Summary

H1 orders reached EUR 11 billion and sales EUR 9.3 billion, but project charges drove Adjusted EBIT to negative EUR 396 million, net loss to EUR 554 million, and free cash flow to negative EUR 1.248 billion. FY guidance targets around 1% Adjusted EBIT margin and negative EUR 1.5 billion free cash flow, alongside a EUR 2 billion deleveraging plan.

Operator

Welcome to the Alstom 2026/2027 half-year results presentation. For the first part of the conference call, the participants will be in listen-only mode. During the questions and answers session, participants are able to ask questions by dialing pound key five on their telephone keypad. Now, I will hand the conference over to Martin Sion, Chief Executive Officer, and Bernard Delpit, Executive Vice President and CFO. Sirs, please go ahead.

Martin Sion
CEO, Alstom

Good evening, and thank you for joining us to discuss Alstom results for the first half of fiscal year 2026/2027. I am Martin Sion, Chief Executive Officer. Joining me is Bernard Delpit, Executive Vice President and CFO. I will begin with the first half highlights on our priorities. Bernard will then take you through the financial results before I return to conclude this outlook. Turning to page five, with the highlight for the first half. In the first half, the group recorded EUR 11 billion in orders, representing a book-to-bill ratio of 1.2. Sales reached EUR 9.3 billion, with organic growth of 2.2%. Adjusted EBIT was negative, with a loss of EUR 396 million, reflecting gross margin adjustments on certain rolling stock projects. Free cash flow was negative at EUR 1,248 million, mainly reflecting the seasonality of the business.

These results are obviously unsatisfactory and fall short of what is expected of a global leader in the rail industry. The priority actions launched shortly after I took up my role in April are underway and have started to deliver results. However, as announced on November 2, we revised down our outlook for car production, sales margin, and cash for the current fiscal year. The first half performance reinforces one conviction: the current organizational structure needs urgent reshuffling. We have been working on a comprehensive review of Alstom's operating model in recent months. In addition, we have announced a deleveraging objective of around EUR 2 billion. These will be key areas of focus over the coming months as we prepare for our Capital Markets Day. Moving to slide six. Over the last six months, I spent a significant amount of time visiting Alstom's manufacturing sites and design offices.

I have met with customers, employees, suppliers, public authorities, and of course, investors. What I have seen and the feedback I have received have reinforced my initial view of the business. First, services. Alstom has a strong leading franchise, which now represents 39% of the backlog. It is delivering solid operational and financial performance with further room to grow. That growth will come partly from the increasing number of new rolling stock projects that include long-term maintenance contracts, but there is also significant potential to increase maintenance penetration across Alstom's installed base, including in markets where maintenance was traditionally performed by legacy operators. Second, signalling. This is a crucial pillar of our portfolio, positioning us to capture opportunities from signalling upgrades across existing networks, particularly in Europe, and signalling greenfield opportunities everywhere.

Signaling is also a key component of the turnkey business, combining rolling stock, signaling, and systems integration to provide end-to-end solutions for greenfield projects and major line extensions. Third, rolling stock. My site visit, together with the first half performance, have reinforced my determination to address the uneven performance across projects. Importantly, the root causes of these execution challenges are well identified and often shared across projects. They typically come down to operating complexity, quality gaps during design and development, and inconsistent adherence to project planning. These are precisely the areas we are addressing through the priority actions launched in April and the operational plan now being developed. Next slide. Let's now turn to slide seven on the progress we've made on the priority actions launched earlier this year. First, lean management to strengthen operating discipline across projects and sites. It may seem basic, but it is nevertheless needed.

Project teams have introduced more consistent routines to identify issues earlier, understand their root causes, and resolve them faster. We have multiplied the number of lean initiatives in the workshops in order to accelerate execution and improve quality. Second, accountability. Project managers now have clearer ownership of decision throughout the project lifecycle, from bid signature through to delivery. To make it work, this meant, for instance, aligning individual objectives closely with project performance on clear criteria to select project managers according to project criticality. Third, what I call the tiger teams. These teams of Alstom experts provide hands-on support to specific projects. They focus on resolving technical issues, challenging the initial risk assessment, strengthening planning, and putting effective mitigation actions in place. So far, they've been deployed on more than 10 major projects on platform.

These include projects requiring particular attention, such as those of the Coradia Max platform, as well as projects in the early phase of development to help them get off on the right start. Beyond these immediate actions, we are working to make the organization simpler and leaner. Initiatives are already underway to simplify processes and make decision-making earlier, improve our cost base, and make better use of Alstom's purchasing scale.

Let's now move to slide eight, to have a closer look of rolling stock. Of the group's EUR 111 billion of backlog at the end of September, around EUR 47 billion relates to rolling stock, with projects being at different stage of execution. The largest share of that backlog consists of projects that are still in a design and development phase. Most were awarded over the last two to three years, at the time the group reinforced its bid selection process.

Example includes Trenes del Norte in Mexico and metros for MTA in New York. At the other end of the spectrum, roughly 25% of the rolling stock backlog is already in serial production. For example, commuter trains in the Paris region and intercity trains in South Africa. For these projects, execution is at the right standard, and we observed efficiency improvements. The remaining 35% is at the end of development and in industrial ramp-up, typically the most critical phase. This is when we turn a design into an operational train, move towards homologation, and ultimately serial production. Performance at this stage is uneven. Coradia Max in Germany is proving particularly challenging, and by contrast, Avelia Horizon has now passed the most critical milestone with the entry into commercial service early November. During ramp-up, development gaps can quickly translate into operational and financial challenges.

Reducing that risk means getting project right from the start, and this is central to our work on the operating model. Let's now turn to slide nine and look more closely at Coradia Max for Germany. This is an overview of the six different projects we've got on Coradia Max. At the end of September, the Coradia Max backlog stood at EUR 3 billion-EUR 4 billion across six projects. Around 1,300 cars have been ordered to date under contracts awarded between 2021 and 2024. These contracts also include optional tranches. The design and manufacturing setup varies across this project, with development shared across France and Germany. Production and train happen either in Poland or in Germany. Next. On slide 10, on the recent development of the Coradia Max platform.

In the first quarter of this fiscal year, a team of experts was deployed to support the Coradia Max project, following technical issues that emerged early in the fiscal year. Production was paused to limit the risk of future retrofits while technical solutions were developed. These solutions were finalized by the end of the summer. In late summer, a further review showed that the testing program needed to be adjusted in order to meet validation and homologation requirements. This resulted in a new planning, leading to a later start of commercial service. This change affects the broader Coradia Max portfolio in Germany, given the link between the different projects. With the revised schedule in place and the required tests clearly identified, the teams are working towards homologation of the first of the six projects no later than March 2028.

Commercial service is expected to begin soon afterwards, depending on the customers. The revised timeline affected gross margin in the first half and cash generation for the full year. Bernard will cover the associated financial impact later. Slide 11 on Avelia Horizon. Avelia Horizon provides a different example of a project going through industrial ramp-up. Avelia Horizon is Alstom's double-deck high-speed platform with more than EUR 6 billion of backlog across several customers and geographies. The platform now serves SNCF in France, Eurostar, Velvet, and ONCF in Morocco. Several major milestones have now been achieved. Commercial service with the French operator, SNCF, started earlier this month. After several years of development and testing, this is an important step for the platform. At the same time, we have added manufacturing capacity in La Rochelle and Valenciennes in France, and the production rate is gradually increasing.

The priority now is to translate these milestones into stable serial production across the portfolio. On car production. In the first half, Alstom produced 1,860 cars, around 150 fewer than in the same period last year. The mix was different. On the one hand, a higher share of regional and commuter trains and a lower share of metros, so bigger trains compared to smaller trains last year. On the other hand, a higher share of projects at the beginning of their industrial phase, and therefore, at the start of their learning curve, like, for example, projects in France, U.S., Spain, and a lower share of projects in serial phase when compared with the same period last year. However, the mix does not explain the full shortfall versus last year on the initial plan.

As discussed earlier, production of Coradia Max was paused during the first half, and the production plan for the year was revised following the extension of the homologation timeline. As a result, the outlook is for around 4,000 cars for the full year, with Coradia Max contributing for most of the shortfall. On slide 13, while the immediate priority is execution, there is also continued attention on the commercial side, maintaining discipline on order intake and building a high-quality backlog for the future. The first half was solid, with EUR 11 billion of orders. This includes a significant share of bundled contracts, combining rolling stock with services, as well as end-to-end turnkey solutions. For instance, Alstom secured EUR 3 billion order with VIA Rail in Canada for 313 cars together with 15 years of technical support on spare parts.

In the U.K., Alstom was awarded a EUR 1.2 billion contract with TransPennine Express for 29 battery electric trains together with maintenance. In South Africa, the Gautrain contract combines new commuter trains, signalling, and long-term maintenance. In Saudi Arabia, an order of EUR 400 million covers additional driverless metro trains for three Riyadh lines, together with maintenance. There was also further business for option being exercised with additional trains in Australia and Sweden. Finally, in signalling, a large batch of contracts was secured in Egypt for the modernization of the network. Let's now turn to slide 14 and look at the backlog. The backlog increased to EUR 111 billion at the end of September. Gross margin in the backlog was broadly stable at 18.1% at the end of September. Order books in the first half continued to support a higher overall backlog margin.

However, this positive contribution was offset by gross margin adjustments on certain rolling stock projects, which Bernard will discuss later. By the way, I can hand over now to Bernard for the review of the financial result.

Bernard Delpit
EVP and CFO, Alstom

Thank you, Martin. Let's start with orders on slide 16. Orders reached EUR 11 billion in the first half, slightly up from EUR 10.5 billion in the same period last year. For the first half, the book-to-bill was 1.1, and as expected, orders picked up in the second quarter, reaching EUR 8.4 billion. The book-to-bill ratio for the second quarter alone was 1.8. From a product line angle, rolling stock orders reached EUR 5.7 billion in the first half. Two large contracts contributed, VIA Rail in Canada and TPE in the U.K. Services orders reached EUR 2.9 billion in the first half. This was partly driven by the high volume of new rolling stock orders that included maintenance contracts. We also increased our services penetration across Alstom installed base in some countries, notably in Italy. Systems orders reached EUR 1.3 billion in the first half, with a book-to-bill of 1.5.

This was driven by contracts in South Africa and the Middle East. Signalling orders reached EUR 1.1 billion. These included large contracts in Egypt, as well as some contracts in Ireland. Turning to regions, orders in the Americas were driven by the large VIA Rail contract in Canada. The Africa, Middle East, and Central Asia region reported record orders for the half-year period, thanks to large contracts for turnkey solutions and locomotives. Looking ahead to the second half, two large orders have been secured, one for metros in Vietnam and one for maintenance of an Aventra fleet in the U.K. We expect a book-to-bill ratio above one for the full year. Let's move to slide 17 on sales. Sales reached EUR 9.3 billion in the first half, up 3% compared with the same period last year. Exchange rates had a positive impact. Excluding this impact, organic growth was 2.2%.

Growth was slower than in previous periods and below our guidance. This was due to two factors. First, production was slower than planned in rolling stock, 8% down year-on-year. Second, signalling faced a high comparison base after organic growth of 17% in the first half of last year. Both factors had a greater impact in the second quarter. As a result, organic sales were broadly flat in Q2. Looking at each product line, rolling stock organic sales grew by 3% in the first half, thanks to the mix leading to higher value per car. Services delivered a solid performance with organic sales growth of 5% in the first half. Signalling and system both saw low single-digit declines in organic sales due to high comparison basis. Let me now turn to the P&L on slide 18.

Gross margin stood at 3.6% in the first half, down 10 percentage points from the same period last year. This decline was entirely driven by gross margin adjustment on projects. Industrial efficiencies remained broadly unchanged from last year. Cost of sales increased by 15%. This reflected higher activity across the group, but was primarily driven by higher provisions for loss-making contracts compared with the first half of last year. R&D expenses increased by 25% compared with the first half of last year. This reflects the group's strategy to step up off-cycle investment in developing solutions and advancing technology ahead of project execution to reduce risks. It also includes EUR 22 million of amortization of capitalized R&D for the regional train platform after the Coradia Max revised profitability. Selling and administrative expenses remain well controlled, declining by 3% compared with the first half of last year.

Finally, and as expected, the net income contribution from joint ventures reached EUR 65 million in the first half. This mainly reflected lower contributions from two Chinese joint ventures. Overall, Adjusted EBIT turned negative with a loss of EUR 396 million, reflecting the impact of gross margin deviation. Let's now turn to slide 19 and look at the main drivers of Adjusted EBIT margin in the first half. As discussed, gross margin adjustments on projects for and from Germany reduced Adjusted EBIT margin by 10 percentage points. Around two-thirds of this impact related to the six German Coradia Max contracts, and the rest for other contracts developed in Germany. Higher R&D expenses and the lower contribution from joint ventures also weighted on the margin. These headwinds were partly offset by continued control of S&A, which contributed 40 basis points.

Overall, Adjusted EBIT margin declined by 10.6 percentage points to negative 4.2%. Let's now turn to slide 20 and look at net profit. Non-operating expenses reached EUR 87 million in the first half. These mainly related to footprint rightsizing in Europe, to transformation initiatives in Germany, and some legal costs. Net financial expenses were broadly stable at EUR 77 million. Lower interest charges were offset by higher currency hedging costs. Income tax charges rose to EUR 223 million in the first half, compared with EUR 104 million in the same period last year. These reflected write-downs of deferred tax assets. With the loss before tax, the effective tax rate was negative 35.5%. Finally, net profit turned negative with a loss of EUR 554 million in the first half. Let's now turn to slide 21 and look at free cash flow.

EBITDA, together with dividends received from JVs, turned negative at minus EUR 162 million due to the Coradia Max and other contracts executed from Germany. CapEx and capitalized development costs stood at EUR 286 million in the first half, representing 3.1% of sales, up from 2.5% in the same period last year. These reflected the planned acceleration in R&D investment, as well as higher CapEx, notably for the growing services footprint. Cash outflows for financial expenses and tax were EUR 122 million, down from EUR 152 million in the same period last year. These brought funds from operations to EUR -628 million, and after a working capital outflow of EUR 620 million, free cash flow was negative for EUR 1.248 billion. Details on trade working capital are on slide 22.

Trade working capital stood at 36 days of sales at the end of September, up from 29 at the end of March 2026, but down from 43 in September last year. This movement resulted in a cash outflow of EUR 483 million in the first half. Inventories rose to 88 days of sales at the end of September, from 81 days at the end of March, roughly stable versus September last year. This reflected seasonality, with the impact of the updated Coradia Max planning and higher car production preparation for the second half. Payables declined both in euro terms and in days of sales at the end of September compared with the end of March 2026. More color on contract working capital on slide 23. Contract working capital remained favorable at 81 days of sales at the end of September, compared with 86 days at the end of March 2026.

It stood at negative EUR 4.3 billion. Contract assets increased to 135 days of sales at the end of September, up from 124 days at the end of March. This was driven by the industrial ramp-up of rolling stock projects, including TGV high-speed trains, as well as growth in services. Contract liabilities remained broadly stable at 179 days of sales, reflecting solid down payments in the first half. Current provisions increased by around EUR 460 million in the first half. This reflected higher provision for projects for and from Germany. Slide 24 shows how net debt increased to EUR 1.1 billion at the end of September, compared to EUR 404 million at the end of March. In addition to negative free cash flow, leases, dividends to minorities, combined with a hybrid bond coupon, amounted to an additional EUR 150 million total cash outflow during the first half of the year.

The net debt bridge also reflects the issuance of a hybrid bond in June 2026, resulting in cash proceeds of around EUR 700 million. You will find in appendix of this presentation the updated bridge computation from EV to equity value reflecting these evolutions. Let's now turn to slide 25 and look at liquidity and debt maturities. Cash and cash equivalents stood at EUR 1.6 billion at the end of September 2026, compared with EUR 2.3 billion at the end of March. At the end of September, the group has access to a revolving credit facility of EUR 2.5 billion and a commercial paper program of EUR 2.5 billion, both undrawn. In November, we put in place an additional revolving credit facility of EUR 2 billion in line with our conservative liquidity policy and the updated free cash flow guidance.

Turning to debt maturities, the EUR 700 million bond was repaid in October. A further tranche of senior debt amounting to EUR 500 million will mature in July next year. Slide 26 details how the operational challenges discussed earlier translate into the first half gross margin adjustment and will impact cash trajectory over the near to medium term. As discussed, the extended timelines for homologation and commercial service on some rolling stock projects have financial consequences throughout the life of these contracts. The longer timelines are resulting in additional costs to complete the projects, as well as assumptions of higher customer compensation. These revised assumptions reduce margin at completion by EUR 1 billion to EUR 1.5 billion, with a similar cash impact over the life of the contracts.

The 10 percentage point gross margin headwind recorded in this first half reflects the accounting impact of these adjustments under IFRS, but is largely non-cash in the period. Moving to the bottom part of the slide, the EUR 1.5 billion cash outflow we forecast for this year mainly relates to milestone payments expected later than initially planned. As these projects progress towards homologation and delivery, we expect at least EUR 1 billion of this EUR 1.5 billion shortfall to reverse over the next few years, reflecting the timing of milestone payments rather than a permanent cash impact. Of the remaining EUR 500 million , part relates to contracts award that were previously expected, but that will no longer materialize, while for the balance, we are reassessing the timing and potential recovery.

The important distinction that the lower margins recorded in this first half have a cash impact over the life of the project, while most of this year's cash shortfall includes a matter of timing. Ending my part with slide 27 before leaving the floor to Martin for the outlook and the conclusion. Alstom's investment-grade rating was recently affirmed. It reflects the commitment of the company to maintain its investment-grade rating in the context of the revised outlook to protect its business model, as the execution of long-term contracts requires the issuance and rollover of bonds and guarantees that rely on a solid rating. I believe it also reflects the credibility gained through the execution of the 2024 deleveraging plan and the change in leadership, as restoring execution excellence is clearly at the top of the agenda with new plans underway alongside solid commercial momentum.

In this context, Alstom's solid liquidity position is further strengthened by a new EUR 2 billion RCF with no financial covenant. A 12- 18-month period is considered by Moody's for the execution of the EUR 2 billion plan initiated with the board, with the objective of returning to credit metrics in line with a Baa3 rating. It sets the conditions to act in the best interest of all stakeholders and gives the necessary and sufficient time to implement the deleveraging plan. Importantly, the timing fits with the company's plan to announce and implement tangible changes in the way it operates. Now for you, for the outlook and the conclusion, Martin.

Martin Sion
CEO, Alstom

Thank you, Bernard. Let me now recap on slide 29 the guidance for the current fiscal year as communicated on November 2 when the preliminary results were released and the objectives for FY 2026/2027 were revised. The outlook is for a book-to-bill ratio above one at group level. Organic sales growth is expected to be low to mid-single digit, partly reflecting lower car production than initially planned at around 4,000 cars for the full year. Adjusted EBIT margin is expected to recover to around 6.5% in the second half, bringing the full year Adjusted EBIT margin to around 1%. Free cash flow is expected to be negative EUR 1.5 billion for the fiscal year, partly driven by the timing effect that Bernard just described earlier.

Finally, the review launched with the expert teams to identify risk and opportunities across the project portfolio is expected to be completed by the end of this fiscal year. From the next fiscal year onwards, the expectation is for a performance to normalize. Let's turn to slide 30 on the next steps. Priorities are clear. Improve execution and strengthen the balance sheet. To improve execution, we are developing a comprehensive plan focused on three areas. First, a new operating model to clarify accountability, simplify decision-making, and improve project management. Second, operational excellence, particularly in development, manufacturing, and procurement. This builds on the actions already launched this year, and we are also leveraging artificial intelligence not only across products and solution, but also throughout project execution, from engineering to manufacturing. Third, products and footprint. We will increasingly focus resources on core activities while maintaining discipline and selectivity in new business.

In parallel, deleveraging is a key priority with a target of EUR 2 billion, as Bernard just presented. Organization decision will be taken soon and communicated once they take effect. At our Capital Markets Day in the second quarter, we will present the comprehensive plan and the new medium-term financial trajectory in more detail. Our goal is better execution, stronger cash generation, and a stronger balance sheet. That concludes our presentation, and we will now open the floor for questions.

Operator

If you wish to ask a question, please dial pound key five on your telephone keypad to enter the queue. If you wish to withdraw your question, please dial pound key six on your telephone keypad. The next question comes from Gael De Bray from Deutsche Bank. Please go ahead.

Gael De Bray
Analyst, Deutsche Bank

Oh, thanks very much. Sorry, good evening, everybody. Can I start with first question on the root causes behind the technical issues on the Coradia Max? I mean, are there any specific components or processes that you'd like to call out? I mean, it seems that one-third of the project charge that you booked in H1 is actually related to other projects outside the Coradia Max. I am wondering what's the risk that these issues you're seeing on the Coradia Max will actually be seen even more broadly, perhaps in other projects that are not necessarily coming from Germany? That's question number one.

Martin Sion
CEO, Alstom

Okay, thank you. Coradia Max is a project that we have looked very carefully to understand, I mean, to solve the difficulty, and by solving the difficulty, to understand the root causes. If I want to give a summary of the root causes, I would say that first, project management was not at the level it should have been. It was all the more important to have a strong project management because the organization of this project relies on several regions working together, between France, Germany, Poland. There was a complexity of the setup. In this complexity, some engineering mistakes which happened were not detected earlier, soon enough, and took large consequences. If we look at what happened, we had two phases in H1 on Coradia Max. First phase was around Q1.

It was technical topics on the car body shell, and our experts found solution to overcome this difficulty, and that's when we paused production, and we were in a situation where we could restart production. We discovered another topic, which is more a problem of development logic and engineering, is that the test and validation plan that we had was not robust enough. If we wanted to be homologated at the end by the German authority, our experts, what I call the tiger team, recommended to rework the baseline with the team, and a new plan was built in September, and which led to the consequences that we mentioned.

So, if we look at that, it is clear that when we have been working on the new operating model for Alstom, we are insisting on how can we reinforce engineering to prevent mistakes, how can we reinforce project management, and separate project management and engineering to have a good check and balance. I mean, I will not go into the details, but you can be sure that the organization that we are working on and which will be shared with our teams end of 2026, on which we will be able to communicate, will embed the lessons learned from Coradia Max to make sure that it does not happen elsewhere.

Gael De Bray
Analyst, Deutsche Bank

Understood. Thank you very much. The second question is on the deleveraging program. I think you mentioned today that you see room to further grow the service business, and that signalling was a key pillar of the portfolio. Shall we conclude that these two segments are off the table and will not be part of the divestment program?

Martin Sion
CEO, Alstom

There is a strong link between services and rolling stock. As we said, that we are already growing the services by selling rolling stock and services in a bundled manner. Personally, I consider that the strong link between the two businesses makes it not the best candidate to sell the services business, to say the least.

Gael De Bray
Analyst, Deutsche Bank

What about signalling or part of the signalling operations?

Martin Sion
CEO, Alstom

Signaling is not for sale. To be perfectly clear, what we are doing is that we are doing a full review of all the activities that we are, which are not on our core business, which are profitable, which are separable. We already did a review during the summer, just because as a new CEO, I wanted to see what was the business which could potentially be divested. We had a presentation to the board some months ago on this topic, so now we are working on these topics. There could be some niche of activities on signalling which could be on the list, but as a main business of signalling, considering our strategy, signalling is not for sale.

Gael De Bray
Analyst, Deutsche Bank

Okay. Thank you very much.

Operator

The next question comes from Daniela Costa from Goldman Sachs. Please go ahead.

Daniela Costa
Analyst, Goldman Sachs

Hi, good afternoon. I have two questions. I will ask them one at a time. Just first wanted to ask you about the performance of the JVs. Obviously, they are down a bit in terms of earnings year-on-year. If you could comment a little bit on the outlook for what you expect going forward. Also, what do you get beyond financial mechanical impacts from each of them strategically? Just interested a bit on what is core on those operations versus maybe not so core.

Bernard Delpit
EVP and CFO, Alstom

Okay, I will take the first one, Daniela, on JVs. I think that what you have seen on JVs in the first half is very much in line with what we guided for at the beginning of the year. So, no change to the guidance. We knew that last year we had some specific high contribution for two of those JVs that are, by definition, non-repeatable this year. And we continue to see a high dividend payout for the JVs. So, no specific and related to the warning situation for the Chinese JVs.

Daniela Costa
Analyst, Goldman Sachs

And to the second part of like

Bernard Delpit
EVP and CFO, Alstom

Yeah. What was exactly? Could you repeat the second part of your question? Was it also related to the Chinese JVs?

Daniela Costa
Analyst, Goldman Sachs

Yeah, it was related to basically strategically what do you get from them? Obviously, you get a financial impact. Should we think about them as just financial investments, or there are other things that the JV brings to the group that you would consider strategically important?

Bernard Delpit
EVP and CFO, Alstom

Yeah. Well, there are some JVs that are more strategic than others, some that are more contributing to our operations and to our financial than others. I would say that you shouldn't consider that as a single strategic asset, but more than a list of assets, and we are considering them this way from an investment point of view. So, no specific views. We have not specifically considered them in the deleveraging program, and we are continuing to consider those JVs are really strategic, both in terms of signalling and rolling stock.

Daniela Costa
Analyst, Goldman Sachs

Thank you.

Martin Sion
CEO, Alstom

Sorry. A limited aspect of this question is the fact that this JV offer us also a window on the railway industry in China, where we are operating inside the JV. I think that it's always good to have the ability to benchmark in order to challenge our way of working and operational excellence.

Daniela Costa
Analyst, Goldman Sachs

Thank you. Just a follow-up, because you mentioned a lot of times, like trying to reinforce project management and operations. I'm wondering if there's also any specific hard stop criteria that you're putting in terms of the commercial bidding process to make sure that while you're still fixing how you want the operations and project management to run, that you're not sort of at the same time loading your backlog with things that you might not be able to deal with the ideal way? Or is that going on at all or not? Any steps going on, would you be comfortable with going below book-to-bill of one for a period to make sure you get exactly the right backlog? How are you thinking about this?

Martin Sion
CEO, Alstom

I mean, it's clear that selectivity is a key element of our strategy. I mean, compared to last year, where I think last year we had 1.4 book-to-bill ratio. Our ambition this year is much more limited. It's clear that we want to be very selective. There are projects where we a significant project where we decided not to bid because the development time was too short, the level of risk was too high. That's something which is very well understood inside the company. By the way, the tender process which was in place before I joined and which has been reinforced three years ago, is a tender process which I believe is really strong.

We may always make mistake because if the inputs are not perfect, but I think we've got a strong process, a strong understanding of everyone in the company that quality of the backlog is the best asset of the company. I think that today we are doing the right thing when we decide to bid.

Bernard Delpit
EVP and CFO, Alstom

If I may just add on this one. I mean, the six Coradia Max contracts were awarded in 2021, 2022, and sometimes in 2023 for the last ones. What we face here is more an execution issue there, rather than acknowledging that since the beginning, because we didn't realize the risk, it was something risky. I mean, this was on our radar, for sure, because of the size, because of the product, because it was six contracts coming very close in terms of homologation and deliveries. But definitely, this was not a bidding issue. This is an execution issue.

Daniela Costa
Analyst, Goldman Sachs

Got it. Thank you.

Operator

The next question comes from Martin Wilkie from Citi. Please go ahead.

Martin Wilkie
Analyst, Citi

Thank you. Yeah, good evening. It is Martin from Citi. The first question I had was just to come back on the timing of the deleveraging. You are talking about the EUR 2 billion by next September, and I think some investors might see that length of time as potentially an overhang on shares, particularly if you are going to be raising equity towards the end of that period. You have given some comment on the reason for the timing, but just to clarify, is this that you want the Capital Markets Day completed, the early part of the review completed, so that investors have a better sense of the future outlook as opposed to the time that you might need to identify and carve out disposals, for example? Just to understand that timing. Thank you.

Martin Sion
CEO, Alstom

Okay. Maybe I start, Bernard can complement. I mean, today, we are working on disposal of businesses, as I said before. I mean, we have already a list, and we have to work on it. We are working also on organic measures. You remember that we have been specific on the fact that the EUR 2 billion could come from organic measure and inorganic measure. In the organic measure, it is mainly negotiations with our customer, so that is more on the short term. Separately, what we are working on is the new operating model, the improvement actions, and we believe that we need to be able to present a comprehensive plan in order to attract new shareholders. Obviously, it is clear that the updated financial trajectory for the next years, including the improvement that we are putting in place, will be a key element.

All that drives to something which is around the Capital Markets Day that we have planned in Q2.

Martin Wilkie
Analyst, Citi

Thank you. That's helpful. If I could just have one other question on the backlog. I think, Bernard, you mentioned that new orders coming in were supportive to the gross margin. Should we think that the new orders that you've taken in are meaningfully higher than the prior gross margin in the backlog? Just to get some sense as to, obviously, it's a relatively modest uptick in the gross margin in the backlog, but just to understand the dynamics of what's changed in the period to keep that gross margin in the backlog still relatively elevated. Was it that the profitability in those new orders is meaningfully higher than what you've seen in the current backlog?

Bernard Delpit
EVP and CFO, Alstom

Okay. There is no major difference in terms of gross margin in the order intake now, I would say in the last two years. But there is maybe some technicality that I should explain at that stage, that the gross margin in the backlog is floored at 0%. What comes as negative is booked as a loss at completion with the provisions. Okay? That's what explains with this significant provision that we have taken in H1 why the gross margin in the backlog continues to grow. It's 18.1% versus 18%. So it's not major because, of course, part of the degradation of the Coradia program was taken in the gross margin for their residual value, I would say, in terms of margin. But the rest of it was taken as a new provision. Is that clear?

Martin Wilkie
Analyst, Citi

Yes, it is. Yeah. No, that's very helpful. Thank you very much.

Operator

The next question comes from Akash Gupta from JPMorgan. Please go ahead.

Akash Gupta
Analyst, JPMorgan

Yes. Hi, good afternoon, and I got a couple as well. My first one is on organic measure, and Martin, you alluded to in last question as well. It's been two weeks since you had the profit warning, and again, the share price reaction has got substantial media attention. Just wondering what sort of conversation you had with customers in last couple of weeks. Given your size, you must be quite important to several customers. Just to get some thoughts on when you see potential for these organic measures now versus two weeks ago, has there been any change in your thinking based on your conversation with customers in past two weeks? That's number one.

Martin Sion
CEO, Alstom

As you can imagine, we've been discussing with our customers in the last two weeks. I think that our customers understand the situation, and I cannot be more specific. I think you perfectly summarize the situation where we are with some customer in a real partnership relationship, and we'll see how we can improve potentially some position that we've got with them in order to reduce the level of money that we have to contribute to the deleveraging plan of the EUR 2 billion. But I cannot be more specific with the discussion we are having with the different customers. But I think you summarized it well.

Akash Gupta
Analyst, JPMorgan

Thank you. My second question is on rolling stock business. When we look at these Coradia Max orders, many of them have framework attached to them. Just curious to know, when customer in future, if they exercise these options, would there be any difference in margins given this additional cost, or there could still be profitable, those remaining framework orders?

Martin Sion
CEO, Alstom

Thank you for the question, because it will allow me to be very clear on one topic. Because I had questions about customer or potential customer of Coradia Max, which were a little bit worried about this train. Okay? The way I present it now is, it's clear. The development is a pain, is a pain because we are late. It's a pain for us due to the cost. But the product is good. The product is good, and it's not because the development has been longer, more costly than expected, that for new customers or for new options, it's not a good product. It's a good product which will be benefiting from all the know-how we've got in Alstom. So if any option was exercised, it would be accretive in terms of margin.

And if you look at a big industrial project in commercial aviation, et cetera, having a development which is complicated and then a very good product is not unique. I think that we are in this situation.

Akash Gupta
Analyst, JPMorgan

Thank you. Lastly, you have an arbitration going on against Bombardier, and I think in your annual report you mentioned there were some dates in first half on that case. Just wondering any update on that and any timeline that we should be aware of for any update in near future on Bombardier arbitration?

Martin Sion
CEO, Alstom

No, I Okay, thank you for question, but I cannot comment on this arbitration.

Akash Gupta
Analyst, JPMorgan

Thank you.

Operator

The next question comes from Andre Kukhnin from UBS. Please go ahead.

Andre Kukhnin
Analyst, UBS

Yes, good evening. Thanks so much for taking my questions. Can I just double-check on Coradia Max and what you described the process very helpfully of the H1 with the first issue occurring being resolved, and then your tiger teams looked at it more closely, found something a bit more fundamental. Have they finished going through this project? How should we think about the milestones in the run-up to homologation in the next sort of 15 months?

Martin Sion
CEO, Alstom

Yes, the team have worked between the Coradia Max team and the tiger teams, have worked in September, beginning of October, to have a plan which is comprehensive. We know exactly what we have to do in terms of documentations, in terms of tests. We have been successful two weeks ago in a critical test which needed to be done with the body which analyze the safety of the trains. Now we have a lot of tests to do, hundreds of tests to be made in the next months, but we know exactly what we have to do. We have the tests, the trains which are in the good configuration to make the test. Now, we will obviously find some topics during the test, as in any projects, but that's normal life, okay?

Because now we have a plan which go from A to B being the homologation. We've got review at high level since beginning of September to make sure that this project remains the priority of all regions which are involved. I can tell you that the adherence to planning is good. On my side, and I always know that these complex projects have always some difficulty, but I think I said it because I had the question at the last call, I consider that this is the last rescheduling of the Coradia Max.

Andre Kukhnin
Analyst, UBS

Got it. Because I was also thinking about the timing of your Capital Markets Day for Q2 2027, and you've got, I think, two key questions, I think two issues to address. One is the Coradia Max, and the other one is the EUR 2 billion deleveraging. I just wondered if that timing means that you expect to have a good line of sight on both of these by then?

Martin Sion
CEO, Alstom

I think that operationally, we will be in a situation where we will be able to present in details what is our new organization, our new operating model. What we plan is to have demonstrated also significant improvement in what we do day by day. It's not only about Coradia Max that we want to communicate at the Capital Markets Day. Concerning the deleveraging plan, as it was said before, all options are on the table, depending on the size of the organic part, depending on the size of the asset disposal. We'll see where we are at that time, but it's too early today to tell you what will be the part of the deleveraging plan, which will be fully clear at that time.

Andre Kukhnin
Analyst, UBS

Thank you. If I may, just very final one on this other projects, I wanted to follow up on that. How do you assess the risk of having to do any further margin adjustments there?

Martin Sion
CEO, Alstom

We are working to secure all our backlog. That's normal. As it was presented in this presentation, we try to look at the backlog in a systematic manner. We consider that there are risks in the services and signalling, but more or less, they are managed, and we have demonstrated in recent years that we can manage them. In the rolling stock, we have three parts in rolling stock. Serial trains, and the serial trains, we are very good at it. Early development trains, what I've seen, for example, even in Germany, what I've seen on the new trains like S-Bahn Rheinland or DT6 are projects which started on the good foot, and with a lot of monitoring of the management to make sure that we start properly.

There is a part of the backlog of rolling stock, which is for trains which are in the development, end of development, beginning of ramp-up. This is a critical phase. This is a critical phase. Some of the trains there, the Coradia has been fully looked at in different situation. The high-speed train in France, TGV, is progressing well. As I said, it has entered into service. For this version of TGV, a lot of risks are behind us. The other projects are being looked at by the tiger team, not looked at in order to grade or to make an assessment. It is mainly to help them. But when you help a team to de-risk, you may find a topic which was unexpected.

The idea is more to find ways to compensate the risk, and if it does not work, to highlight the risk, and then we take a decision.

Andre Kukhnin
Analyst, UBS

Great. Thank you.

Martin Sion
CEO, Alstom

I assure you, at the end of this fiscal year, I think that all the portfolio will have been thoroughly reviewed.

Andre Kukhnin
Analyst, UBS

That's very helpful. Thank you. I appreciate it. It's easier to ask about this than to answer and manage. Thank you.

Operator

The next question comes from Delphine Brault from ODDO BHF. Please go ahead.

Delphine Brault
Analyst, ODDO BHF

Yes. Good evening, everyone. Thanks for squeezing me in. I have two, and will ask them one at a time. On the contracts in your backlog with gross margin below 10%, so on slide 14, how many contracts are embedded in this category, and did your tiger team reviewed each of them?

Martin Sion
CEO, Alstom

I don't have the figure, and I don't think it's meaningful, because we've got 2,500 projects, and I don't know how many are in the less than 10%. The tiger team are not necessarily looking at the one who have the lowest margin. Tiger teams are looking at the projects where we are identified that there are some risk. It can be technical risk, homologation risk, it can be industrial risk, that we are not sure that they are properly mastered. So, it can be a project with a good gross margin, but if it face a risk which is not properly addressed, this gross margin may be degraded. So, I prefer to speak about the tiger team on the critical phase of the projects, which is end of development, beginning of ramp-up, whatever the gross margin of this project at this stage.

Delphine Brault
Analyst, ODDO BHF

Okay, thank you. Second question is on Avelia Horizon. You mention on the slide that the margin is accretive. Can you be a bit more specific? Accretive to what, concretely?

Martin Sion
CEO, Alstom

It was on the options. That's No, it was on-

Bernard Delpit
EVP and CFO, Alstom

Description. Avelia Horizon.

Martin Sion
CEO, Alstom

Ah, on Avelia Horizon. When we say it's accretive, it's in terms of P&L. Okay?

Delphine Brault
Analyst, ODDO BHF

Okay.

Martin Sion
CEO, Alstom

It's in terms of P&L, of today's P&L.

Delphine Brault
Analyst, ODDO BHF

Thank you.

Operator

Ladies and gentlemen, as a reminder, if you wish to ask a question, please dial pound key five on your telephone keypad now to enter the queue. The next question comes from Aron Ceccarelli from Bank of America. Please go ahead.

Aron Ceccarelli
Analyst, Bank of America

Hello. Good evening. Thanks for taking my questions. Not many left. I have two around the operating model. You plan to communicate the new operating model by year 2026. How quickly do you expect to implement it across the organization, and where would the rollout start?

Martin Sion
CEO, Alstom

Thank you for the question. In several countries like France, Germany, Spain, Sweden, we have some regulation in terms of social consultations of union, which create some delays. We will have to comply with that. Typically, it can be three months, which would lead us to beginning of April. My intention is that as soon as possible. We start to have some part of the company which works in a project mode, as in the future organization. It will not be perfect, but I believe that on the regions where we do not have this kind of constraints, whatever can be done in advance should be done. We will be pragmatic, but it is true that given the size of Germany, Spain, France, and Sweden, significant part will need to be done according to the regulation. I think I explained.

As you understand, I want to go as fast as possible, pragmatically, and at the same time, obviously, we will comply with the rules and regulation of each country.

Aron Ceccarelli
Analyst, Bank of America

Thank you. Perhaps following the issues you have identified, do you still believe the region-led model is the right structure for Alstom, or do you see a need for greater centralization of project execution?

Martin Sion
CEO, Alstom

I think that on rolling stock and services, the fact that we are very close to our operators is important. I believe that when you look at the homologation rules, et cetera, they are very different from one region to another. It is not the scope, but I will not totally challenge the model of Alstom in terms of regions. For rolling stock, what is important is to be more efficient, especially when we work between two regions, and that is a key topic. No, I will not challenge that much the fact that rolling stock and services are organized by region.

Aron Ceccarelli
Analyst, Bank of America

Got it. Thank you very much.

Operator

Ladies and gentlemen, thank you for your participation and your questions. The live event is now over. You may now disconnect.