Good morning, and welcome to EcoRodovias' Third Quarter of 2026 Earnings Presentation. With us here today are Marcello Guidotti, CEO, and Andrea Fernandes, CFO. This presentation is being recorded, and all participants will be in listen-only mode during the presentation. After that, we will begin the questions and answers session for analysts and investors only, and further instructions will be provided. The slides of this presentation are available on the company's investor relations website, ri.ecorodovias.com.br, in the Results Center section. After the end of the earnings presentation, the recording will be available in the same section. Before proceeding, we would like to clarify that the forward-looking statements that may be made during this presentation relating to EcoRodovias' business prospects, projections, and operational and financial targets are based on the management's beliefs and assumptions, as well as on currently available information.
They involve risks, uncertainties, and assumptions, as they refer to future events, and hence depend on circumstances that may or may not occur. Investors should understand that general economic conditions, industry conditions, and other operating factors may affect the future performance of EcoRodovias and lead to results that differ materially from those expressed in such forward-looking statements. I will now turn the floor over to Andrea Fernandes, who will discuss the results. Andrea, you may proceed.
Good morning. Welcome to EcoRodovias' earnings presentation discussing the third quarter of 2026. We thank everyone for attending. We begin the presentation with some highlights. Last week, we started the operational activities of EcoRodovias das Gerais after the conclusion of the 100-day plan, which included pavement, signage, and safety improvement works, in addition to conservation services on BRs 116 and 251.
During this period, we also completed the installation of the nine free-flow gantries along the highways, with collection expected to start next month, earlier than anticipated in the business plan. In October, we opened the Operational Intelligence Center in Uberlândia to integrate the control centers of five concessions. By 2027, the operation of our 12 highway concessions will be concentrated in just three control centers in São Paulo, Rio de Janeiro, and Uberlândia, contributing to an increasingly lean and efficient structure. Another highlight was the announcement in September of a strategic partnership for the exploitation of out-of-home media on highways, expanding the opportunities for generating ancillary revenues in our portfolio.
Finally, I'd like to highlight that in October, the Ground Transportation Agency, ANTT, approved the partial compensation of the economic and financial rebalancing of the effects of the COVID-19 pandemic and of the conflict between Russia and Ukraine on the price of inputs at EcoRodovias do Araguaia. That same month, the concessionaire already received, as a precautionary recomposition, BRL 105 million, equivalent to 61% of the total amount of BRL 171 million. This measure reinforces the advances in the regulatory environment of highway concessions. Moving on to the results. Slide five presents the operating performance, which registered a comparable growth of 1.8% in the quarter and in the nine months, driven by heavy vehicle traffic, the highlights being EcoRodovias Norte Minas, EcoRodovias Capixaba, Minas Goiás, and Rio Minas.
The performance in the quarter is the result of the deliveries of works to improve and expand capacity on our highways, the growth of industrial production, and the pulp cycle in the Espírito Santo region. Moving on to slide six, we show adjusted net revenue of BRL 2 billion in the quarter, down 1%, and BRL 5.6 billion in the nine months, up 2.5%. The reduction in the quarter was mainly due to the termination of the concession agreement of EcoRodovias Sul in March. Comparable net revenue, excluding EcoRodovias Sul, grew 8% in the quarter and 10.3% year to date. Adjusted cash costs, excluding Ecoporto, were up 4.8% in the quarter and 4.7% in the nine months, variations that are in line with inflation in the last 12 months.
In the quarter, the increase is mainly explained by the costs of third-party services due to the hiring of consultancies specialized in technology and innovation aimed at optimizing operational and administrative processes to support the ongoing expansion of the free-flow system in our concessionaires. Finally, in the chart on the right, we can see that operational resilience and cost discipline have sustained EBITDA, even with the termination of EcoRodovias Sul's concession agreement, reaching BRL 1.5 billion in the quarter and BRL 4.2 billion in the nine months. Excluding the effect of EcoRodovias Sul, comparable EBITDA presented an increase of 6.7% in the quarter and 10.6% in the nine months, underscoring the consistency of EcoRodovias' operating performance. On the next slide, recurring net income totaled BRL 321 million in the quarter and BRL 364 million in the nine months.
Comparable net income, excluding the effect of EcoRodovias Sul, was BRL 370 million in the quarter and BRL 507 million in the nine months. This increase mainly reflects the improvement in financial results, with the highlight for the reduction of monetary variation on the debentures due to the lower IPCA index in the quarter and the increase in revenues from financial investments due to the higher average cash balance. On slide nine, investments amounted to BRL 2 billion in the quarter and BRL 4.5 billion in the year to date. We continue to advance in the execution of the works with the delivery in the quarter of 11 km of additional lanes at EcoRodovias Noroeste Paulista, totaling more than 24 km in the year, and 11 km of road widening roads at EcoRodovias Capixaba.
At EcoRodovias das Gerais, we continue with the execution of the initial works necessary for the start of operations in November and the toll collection scheduled for December. Moving on to slide 10, we ended the quarter with consolidated leverage of 4.3 x, reflecting the volume of investments made. Of note are the additional investments in EcoRodovias das Gerais aimed at anticipating the startup toll collection for the next month, which was only scheduled for April of next year. In addition to the investments of EcoRodovias Capixaba that will enable the application of the tariff triggers scheduled for February 2027, pursuant to the contract optimization amendment. The leverage of EcoRodovias Concessões e Serviços ended the period at 4.1 x. It is worth noting that the percentage of gross debt indexed to inflation reached 78%, the same index as the toll tariff adjustment of the concessionaires.
The percentage of gross debt allocated to highway concessions reached 72%. On the next slide, funding and disbursements in the quarter increased our cash position, which ended the period at BRL 6.4 billion, more than sufficient for the maturities of the next few years, with the next relevant maturity being only in 2029, referring to the EcoRodovias Raposo Castello bridge loan. It should be noted that the concessionaires still have BRL 9.5 billion in contracted financing to be disbursed for the execution of the works of the investment cycle in the coming years. On slide 13, we present some sustainability recognitions. For the fourth consecutive year, we were selected for inclusion in the IDIVERSA B3 portfolio in recognition of initiatives focused on the themes of diversity, equity, and inclusion.
We were also recognized among the top 100 outstanding ESG in the overall ranking of the fourth edition of the 2026 ESG Integrity Yearbook. Our sustainability initiatives are available in the earnings release and in our integrated report. We close this presentation by reinforcing that we continue to advance in the execution of our investments and maintaining discipline in cost management with initiatives such as the opening of the Operational Intelligence Center, which underscores an increasingly integrated, efficient, and lean operation. I also highlight the evolution of the regulatory environment and the effectiveness of contractual risk mitigation mechanisms, as demonstrated by the rebalancing of inputs requested at EcoRodovias Araguaia. We have a robust investment cycle ahead, with financing already contracted for the main works, providing greater predictability to their execution.
In addition, as of 2027, EcoRodovias das Gerais will fully contribute to the company's results, reinforcing the recomposition of our portfolio after the end of the EcoRodovias Sul concession and expanding the company's operational generation capacity. We would now like to turn to the questions and answer session. Thank you.
Thank you. We will now begin the questions and answer session for investors and analysts. To ask a question, please click the raise hand button. If your question is answered, you can leave the queue by clicking lower hand. Our first question. Guilherme Mendes, JP Morgan. Guilherme, you may go ahead.
Good morning, everyone. Thank you for this opportunity. Two questions. The first about the third lane, or the third road, if you can talk about the timeline of this project, what's already been delivered, and when we should expect the definition about that, and about financing. With the higher interest rate environment for longer, does it change anything in the assumptions or in the decision-making process of this project? The second point about the tax reform. How were the discussions with the concession authority and regulatory agencies to the detriment of a potential rebalancing due to this tax reform? Thank you.
Good morning, Guilherme. Thank you for your questions. About the third road, yes, it's confirmed. EcoRodovias has delivered all of the studies that are object of the contract amendment, executive projects, environmental licensing. They still need the final stage of the environmental licenses, but everything's been delivered, and now we have to wait for the definition of how this is going to be executed, the timeline and how.
It is important to remember that recently there was an ordinance published by SPRTest setting forth a specific procedure to include new works of relevant volume to existing concessions. They created the rules, and it determines a little bit that any negotiations have to follow. That is good on the one hand, because the government is starting to put rules into place to be able to discuss and negotiate new investments to existing concessions. Now it is up to us waiting for the beginning of the new administration or the next term to start the discussions about the financing. I think Andrea may add, but Andrea, please go ahead.
Yes, about the financing. A lot of the long-term financings are already brought forward, thinking even about this potential convoluted period this year due to the elections.
We also have, and we are always seeking opportunities for liability management with the possibility of an earlier contracting of Raposo Castello itself, which has a bridge loan that is due only in 2029, but we can equate the long term at a very competitive cost. Aside from that, in 2030 is the maturity of the bridge loan of EcoRodovias Capixaba. It was the company's choice to take a bridge loan, considering this concession is in its transition period. There will be a series of tariff triggers that are important as we deliver the investments. It has gone through the renegotiation process to optimize contracts, so we believe a lot on the de-risking of that concession. It makes more sense to, on the long term, do it only once the maturity of EcoRodovias Capixaba comes. A lot of the investments are already contracted.
We have BRL 9.5 billion contracted that have not yet been disbursed to meet the investment of the coming years, and we will choose the best moments of the market for any potential funding. The last topic about tax reform, we are discussing those important points and the methodologies to rebalance, so for the rebalancing will be done. We are already discussing with the two main agencies, ARTESP and ANTT, and we are going towards a joint decision to rebalance the concessionaires, first with the cautionary, and then during the year, the precautionary compensation, and then during the year to raise the unbalances to renegotiate during the year. We are making progress positively, and the whole industry and the agencies are working towards a timely decision for everyone. I think that is it, Guilherme.
Great. Thank you, Andrea and Guidotti.
Our next question. Filipe Nielsen from Citi. Please, you may go ahead.
Good morning. Thank you for this opportunity. My first question is about CapEx. CapEx this quarter, I understood that you brought forward or brought ahead a series of works that you intend to do, but I would like to understand the dynamics of non-contractual investments versus contractual investments, if there is any additional work that you included in the portfolio, or any additional investment, and how does that impact the predictability of the full- year if we have a slowdown in the fourth quarter? Or if the space will be maintained in the next quarters and we will see bigger deliveries than expected for the full- year. Another point that I wanted to understand is about the synergies of the operations center.
You talked a little bit about the entry of those two centers coordinating 12 concessions in 2027, so I'd like to understand how much you expect in terms of margin gains and operating benefits stemming from this initiative. Thank you.
Filipe, good morning. In terms of CapEx, yes, we are fulfilling the contractual CapEx, as Andrea mentioned. It's going at full steam in different fronts, Rio Minas, EcoRodovias do Araguaia, and Noroeste Paulista. In addition to the contractual CapEx, as you could see in the release, we have EcoRodovias das Gerais that started to realize CapEx, and we're already quite advanced. The two main items added to contractual CapEx that are the advancement to suppliers that are cash revenues that during the execution are reabsorbed by contractual CapEx, and the contractual amendments.
In this quarter, they added BRL 270 million of CapEx that is not contractual, but that will be received in the contract via rebalancing. There's a series of items. They're spread out throughout almost all of the concessions. Rio Minas has the main ones, but there's 35, 40 million there, and then other smaller items, a series of adjustments and new investments that arise when we have a large network and the concession contracts don't foresee all of the needs, and things come up and they're rebalanced with the tariff or extension of the term, like São Paulo.
For the fourth quarter, we estimate BRL 1.5 billion of contractual CapEx, which closes with that 5.4 that we had estimated, in addition to EcoRodovias das Gerais, which will be faster in the fourth quarter, will have a bigger impact of EcoRodovias das Gerais, because as Andrea said, we will start toll collection in December. We are ahead of time. We concentrated what was expected to happen in nine months, 10 months, we've done it in six months, basically. That will impact the fourth quarter. We'll also have the contracts or some non-contractual investments. In total, we estimate a total CapEx, including capitalized interest of BRL 6.5 billion, more or less. That's for 2026. The last next question was about operational revenue. It's difficult to calculate exactly. Obviously, it's reductions of GTS and of people, but the main gains will be on the long term.
You start to have a fully digital operation controlled via cameras, an operation that generates a lot of data, that's predictive. We're able to do predictive maintenance rather than corrective maintenance. We can monitor the works and maintain safety. They're gained throughout the operation, and that's what's going to give us the confidence to say that we will reach margins above 30% in two, three years. I think the gains of this initiative itself may not be relevant in the number of people, but the gains are going to be more throughout the entire cycle of the operation. The operations with centrals that are able to monitor the equipment, work sites, traffic, and all that data will generate operational efficiency on the long term. I don't know if there's another question. No, that's it. Thank you, Filipe.
Great. Very clear. Thank you.
Next question. Matheus Sant'Anna with Bradesco BBI. Matheus, please go ahead.
Good morning. Thank you for taking my question. I have two. I'd like to mention two specific concessions. First, to understand a little bit about this beginning at EcoRodovias das Gerais, how it's been. I saw this anticipation of the toll collection for December. I'd like to understand more about the other variables and how it's going. The second point was also about Capixaba. We saw that first tariff trigger that increased the tariff. How do you see the process to get to this next trigger, the works going within expectations, the licensing? So those are my questions. Thank you.
Matheus, good morning. Thank you. About EcoRodovias das Gerais, the operation and the first 100 days of the required investments to start the collection are pretty much concluded.
We still have 25 days ahead. We had good surprises in CapEx with important savings in technology and some hirings or contractions. We started well with the right foot. All signs point that from what we see and the complexity of the interventions, it's a very heavy traffic there. Pretty much a heavy vehicle traffic. It's a concession that on the long term will require more investment than expected because there's very strong traffic levels. We expect Gerais to contribute significantly more than what we forecast in the initial plan. About Capixaba is another pleasant surprise. It's going very well, exceeding our expectations. The CapEx is in line, being executed with a trigger expected for February of 25%. I'd say we have pretty much fulfilled all of the contract obligations to be able to reach this trigger.
It's a trigger we're going to get. We are already pretty much beginning the works for the next trigger after that during 2027. Thank you, Matheus.
Very clear. Thank you.
Our next question, Rogerio Araujo with Bank of America. Please, Rogerio, go ahead.
Good morning, Guidotti, Andrea. Thank you for the opportunity. I know you talked a lot about this, but I wanted to add in a single question and hear a little bit about liquidity and the need for capital. That's the main question we're getting from investors. I'll list some points that we'd like to hear about. First is, how much debt is maturing in the coming years? How does the company intend to fund the cash gap of CapEx? How much is already contracted with BNDES? At what rate? How much is still not contracted, and how you intend to fund it?
Will there be an auction of the balance without a primary offer? What's your mindset for bidding processes now? Is there going to be an amendment for the third road? If not, how does the company see this balance between opportunity for growth and more restricted balance sheets, and what do you expect going forward? Can we think about recycling of assets, where you sell mature assets to allocate capital where there's more opportunity for returns? I think that's the main. Then I have two quick follow-ups from what has already been asked.
Rogerio, thank you for your question. I'll let Andrea give you more details about the future maturities and the lines that we're raising for the CapEx. As she already said, all of our CapEx, our future CapEx, we already have the contracted funding with BNDES.
The only two, and she will give you details, are EcoRodovias das Gerais and Capixaba, which will be structured in the future. Raposo Castello is ongoing. We are close to finalizing contracted funding with BNDES. So Capixaba and Gerais, the funding of the concession contracts, the CapEx, are well advanced at rates that have been closed. I will talk a little bit more about the strategy, the balance, and growth. EcoRodovias has already had a very robust growth cycle in the last six, seven years. We do not have any immediate need to work on the portfolio. Actually, our portfolio is expanding with what we already won, so I do not think it is a priority to participate in new bids. We will monitor the market.
We are looking at it, but I think 2027 requires discipline and the execution of the contracts, and to be limited to that, focusing only on the operations and generating cash, and spend another year of operations delivering good results. That is a little bit of our guide. Of course, there are contract amendments, as I just said, but that constantly comes up. It is not a big volume. Most of them are not, and they can be managed. Many of them may be rebalanced via tariff increases that generate cash immediately, so they are contract amendments that we can execute without having to do them in very short windows in a way that could lead to unbalance for the company liquidity. The third road is a different story. The volume is a lot bigger. As I said, the discussion with the concession authority is being regulated.
The concession authority is regulating the way in which new investments will be included, but it is an opportunity that if they come up, they will give us sufficient time for us to be structured and definitely do any changes to support that. In the coming years, it is not an amendment that, if included in the concession, will resonate immediately. They give us some time, at least two, three years window. Asset recycling, I think, is a very opportunistic strategy. Now, with the current rates, it is probably not going to be the best strategy to pursue. Considering our balance structure, the cash, the cash generation we have, we do not have the need to do that, so we do not plan to recycle assets in the short -term.
Focusing on our contract obligations, run our business well, and wait for the developments of how it is going to affect traffic, the GDP, the interest rate curve, inflation going forward. Andrea will give you more details about the maturities.
Okay, so Rogerio, we ended September with BRL 6.3 billion in cash. The maturities of 2027 and 2028 are of about BRL 2.5 billion. The main maturity that we have, as I mentioned, and Guidotti as well, in 2029, that would be Raposo Castello with the bridge loan, the four-year bridge loan. But now, we are working to anticipate this and bring this forward using a window and an important rule that exists today, that would be for us to raise using the B Loan of the BID. We are already at advanced stages on the payment of that grid and already having the long-term financing that is expected only for 2029.
2030, as I mentioned, EcoRodovias Capixaba will need to raise about BRL 4 billion to meet the investments there. This was a choice the company made to wait for the asset to perform with all of those tariff triggers and everything involved in this agreement process, a renegotiation process. We understand that in 2030, a performed concession versus whether we already did it in the long term, that could cost the company. The fundings, the financings have been done over the last two years. I would say we have costs on the IPCA plus 6.5, IPCA plus 8.5, depending on when we raise the funds in Araguaia, Noroeste, and Rio Minas. This funding of Raposo Castello is going to be concluded. It's not been concluded, but at a very competitive cost.
We will contract with the optionality of 2029, observing what the market would be, but at much better rates and a guaranteed anticipated funding in pretty much three years ahead of time, since it only matures in 2029, the bridge loan. We have the details, the breakdown of each of the fundings in page 24 of the release, but I'll be available. As I said, we also have that BRL 9.5 billion to disburse of the debentures, both at Araguaia and Rio Minas and Noroeste Paulista, which I think are the biggest amounts. Rogerio, you had other questions? Do you still have any doubts?
Thank you, Guidotti and Andrea. It's very clear. I have two follow-ups, if I may. One about the tax reform. What's being discussed with the government today in terms of rebalancing?
I understand that the government could increase the rate, or you pay more in the resale tax, or give you a longer maturity for EcoRodovias. Would it make sense? Would it be worth it? Is it possible to have a negotiation like that so that it doesn't increase leverage in the short term? Any increase in terms of the duration would also have an impact. It would generate less cash in the short term, but it may be positive in terms of rebalancing. How do you see that? The other follow-up about the BRL 170 million of CapEx that you talked about and the rebalancing. Has this been defined that's subject to rebalancing before the implementation of CapEx, or is it being discussed with the government to understand whether this is going to be rebalanced or not? Thank you again.
To share you about the tax reform, I'd say that since it's a tax that affects revenue, the best way that we will all pursue is to have a recomposition of revenue and cash whenever possible. That may be done via the payment of the use of other revenues, or a lot of the concessions had payments of concession fees that are in the next account that are used to renegotiate contracts or future rebalancing, Araguaia, for example. Whenever it's not possible, it should be via tariff. This is something that should be decided year by year to prevent bumps on the road in terms of cash and the level of indebtedness of the concession. What we're going to pursue are the recomposition of cash and revenue as it happens. That's the design. This is something that's going to be calculated year by year.
We cannot think about maturity or duration. About the rebalancing, definitely we won't go out there doing things without having the rebalancing approved. All the rebalancings are recognized. Some of them, maybe the way the rebalance will occur have not been defined, but the rebalancing itself is guaranteed. We will not prepay or anticipate anything and then define the rebalance, because the works have been authorized and we're executing. A lot of them have been rebalanced and others are being discussed.
Rogerio, just to add here to what Guidotti said, the more recent concessions, all of them, we have the funds in the reserve accounts that could be an option. For example, the increase in tariff, as Guidotti mentioned, at Raposo, Noroeste, Araguaia, Rio Minas, and Capixaba. These concessions have these resources of reserve accounts that could be used to prevent or avoid increase. It's just a matter of migrating, just like in Ecovias do Araguaia , the funds from the reserve account to the current account of the company, and it becomes cash immediately.
Great. Guidotti and Andrea, thank you. These points are very clear.
Our next question, Alberto Valerio at UBS. Alberto, please go ahead.
Good morning, Guidotti and Andrea. Thank you for the opportunity. I have two questions, two quick questions here. First, the monetary restatement of the debt that was a little bit over in the P&L this quarter, and the adjustment of the inflation was close to zero. The second, about supplier. You said maybe making the prepayments for suppliers for the CapEx. Is there any point of concern in this more challenging scenario of the economy or a potential slowdown of the GDP next year? Does it concern you in terms of suppliers? Thank you.
Hello, Alberto. Thank you for the question. About the monetary restatement, you're right. We had a deflation, a peak of negative inflation in August that contributed. Definitely, the fourth quarter will be different. We are sensitive to inflation. The result on the income of the fourth quarter will probably have a higher impact of inflation. This is normal. It's expected. All this inflation will come in tariffs in 2027, recovering the profitability of the portfolio. But it's completely normal. I think it also shows how sensitive we are to inflationary peaks. Once the inflation's stable, we can have greater predictability. This year was very It oscillated as well, a lot. Now in the fourth, it should become somewhat normal. That's what we expect. About the prepayment, that's normal. The volume normally of 0.5%, 1%, 2% of the entire CapEx, so it's nothing relevant.
It's normal prepayments that during the execution of the works are consumed. As for the impact of the slowdown of the GDP, I don't see a lot of impact. The slowdown of the GDP may potentially affect traffic. We're foreseeing a GDP of 1.2%, 1.3%, and a need of maybe 1.5%. The traffic increase could be at around 2%. There's the pass-through of inflation and the operational costs that are always more controlled, bringing good opportunities. So I think we expect it to be a normal year where we continue to operate well and deliver results. Our CapEx, there's a composition of more or less 60% of contractual CapEx for expansion with less flexibility that we have to do. But the CapEx that once is executed, we also deliver tariff triggers.
We have about 30% of maintenance CapEx that gives us a little bit more elasticity to divide or break down the cycles in one, two, three years. There is 10% that is discretionary, which are maybe those contract amendments that come up or some replacements that we may do ahead of time at discretion. That is also an environment that may be worse, but to summarize, that is kind of how it is.
Great. Thank you.
Our next question, Daniel Gasparete at Itaú BBA. Daniel, please go ahead. Daniel, you may go ahead, please.
Can you hear me now. Can you hear me.
Yes. Great. Thank you.
Thank you for this opportunity. It is a follow-up on one of the comments that were made earlier about the third road at Imigrantes. I just wanted to hear from you a more detailed timeline or schedule, just to understand a little bit of how it can be in terms of disbursement. You talk about waiting for approval now. Then there would be a window to adjust before beginning the works, just trying to understand how you see this window, and how we could, after approval, start to see this CapEx disbursement, and to understand the timeline of this equity that you mentioned, Guidotti, please.
Daniel, let me be clear. The third road, our contract obligation was the execution and delivery of the package of studies, executive projects, and the pre-environmental license. All of that was an expenditure of about BRL 160 million executed in trading. Our task and the new government will prepare the discussions now for the construction of this third road.
We may be leading players, but the government is regulating the way through which we include new investments in existing concessions. We need to wait for those analyses, we need to wait for those discussions. I would not be concerned with the timeline now. I think it is too soon. Once the rules are set forth and the way things will be done is defined, we will have more clarity. This is something, a work that can be mobilized quickly. In two, three months, we can start being mobilized, because it is a work that starts with preliminary activities and starts to grow. It is 22 km of highway and tunnels and different moves. It starts and align and the intensity increases more in the second or third year of execution. That is when you start to inject concrete and finalize the overpasses and the tunnels.
We start at a relatively slow pace, the mobilization and earth moving and so on, and then it grows in the second, third years. That is when you should reach the peak. Estimation is five years. That is the execution capacity, more or less. Once we have clarity of the contract and how the government intends to do it, we will definitely have a very clear notion of the timings and everything that is going to happen with the concession. But again, it is a five-year work, and the peak of execution is more around the second and third year of construction. That is more or less how it is.
Excellent. If I may, just a quick follow-up. I apologize, Guidotti, just to understand as much as possible. Do you imagine, or how long do you foresee, in an order of magnitude, for the ARTESP approval, their study? You're talking about the CapEx peaks two or three years after the beginning of the work. Do you imagine that any potential needs for allocation would be more to that window, two, three years after the beginning? After the approval?
Yes, the execution that may be done via concession, also depending on the type of rebalancing, but there will not be an equity allocation immediately. We have a window, and we make the most of the best windows in the markets, but the minimum is three years for the window. That's always how it is. Again, considering volatility and the windows during those three years, we may have, or we may potentially reach out to the equity market, but ARTESP is regulating it. The regulation has just been published.
There's the hearing about this desire to create a chamber of consensus for the existing contracts, but maybe even for new investments. This is all being defined. I think that it's a productive, good moment to have these instruments and getting the environment ready for transparent negotiations, as has occurred in the past year in São Paulo and at the federal level. The environment is moving forward, the discussions are going, and a good first half of 2027 will be a good chunk of the first half will be dedicated to these discussions. I cannot foresee it being faster than that.
Excellent. Thank you very much.
The questions and answers session is concluded. I would like to turn the floor to Ms. Andrea Fernandes for the company's closing remarks.
Thank you all for participating, and we remain available, myself and the team, for any other doubts you may have. Thank you. Have a great day.
EcoRodovias' earnings presentation is now closed. Thank you very much for your participation. We wish you all a good day.