Welcome to Cargotec's Second Quarter Results Call. My name is Aki Vesikallio. I'm heading IR. Today's results will be presented by our CEO, Mika Vehviläinen, and CFO, Mikko Puolakka. After the presentation, there will be a Q&A session. Cargotec's second quarter was a record-breaking one. We broke new records in orders received, order book, and in comparable operating profit. Especially Hiab and the service businesses had a record performances in the quarter. On the other hand, supply chain challenges continued, and we expect them still to continue in the second half of the year. Please pay attention in the disclaimer in the presentation as we will be making forward-looking statements. First, Mika will go through second quarter highlights and the market development and also the group level financials. Then Mikko Puolakka will take over and go through the business areas and our financials and the outlook.
With that, over to you, Mika.
Thank you, Aki, and good afternoon from my behalf as well. Thank you for joining the Cargotec Q2 call. The second quarter 2022 was a strong quarter for Cargotec. The demand in all of our business areas was strong, resulting to the record order intake. Despite the supply chain challenges, our revenue both in Kalmar as well as in Hiab developed favorably, and as a result of our capability to defend the margin of those businesses, that resulted in the record operating profit margin as well. Overall, when we look at the market development, we can see now the stabilization in the equipment running hours. Even though some of the numbers you see here on the slide are negative, one needs to remember that these are sequential development.
If I compare the running hours here to the same running hours during the Q2 last year, those running hours are roughly stable or somewhat up. Very clearly, we saw exceptionally high running hours for some quarters, and we now see the stabilization of that one then further in, so those capacity is coming to the customer operations as well. Overall, on the market development, we see slower growth, however, at the moment. First of all, when you look at the container traffic development, the Q1 actually turned to be a negative quarter in terms of the container development or container traffic growth. That was really caused by the disturbances, first of all, from the war in Ukraine and secondly from the COVID issues in China.
For the rest of the year, we expect the container traffic to grow again with somewhat lower rates as well as in 2023 when one is expecting still a further growth in the container traffic. In the construction, both in U.S. and Europe, we have seen the growth slowing down but at the very high level of activity. At the moment, actually the growth is really primarily limited by the supply factors such as the labor and material shortages. The picture in the shipping side is very good. Last year, ship order number actually proved to be higher than expected, nearly at 2,000 ships, and now then that starts to be visible in the MacGregor order intake during the Q2.
We also see a more favorable development now starting to take place in the offshore side, both in terms of renewables, which has been a growing and very strong market for a while, as well as oil and gas, of course, primarily driven by the energy situation now, especially in Europe. As said, orders were at the very high level and across all three businesses. This very good order development resulted in the record high order book over EUR 3.5 billion. As said, the excellent development despite the supply chain challenges in Hiab and Kalmar resulted in a better revenue. That revenue in combination with our capability to defend our margins through sourcing actions and pricing actions resulted in a good profitability in both of those businesses.
MacGregor is struggling with a number of issues, one caused by the very low revenue number, only EUR 127 million in Q2, and Mikko will go through the MacGregor situation a bit more in detail in a moment. Our services business goes from strength to strength. Another quarter of double-digit growth, a 13% combined. In MacGregor, we suffer from certain logistics issues related to some of the arrangements we are doing in our warehousing and that's also impacting obviously for MacGregor profitability as well. Kalmar, excellent performance with 22% growth. In Hiab, the services growth was good, but that was really limited by the availability of truck chassis that actually limits our revenue growth in installation services, for example. During Q1, Cargotec announced a renewed strategy. Our strategic targets remain the same. We will drive for profitable growth and sustainability.
As a part of the renewed strategy, we are really building from the very strengths we are having there. Leading very strong market positions, leading brands, strong services operations with double-digit growth, investment in the leading technology, and equipment driving for robotization, automation, electrification, and digitalization. We are enabling our customers to go for more sustainable and safer operations. As a part of the renewed strategy announcement, we also described some of the next steps we will be taking. We are making good progress on those ones. We have now started the strategic evaluation of MacGregor and have appointed advisors for that one. We already announced recently the agreement that enables us to plan for the heavy cranes exit in Kalmar.
In terms of our capital allocation going forward, we will be driving for further development in our M&A pipeline. We are continuing to invest in our R&D, in robotics, automation, electrification, digitalization. Our R&D investments actually grew another 13% during the Q2, and we are maintaining strong focus on our mission climate actions. Our eco-portfolio sales grew by 25% in Q2. Actually, on the comparable basis, if you take away the Navis numbers from the previous year, our eco-portfolio sales were growing by 45% during the Q2. That very clearly shows a very strong market demand in this type of solutions from our customers at this stage. As a part of that, exit plan we are now having on that one, there are a number of issues that we are working on at the moment.
We have announced a combination of the two operational units in Kalmar, the automation business and mobile equipment, into one operational unit into the so-called new Kalmar that will be headed by Michel van Roozendaal. The heavy crane exit agreement has following points. First of all, the business will be actually taken over by RCI Rainbow Heavy Industries, which has been a long-time partner for Cargotec and Kalmar. The crane automation as well as the services business will remain in Kalmar, and this is highly attractive business for us. We will also be responsible for executing the remaining projects. We have about EUR 140 million of backlog in the heavy crane side, and we want to control the execution and smooth performance for our customers. A number of assets and employees will transfer into the Rainbow as a part of this deal.
We estimate that this deal will lead to the restructuring charges of roughly EUR 25 million in Q2 and a further EUR 11 million during the Q3. As a part of the strategy, our investment in the market-leading technology and services are winning ground at the moment. Here are some of the proof points. We announced during the Q2 further investments in our production plant in Kansas, in U.S.A., enabling us to address the growing demand for Electric Vehicles. As a part of our sustainable portfolio and automation, we announced a very large agreement with APM Terminals enabling us to drive further automation, for example, in Los Angeles port with automated straddle carriers. We keep on investing into the further expansion of our eco-portfolio.
One example of that one are the new heavy cranes that are enabling more energy saving performances during the operations in port. We are expanding our life cycle services, and more and more we are combining the new technology offering together with the service offering. A good example of that one is the recent deal in Sweden, where we are combining the delivery of the new electric forklift trucks with the total care services packages as well. Again, we see a strong demand both from services point of view as well as technology point of view for these type of solutions. Sorry, I have a little technical issue here. With that one, I'd like to hand over to Mikko Puolakka for the business areas.
Thank you, Mika, and good afternoon, ladies and gentlemen, also from my side. Let's start with Kalmar, where the core businesses, meaning the smaller equipment, straddle carriers, as well as services, performed very well in quarter two. Kalmar orders were down by 5%, but if we exclude Navis, which was divested in quarter three 2021, Kalmar orders would actually grow 1% on comparable basis. In June, we got two very large straddle carrier orders, one in the U.S. and one in Morocco, in total 85 units. We have had a very solid demand from the smaller mobile equipment customer side.
However, due to the component availability, especially in our terminal tractor business, that has led to over 300 days lead times. Due to this fact, we have temporarily closed our order book during the second quarter. Despite the continuing component shortage, we were able to deliver actually significant volumes in equipment and in services in quarter two. If we look at the core Kalmar business, meaning the smaller mobile equipment, also the straddle business as well as all related services, that business grew in sales by 24% in quarter two. Like Mika said, we do not expect any easing in the supply situation during the second half of this year. Kalmar's profitability improved also significantly.
This was primarily driven by the sales growth during quarter two. We booked also below the comparable operating profit in Kalmar EUR 25 million restructuring costs related to the heavy cranes exit, and we estimate to book further EUR 11 million in quarter three. These are mainly costs which are related to the execution of the remaining order book for the business. When looking at Hiab, excellent performance by all metrics. All-time high orders. We had very good customer activity both in Europe as well as in North America, especially with the larger clients. Our orders grew especially in the Truck-Mounted Forklift business, as well as in demountable. Also the other business lines in Hiab were performing very nicely from the order intake point of view.
Also, like in Kalmar, Hiab has been able to deliver good volumes in quarter two, despite the challenges or bottlenecks in the component availability, as well as the truck chassis availability. Record high comparable operating profit 15.6% for the quarter, very much driven by the higher volumes. Also Hiab organization has done excellent work in the component sourcing and procurement area, as well as then in the price management, keeping the sales margin very stable year-over-year. When looking a bit forward in the second half of this year, it's also good to remember the seasonal patterns in Hiab business.
If we look, for example, years 2017, 2018, 2019, Hiab's quarter three has been typically 10%-15% lower compared to quarter two. In MacGregor, finally a significant uptick in the order intake, very much driven by the merchant vessel contracting. This is a result of the order intake or the vessel contracting pickup in 2021. Merchant vessel orders were driving the order intake in MacGregor. Roughly 80% of MacGregor's quarter two order intake was related to merchant vessels. Also service orders grew very nicely, supported by the high vessel utilization. MacGregor's sales were unfortunately impacted and down due to the offshore—fairly low offshore orders in the past few quarters.
The merchant as well as the service business has been stable in quarter two. MacGregor profitability for quarter two was unsatisfactory. This is driven by a few factors. As mentioned earlier, low offshore sales. We have done quite significant investments in offshore wind-related product development, and we unfortunately continue to have a negative result in a very limited number of offshore wind projects. Also, like Mika indicated, we have had some delays in service spare parts deliveries temporarily in quarter two. MacGregor service is a highly profitable business and also the merchant vessel results have been positive during this year, despite the fairly low volumes.
When we exclude in MacGregor first half results the offshore wind projects, MacGregor comparable operating profit would be 2.1%, while now the total reported MacGregor first half results were -2.7%. Couple of financial highlights from the first half and the second quarter. We have a record high order book, almost EUR 3.6 billion, and this is of course a very good basis for our deliveries for the several quarters ahead. Of course, very dependent still on the component availability as well as transportation availability. We had a significant improvement in the first half comparable operating profit up by 24%, very much driven by the volumes, but also effective sourcing and price management.
We booked in total EUR 38 million items affecting comparability in the second quarter. Largest single item was related to previously mentioned Kalmar heavy cranes exit EUR 25 million. Year-to-date June net income was EUR 62 million, up by 75%, very much driven by the volume growth. Our effective tax rate for the first half was 19%, very low compared to the historical levels, as we have been booking some tax income from an old tax dispute, for which we have received a positive decision. When we look to core businesses, Hiab and the future Kalmar, those were growing 26% in the second quarter and having a 12% comparable operating profit margin.
Looking at our cash flow, that improved slightly from the comparison period. We actually generated EUR 80 million EBITDA during quarter two, but then we continued to tie up some working capital in total EUR 42 million during quarter two, mainly in inventories, work in progress, goods in transit, and also inventories supporting the service growth.
Our balance sheet is very strong. Gearing has remained stable. Our net debt to EBITDA ratio has been 1.2, and our balance sheet or financing structure is very favorable. No big debt repayments coming up in the coming years. We reiterate our guidance for 2022. We estimate the comparable operating profit to increase from last year's EUR 232 million. Good to remember, like I said earlier, quarter three will be seasonally somewhat lower than quarter two, especially in Hiab. We are expecting to have a weaker mix in quarter three compared to quarter two.
Thank you, Mikko, and thank you, Mika. We have also sent out save-the-date invitation to our Capital Markets Day, which will be held 15th of November in Helsinki, followed by a site visit in Raisio, a Hiab's assembly unit also here in Finland. Pencil in the dates in your calendar. With that, operator, we are ready for Q&A.
Thank you. If you would like to ask a question, please signal by pressing star one on your telephone keypad. We will now take our first question. Please say your name before asking your question. Thank you.
Yeah, hi, this is Johan Eliason from Kepler Cheuvreux. Thank you for taking my questions. I have a few. Now starting maybe with the most important issue here, the MacGregor orders, EUR 300 million order intake. I can't see that has happened since the fourth quarter of 2014. You did mention a couple of big RoRo orders in the quarter that I know is quite big for you typically. Is that what drove it or is it this big container shipyard order intake that we saw last year that is now finally turning into orders implying that we should sort of expect the order intake to be around this level for another couple of quarters for MacGregor? That's my first question.
Okay, Johan, if I take that one, thanks for the question. Yeah, the MacGregor outlook is actually very bright at the moment. The order intake is actually a combination of what you just described. We have seen very good development in the RoRo car ferry market but also into container shipping as well and we had a number of orders in both vessel categories. As Mikko was saying, about 80% of the order intake was in merchant marine. This is the core business, the business that the traditional strength of the MacGregor is that and as such the margin development on those orders and order book is very favorable for us. I think we will see that development continue favorably. There is still a lot of vessels.
It's a combination of number of vessels, but also what you will see now is that when the shipyards capacity started to be full, what typically happens, and we see it happening this time as well, is that the scope of our orders will be expanding. Rather than doing just the design and key components, we are also now starting to do full deliveries, including a larger scope as well, and that's also expanding the order book as well.
Good. I think you mentioned offshore, and we heard Alfa Laval this morning talking about offshore CapEx being on the up going forward. What potential do you see in the offshore segment for you? Not only in the wind, I think it's an early phase, but in the traditional offshore vessels that used to be quite a big part of the business some eight years ago or so.
That's right. We still see a very favorable development on the wind sector obviously, at the moment, and that market remains very strong. We have seen now a recovery of the oil and gas market as well. If you look at the blocks and estimate now about 31% uptake predicted on that one. Some of that will be sort of back in more into traditional oil and gas and production and exploration type of ships as well, which is a good market for us as well.
Good. That should bode well for your divestment process of MacGregor, so you don't miss the opportunity similar to what happened in 2013. Can you say anything? You mentioned you have hired the bankers. Are you talking to any potential buyers for the MacGregor division already?
It's in early phases at the moment, and we have seen interest sort of increasing towards MacGregor. We have now hired the advisors and we'll keep you updated once the sort of plans will progress further.
Okay, good. A question on Hiab. It seems like order intake was really good in the quarter. Again, I was sort of expecting it to slow down. Is this also an issue about taking market share? I guess your competitor with sourcing in Russia might be a little bit more impacted by the geopolitical situation and the war in Ukraine and Russia. And they comment on that?
I think it's primarily driven by the fact that especially the large fleet customers in U.S. placed a number of large orders during the quarter as well. On that one, we also see a positive development in the military side of the business where we have seen acceleration of the order intake from some of the deals that we have announced a while ago. That's really driving the demand and primarily. As Mikko was saying, it's across the different business lines across the different markets, we see overall still a very favorable development.
Okay. On this eco share, which I think is interesting, the number you presented was it 25% or so of your total order. I guess most of this is in Kalmar and to some extent Hiab. How would it look like in the share being in your sort of core business remaining, after the potential divestment of the MacGregor division and this winding down of the heavy cranes? Are we talking about above 30% or 40%, or how should I think about it?
Most of this eco portfolio products are actually within the core businesses themselves, so, that remains strong. It really has been I mean, we clearly have seen the customer demand increasing and as I said, we had a 25% increase. If you take the Navis numbers out from last year, it was 45% increase in sales of the eco portfolio. It's also in terms of our total revenue, it was, if I now remember correctly, like a 23% of our revenues in Q2, and very good order development on that side as well.
For example, in Kalmar.
Okay. It will be.
In Kalmar forklift trucks, nearly 40% of the order intake was for fully electric forklifts during quarter two.
Yeah. That sounds good for your future profile as well. Finally, just a small detail here. You announced this large CapEx for the Ottawa plant. Where will your full year CapEx number end up at around?
Yeah, last year, our CapEx number was approximately EUR 65 million. We expect to be somewhat higher on the CapEx this year. Not all these Ottawa related CapEx numbers or investments will land this year yet. It will be 2020-2023. Slightly higher than last year's EUR 65 million.
Okay. Thank you very much.
Thank you.
We will now take our next question.
Yeah, hi, it's Massimiliano from Credit Suisse. I had just a couple of questions. The first one would be maybe on the Kalmar business. If you could provide some more color on the heavy crane side versus the core side for this quarter in terms of maybe how many sales were actually related to the heavy cranes business and the margin profile that Kalmar Core would have excluding the heavy cranes side.
The Kalmar, out of the total Kalmar revenues, the heavy cranes were representing approximately EUR 10 million in quarter two and roughly EUR 40 million in the first half of 2022.
Maybe a word of warning on that one. As Mikko indicated earlier, we actually expect that proportion of the deliveries to be somewhat higher in Q3, that they will have then a diluting impact on the margins.
Okay. Yeah, it makes sense. In terms of component shortages and the delayed sales, because in the past quarters you provided very useful quantifications of how much of your sales were actually delayed because of component shortages and supply chain issues. If you could comment on where delayed sales were going in Q2 and maybe the outlook for H2. If you see it getting better or worse given China, and you had commented that there would have been a lag between the lockdowns in China and component availability.
Yeah. If I start with China, first of all, I think. Right now there is a catching up to be done. I think they are roughly two weeks delayed in terms of shipments out of Shanghai at the moment. One is to remember that there is a delayed impact. Most of the issues that we actually saw happening during the COVID, heavy COVID restrictions are only starting to be available for us during the Q3. A very large part of that one is not direct. We don't have that many components coming directly from China, but I think we can see our suppliers actually being impacted by that one. That will still be very much visible during the Q3.
Overall, there has been some easing of the list of the critical suppliers, which has somewhat reduced, but we still have breaks and it keeps, you know, you have one component, then the next one becomes a bottleneck and so forth. Overall, the missed revenues is probably in the same ballpark as we had in Q1. Still today, I think for the remaining part of the year, we are not capacity constrained. We could deliver more, but then we are clearly supply constrained and that situation we expect to be continuing in the second half as well.
Okay, perfect. In the second half due to this China situation, would you expect it? I know that the visibility is limited, but would you expect it to be stable or perhaps it could worsen again before actually getting better towards the end of the year?
Yeah. The visibility and predictability of that one is really hard at the moment because it keeps on changing such a quick variant. Then, of course, you have Covid issues. I think the Covid is still pretty rampant, and that's impacting our sort of absenteeism, but very much our suppliers as well. At this stage, as I said, generally, I think there is a trend of starting to see easing off, but that situation changes from one week to another, so the visibility is still there. There is certainly opportunities to do quite well on the, you know, second half as well, but the situation is fragile.
Yeah, very clear. Thank you very much.
Thank you.
We will now take our next question.
Hi, Mika, Mikko, Aki, Magnus with UBS. A couple of questions from me. First, order intake again, very strong. Could you comment a bit on how far into 2023 your backlog extend? If you have any cancellation charges that customer would incur if they decide to not take deliveries?
We have, if I guess, start from the end of the question, then we have introduced cancellation charges during this year. For us overall, we have seen very little, if at all, cancellations at the moment. I think, one of the, maybe the safeguards we all have at this stage with the very high inflationary situation is that, I think the customer's decision potentially to cancel is more unlikely than typically because of simply if you now cancel and then you reorder, that equipment is likely to cost you considerably more at the moment. That's one thing.
Again, underlying operations with our customers remain at a very high level at the moment and all of the main categories in terms of construction and container movements and logistics overall, the activity level is still very, very high on that one.
Perhaps on the question.
What is the sort of?
Yeah. On your question.
Sorry
Concerning the backlog coverage or extension, I would say that in Kalmar's case or Kalmar mobile equipment case, smaller mobile equipment, we are talking about four quarters with the current component availability situation. Then in Hiab's case, the current backlog basically covers close to three quarters of sales, again, with the current component availability situation.
Yeah. To simplify, if you place an order on those categories of equipment, you are more likely to have it in the second half of 2023 rather than the first half.
Perfect. Thanks. That's clear. With respect to the cancellation charges, is that a charge as proportion of the value of the order or how does it work?
Yeah, it's of course always a question of negotiation. Generally, it's a fee or charge against the value of the order.
Perfect. Thanks. Secondly, how much did the currency contribute to revenue and order growth? Was it different across Kalmar and Hiab in the quarter?
All in all, during quarter two, the currencies had approximately 4% unit impact in order intake as well as in revenues. This is pretty much similar for Kalmar and for Hiab.
It's good to note that I think.
In terms of-
Yeah, sorry. If you look at the Hiab performance, I think what makes it particularly excellent is the fact that, of course, as we are hedging, we have a U.S. dollar exposure in Hiab, unlike we don't have that in so much in Kalmar, is that we are hedging that one. Actually, the current dollar strength is not coming through in the Hiab numbers at this stage because those deals that we delivered during the Q2 had been hedged sort of mostly during 2021, actually.
Oh, okay. Got it. That's clear. Could you comment a bit on the price cost situation across Hiab and Kalmar? I mean, in Q1, you suggested Kalmar was lagging a bit there, and given what you've seen in Q2 doesn't seem to be a major issue. But how did that turn out in Q2, and what do you expect for the second half?
I would say overall in Hiab, we done well in defending our margin, and it's really a combination of sourcing activities and proactive pricing meeting the market demands. I would say in most of the product areas in Hiab, the margin has been roughly at the stable level. In Kalmar, we were a little bit slower maybe to introduce some of the pricing, but then we have introduced last year successfully a number of surcharges for customers, and they started to have a positive impact already in Q2, and that has also helped the situation in Kalmar.
Excellent. Thank you. Yeah, sorry, final one and a follow-up there. Could you help us a bit quantify the EBITDA margins on Kalmar Mobile in the quarter and what was core margins for the group in the first quarter?
Basically what I showed in one of the slides for the second quarter, the core businesses, meaning Hiab as well as the new Kalmar, that delivered 12% comparable operating profit margin. For the year to date June, so for the first half, it has been slightly up to 11%.
Perfect. Thank you so much.
Thank you.
We will now take our next question.
Hi, gentlemen. It's Erkki from Inderes. A couple of questions from me as well. First regarding Kalmar. The demand drivers in the second half look a little bit questionable as container traffic growth expectations have been cut all the time. I mean, what are the customers playing now, and how is your own quotations number developing?
Yeah. On that one, our sort of sales pipeline actually has remained pretty stable now in the first half of this year and still very strong. The Q2, we landed, as we announced, two fairly large straddle carrier contracts with APMT, especially the Los Angeles one being fairly significant. At the same time, the demand in the mobile equipment remained robust. As Mikko was saying, we closed actually the order book for most of the Q2 for terminal tractors because of the long lead times, and that obviously then reduced the order number compared to last year on that product sector.
Okay. Thanks. That was actually what I was going to ask next. What was the impact of this closure of your order book and how long will it last?
We have not quantified the impact, but the let's say closure of the order book was valid, I would say, during the whole May and a good part of June, so majority of the second quarter. It had a significant.
And-
Volume-wise, a significant impact, which was partially compensated or to a great extent compensated by these large straddle orders which we got during quarter two.
Do you see that these orders would come back later in Q3 or and so forth?
Yeah. The demand is.
You kind of want-
The demand continues to be strong on that and the activity levels remain high at the moment, so we have now opened the order book again on this one.
Okay. Thank you. Finally, a housekeeping order. Mikko, what is going to be the group tax rate in the second half this year?
Yeah, that depends, of course, our country mix to a great extent, but if you use
Approximately
Roughly 30%, as a proxy, as said, year to date June was 19%, but it was impacted by this one-off tax decision. 30% would be a good proxy for this year.
For full year, or for the second half?
For full year.
Okay. Thank you so much.
Thank you.
We will now take our next question.
Yes. Hi. It's Tomi from DNB. Still wondering if you were able to quantify the delays, delay impact, in terms of sales in the second quarter.
It's a bit difficult to quantify the magnitude, but as Mika said, definitely we could have delivered some tens of millions of euros more in revenues during the second quarter if we would have had the needed components. We have enough assembly capacity, both factory capacity and personnel, but we are still significantly limited by the certain component availability.
Is this level expected to continue also, in a way, some tens of EUR millions, in the next couple of quarters?
Correct. Yes.
There's no easing, there's no improvement then?
Not in sight.
Let's put it that way. I wouldn't count on that one. I said there is a sort of somewhat underlying trend of the number of suppliers or the list of the critical component suppliers is reducing, but the new challenges are popping up and it's so unpredictable still at the moment that I certainly wouldn't count on the clear improvement during the second half.
Are you able to quantify the cost over and relating to the wind offshore project in the second quarter?
We have approximately EUR 10 million in the first half of this year. Like I said, if we exclude this offshore wind projects during the first half of this year MacGregor results, the rest of the MacGregor profitability would be 2.1%. The full MacGregor first half results as we have reported are -2.7%. It's a sizable number, very much related to the first of its kind technology for the offshore wind business, where we see opportunities going forward.
You booked EUR 27 million last year. Is it possible that the number by the end of this year would be similar?
We try to do a prudent assessment of those offshore wind projects end of last year. It's good to remember that when we have booked these costs in the past, that takes the project profitability to a very low level and it remains on a low level until we close the project. That is why we have this drag during this year in the offshore wind projects. We expect the service business to deliver a strong year. Also the merchant now gradually, thanks to the improving order intake, will also improve profitability.
It's good to note, of course, when you look at the MacGregor, I mean, the revenue was exceptionally low with only EUR 127 million. The issue combined with the cost overruns, with the fact that the offshore revenue remained very small, of course, and had an impact there.
Maybe on the pricing, are you able to comment the pricing component in the order and sales growth?
Yeah, I would say that on year-over-year basis, we are probably somewhere between 15%-20% higher, depending on the type of equipment in there. Overall, when I look at that one, we've been able to defend our margins to a quite large extent by pricing increases and additional surcharges in Kalmar side as well.
I think you wrote that you are monitoring the pricing environment after completing price increases. Have you planned price increases also?
Yeah
For the second half?
Yeah. Yeah, we actually did a pricing increase round in a number of product categories during July.
Good. A final question, if I may. The sales mix, is there anything else? You mentioned the heavy cranes equipment share maybe bigger in the third quarter. Is there something else since you raised this issue for the third quarter?
The heavy cranes, Kalmar heavy cranes volumes and then also MacGregor volumes are growing in the second half, compared to the first half. Taking into account what I said also earlier, that typically Hiab quarter three revenues are 10%-15% lower than in quarter two due to the less delivery days in the northern hemisphere during the summer break time, customer summer break times.
Perfect. Thank you very much.
Thank you.
We will now take our next question.
Yes. Hi, this is Tom from Carnegie. I wonder about this heavy crane project losses that you seem to book as EU items. I mean, when will you move over to reporting heavy cranes as a discontinued business instead?
Yeah. The heavy cranes order book, like Mika said, is some EUR 125 million-EUR 130 million. It takes approximately two years to deliver majority of this order book. We have booked now, based on the prudent risk assessment, this EUR 25 million for quarter two. Some exit related bookings still in quarter three, but we expect that we should cover from these bookings basically the project risks until we have delivered the order book. We have had quite significant one-off items in this year, also in the past years, and these are mainly related to Kalmar, especially to this heavy cranes business as well as MacGregor restructuring.
Now with the new refocused strategy of Cargotec, we expect that we have reshuffled the business portfolio so that we do not need to have these one-off items like we have had in the past.
This means that the business will now run at a zero EBIT margin the next two years until all the projects have been delivered. Is that right?
Basically, the heavy cranes order book, deliveries are having a single-digit profitability margin. If we can execute those projects better than what we have done based on the current risk assessment, then of course we do not necessarily need to use all those risk provisions.
Okay. Then the dollar hedging in Hiab. We know, of course, that the dollar has strengthened a lot. When will that impact the margin positively?
Due to the long lead times, we do not necessarily see any visible impact during this year. We start to see that more starting from the beginning of next year.
Okay, thanks. Then the new strategy, say, the review of the operational model to support the refocused group. Can you just help us to understand, you know, what are we talking about? Is it possible to split Cargotec into two companies, into Hiab and Kalmar? Or is it just to take out head office cost and move that into the business areas rather than we are talking about?
Yeah. It's if you think about actually now with the combining, first of all, the Kalmar into the one business area and then a potential possible exit for MacGregor, we would actually end up with only two business areas now in Cargotec. Obviously, the requirements in terms of the headquarters activities and support for that one. Effectively, we are looking at what activities should be retained in the group cost and what activities would be better actually served directly in the businesses themselves. That review is going on.
Okay. Then about this, the automation business. Is the plan to sell now automation solutions using whatever Konecranes, ZPMC or Rainbow's cranes? Is that what we should understand, if you plan to keep automation on?
I don't think so. I think it's primarily focused in the capabilities we have in automation. First of all, of course, to still serve the straddle business that is highly successful and having a good progress for us. Also using the same automation software capabilities we have built for other parts of our businesses in Kalmar mobile equipment and potentially even in Hiab.
You are working on the basics of automating RTG and RMG cranes, et cetera. I mean, that's not the plan. The plan is not to do that in the future.
That's not in our focus anymore.
Aren't the facilities that you have there oversized? I mean, is there a big opportunity to cut back on fixed costs a lot then? You have built up, I don't know how many people you have working for and what the fixed cost base is in automation.
I think it's a highly skilled team that we can certainly leverage in other businesses. A part of the current deployment of the automation technology has been actually done in combination with some external resources and partners. I would assume that part of the business would be ramped down.
this very large order growth in Kalmar many quarters there, is it sounds like, I mean, the market cannot grow like this. Who is losing market share? Is it so that especially like U.S. customers want to buy from Western suppliers or what's going on behind the scenes that we don't know as outsiders?
Sorry, Tom, was it about Kalmar or?
Yeah. I mean, the Kalmar market cannot grow like this, what you have shown the last years.
Yeah. Let's remember first that we have had a growth spurt in the container traffic. As we know, these investment decisions always become delayed on that one. We're seeing some of that impact happening there. It's good to remember now that with the refocused strategy, actually the primary customer group for Kalmar is not any more the large container ports, although we still serve them with the straddle solutions, but it's primarily the sort of inland terminals or logistics yards, et cetera. That, as we know, has been a business that has a sort of clear underlying growth trends driven by e-commerce and changing the logistics, et cetera. We assume that and expect that market to continue to grow going forward as well.
For the new Kalmar, how large share is port terminal and how large share is an inland terminals and logistics and so on?
I would say that, roughly speaking, and this of course varies, the larger terminals would probably represent not more than maybe 20%, 20%-30% of the revenues. The rest is actually smaller inland terminals, logistics operators, et cetera.
The port terminal is only 20%-30% of new kind of business growth. Was that right?
Yeah.
Okay. Thank you.
We will now take our next question.
Hi. Just a couple of follow-ups from me. It's Massimiliano from Credit Suisse. The first one would be on MacGregor. Given that the shipyard capacity is almost full, when do you expect this increase in orders to flow into revenues? What are your capabilities to scale up very quickly? I know that MacGregor is very outsourced, so when should we expect this big increase in orders to flow through revenues?
I think typically we have seen about 12-month cycle from the ship order to our order cycle, another 12- months from the order into the revenues as well. I think we primarily look at the good order intake now during Q2, which we expect to continue to be having a revenue impact from 2024 onwards. On that one, some of those orders that are fairly sizable can be a series of ships. For example, one of them was a series of 12 ships, so obviously that revenue will be actually deployed over multiple years when those ships are built there as well. Primarily the revenue impact should be visible from 2024 onwards.
In terms of the scaling, actually as you pointed out yourself, the MacGregor is an asset-light operation mode, so we are relying on the subcontractors which are usually located close to the shipyards in China, Korea, Japan and other locations. That supply chain is actually very much intact, and I think we should be able to ramp up. The visibility at the moment on that one is quite positive.
Okay. Clear. Thank you very much. My second one would be on Hiab and Kalmar prices, because I remember that in July 2021, you put up prices significantly. If I look at Q2 revenues, these price increases have already flowed through revenues completely, or should we expect something more from that July 2021 increase in Q3?
I think if you think roughly simplified almost now as Mikko was saying three-four quarter cycles because of the lead time. The Q1 pricing increases, they're relatively modest. Some of that has floated into the Q2 this year. The Q2 pricing increases, I think we were starting to be a little bit more aggressive. That had probably a small impact on Q2, but we would actually primarily see the first half pricing impacts from 2021 to be visible in our second half revenues now this year.
Yeah, if we think that.
Okay
If we think that Hiab and then the Kalmar core businesses have been growing roughly 26% year-on-year, roughly, more than two-thirds of that is coming still from the volume growth and one-third from the price impact.
Perfect. Very clear. Thank you very much.
We will take now our next question.
Yes. Hi again, it's Johan. Just a bit of a follow-up here. On these heavy cranes, you've given the IPs to your Chinese partner, Rainbow Heavy. Didn't you get anything paid for that? Or is it just to make sure that you keep some service revenues in the future? Do you still own the shares in Rainbow Heavy, and what's the plan with those? Thanks.
Mikko, maybe you take the Rainbow Heavy shares. I can't remember the actual situation.
Yeah, we still own shares in Rainbow Heavy. If I remember correctly, the ownership is roughly 4%. Originally, it was around 7%. We have divested some of the shares. We are not planning to be a long-term shareholder there. The ownership has been gradually declining.
Coming back to your question. We looked at the multitude of options here: just simply ramping down the business, selling the whole business to an outside partner, there was some interest for that one, or then this option. From our point of view, the business case on this option was the most attractive. We did receive a payment for the IPR and the assets we are moving. It was in the sort of EUR 1 million. What made this primarily attractive was the fact that we are able to retain the services business related to this type of equipment in-house, retain the automation capabilities and then having the control on the closing of the open projects.
Okay. Excellent. These charges you announced in relation to this development is net of the potential purchase price you received then?
Yes.
Yeah. Okay. That's all from me. Thank you very much.
Thank you, Johan.
We will now take our last question.
Hi, it's Magnus here again. Just a couple of follow-ups. I mean, first, you talked about pricing hikes about 15%-20%, and then you had 4% FX on top of that. Does that mean that your volume growth in the quarter was significantly negative or am I missing something?
No, actually, Mikko, you wanted to take-
Are you referring now to, orders or sales?
Now it was sales, but yeah. Yeah.
We got roughly 4% tailwind in sales as a total for Cargotec, taking into account the strengthening, for example, of the U.S. dollar during quarter two. As said, yes, we have been increasing prices in the Cargotec core businesses. The price increase impact has been roughly one-third of the total quarter two sales growth.
Two-thirds of volume. When I talked about pricing increases, I was talking about the order intake price levels now in comparison to last year.
Okay. We still have some conversion on the sales, of course, in those prices as well. What should we expect on pricing into the second half of the year on the volume, how much growth contributions should we get from pricing in second half?
Obviously, as said, a lot of the main pricing increases were really around the Q2 last year and the summer last year. Then with the three-four quarters delivery time, that pricing should be more visible in the second half of the year.
Okay. Good. Thank you. Just finally to Tuomas' point on the FX impact. I think a couple of years ago you had a quite significant tailwind from FX in here. I mean, do you have any assessment on how much that could help margins through the course of next year?
Yeah. Correct. We have said that typically kind of 1 cent US dollar change should contribute couple of million EUR to Hiab. If it's strengthening U.S. dollar, that would have a positive impact. Weakening U.S. dollar, negative impact. Like Mika said earlier, the hedge is what we have been doing now for the deliveries, what we are now delivering. Those have been done already in 2021 and due to the long lead time. We are currently not seeing yet the impacts from the stronger U.S. dollar that will become more visible in the beginning part of next year.
Okay. Thank you so much.
Thank you.
Okay. Thank you for great questions and great answers, Mikko and Mika. Our third quarter results will be published on 26th of October, so stay tuned.