivering small-scale data centers through modular, energy-efficient sites of 2 MW- 4 MW. On top of the physical infrastructure, we are already offering sovereign cloud and AI services, from bare metal to platform as a service or inference.
Execution of this model is already underway. We target to deploy by 2032 up to 60 of these type of data centers. One site already operational in Germany, and another will be delivered by end of the year. Two more are being commercialized, and we are very encouraged by the recent award by Blackpool Council in the U.K. to deploy an almost 5 MW site. Putting all this together, at scale, we're targeting equity value of EUR 16 billion-EUR 18 billion by 2032, which is more than 4x its current value. Valuation is done through ratios that are based on similar market transactions, contribution of Coravel and ACS own developments, and a very conservative assumption on pipeline. The valuation is calculated as our megawatts travel through the different stages of development. The chart shows three fundamental steps in the value creation.
First, increase through commercialization momentum that will take place in 2027 and 2028, which will bring the valuation to a range of EUR 7 billion-EUR 9 billion as a target for 2028. Second, following this commercialization momentum, the projects will become operational in 2028, 2029, 2030, which will bring us to a target value of EUR 13 billion- EUR 15 billion by 2030. Finally, we are expecting to reach the EUR 16 billion-EUR 18 billion through the final stage of consolidation of our existing portfolio and as our new pipeline comes to fruition. Key takeaways. First, commercial momentum. We feel confident to reach our commercialization target for 2027 of 1.3 GW. Second, this target will unlock a clear path to achieve our target valuation of EUR 16 billion-EUR 18 billion by 2032. Third, we are future-proofing our business by placing technology and energy at the core of our strategy.
This is how we will continue moving from concept to execution. Thank you very much for your attention.
Hello. Good afternoon. I am Nuria Haltiwanger. I am the Chief Investment Officer for Infrastructure for ACS Group, and together with Pepe Aljaro and Martin D'Uva from Abertis, we are going to explain to you a little bit about our infrastructure investments that we have in some of our, what we traditionally were calling our more core infrastructure. Although, now as you have seen, digital infrastructure and all this has become part of our core mission within the Group. Our goal has always been to create value and maximize value across the full infrastructure lifecycle of projects, from development through construction, delivery, operations, and then into selective divestment where necessary. This has really been structured around two and built around a strategy of two priorities: driving growth in our core business by leveraging our integrated capabilities, which you have been hearing a lot about today.
This is basically priorities that help reinforce each other. Our development and construction capabilities help us to create operational assets that then we are able to do selective asset rotation that allows us to realize value on those assets and then redeploy into new projects. This integrated model allows us to pursue both growth while always maintaining a disciplined approach to group risk allocation, capital allocation, and investment return expectations. As you will see, this discipline has been shown through our historical results. Our group is a leader in greenfield infrastructure development and long-term operation and maintenance, mainly through public-private partnership or concession-style contracts. Our current portfolio stands at over 80 assets with a total investment value of the projects of EUR 63 billion and an intrinsic equity value of about EUR 3 billion.
This is in four main verticals that you will see: highways, rail and transit assets, social infrastructure such as hospitals, schools, military barracks, and what we call next-generation mobility solutions, which I will explain a little bit more about as well. Our portfolio is also very geographically diverse, and it is held through a number of entities that you have heard about. IRIDIUM, ACS Infrastructure, which is focused primarily in North America, Latin America, and Western Europe, Spain, U.K., and Ireland. We also have HOCHTIEF PPP, which is focused mainly in Germany, Eastern Europe, as well as projects in the U.K., and Pacific Partnerships for our APAC region, which is focused mainly in Australia and New Zealand. Our strategy is supported by a proven track record of development and value creation. We have produced very strong equity IRR return of 16% post-tax on our portfolio, and this is a pure equity return.
This does not include operation and maintenance margins, technical services fees that we often also charge to the projects, and obviously not the construction margin. This is just based on the equity that is invested. We also have a very successful strategy, as I said, of selective asset rotation that has produced a solid exit- to- equity investment multiple of over 2x . Since our last CMD when we were together, we have won 32 greenfield projects, including our SR 400 managed lanes project, which I will give you an update about.
As well, we have also included and added some highway projects in Germany and the Netherlands through HOCHTIEF PPP, a light rail asset in Australia through Pacific Partnerships, and a number of social infrastructure projects, as well as 15 wins in our next-gen mobility, which next-generation mobility is the exposure that we have to some of the emerging technologies and that are potentially disruptive technologies that are reshaping transportation, such as our autonomous transit network projects with our partnership and investment through Glydways, as well as our participation in advanced air mobility through Skyports. Some of these projects, wherever they are. I cannot see them. Sorry, I cannot see them. But some of the projects that you will see are the 15 projects within our next mobility.
They are actually smaller projects because some of them were government-funded, but as the technology has proven itself and they have been successful pilots, they are actually going to be developing into larger opportunities that are going to be able to scale. As it relates to our more traditional pipeline, we have a very healthy pipeline in our core infrastructure business. This is specifically because of what you have heard throughout the day. In the areas where we have a significant presence, there is aging infrastructure and growing infrastructure needs. This is coupled by budgetary constraints that are putting particular pressures on availability of funding for these needs. Through that, we think that there is going to be increased opportunities for us, particularly in the places and in the markets where we have a deep presence through our group companies.
We are actively pursuing about 80 projects, and the list here, there is actually many projects that we could do. What we have tried to select here are the projects that have already gone through a filter between our group projects where we work collectively together. These are projects worth a total investment value of about EUR 60 billion. We are selective in that pipeline. We work together to find the projects where we really have a prospect for winning based on our presence, based on where we are best positioned to win, and where we can work together. This integrated growth strategy will concentrate on our three main development areas, as you can see, and we have a very big ambition, which is to reach about EUR 20 billion-EUR 21 billion of equity value by 2035.
This will be focused primarily in our three areas, our managed lanes concessions, which I will talk to about more specifically, our next-generation mobility solutions, which I referenced, as well as our transport and social infrastructure PPPs. Our managed lanes, we feel like, are the area where we have the most ability to scale our equity value, particularly as those projects get de-risked following construction and ramp-up of the assets. Our core conventional PPPs, which traditionally are availability payment-based projects, are also key to our portfolio. They provide long, stable cash flows at a lower risk. Our current ambition is to grow the platform from what it is today at EUR 3 billion equity value to between EUR 5 billion- EUR 6 billion by 2030, and to the EUR 20 billion-EUR 21 billion of equity value by 2035.
This will be done through cumulative investments of about EUR 4 billion-EUR 5 billion during that period. Again, this will always be underpinned by our selective investment criterias and our disciplined execution. To give you a little bit of an update about our project that we won, which was a big success for us, was our Georgia SR 400 project. This is a landmark project that we actually hope to replicate the success of for future opportunities. The SR 400 itself is a radial commuter corridor, and it connects the affluent northern suburbs to a lot of major job and retail centers throughout the corridor. There is really not a comparable alternative for people who want to go north or south in the area. Our project involves building two express lanes in each direction for about 25 km of that. We are moving along.
We won the project and have successfully reached some of the important milestones related to the project, commercial close, financial close. We have advanced design. We are about 90% complete in design, and we are actually ahead of schedule about four months. This is an excellent example of what distinguishes ACS, and I think you have heard about it, but this is an example of what we can do and what we achieve together and the value proposition that we have at ACS, which is the financial strength and experience to be able to invest in and finance a project of this size. This size had approximately EUR 11 billion of investment value, and we as ACS invested about EUR 1.1 billion of our equity.
But it also involved the integrated capabilities of our group in order to optimize the project itself for the bid, the local capabilities and presence to be able to deliver it and then operate it for the 50-year term following the construction. An example of this integrated approach was our ability to deliver on technical, what we call alternative technical concepts. As you see here, there is a lot of intra-corridor movements that happen. Only about 1% of the trips go from the full length of the project. What we tried to do was optimize connectivity in order to maximize revenue, and we did that as part of our bid through alternative technical concepts. Our bid had over 30 alternative technical concepts. 18 of them were construction-related, so those involved lowering costs and improving constructability.
But then we had 15 ATCs that were related to additional connectivities, where we could bring in more people into the managed lanes and provide better alternatives for them as they were traveling. That as well as an ATC that helped us increase the travel speeds from 270 mi/h on the managed lanes compared to the general-purpose lanes, increased revenue, and gave us a revenue uplift of over 9% compared to the base design that GDOT had at the time. Our work really didn't stop there, because we continued optimizing through. Following commercial and financial close, we continued working together and optimizing. We've actually finalized two change orders that have produced additional connectivities and will allow us to increase and give us additional uplift in revenue of about 4%.
We're going to look to continue to leverage that into the opportunities that the managed lanes pipeline specifically provides. There is a robust pipeline that's in the United States, and we're actually seeing a lot of interest in other jurisdictions where the economics make sense. Managed lanes really do—t hey're growing because they are very necessary and provide important service to public sectors, which is providing reliability to increasingly congested corridors. Here is just the sort of more imminent pipeline that we see coming. There's a project that we're already pursuing, which is the I-77 in North Carolina. Given where these are in North Carolina, Virginia, Tennessee, Georgia, we feel that we're specifically well-placed, particularly given the presence that we have through FlatironDragados in those areas. Then there's additional, like I said, there's additional states that are looking to do this.
Our goal really is to win, in addition to our SR 400, two more of these projects in the future, with an idea of an equity investment of about EUR 3 billion by 2035. As Juan mentioned, these will be won first, but the investments actually, because the equity is back-ended, the equity will be committed, but it'll be invested along that period of time. To summarize, we see significant opportunities to grow our infrastructure platform, particularly in the United States, but as well around the world with managed lanes. We're going to continue to grow on what we've learned and what we were able to achieve on SR 400 to compete for those and provide alternative technical concepts that do not just optimize the bid at the bid phase, but continue through delivery.
We have an established track record of delivering complex PPPs, supported by our longstanding relationships with our clients and authorities and our partners and the financing community as well. We have a history of disciplined capital deployment. We think our integrated model allows us to create value across the full lifecycle of the infrastructure, like I said, from bid to financial close, through delivery, through operation, and through strategic asset recycling. With that, I'm going to pass it over actually to Pepe and to Martin so they can tell you a little bit about our brownfield.
[inaudible] cash cow company. Due to we have a very well-diversified portfolio of assets, and our revenues are linked to inflation. We have very predictable cash flows that allow us to pay EUR 600 million dividend per year. The second message is linked to growth. For us, due to we manage concessions with a very clear maturity date, we need to replace the [EBITDAs]. For that reason, growth is a key in our strategy. The third is financial discipline. For us, it's one of the key pillar in our strategy to maintain the financial discipline and to apply a very rigorous capital allocation. I'm going to share with you some key figure expected at the end of this year, 2026. Let me to focus in EBITDA, EUR 4.6 billion.
We have extended, as Juan said at the beginning this morning, our average remaining life of the concession. Good news. We have a strong commitment for the bank to maintain the investment grade. We have other good performance in our financial figures, but I prefer that Martin will explain to you in few minutes. Let me to focus in inflation. Our tariff mechanism imply that our revenues are linked to the inflation performance. This year, 2026, we have increased our tariffs on average +3.5%. It's true, I'm trying to be fair with all of you, the traffic this year, 2026, is not performing as we expected. The traffic is slightly below some traffic performance in 2026, but that, in fact, is necessary to analyze what are the reasons to justify that. Mainly, it's due to the increase in oil prices and also in gasoline prices.
In some countries, the gasoline prices are increasing 30%, 40%, 50%, and that is penalizing our figures for 2026. In the other way around, that is producing a significant increase in the inflation. Really, inflation is our great friend. It's the best dance partner for us. For that reason, we are going to increase tariffs in 2027 above 4.8%. That is great and fantastic to maintain a very sustainable growth in the operational performance of the company. As I said before, growth. Growth is the other key lever in our strategy, and we have three mechanisms for growth. First, the operational, the organic performance. I explained it's linked to traffic, linked to tariffs, and also expenses. We have very strict control of the expenses. The second lever is extension. Extension or renegotiation of the current concession contracts.
In most of the cases, are linked to extensions, to provide some advantages to the user in agreement with the administration with very high returns, but extension is the second way for continuous growing. The third is acquisitions. That means new assets in our portfolio. Of that sense, in the new acquisition, we apply the cost control, we improve the operational expenses, and also we apply this financial discipline. You saw in the next, our delivery. This is the detail, the breakdown of a transaction closed from the previous Capital Markets Day. You see a combination of transactions in which some of them we are acquiring new assets in the portfolio, like Santiago-Los Vilos in Chile with 30 years, up to 30 years. We have Atlandes in France with + 26 extra years. In some cases, we acquire minority stakes in some assets that we just control.
In other cases, renegotiation of assets, like in Chile, Intervias and Fluminense—s orry, this is in Brazil. In Chile, Autopista Central. We have also two transactions under analysis that we expect to close in the coming months. It's in Litoral Sul as an extension of five extra years, and Los Andes. Let me to remark FARAC. FARAC has been extended 20 years. It's part of the big increase in the backlog that then Martin will explain. But on that case, was an excellent deal because we extended the concession, and at the same time, we are increasing the tariffs for the heavy vehicles. That is producing significant increase in our expected EBITDA for the future. It's not on that table, but now I'm absolutely under pressure. After the speech of Juan Santamaría this morning, he said we have two other assets under analysis.
That means, as I said before, we try to deliver our commitment. For that reason, I'm personally in a hurry to sign both concessions. Now I pass Martin to explain some financial figures. Thank you.
Thank you, Pepe. We've been busy, and it seems we're going to continue to be busy. Busy delivering on our perpetual growth model, a model that is increasing the value of Abertis year after year. Let me walk you through some key metrics that Juan shared this morning, metrics that help illustrate that increase in value. First, our EBITDA. Let's look at the graph on the left. That's our EBITDA for the next 40 years. If we were to go back and look at the portfolio that we had back in 2018, when there was a change of control, our EBITDA curve in the long term would be the gray curve that you see in the bottom.
Now, what we've been able to do with the investments that Pepe shared and the ones we'll continue to do, we've been able to continuously raise that curve to the blue line where we were last time we met in the CMD in 2024, and now to the orange line. We've been able to configure a portfolio that will be able to deliver long-term sustainable EBITDA for the next 40 years. Now, if you were to summarize that graph in one number, that would be the EBITDA backlog that we talk about. That's the sum of our EBITDA of each asset until the end of their concessions. You see on the right that back in 2018, that backlog stood at EUR 49 billion.
It's not bad, but we were able to raise that to EUR 135 billion by the last CMD, and that backlog stands at EUR 226 billion today. We've multiplied that backlog by 4.6x in eight years, and that's a 70% increase since we last met. Of course, we're not going to stop there. The idea is to continue working to raise that curve. I'm sure when we'll next meet, we'll be talking about a few acquisitions that we'll be doing in the next years too. The beauty is that it doesn't matter what metric you pick at, the success of what we've done over the last year comes across. Juan shared three more metrics. First, our average concession life, a metric that many of you look at.
The average concession life is you take the life of each asset and you weigh it by the annually EBITDA contribution. That metric stood in 2018 at 11 years, and we increased that to 12 years by 2023, and today that stands at 15 years. Now let's think about that for a moment. In 2018, we had EUR 3.5 billion of annual EBITDA with 11 years average life, and now we've got EUR 4.6 billion with 15 years average life, despite eight years having gone by. Again, a significant improvement by that metric. Also, and important to the model, is financial discipline, as Pepe mentioned. Financial discipline is not just about being selective in our investments, it's also about ensuring that we maintain a strong balance sheet, part of our commitment to investment grade that Pepe mentioned as well.
What you can see is that whilst we've been getting bigger in size, we've also become stronger in terms of our balance sheet. We've reduced leverage. You see that in the middle with our looking at our net debt- to- EBITDA ratio, which stood at 6.6x in 2018. We've gradually brought that down to 5.2x today. That is why you'll often hear us say that we are larger and stronger today than we've ever been. Last, perhaps the ratio that better illustrates, in our view, the transformation that we've delivered in the past years is if you grab that EBITDA backlog and you divide it by net debt, so the coverage of net debt by that backlog, and you see that on the right that 2018, that ratio stood at 3.4x . We have managed to triple that to 9.5x .
So again, huge sign of that transformation. To wrap up, three key messages. The perpetual model is working. We're delivering on that growth. We've grown EBITDA backlog by 4.6x in the last eight years. Second, the key ingredient to that model is our large diversified portfolio of high-quality assets that are doing exactly what you expect them to do, generating strong recurring inflation-linked cash flows into the long term. Today, those assets are generating a record level of EBITDA at EUR 4.6 billion. Third and last, while we have those cash flows, we're using those cash flows to pay down debt, to pay our shareholders an attractive dividend yield, and to continue investing in growth. Growth that will continue to increase the value of Abertis and to compound returns for shareholders for many years to come. Thank you. That's all from us.
Good afternoon, everyone, and thank you very much for joining us today. My name is Emilio Grande. I am ACS Group CFO, and I'm going to run you through the financial strategy for the coming years. I feel a little bit like Pepe, so I'll start saying that I feel a little bit like Pepe because you're not going to find great surprises. What I'm going to walk you through in terms of our financial strategy is very consistent with what we've been doing over the last years, which I guess is a good thing because it's been so far very successful. To start with some key messages, highlights that I will develop through the presentation.
First of all, we've been listening throughout the different presentations, the amazing positioning we've built for the Group in the different markets, the verticals, the traditional and core transport, the capabilities, the market trends, et cetera. We are ahead of a double-digit earnings growth, and that we're in the best position to take advantage of because we have a very resilient business, both in terms of the end-to-end platform, cash generation capability, the development of our infrastructure investment platforms, which I'll talk to. That is going to allow us to continue with our consistent financial policy of addressing very attractive and value-generating investment opportunities while offering an attractive shareholder remuneration to our shareholders and keeping the strength of the balance sheet. That's in a nutshell what I'm going to walk through in the coming slides.
First of all, again, we've heard a lot about growth and the attractiveness of the market opportunity. I'm going to focus that from the resiliency angle. What brings the resiliency to our end-to-end platform business? It's about diversification in every way, right? We are absolutely diversified by end market. You can see the composition of our backlog, the greatest being around the 25% mark. Around geographies on the most mature markets with tier one positions in every mature market in which we operate. Clients with a good balance of 50/50 private and public clients, which gives you stability as well. On the other hand, cash flow generation capacity, which is rooted on lower-risk contractual structures. We've gone through a big transformation, as you know, in terms of de-risking the balance sheet and the nature of our contracts by changing to collaborative type of contract or pre-construction.
And also we have, and we've heard the different companies talking about, like Turner, Thiess, et cetera, their 100% cash conversion being very solid cash conversion businesses. This gives the resiliency to the end-to-end business, which in addition to the resiliency of the infrastructure platform business, gives us a lot of confidence in the targets we are talking about. In terms of the infrastructure assets, we've heard more recently our colleagues. I am sure you appreciate in those presentations the amount of synergy and diversification that brings having such a portfolio with the different technologies, different markets, different levels of operations and maintenance, different end clients, demand risk versus offtaker type of risks, et cetera. So, this brings diversification and therefore resilience, and also a lot of synergies in terms of growth and ability to perform in the market.
The other key topic to me in terms of resilience and our asset portfolio is the inflation protection, which has been a common theme as well, especially in the current more uncertain macro environment with higher funding costs and more uncertain inflationary evolutions for this. Looking at the right side of the screen, and I think this is a very important topic for today, this is the expectation of dividends we are expecting as ACS from the different platforms to whose management we've been listening to over the last half an hour. So, if you look at the next period, 2026 to 2030, we are already looking at an average annual dividend of EUR 500 million from our portfolio. Still early days.
Obviously, we've got a mature brownfield platform such as Abertis, but we start to see, even though we are still investing, we are starting to see returns from the investment in the data center platform, Coravel, and the D&E platform as well, and you can see how all that runs up. Two relevant comments. One is, all of these dividends are either at hand today in terms of what assets we own, or part of our capital allocation strategy I am going to talk about. So we've got the funding to all of this, plus what we've got today to develop, right? And you can see what kind of numbers it gets to, which is very relevant in terms of resiliency, because dividend and this cash-yielding platform is going to have a progressively greater share in terms of net operating cash flow as a group, right? So balancing out the cash generation prospects.
The other comment is, which I think is relevant, is we are, and I think Juan was very clear on this as well, our objective is to build a brownfield platform in every stage and continue to invest in greenfield, but not rotate assets, right? Even though the financial policy is to have liquid assets as they are brownfield, but the ambition is to keep all of that. And I will talk about this in the capital allocation strategy. Resilience also has to do with the balance sheet position, right? And we talked about this a year ago in November 2025 as well. We've been deleveraging the balance sheet over the last years, even though we've been investing quite heavily, as you know, as per our capital allocation policy and increasing our shareholder remuneration to date. And that continues to be a key priority going forward.
In terms of management of the debt at an ACS level, you can see, as we discussed last time, very conservative management of liquidity, refinancing risk, hedging, et cetera. Business as usual and continuing to manage in a conservative manner. I think I would position the rating upgrade we've had as an external recognition of the strength of the business, the diversification and resilience of the business, together with the financial performance on the back of that strong business performance. That BBB status is one notch above and translates to the other group companies, which is very positive news, especially in the current environment, because it gives us the flexibility and the strength to really address the market going forward and the greater macroeconomic uncertainty in the macroeconomic environment.
It's not just about the management of the ACS debt, but it's also about managing the debt that sits in our investment platforms, right? The good and the bad thing of talking at the end is that a lot of these topics have been already discussed, and I think our colleagues in the infra platforms have done a great job. I'll run quickly through this. In the PPP space on the left-hand side, it's really limited funding risk because, as you well know, it's part of the bid, it's priced in, there's no financial close risk typically. Even though there's big debt-sized tickets, as you can see there in some of the big projects like the managed lanes, but it's part of the tender.
Abertis, Pepe and Martin have gone through the credit metrics and the amazing job they've been doing lately to replace EBITDA and put Abertis in a strong credit position. Abertis is a frequent issuer in the capital markets. They've got the best access to debt, et cetera. So, we're in the best hands. In the same way, on the data center large scale, I actually think Howard did a great job talking about this, but we've got a EUR 20 billion funding task in the data center space going forward. That might seem like a lot, but when you put it in context versus the EUR 1.9 trillion expected in the same period for data center construction, and the fact that we are in the lowest risk part, it's a funding task that we can develop, as Howard explained, over time, which is business as usual in that sense.
It's an achievable task for many reasons, but the main one is this is a prime asset from a bankability perspective, and I'm sure a lot of the bankers here would agree with that. It's on the infrastructure layer only. It's based on long-term leases. It's backed by investment-grade counterparties, et cetera, and delivered by tier one technical reps, like Turner and other companies of the Group, as well as credible sponsors. So, this is also a key part and a key focus of the financial strategy for the coming years, particularly in the funding task for the large-scale data center platforms. Let me talk about the targets from a financial perspective and how that translates into cash generation and capital allocation strategy, which is a key topic, right?
In terms of top-line growth and margin expansion, we've talked at a high level, Juan explained at a high level, and also in the different presentations. These targets are fully capturing the value of our current positioning with all the work that has been done both on the end-to-end delivery platform with the verticals, but also in the investment platform. They are quite impressive, and given the resilience and all the analysis and the strong market positioning, we're very confident with these targets. Maybe the one that hasn't been discussed, although CIMIC and DRAGADOS made some comments through their presentations, we've got an ambitious program of efficiencies across the Group. Some of them are very obvious and have been communicated before, like the Flatiron and DRAGADOS integration, which comes on the back of an integration. CIMIC is doing a big job in terms of centralizing services and optimizing processes.
Everywhere in the Group, we're harmonizing processes and systems, et cetera, which is really driving the cost of the business down. This has been a significant contributor in the past years, especially the latest year, in terms of margin expansions in the different businesses, and it's going to continue delivering and supporting the margin expansion strategy. Now, how do these targets translate into cash generation? Let me start from the CMD of 2024. At that time, we talked about EUR 1.1 billion-EUR 1.3 billion net operating cash flow on a yearly basis. We've been delivering over the last years above EUR 2 billion, with positive working capital impacts overall, right? When you look at our last 12 months Q3 number, we are running at EUR 2.3 billion net operating cash flow, but when you adjust for working capital, it's EUR 1.5 billion, right?
Which is in line with the latest number we discussed in last November, which equated to EUR 900 million investment on a yearly basis going forward. Now, with the new targets, with the full integration of all the market positioning one year later, and the further development and establishment of verticals, and the good performance of the business and the market opportunity, we're getting to a number of between EUR 2.25 billion and EUR 2.75 billion on a yearly basis, right? This is the net operating cash flow we generate to remunerate shareholders, to invest, and to preserve the balance sheet, basically. This is, I mean, just to put in context, is multiplying by between 1.5 and 1.8 the prior cash generation, and more than that, versus more than doubling the number we were looking at in 2024, only three years ago.
Now, in terms of allocating all that cash flow generation of EUR 9 billion-EUR 11 billion in the period, which equates to the EUR 2.25 billion-EUR 2.75 billion, let's start with shareholder remuneration, right? We've increased 50% the shareholder remuneration between 2023 and 2026. This has been despite all the investment we've been doing through the process, or through the last three years, plus having the balance sheet, as you know, with the lowest leverage in some time. That talks to the financial discipline we've been applying when allocating capital, and that's going to continue to be the case going forward. That's why I talk about consistency and continuity. Our ambition is to continue to grow the shareholder remuneration, to continuously grow it, in alignment with the business performance, the cash generation, and the profit, right?
If we were to maintain current payout, we could get to an upper number of EUR 4.9 per share in terms of dividends. However, this is all subject to the capital allocation policy I am going to talk about in a minute in the next slide. I am sorry to insist a lot, but to make sure that we balance in the right way the shareholder remuneration with the investment and the balance sheet position and the financial policy of investment grade. No doubt we are going to have a lot of investment opportunity. I am going to talk in a minute about the most obvious ones in the short term, but there is so much optionality that we are going to be going through a lot of investment opportunities as we have been doing in the past.
In my view, optionality drives discipline because you have to, and I think we have been disciplined, and we commit to continue to be disciplined in this sense. So, once we take care of the maximum shareholder remuneration we were discussing of up to EUR 5 billion, including HOCHTIEF minorities, which would imply EUR 4 billion of cash, we would be in excess of EUR 6 billion for the period to invest in our investment opportunities. What are those opportunities? First of all, Nuria has discussed about the SR 400. Between now and 2030, there will be the deployment of the EUR 1 billion, $1.1 billion, Nuria mentioned for the SR 400. At that point, we will have already capital committed for the further jobs we are going to win, and will be deployed beyond 2030. EUR 1 billion for strategic value or bolt-on acquisitions.
We have got a track record already in some of the different businesses I have been talking about it, how to build organically a capability, but on a selective basis and on a highly synergetic analysis approach to bring capability into the business to accelerate the growth. Critical minerals, more lately, industrial and energy, we have done quite a lot. I think there is a space there as well for modular construction and prefabrication, selectively maintaining our low-risk and strong cash generation model in Turner and other group companies, but selective investment in modular to accelerate the implementation. EUR 1 billion for Abertis, our super busy colleagues in Abertis, which we support very happily to continue to grow the business and replace the EBITDA and give us very attractive returns. So, EUR 1 billion for Abertis and EUR 2.8 billion for data center development.
This includes large scale, both platforms, plus the small scale, which is much smaller in size, right? But it is EUR 2.8 billion, which is a net investment really, taking into account on the one hand, the agreements we already have when we set up Coravel in terms of renounce, et cetera, as were agreed at the beginning. But also, the monetization of 50% of the portfolio in ACS, currently in ACS D&E, at the right time, at the maximum price, right? So, that is already netted. All that amounts to EUR 2.8 billion. We are still left for beyond EUR 500 million to invest in other opportunities.
Nuria has talked about the amount of, which we do not talk about so often, but there is a continuous pipeline of opportunities, PPP opportunities, et cetera, which we will continue to invest in. Now that we are getting deeper into industrial and energy, there will be opportunities. We've been tendering in the past transmission lines. There will be more of that, storage, generation, et cetera. We will analyze those opportunities as well. To reinforce the point I made earlier, as you can see here, there's no monetization or divestment of assets. Our intention is to keep the brownfield assets in the balance sheet and make them liquid and cash generative, and that's why we count on the dividends I showed earlier.
We don't need to divest other assets. If we do any non-core sale, we'll be on an opportunistic basis, maximizing value, et cetera. This is quite a solid position to address our investment optionality. If there's more, which I'm sure there will be, in terms of investment opportunities, we will balance out in terms of capital allocation with the balance sheet, again, the shareholder remuneration and investment. We've got other levers as well, which would be selectively monetizing mature assets or using part of our leverage capacity to a certain extent within our financial policy.
Well, I'm not going to stop a lot on this one. This is just a summary of the valuation investment values I've talked about and the valuation measures or the valuation expectations for 2030 and 2035 for the greenfield portfolio that our colleagues have been talking about in previous conversations, presentations, sorry. These are based on market standard consistent ratios and multiples, and contrasted with DCF valuations on market terms. As you can see on the slide, we're looking to approaching EUR 40 billion value of this platform by 2035 or EUR 20 billion in 2030, just for the greenfield portfolio. To sum up and reinforce what are the key messages in my view.
I think that the Group has done a tremendous progress over the last year to position ourselves to take the next phase of growth that's coming and this supercycle of investment. There's been a lot of progress as well in terms of developing our investment platforms, Coravel, support or further investment in Abertis, D&E, and all the establishment in that part. All of that give us resiliency and very strong cash conversion to a completely different scale of the one we were discussing two or three years ago only. I think that's very transformational for the Group in terms of scale. We will continue to apply very strict discipline in terms of the capital allocation decisions between remuneration investment opportunities. We will balance that out in the right way for the best interest of our shareholders, and we will preserve a strong balance sheet. Thank you very much.
Okay. We're coming to the end of our presentation, our Capital Markets Day, and I do not want to sound redundant, so I will be very, very quick through our closing remarks. The first thing that I want everyone to take away is that we have been delivering since our last Capital Markets Day. We've been delivering, we are delivering, and we will deliver. We have in front of us a supercycle we have mentioned several times along today, but it's not for everyone. It's complex. It's for companies like us with global scale, with capabilities across sectors, with the right people, with the right knowledge, with the right systems, and embedding AI. It's a big supercycle for big global platforms. We've gone through a lot of information in terms of targets and in terms of valuation.
When you look at the screen, I think that the most important part of the presentation is where we believe we're going to be. We have a current market cap around EUR 25 billion, and we said right at the beginning, we have an intrinsic value and a consensus value of EUR 42 billion. So we have a first upside, but most importantly, when you look at 2030 and you look at the growth, we came to the conclusion that our intrinsic value, just looking at the EBITDA, keeping conservative multipliers, we could be between EUR 52 billion and EUR 56 billion intrinsic value for our end-to-end business, and we can have EUR 25 billion just with the assets we currently have by 2030 of asset valuation. So that brings us to EUR 77 billion-EUR 81 billion potential intrinsic value by 2030. What's not in here? Let me recap.
We don't have here some of the value we could generate across some of our high-growth verticals. What if a lot of the EPCM we have in critical minerals become a reality? What if we create additional synergies? We still don't know the nuclear market and the extent of it. So there's plenty of possibilities. On top of this, we have been very conservative in the way we have approached the artificial intelligence and digital demand. We're going through the curves from the 300 GW to the 180 GW, and we kept the 180 GW curve and our current market share. But when you go to the assets, we haven't spoken about the energy market, and I believe it's going to be a huge one when it comes to greenfield opportunities.
Emilio explained the capital allocation, the cash flow we're going to be able to generate, and how we will find additional opportunities in that space. Also, we gave a lot of information about the small-scale data centers. 30 data centers by 2030, potentially 45- 60 by 2032 to 2035. EUR 25 million EBITDA each. What multiple do we apply? We don't know, so we're not considering. So there's plenty of opportunities and upsides to these valuations. So, we are ready for the challenge. We have ambitious goals. We believe we can make them possible. Now I'm going to turn to the Q&A in a few minutes. I just wanted to say thank you to all of you supporting ACS, everyone that has been following and continues to support us through the web today.
More importantly, ACS people, our people that make ACS possible, and everyone that has been working very, very hard to make this Capital Markets Day possible. So I'll stop here, and then we can prepare everything for the Q&A. Thank you.
Hello. Can you hear me?
Yep.
Thanks again for today. Super useful. I had a couple of questions. You continue to talk about two additional projects beyond the SR 400, EUR 3 billion of equity deployment. Is this still valid given the context of the potentially much larger magnitude of projects after what we have seen with the I-24, the I-285? They are larger projects than we all thought initially. And the second question, you place yourself in the conservative scenario that you have identified for global data center construction. However, isn't there an even more negative scenario, more conservative scenario in which funding availability struggles both at client and ACS level? Or you completely rule that out?
Thank you. Let me start with the first one. As I said before, we still need more information about what has happened in the first ones. Let's wait pretty much to get that information. The first thing that I would like to say is, let's assume that we get information and we realize that we could have done something different with RFP. That's one option, and obviously we're going to look forward to the next ones in a different way. But when you look at the equity involved on the next ones, a lot of the equity is back-ended, right? When we look at the capital allocation and we're looking at the $1 billion-$2 billion, we're assuming that first, from now to 2030, no matter whether we win two or three, there's no equity deployment.
And even for the next generation, a lot of that is going to be back-ended. Still, that equity is valid within our pipeline and within the timing. Regarding the second question, the challenge we have with the demand is our forecast is not based on theoretical demands. It is based on what we are talking to our clients. Sometimes we struggle to correlate our conversations with our clients versus pretty much the fear we are finding in the market. Our clients give us a lot of visibility from now to 2030, and they give us a lot of flexibility on what they want to do and how they are going to do it. That is why in the presentation from Mike, Ben, and Jan on one side, and from Turner, and Peter explained it before, we have all the hyperscalers with each one of the investments per year.
Now, because we are just basing on what they are asking us to do, we believe that we are not making a mistake. So I guess you are right. We could get into a theoretical conversation about what is the global demand, and if it is 180 GW, 140 GW, 200 GW, 260 GW. But when we really base on our current conversations, we are quite confident that our forecast is sound.
G ood afternoon. It is Victor from Bernstein. Congratulations for the presentation, both Juan and Emilio. I have three questions. The first one, there is a slide when you mentioned this morning, Juan, a EUR 5.4 billion EBITDA in 2030. You mentioned in brackets, excluding infrastructure. Can you provide the figure when you include the infrastructure and the data centers coming from HOCHTIEF? This is the first one. The second question is that you mentioned that this scenario of EBITDA has been built in conservative assumptions for data centers, as [Luis] has mentioned. What could be the sensibility in terms of EBITDA and net cash flows if we go to a more aggressive scenario, let us say, more bullish scenario? And the third question is that you mentioned, Emilio, about the good chances of operational efficiencies in order to be applied for the Group.
What happened with the financial, let us say, efficiencies that the Group could reach? Because at the end, what I am taking from Turner, your colleagues, is that this group is going to generate more than EUR 2 billion EBITDA on an annual basis in the midterm, with a cash conversion of 100%. So if I am correct, this division is going to amount in billions or billions of net cash. So if we allocate that one in a proper way, what could be the impact on the EPS of the Group and the EBITDA? Thank you.
Thank you. Let me start with the first two, and I will let Emilio go to the third one. Let us look at EBITDA 2030. We are assuming, and that is what we said, separating asset versus non-asset EBITDA. Our total EBITDA forecasted for 2030 is EUR 5.8 billion. EUR 400 million of that is coming from assets. That is why I was referring to EUR 5.4 billion EBITDA, excluding assets. The reason I did that was to avoid double counting, so we could refer to a EUR 5.4 billion EBITDA from end-to-end services or end-to-end construction activities. We applied a multiplier between 9.5-10.5. That is the way we got to the EUR 52 billion-EUR 56 billion, and then we analyzed assets not through EBITDA, but through discount of cash flows. That is basically what we said before. Now, in terms of the sensitivities.
Let us try to see which are sensitivities through the Turner business and across ACS. I think that the biggest upside we have from Turner, from now to 2030, is margin, right? We are talking about more than 5% margin, potentially, right? We started at +2.4%, we came to 4%, we are looking at 5%. There is a big chance that if Turner goes through all the process, in terms of services, SourceBlue, xPL, Engineering Services, et cetera, that there is a potential for growing. Looking at the revenues of Turner, any 10 basis points of increase in margin is significant. I would say that that is the biggest sensitivity, right? Could we expect more revenues? We can. But right now, we prefer to be cautious, right? Because we need to understand more.
All these conversations about, especially the delay, not so much about if we will have the revenues, but the shift location and the timing, we prefer to be conservative. At this stage, we are cautious on the revenues, we are cautious on the market share that drive those revenues, but we do have an upside that could be the margin.
Victor, I would say several things. The first one is that optimizing the financial costs for the Group is a key priority. One of, and probably not the biggest lever for now, but one of the levers, and we are already working on that and seeing the advantages of that, is the improvement of our credit quality and the upgrade on the credit rating. We are already refinancing and saving costs on that basis. The policy by the Group has always been accountability on the financings and management of the liquidity and the debt balances in each of the different units. The steeper the curve and the greater the credit margin, the credit spreads, the more costly that strategy is, right?
On our side, you are exactly right. I mean, we are generating a lot of cash in U.S. dollars through Turner and in other currencies, and we are investing in the U.S. So, as this plan moves forward and we generate further cash in Turner and other parts of the business in the end-to-end platform, we need to redirect that cash in an efficient manner. We will deal with that over the coming years. We are already doing some, but we will deal, as the cash is generated, we will deal with that situation to optimize the cost.
Hello. Thanks, Juan and Emilio. It is Amal from UBS. Just two questions on my side. Lots of exciting opportunities ahead, and competing needs for capital. I guess you outlined, I think it was EUR 1.5 billion of M&A and additional opportunities, excluding data centers. I guess given the scale and the ambition which you have outlined, do you really think this is enough? I think, Emilio, you mentioned potentially using additional leverage. What headroom do you think you have whilst maintaining your current credit rating? Can we rule out any future equity raises? Then secondly, more specific on Coravel, but I believe the commercial operation dates have all shifted by one year versus the disclosure last year. Just want to understand what drove this. Are there some bottlenecks in construction which you did not previously anticipate?
I guess, what should give us confidence in the delivery of these new timelines? Thanks.
I will start with the last one. I do not believe we are delaying anything. In fact, the 350 MW that we did announce for commercialization by the end of the year is on track. We could miss it, worst case, by one month, so it does not really make a difference. From that perspective, it is going fast, and it is going faster in the sense that by next year, we are expecting 1.3 GW commercialized, which was not in our plans. In terms of construction, the construction is going in the right way for the three assets that we showed before, and Howard and Vicente were explaining. In terms of the capital allocation, is it enough? At the end of the day, we need to balance, right? This is not an exact math. We put different buckets, right, between the different assets.
Are we going to deploy more for M&A, or are we going to deploy more for probabilities or less in greenfield, vice versa? We're going to be flexible in that sense. Important thing is that we do have different opportunities. We have optionality. We do have strong cash flows. We can always handle the capital allocation with dividends. We also have the option of monetizing non-core assets. On the balance sheet?
Yeah, I guess a similar question. I would just add, you were asking about the additional debt capacity. The intention is not to lever the balance sheet as a principle to address investments. We want to do this as a principle, keeping our balance sheet strong where it is. Having said that, within the investment rating headroom, I mean, category, we have significant headroom at the moment. In the billions right now. We're sitting on BBB. We have really strong metrics at the moment, and the projections are very solid. Over time, we will build more.
Hi, thank you very much. It's Graham Hunt from Jefferies. I've just got three questions, if that's all right. First, if I could start with Abertis. You talked a lot about the work you've done on that business and the much more significant growth you see now versus a few years ago in the backlog. But we're still sitting on similar dividends or the same dividend payout from the asset, and you've got EUR 1 billion of equity to invest back into that business by 2030. I guess my question on Abertis is, when could we expect some of that growth that you're talking to come through the dividends back up to you as equity holders?
Second question, just on going back to the express lanes, could you maybe talk a little bit about the relative attractiveness of those other projects outside of the I-285 and the I-24? Are those similar in terms of what you perceive as sort of IRR potential in terms of the congestion and pricing frameworks that they're on offer, for example, in the I-77 South? Last question, just quickly on HOCHTIEF. I don't think I saw that explicitly in your capital allocation framework slide. Just where does that sit? Is that on top of the buckets that you've laid out in terms of opportunistic purchases of shares there? Thanks.
I'll start with Abertis. Abertis is very accretive for us, in spite of being a brownfield platform. It is accretive because most of the EBITDA of Abertis is restricted. It is restricted because of different things. Ratios, FFO versus net debt from rating agencies, because of soft currencies, different things. As we put equity into Abertis, first, we do have a profit IRR at project level. At Abertis level, obviously, gearing and leverage works in our favor. Then we are unlocking a lot of that value. Unfortunately, there is a threshold to unlock that value. It is not linear. There is a threshold. As soon as we get into that threshold, all of that is pretty much released.
That is when you look at our dividends, you will see that we are at EUR 300 million, we grow to EUR 500 million within the next five years, and eventually it goes to EUR 1.5 billion, EUR 2.5 billion, et cetera. That has to do with data centers, that has to do with greenfield, but it has to do a lot with Abertis. That is why it is so important for us, Abertis. That is on Abertis. On managed lanes, we still believe that managed lanes are attractive. The positive thing we have is, and we are referring to optionality in general, but look at our possibilities around the greenfield, right? Not just in managed lanes in the U.S. We are being very successful in winning projects across transport, across sustainable mobility, and potentially across energy in the future, in addition to data centers. Again, we have optionality.
It is about capital allocation, what works better for us. Abertis competes with that, for all the reasons I mentioned before. We need to add Abertis into that optionality. We want to make sure that we do the right thing and we maximize the profitability. Eventually, we will know what has happened in Tennessee and in Georgia I-285. No matter what has happened, the winner has paid $18 billion more for each one of them. That is a fact. I mean, that is a fact. If we had won those jobs, we would have paid $18 billion more in each one of those projects. We will analyze the conditions and we will see if that is worth it or not. We will need to look at the rest of the projects. It is early days to analyze it. Two things can happen.
The first one is, yeah, they still make sense and we will go through the market. Two, we will get to the conclusion that best case, they are paying brownfield values for greenfield projects. Maybe then we decide to go to data centers. Maybe we decide to go to energy transmission lines, or we go to Abertis. So we have optionality. That is a good thing. It is about resiliency. On HOCHTIEF, you are right. It is opportunistic. That is why we are not including in our capital allocation.
Luis Prieto again. Sorry, a follow-up from me. I just wanted to ask you how you feel about Sanef in the context of the debate of the increased tax on long-distance infrastructure concessions in the country. Then ahead of elections, and obviously there are certain scenarios that could be adverse, have you given any thought to a potential nationalization of the assets? Which obviously could lead to a slightly different outcome versus the numbers you presented. Thank you.
On the tax in Sanef. I mean, obviously, well, first, still subject to ongoing legal process. On the other side, if appeal moves forward, we're going to challenge in court. The important thing is that assuming the worst case, that the tax will happen, we are not changing our guidance, or we haven't changed any of what we have explained today, which is assuming that the tax will happen. We're not thinking, or we are not assuming, making an assumption or a potential recovery, right? That doesn't change. Our assumptions include that deal happen. Our assumptions include that Sanef will come to an end, and we are not thinking at this stage, we're not speculating about a retender. Do I think that the base case of France would be to retender those jobs? I believe that's reasonable.
We're not considering it, but I believe it's reasonable because it's good for France. One of the challenges that the world is going to face, and I'm sure through our presentation we got to that conclusion, is all of these projects traditionally have been paid by public agencies and nations. There's no capacity. There's a need to bring the private sector. All of those are pretty much PPPs. If right now all the countries in Europe, they need to face their social obligations, their debt obligations in a scenario of increased interest rates with the restrictions of the rating agencies and what we're seeing. If they need to go through all the increase in escalation of inflation of services like healthcare, pension funds, and now at defense, there's a need to get additional money.
I believe that it's reasonable that anyone that gets into power will consider private money from PPPs, in this case for France. But there's a lot of different views about it. Different candidates have expressed different views and otherwise, and different directions. So, it could only be an upside for us, because right now we are assuming that there's no renovation, there's no retendering, we are not getting back France, and we're assuming dealt. So we're assuming the worst-case scenario. That could only be an upside.
Hello, this is José Manuel Arroyas from Santander. Thank you. Thank you for your presentation and the opportunity to ask you. I have three sets of questions, if I may. I will come back to Abertis and Sanef. I'm afraid there has been a lot of emphasis in Peter's presentation today about the EBITDA replenishment, but I wanted to focus more a little bit on the dividend replenishment at the holdco level. Is there any platform within the Abertis group, be it RCO in Mexico, Brazil, Chile, that can provide the same level of dividends that Sanef is currently providing to Abertis? That's as far as Abertis goes. Then I wanted to ask you about the energy, water, and industrial solutions unit and the nuclear unit, which are a significant contributor to the 2030 targets. What type of contracts are you pursuing in those businesses?
Are they also cost- plus, or are they more EPC lump sums? Are you factoring in any M&A in the 2030 targets that you have provided for revenues in particular? My last set of questions is on Coravel. Correct me if I'm wrong, but I believe last year you provided a slightly earlier commercialization dates for some of the assets. I wanted to get your thoughts on why there has been, if I'm right, a slight delay. I don't know if you could help us to build our models, what revenues, EBITDA, or dividends will Coravel contribute, and are they part of your earnings targets that you have provided today?
Okay, so I'll start with Abertis. At the end of the day, we look at the dividend from Abertis as a whole, okay? I get back to my previous answer in the sense that we have plenty of EBITDA backlog to replace that dividend, right? As per today, Abertis is giving EUR 600 million overall, and we believe that those EUR 600 million will continue, thanks to all what we have achieved and thanks to additional potential growth, whether organic or inorganic. So, what we are expecting and forecasting, it's a dividend of Abertis for EUR 600 million within the next years and starting to grow eventually. So from that perspective, it's not just that we are replacing the EBITDA, and you're right.
I mean, the EUR 4.6 billion that we have today, this year, will continue having the EUR 4.7 billion post 2033 once Sanef finishes, but also we are expecting to continue keeping the dividend with all what we're doing. In terms of data centers, I mean, I asked the questions too. I mean, the last time we spoke, we spoke about a commercialization of 250 MW before the end of the year. Right now, we're updating that to 350 MW. So I'm not sure where the delay that everyone is referring, right? We're thinking from 2025 to 2030 to pretty much incredible reach the 1.2 GW. And right now we're looking at 1.3 GW next year, right? And 2.1 GW in the same period, with assets secured. Some of those 2.1 GW IT, which is 3 GW total utility, were without assets, right?
Or assets not identified, and now all those assets are identified. I believe we are moving faster than what we said, right? Was there any other question?
Type of contracts, I think you asked about—
That's right, on the industrial side. We're looking at the full scope, or range of projects that we put on screen. We see a lot of opportunities, especially in generation and transmission, right? A lot of opportunities in that space. But we also see opportunities in some of the industrial plants, as a consequence of the onshoring to Europe and to the U.S. We are not looking for [inaudible] EPCs, right? I mean, we have a very healthy balance sheet. We don't want to destroy it. So we're looking forward more to collaborative, progressive designs, alliances, et cetera. No difference with our current civil strategy.
Hi, yeah, it's Graham Hunt with Jefferies again. Thank you for the follow-up, and I should say thank you to everyone at ACS for a very detailed presentation. Just two quick questions. First on group structure. I think, Juan, you've been very successful at simplifying ACS and bringing the Group together as one. Do you see any more opportunity for corporate structure simplification from here? And then second question, I know you have commented on this, but just on the U.S. listing, the sort of headlines earlier in the week or last week, what's your position there in terms of a U.S. listing? And I suppose, why wouldn't it make sense for ACS to have a U.S. listing?
Do we see further opportunities? Yes, we do see further opportunities. Mainly it will depend how things evolve, right? The reality is that integrated solutions in ACS is becoming very, very strong, represented by Turner globally, right? So Turner is not anymore only a U.S. platform, it's a global platform, right? With projects everywhere and supporting the rest of the Group. That's a fact. At the same time, we do have our critical minerals and natural resources division that is global, right? It's becoming more global than ever. It was very much focused in Australia, Asia-Pacific. They continue winning work in North America and South America. So that's a global platform by itself. We're seeing an industrial platform that is being born right now, but it's growing very, very, very fast.
We see a nuclear platform as a subset of that energy, water, and industrial that is also taking shape, and it's going to become a major one. Then we have the civil and building business, which has always been and will continue being very local. There's a potential also to be working globally under one brand, and then locally under different brands. Would it make sense that eventually we do have four end-to-end divisions globally with an asset infrastructure, ACS Infrastructure business, with the overheads through regions, so that we are self-service? That would certainly simplify even more. That would show and provide visibility on the multiples for each one of those sectors. We would have an upside in terms of multiples, because right now, if you go back, the first change we did before 2022, we used to report through geographies.
Everything was the same, civil, building. One single multiple for everything. We decided to go one step, as we were transforming the business, we had to give visibility, which was the company better positioned to capture most of that growth, Turner. So we gave visibility on Turner, integrated solutions, right? We kept CIMIC, we kept E&C. What if we were giving visibility of each one of those businesses? Today, we introduced the verticals, then we explained how it integrates into the businesses. What if we were pretty much converging verticals and report higher multiples, more simplicity, upside, right? That's something that we keep in mind. Yes, we prefer —does it make sense for us to be listed in the U.S.? Yeah. Does it make sense for us to acquire the rest of HOCHTIEF? Yes. But we are not considering it right now. We're opportunistic, right?
That's something that if the opportunity presents, we'll analyze, but we are not there, and we haven't made any decision.
Thanks for allowing me to follow up. Three further questions, if I may. Just wanted to dig a bit more into the Turner 2030 assumptions. I think previously you spoke about $30 billion revenues in data centers, and I think now this is $28 billion-$30 billion. I know it's obviously a small thing, but is this you exercising caution ahead of what you anticipate will be tighter regulation, or is this an adjustment you're making based on real-time developments that you're seeing today? Also the 5% PBT margin. I understand obviously that DCs are not only accretive to the top line of Turner, but also from a margin perspective, and you were very helpful last year in providing us some of the margin profile of your data center products within Turner. But I guess, this still looks quite ambitious even considering that, this 5% PBT.
I guess beyond the growing share of data centers in Turner's revenue mix, can you walk me through the levers for margin expansion within Turner? My second question is on the power usage efficiencies. Based on the megawatt of IT, which you show on the slides today, I think some of the assets are closer to 1.5. I understand last year you gave around 1.45 as the guidance, but I guess my understanding is some of the most sophisticated hyperscaler facilities have power usage closer to 1.15, 1.1. So, why are yours so much less efficient? Do you think this will act as a detrimental cause to you sourcing customers, or is this a [floor], and this is just you guys being quite conservative? Thanks.
Starting with Turner. Giving ranges for the numbers really doesn't really change. It's not an adjustment. We prefer to be cautious and provide ranges, and we have thought a lot about, should we give a number, should we give ranges, et cetera. Things at the end could move around. At the end, we try to be as disciplined as possible with information and try to not overpromise and underdeliver. That's why we also give a little bit of room, right? Bear in mind that we're talking about revenues of $30 billion by 2030 in data centers. Through our conversations, it's not a guidance, it's a conversation. When we communicate today, we give a little bit more seriousness to the communication, and we prefer to be cautious. On the other one, on the last one, the efficiencies, do you mind to repeat the question?
When you're talking about the ratio and efficiency—
Yeah. So, capacity versus megawatt of IT. So, the power usage, essentially, effectiveness. I believe last year you spoke about around 1.45 on your slides. If I calculate correctly today, some of those assets are closer to 1.5, and I think, or at least my understanding was some of the more sophisticated facilities being built by some of the hyperscalers are pushing sort of close to 1.1 in some cases. What explains that difference there?
Yeah. I mean, 1.45, I would say that is the high peak. 1.1, 1.15 is pretty much the average, right? There is a difference. When we were referring to the 1.45, we are referring to the peak. If we were going to average for the same assets, it is more 1.1, 1.15. We are pretty much talking about the same figures.
Let us go to the virtual questions. We have several questions from our followers of the stream. There is a couple, some have been already asked, and I am not going to repeat them, but there is a couple of them that are interesting. Jamie Smallbone from JP Morgan is asking about that we have said that 90% of data center revenues have been secured for the next two years, but how much is secured thereafter? Is there any difference between a data center contract in construction model, economics models, between U.S. and Europe?
Starting for the first one. Of the buckets, the first one clearly is under construction, and the second bucket, it is in engineering, so it is very much advanced. The third one is the one that we have less visibility. As we said before, it is not so much about cancellations, it is about location shifting and maybe timing. But we do not have any information, right? I came back to some of the communications and declarations from current governors in the U.S. that they are saying, "We are not against it. We just want to make sure that we analyze and we make them sustainable before making a decision." That is on data centers. In terms of the U.S. versus Europe, there are basically difference in scale, right? And difference in energy.
In the U.S., they are having huge facilities because of training of AI, and also they are much more flexible when it comes to behind-the-meter solutions, because they do not have a problem with gas, while in the EU, gas is quite expensive. Contractual obligations are similar. We are not seeing any difference. They are global, right? From a legal perspective, pretty much they are the same. In terms of size, the difference is basically what I said, 400 MW up in the U.S., Europe up to 200 MW. That is what we are seeing, with a few exceptions. There is always exceptions with both things. But the driver is more about the location. It is not so much U.S. versus Europe. Tier one locations have higher economics versus tier twos or tier threes. It depends on the cost of energy, it depends on permitting, and speed to market, I would say.
There is a second question. Hello? There is a second question from Filipe Leite, CaixaBank, which is asking us about how much of the total valuation of EUR 25 billion of the infra assets by 2030 correspond to Abertis.
EUR 6 billion.
There are no more questions.
Yeah. Yeah. Can I? Yeah. Miguel Medina from [inaudible]. Just one clarification and one question. The clarification is regarding Abertis. I am not sure I understood correctly. The potential impact of the tax change in France that kicks in next year, if it is finally approved, is that already incorporated into the cumulative EBITDA of Abertis? That was the clarification. The question is regarding the incentive plan that was announced yesterday. If I go through all the presentations from today, you have provided very detailed targets in terms of backlog, revenues, EBITDA, margins, but you have never mentioned returns. I think with the exception of transport infrastructure, which was, they mentioned the equity IRR. If I go to the incentive plan, the only financial threshold is the return on equity.
Just wondering whether it would make sense to incorporate into the incentive plan some targets in terms of EBITDA, revenues, et cetera. Thank you.
Okay. When I was referring to Abertis, at the end of the day, the deal is incorporated into the ACS plan, right? In our forecast as ACS. Whether the deal incorporated into Abertis or not, I am not sure at this stage.
Well, our position is we have got a recovery claim for the deal.
Within Abertis.
Within Abertis.
Within Abertis. Abertis, right now, the position is recovery. At ACS level, it's different, and that's the one that I was referring before. Does it make sense to incorporate that in the plan? I guess so, right? I mean, it's already approved. We have been following the same guidelines that were given to us in the benchmark and what pretty much has been the same incentive plan for the last 20 years from ACS, right? In that sense, it remains the same. We can always incorporate towards the next one, because this one was approved, those factors. You want to add anything, Emilio?
No, maybe just that, I mean, there's an [ROE], return on equity requirement, but there's also a relative performance in the market versus our peers. So, in a way, you are already incorporating it indirectly because you're comparing to your peers in the different markets.
Thanks. Apologies, you are probably sick of me by now. I just wanted to follow up on one of my earlier questions. The 5% PBT margin for Turner, I think, aside from a growing share of data centers in Turner's revenue mix and that being accretive to the margin, can you talk about the other levers to achieve that 5%? Because that still seems quite ambitious given average levels of data center margins that we see today. Thanks.
Well, I guess the main levers are the ones that Turner was explaining before, right? It is about achieving more self-performance, achieving more modularization, becoming more efficient when it comes to the systems, and embedding AI. A lot of those things will drive the margins. If you look at the specialty contractors, they are getting margins of 12%. So, there is room to grow, right? The more we specialize, the more we modularize, the more it is our ability to increase the margins. We have gone from margins mainly as a general contractor in non-special fields, and we have been growing as we get closer to that. So, there is room for growth, right? I would not say that we are comfortable with 5%, and we believe that we can achieve more. We are not. We are confident in that sense. Okay.
If there are no further questions, I would like to thank you all for coming today, for your continued support, for following us, and I look forward to continuing this proactive partnership. Thank you so much, everyone.