Earnings Call: Q3 2026

Nov 13, 2026

Summary

TGI’s Q3 results improved sequentially as drought-driven thermal demand supported gas transport, though lower domestic supply and delayed tariffs weighed on YoY performance. Cálidda grew volume 10% and EBITDA 15.3%, and lifted its EBITDA outlook by 4%.

Karen Guzmán
Financing and Investor Relations Manager, Grupo Energía Bogotá

Good morning. I am Karen Guzmán, Financing and Investor Relations Manager of Grupo Energía Bogotá. Welcome to our conference of results TGI Cálidda of the third quarter 2026. This is made in Spanish with simultaneous translation, and it is recorded. The final results were published yesterday, and they are available for your consultation today at TGI and Cálidda. Once we have completed the TGI presentation, we are going to be listening to your concerns, and then we will continue with the Cálidda presentation. Please write your questions in the chat of the call with your name and the entity that you represent. Jorge is going to start with the presentation of the TGI results. Good morning, Jorge.

Jorge Andrés Tabares
CFO, Grupo Energía Bogotá

Good morning, Karen, and good morning everybody who are with us in the presentation of results of this third quarter of 2026 of TGI. Thank you very much for the presentation and for the information. I want to start saying that regarding the second quarter of 2026, we have results much better. This shows the behavior of improvement in the market thanks to the implementation of measures that allow us to supply gas in the El Niño phenomenon and the implementation of products by means of contracts and parking contracts to have solutions for the thermal plants to have an economic performance during this drought that the country goes through.

Relevant figures, we are happy to report to you that we have 4.3 greater than the same period last year. This represents COP 466 billion increase with a transported volume of 448 MMcf/d against 419 MMcf/d that we got in the prior period, with a parking that allows us to have 1.9 greater than the second quarter of 2026. Basically, the other income or revenue were concentrated in other projects that came to the operation, 306 million. Here we have COP 14 billion that we got in this third quarter of 2026.

This behavior also is expected for the final quarter of the year with all the measures that the national government and us, likewise, as main transporter of gas, are adopting to supply the gas that is needed in the thermal plants and the industry in this drought phenomenon. Regarding the EBITDA, it is important to mention that we have 18.3 greater than the second quarter of 2026. We have a generation of value, very important, and closer to the same period for 2025 with 4% less than 2025.

We are transporting less gas due to the absence of gas and the absence of this resource in the different sources that the country comes with to be able to transport it and use it. It is important to mention that to be able to obtain this EBITDA with greater conditions, we obtain an OpEx actually positive. Then we have an optimization of reposition of 92, and in cost and gas, the order of COP 2 billion. We got an OpEx of COP 90.3 million and a greater result than the second quarter of 2026 with 18.3% greater with an EBITDA of COP 94.3 million.

In the following slide, we can see that to integrate these results, regardless that we had a financial expense greater, we have two points greater, which is and 17% greater in bonds, which means COP 13 billion more. In the net profit, we have a result of 32% against the second quarter of 2026. We got COP 100 billion greater, which is the most important goal of the last three quarters of the year and w e expect to continue with the same trend this year and to maintain it in the final quarter of this year to allow us to close the year with the best possible condition given the absence of gas. Thanks to the provision of gas, to be able to get better result with the products that the market needs to get a return to close the year in the best.

In the following slide, we report something that is very important. We know that we have an impact of size regarding the absence of the bill. We have made a process of presentation of different resolutions with the CREG. We have made the presentations, and we have made proposals with all the arguments to allow today for the commissioners to have a possibility of new fees, but we have to wait until the administrative act, so we cannot make a big or call victory but w e expect to have very good decisions in the following weeks to be able to apply them in 2027.

We believe that the CREG, as they let us know, they have all the elements and information, and the importance of the transportation by regional aggregation fees to issue the administrative act to allow us to apply these rates in the following year. We expect to have 2026 closed with the new fees that allow us to start applying the new change of WACC of 10.94% and to return to the 11.88%, because very likely the absence of issues of rates and the absence of the WACC 11.88% since April that we haven't been able to apply, it has brought an impact today of COP 56 billion that obviously it brings consequences, of course, in the generation of value of return and in the report of net profit.

We are dedicated with the regulation, legal, and technical team to get the new rates issued soon and to close 2026 with this milestone that has been used in the last years, but we expect this to be a reality. In the following slide, we show you the progress in the projects that have been approved or that have technical report favorable to become IPATs in the following years. This is very important because this is the long-term vision of TGI. The execution of these projects in the following years is going to allow us to bring the returns and to compensate all changes in volume from 2028, 2029.

Today, we have five IPAT projects that are basically the bidirectional Vasconia-Mariquita, Vasconia-La Belleza, the Gasoducto Centauros-Granada, and the Gasoducto Gualanday-Neiva. In addition to that, we have as a private project the regasification plant of La Guajira, which is the first one that it shows there. And f or the following months, we expect to be able to add the produce of useful normative and the extension of Ballena-Barranca, which given the growth of import through the Caribbean, it becomes a need. These projects are going to allow us to have the income that TGI requires to compensate the reduction that we have had this year and to be able to reach net profit figures and dividends to the max as of 2028.

We are promoting the energetic hub of La Guajira, which allows to understand that from the plant of Ballena to be able to supply not only the deficit to the interior to the country where we have most of the industry in the country, but where we have the great size consumption of gas, but also any event that the system in the Caribbean coast may have.

The energetic hub allows to receive the spec gas that can be freed after consumption, or the excess of the thermal plants of the coast, but also allows in the future to receive the Sirius gas. Also, they get the Antonio Ricaurte gas duct, that its rehabilitation has been announced by Ecopetrol in the last days, and where TGI has expressed full interest and the cooperation thanks to the experience and resources that it counts with to participate in this rehabilitation. Let's remember that this is a gas duct of 125 km and 26, which is in between Venezuelan and Colombian territory, but also reaches the Ballena plant. That's why the different sources of gas are going to merge, including the regasification plant in La Guajira.

This hub is going to allow us to supply gas not only from the interior, but also to be able to supply in case of any failures of the Caribbean coast that is supplied by spec that in the future is going to help the Puerto Ballena's plant. B efore Ecopetrol and the different authorities, we have promoted this energy hub to assure the different sources of gas for the country to be able to count with them and to assure that in the future, El Niño phenomenons and the growing demand of industrial gas to be able to supply this resource that, of course, it is the energy resource of the industry and of the regulated sector.

In the following slide, I showed you basically what we have been working with. This is the sample of the best results of the third quarter of 2026, which are in interruptible contracts for the thermal energy. We have in parking and flexible losses, we have COP 6.62 billion. We have an improvement in the curve of transported volume. In the second quarter of 2026, we transported 406 in the first quarter, 404. Now we are transporting 419, and this figure is maintaining in the last quarter.

Regarding contracts, we have also an improvement, but the most important increase is in the interruptible, which we have figures of 113 cu ft that we brought against 111 cu ft. This trend shows the need of gas as the preference resource of energy in these phenomenons of drought, and we are ready to supply with all our infrastructure the gas that is required. We expect that the different sources be able to supply the maximum gas possible, and for us to transport and pack, and to be able to allow by parking to supply the maximum needs with products that allow to have somehow through interruptibles to supply that need that is required by the plants all the way through the end of this year and to the half of next year at the end of the El Niño phenomenon.

In this slide, I show some important factors regarding the transformation pillar. We are working with 18 initiatives in different areas with a financial impact of COP 3.6 billion, a reduction in the HHT of 14,000. The key initiatives that I can highlight is the gas quality tracking and the statistical models for estimating the probability of pipeline failures. All these models allow us to assure better measures, better transfer, and of course, to prevent failures in the transportation systems and in the compression systems. This brings us improvements in all the expenses and investments that we have for repairs in the transportation and gas duct systems.

In the efficiency pillar, I am happy to mention that we have an improvement in OpEx capture of COP 19.5 billion and in CapEx, COP 14 billion. Here we have a hydraulic optimization in transport. We have a repair optimization which allow us to reduce the investment cost, and also we have a reduction in optimization due to insurance. It is important to mention also that regarding the sustainability pillar, we are in the first place in four consecutive years in S&P in gas, and in the first year, we have the Gold Standard of OGMP, which is very important for us to continue in this pathway of high standards that allow us to have a comprehensive and trustworthy operation for all our users and collaborators. This is the most important that I have for today. I leave you with Beatriz.

Beatriz Elena Arbeláez Martínez
CFO, TGI

Well, good morning everybody. I start today sharing with you basically the evolution of TGI in the third quarters regarding the third quarter of 2025. As Jorge has already presented, we have been improving in comparison with the second quarter, but in comparison with the third quarter of 2025, we have presented a reduction in the high capacity due to the events in the reduction of the national sources of import that we are expected to compensate with thermal generation.

Due to that factor, we got a reduction of 34 million of cubic feet, the high capacity that was contracted interruptible. Anyway, we continue with a trustworthy index. We have a Gold Standard in terms of continuity of service because we reach about 100%. This reduction in the high capacity regarding the third quarter of last year, it presented a reduction of COP 38 billion. I n the quarter, we fell 7.5%. This is due to that we started to apply the reduced WACC of 10.94% in the month of April of this year.

When we go to the next one, if we start with the EBITDA, then this fall in the return of COP 38 billion has been compensated with a big reduction that we have had in the OpEx, that we had in the third quarter, that we have a reduction of COP 19 billion. With that, we recovered or compensated the drop of the income, and the EBITDA falls less of COP 19 billion to reach 4.8% of drop in the EBITDA. When we go to the operational income, that includes the impact of the depreciations, amortizations, the provisions, and other operational income, the effect is that we reduce that negative margin, and we have only COP 3 billion of drop in the operational income.

This is due to reversion of provisions for a value of about COP 17 billion, which is compensated partially with the increase in the depreciations and amortization of about COP 2.46 billion, and other results of the operational incomes with operational reserves and the recharge that we've been having of the policies of that course. When we go to explain the net income, fundamentally, we have an impact in all the non-operational factor that has a main driver, the impact that we have had of the increase of the RV this year, which has increased about 200 basis points.

For that reason, we have increased the financial expenses, which were favorably compensated by a positive effort in our participation in Contugas, and because the difference of change of the derivatives that we have to cover the bonus favor us. This is what take us to a drop of COP 7 billion, which is not a big drop fundamentally because we have made some strong actions, mainly on the reduction of the expenditure to reduce this effect, and because we have also recovering in the situation regarding the contracting of gas in the last quarter.

Now, when we go to our financial indicators, we can see there that with the cut in September, we have COP 2.6 billion, and clearly that debt is represented fundamentally in 70% with our debt with international market, the bonds that have a balance of $547 million. The weighted average cost has been increasing fundamentally by the index that we have with the coverage of the bond. Nevertheless, as it can be seen, the indicators of leverage and coverage of financial costs, we have them very favorable, particularly the unleverage that as is been seen in the graph, we have only 1.6x of net debt regarding the EBITDA of the last 12 months.

And our profile of maturity, we have an important change in October. That's when the international bond is due and the glutel that we negotiated last year for 2032, but we are working actively, and it's already been approved the policy to renegotiate the bond that it is probably in the questions we can answer better about the renegotiation strategy. Thank you very much.

Karen Guzmán
Financing and Investor Relations Manager, Grupo Energía Bogotá

Thank you very much. We have several questions, so we are going to start with one that is by Florencia Mayorga of MetLife that also replicates one from Nicole Morales from Glencore, regarding what is the plan for the renegotiation of the bond 2028.

Beatriz Elena Arbeláez Martínez
CFO, TGI

Thank you, Karen. Fundamentally, we already evaluated the different alternatives for the renegotiation of the bond, and this strategy for the refinancing of that bond was approved by the Board of Directors. The proposal is that we are going to obtain a backstop facility that is going to allow us to cover the maturity of the bond in the same 2028, which is the backstop facility basically is about that we are going to sign a committed line that we are managing with the international banks in U.S. dollars, and whose purpose is to obtain the liquidity that it is going to allow us to attend the payment of that obligation on November 1st, 2028.

That committed line we are expecting to launch it to the market in the month of January of this 2027, with the purpose of guaranteeing those resources and signing it before the closure of this year. This committed line would have a term of three years, and those three years are going to allow us to move in the pathway to obtain the long-term funding.

For the finance of this long-term financing, we are combining, for one, the probability with a MIGA guarantee, and second, to obtain some funding by means of a bond in the capital international markets by issuing a global comp, and also we are considering the possibility of issuing in the capital market in Colombian pesos. But for that, we have three years that are going to give us the opportunity. We are going to move on the pathway so that we could anticipate the payment of the facility in the correct terms in those three years.

Karen Guzmán
Financing and Investor Relations Manager, Grupo Energía Bogotá

Thank you, Beatriz. The following question is from Florencia. How we see the trend of the midlife of the contracts? Heliodoro Mayorga, a Commercial Management of TGI, is going to answer.

Heliodoro Mayorga
Business Development Manager, TGI

Good morning, everybody. Regarding the trend of contractual life, we have 13 factors that are being added for this midlife. In the first place, the thermal needs that are being provided with interrupted contracts that are being met, and the following years' need are with quarter or yearly contracts. Most of the demand is being met with this type of contracts, but also there are some agents that are taking positions in long term. There are some agents that have contracted term years as of 2030, which has also improved the midlife that we have reported in prior periods, s o we have the three trends, but this is subject to the potential sources of molecule in the future.

Karen Guzmán
Financing and Investor Relations Manager, Grupo Energía Bogotá

Thank you, Heliodoro. We also have another question from Florencia regarding the feasibility to execute the expansion projects. For this, Jorge Andrés is going to answer.

Jorge Andrés Tabares
CFO, Grupo Energía Bogotá

Thank you for the question. Basically, the feasibility to execute the dispatch projects is absolutely high and feasible because they are the projects that are going to assure the change of gas source that the country is affected. Every day we have less gas from Cusiana, Cupiagua, and Floreña, and the gas that supplies that deficit is going to come from the Caribbean or is going to come from the Pacific. Undoubtedly, those expansion projects are going to allow to get the capacities that the transport system needs to transport by the new sources, this natural gas. The probability of execution is quite high. We have had recurring discussions with the team of the Regulation Commission of Gas and Energy to obtain the assessment of these projects very soon, and for us to be able to start with engineer projects and the construction as of 2027 and 2028.

Karen Guzmán
Financing and Investor Relations Manager, Grupo Energía Bogotá

Thank you very much. We do not have any other concerns now, so we are going to continue with the results of Cálidda. Many see Cálidda as a network that carries natural gas, but we are also a key to the progress, as the popular dining hall of Daniel that feeds more people, or Mr. Victor that moved from a taxi to GNV to a fleet, or Estilos Mari that now uses hot water, and the Galindo that access Cálidda to remodel their home. We have been improving life of more than 9 million Peruvians for 20 years with eco-friendly energy in our country. Cálidda, energy that empowers.

Mario Caballero
CFO, Cálidda

Good morning. Thank you for being with us with the presentation of results third quarter 2026 of Cálidda. So th e relevant factors are, this quarter, we have a growth of 10% in all the segments that we serve, have a positive evolution in the last. We have more than 100,000 between residents and commerce and businesses. It is adding to the volume, all we have now with important efforts in continue developing the vehicle sector. The light vehicle, we have about 330,000 vehicles converted compared to the figures that we have. We have an improvement of 4%, now with 11,000 vehicles with a 20% growth. Now, we have had some effects due to the El Niño phenomenon.

In the construction sector, we have connected a company or relevant industry regarding the glass production, floating glass, with a production that is going to contribute between 2 cu m and 3 cu m in increase. In addition to that, the thermal sector has had a positive performance. The El Niño impacts Peru with rain, and also the reservoirs that increase, which has increased greater thermal generation, so with a growth of 6%. When we see the connection plan, we continue with the plan that we have committed 25,000 connections this quarter and 120 additional kilometers in networks. We are reaching more than 2.6 million customers connected, and we are reaching to 20,000 km of networks built.

We have the status of the distribution with a maturity level, but quite relevant. The EBITDA growing 15%, it has two components, the volume component and also the impact of the fees. The fees that were approved in May has a full impact in the third quarter. Between both of them, it is leveraging this relevant growth. And regarding the credit ratings, we keep it quite stable. We had the review of agencies with stability in the perspectives. As it was mentioned, we continue developing the heavy vehicle sector. We are not only focusing on the segment of logistic or heavy transportation, but also we are engaging other sub-segments.

We are covering the conversion of compactors and a fleet of haulers for the municipality of Villa El Salvador. So we continue working in this segment in the future. And regarding sustainability, the popular dining halls are basic in Peru for the sustainability of the diet in different sectors. Cálidda has supplied 1,000 conversions free of charge to these dining halls, and 40% where we have been able to transform all the infrastructure. It is an anchor infrastructure in this contribution to the communities that we are going to continue developing.

And now in the specific indicators, like the growth of the volume year per year, 10%, all the segments showing improvement that we 7% increase regarding the prior quarter, especially the competitiveness is maintained in very good levels, depending on the segment that it is being assessed. We are between 40% and 60% in the economics than other substitutes, and we continue with the vision that this competitiveness is going to continue in the future, where we could have the forecast of the volumes and to feed the same in the different categories that we serve.

Regarding the operation that we have had, 25,000 connections that we have mentioned, now reaching 2.2 million users. All the areas that cover our concession have been covered. We have some remnants in the peripheric areas. The kilometers that we are going to execute in the future, we are going to continue adding. Actually, they are going to be marginal. It is important to highlight that the proportion of connections that we have made has greater participation of the highest economic sectors that are representing more than 30% due to that in our concession, we started the expansion in the vulnerable sectors.

The increase in the higher sectors has an important impact because a residential client in those levels increase the consumption of what we have today that are covered in our concession. Regarding EBITDA, we have about 15.3% increase, 5.8% per rate. If we exclude the thermal component, this growth would be between around 10%. Regarding the net income, regarding last year, this is an increase that it is about 5%. It is important to highlight that the third quarter of 2025, we had, due to a refunding exercise where we exchanged a syndicate regarding a debt with a multilateral debt.

Also, we had a derivate that it is in a position, that derivate that corresponded to an income of about $6 million for global minimum tax. If we deduct that factor, the increase in the income is of 20%, all with our growing 10%. Regarding the management of our debt, we have about $1 billion of passive liabilities. For 2028, we have about $280 million. And today, we are working in scenarios depending on whether we obtain or not an answer in the following months regarding the extension that I am going to share at the end of my presentation and t he other scenario is basically, if we don't close this, we are working in scenarios for both cases. We have mapped alternatives that we are going to share with greater details in the next OpEx call.

So the lever ratios that we have below four and multiples of five with stability. Regarding perspectives, basically, in operations, we maintain our metrics in 400 km of networks. We are improving the expectation of the EBITDA in about 4%. This is about COP 10 million increase against what we presented in the last call. Not only to have a new rate, consolidated rate with evolution that we receive in the volume, that takes us to present a better perspective regarding the expectation of growth of the EBITDA.

Regarding the mid and long term, the most important project that we have in Cálidda that we have been working for the last couple of years is to concretize what it is to take gas to the central south area of Peru, which is an agenda of 10 years in the concession or the lease. And t oday, the process is in a process which is managed by the state. Cálidda is not participating unless it sees any requirement from the state agency to provide complementary information or to clear some fact points, because we have public information. In the last weeks, the Minister of Energy and Mines has been in different forums and places where he has spoken about the status of the addendum based on that public information. We expect to get an answer between November and the first week of December.

So we understand that due to the public information and the different notices given by the government, they give lots of merits in this addendum. In Cálidda, we believe that it is a project for Peru that is going to improve life quality and prosperity in the country. We are ready and with the expectation to get the confirmation from the final position of the government in the following weeks, so I am ready for any type of consultations.

Karen Guzmán
Financing and Investor Relations Manager, Grupo Energía Bogotá

Thank you, Mario. We do not have any concern right now, but we do have a question for TGI team. Regarding the towers of Corredores . Can you tell us about the closure of the regasification, closure of the project in La Guajira?

Jorge Andrés Tabares is going. Thank you.

Jorge Andrés Tabares
CFO, Grupo Energía Bogotá

We allocated in the month of October our commercial aggregator of the main, BTG, regarding the term sheets, contractual terms to allow the different actors in industrial demand, regulated demand, and all others to obtain agreements in the following weeks. Today, we have progress in a solid way with the industrials. We have a pre-agreement to close in 50 million cubic meters and agreements with the other aggregators to come to the commercial closure at the end of the year. The value proposal of this regasification plant in the first quarter of 2028, the latest, due to the need of natural gas in the country. We expect to get this financial and commercial closure the next month.

Karen Guzmán
Financing and Investor Relations Manager, Grupo Energía Bogotá

Jorge, thank you very much. We do not have any other concerns. So again, thank you very much for being with us with your questions from the teams, from TGI and Cálidda. We are expecting all concerns that you may have. We wish you a very happy day, and we'll see each other next year.

Speaker 6

[Presentation]