Good afternoon. This is Ki Jung Sung from KSOE IR. I would like to start the Q3 2025 earnings presentation. This is going to be our shipbuilding subsidiaries and our key businesses. I would like to go over the key highlights of the quarter, followed by our performance. I will discuss market conditions for shipbuilding and offshore plant businesses and move on to the Q&A session. Currency impact. In Q3, the quarter-end FX rate increased by 46 KRW, while the average rate decreased by 13 KRW. As a result, the overall FX impact was minimal. For reference, the rate had fallen by 49 KRW in the previous quarter. Second, steel prices. Steel prices stayed flattish, with minimal impact on the margin. Despite a bit of losses, steel prices did not impact our margins significantly.
A bit of losses from currency impact and steel prices, but no sizable impact on our margin. Third, one-off factors. At HHI, approximately 25 billion KRW in additional costs were recognized from legacy offshore plant projects. Recently launched projects are proceeding smoothly and continue to maintain solid profitability. At HMD, 53 billion KRW of one-off gains for KiwiRail project cancellation settlement and related cost refunds were recognized. At Samho, around 8.5 billion KRW in restoration costs were incurred due to a transformer fire incident. Next is one-off costs regarding the collective bargaining agreement and merger incentives, including incentives. HHI and HMD recognized 18.6 billion KRW and 7.2 billion KRW respectively. Mostly merger incentives. Lastly, for the annual breakdown of revenue by shipbuilding subsidiary, you may refer to the IR material.
For the breakdown of revenue by vessel type, HHI, LNGC, 49.2% inching down quarter-over-quarter, LPGC 26.4% increasing, and container ships 15.7% decreasing. Samho, LNGC 38.2% inching down, container ships 34.2% decreasing, tankers 15.1% increasing significantly, and LPGCs 5.7% remaining unchanged. MiPo. PCs 62.5% inching down, LPGCs 23.3% increasing slightly, and for other vessels, 13.6% increasing. Page 4, please. I will move on to page 4 and elaborate more on HD KSOE's Q3 2025 earnings. Before moving on to the financial results, let me briefly mention one notable point. Q3, as you know, has been the lowest season in terms of sales, and it is normal to record lower sales than the previous quarter. Despite long vacation periods, our sales rather increased quarter-over-quarter, and it is an exceptional case.
The sales increased by 2.1% quarter-over-quarter and by 21.4% year-over-year, which is attributable to productivity gains and other factors. Despite a weak dollar and seasonal factors, our revenue increased, driven by steadily enhancing productivity, driving our overall revenue. OP increased by 10.5% quarter-over-quarter and by 154.5% year-over-year, a significant increase. Steady improvement in profitability has been maintained, and I will touch on the non-operating parts later. Page 5, earnings by business division. Please refer to the table below, and let's turn to page 6 for further details. Page 6 in sales by key division. First, on the shipbuilding segment. Despite a weak dollar and fewer working days, revenue is solid, supported by higher vessel prices and improving productivity. It would have been better if there was no incident at Samho. Next, offshore.
Sales increased 13.1% quarter-over-quarter and 52.8% year-over-year. The Trion FPU has entered its full-scale construction with 39.4% of completion rate, while the Ruya project recorded a 6.3% progress rate. Engine sales. Engine sales increased 6.4% quarter-over-quarter, 31% year-over-year, driven by higher delivery volumes and an improved product mix. Page seven. Here is the breakdown of OP by division. First of all, shipbuilding. Despite a weak dollar and seasonal factors, OP increased significantly, 7.5% quarter-over-quarter, 128.9% year-over-year, and recorded a very solid profitability with OPM of 14%. Compared to Q2, we have an increase in OPM. Offshore. Offshore slightly turned negative, but excluding one-off factors, the underlying margin remained solid. One-off losses of KRW 25 billion were recognized from a vintage project. Next, engine and machinery.
Engine OP increased 20.9% quarter-over-quarter, 137.5% year-over-year. As I mentioned earlier, overall profitability has improved, supported by sales growth and product mix enhancements. Especially here of engines ratio, if you look at the ratio, two-stroke engine 75% and four-stroke engine 80% showing growth. Naval vessel, which is not included in this page. Sales recorded KRW 373 billion, increasing by 53.7% quarter-over-quarter. Recognition of warship revenue has increased. KRW 15.8 billion, one-off settlement for two frigates that were delivered in 2023 has been made in this quarter. OP recorded KRW 51.1 billion, increasing by 90% quarter-over-quarter. As I recall, profit fluctuations may continue to occur, depending on the timing of project settlements and the mix. In the following quarter and after that, we may witness such profit fluctuations.
Page eight, please refer to the operating performance table of consolidated subsidiaries, and I will provide a more detailed explanation on page nine. First of all, KSOE. On a standalone basis, KSOE turned positive, receiving half-year dividend payments from its subsidiaries amounting to KRW 299 billion. Once again, turning positive. Supported by higher vessel prices and continued productivity enhancements, HHI's shipbuilding segment delivered steady sales and margin growth compared to the previous quarter. As I mentioned earlier, the engine business also maintained a solid operating performance with significant margin improvement this quarter. Although there were one-off costs occurring from a vintage project, it is worth noting the current projects are progressing smoothly. For offshore, we may expect even better results in Q4. Let's move on to Samho. Despite the fire incident, its annual construction target is under control.
Q3 margin was lower than Q2 due to restoration costs and increasing sales portion of tanks, but we expect Q4 margin to recover and show stable operating performance. Page 10. Mipo. Mipo's earnings growth is accelerating. Despite fewer working days, Mipo benefited from faster product mix improvement, higher vessel prices, and stronger productivity gains compared to other subsidiaries. Quite a noticeable change and improvement, especially recognition of projects awarded after 2024 accelerated from 32% to 51% this quarter, and this contributed to rapid margin growth thanks to productivity gains. That was about Mipo. Next, HD Hyundai Marine Engine. Despite the seasonal slowdown, the business achieved steady improvement in ASP and productivity, resulting in higher margins compared to peers and other shipbuilding subsidiaries. Also, the company has engaged in continuous cost control activities, resulting in high margin growth.
There were no one-off factors recorded in this quarter. In Q4, we believe revenue would grow and there will be additional profitability that worth factoring. Lastly, AHDE, HD Hyundai Energy Solutions, although its operating performance appears to have declined from the previous quarter, excluding the one-off Angola project revenue recognized in Q2, the company has continued to show steady quarterly growth. Although domestic sales slightly declined due to the prolonged autumn rain, exports to the U.S. increased significantly, resulting in solid overall performance. Looking ahead, the easing of tariff issues in the fourth quarter is expected to further support U.S. exports, allowing the company to sustain its strong performance. Page 11, non-operating income. Nothing special, due to a KRW 46 increase in the Korean won-U.S. dollar quarter and FX, we recorded foreign exchange-related gains. Page 11, financial ratios.
All four major subsidiaries maintain a net cash position with a combined net cash balance of approximately KRW 8 trillion, a very solid financial standing. The cash flow is very good. That concludes the presentation of HD Korea Shipbuilding & Offshore Engineering Q3 2025 earnings. Next, Mr. Wonsuk Lee, Head of Ship Sales Division, will provide an update on the global shipbuilding market. Hello, I am Wonsuk Lee, Executive VP of Strategy and Marketing at HDKSOE. I would like to present the performance review for the shipbuilding division then share our outlook for the business. Global new orders totaled 51.2 million GT or 1,185 ships, down more than 45% from 113.4 million GT in the same period last year.
This decline reflects the weaker demand sentiment among ship owners amid U.S. trade policy volatility, environmental regulation uncertainty, and a high backlog from 2024 orders. Despite the sluggish orders, HD Group has recorded cumulative orders of $6.2 billion at HHI. $4 billion at Samho, $2.2 billion at Mipo, and $2 billion at HHIP as of Q3 2025, totaling $12.6 billion. This represents 84.2% of our annual order target of $15 billion, demonstrating steady order momentum and continued progress toward achieving this year's goal despite the weaker global demand. As of Q3 2025, the cumulative new building orders by vessel type are as follows. Hyundai, 24 container ships, two VLGCs, two VLECs, two VLACs, and four tankers, including two VLCCs, so 34 units of ships, $6.2 billion.
Samho, five LNGCs, 14 container ships, eight tankers, so 27 units of ships for $4.02 billion. Mipo, 21 container ships, six LNG bunkering vessels, one PC, five MGCs, 33 units of ships, $4.02 billion. HHIP, three PCs, so $22 billion. In total, 97 units of ships, $12.64 billion. Despite the overall contraction in demand this year, we have remained firmly on track toward achieving our ambitious annual targets. By leveraging the continued strength in container ship orders since last year, we focused on selectively securing high-value, high-margin projects to ensure a stable backlog and sustained profitability. This performance underscores our solid competitiveness, supported by superior technological capabilities and agile market responsiveness. As of September 2025, the Clarkson Newbuilding Price Index stood at 185.58, gradually declining from the peak of 189.96 recorded in September 2024.
However, the current level remains more than 40% higher than that of early 2021, indicating the prices are still firm. This trend suggests that ample shipyard backlogs have helped mitigate the pace of price drop despite lower demand. As new order activities have shown signs of recovery entering Q4, new building prices are expected to remain at a high level. I'd like to share an update on the current market conditions by vessel type. LNGC. Up to Q3, only 17 large-sized LNGCs were ordered in the market, a sharp decline compared to 74 units in the same period last year. This is largely attributed to a temporary downturn in the LNG freight market, driven by increased vessel deliveries, reduced LNG imports from China, and a higher share of short-haul trade between the U.S. and Europe, which together have disrupted the overall supply-demand balance.
In addition, delays in several major LNG export projects have further weakened new building activity. However, as new LNG development projects resume and replacement demand for outdated LNG carriers begin to emerge, the LNG carrier market is expected to recover swiftly in the upcoming quarters. Now, container market. Despite uncertainties stemming from U.S. tariff disputes and port fees, the container ship market continues to show strong momentum. This is supported by sustained ton-mile demand due to ongoing disruptions in the Red Sea and by liners' perception that reduced U.S. port fees are now manageable costs through fleet adjustments. Backed by ample cash reserves, major liners are actively expanding their fleets. With continued competition in capacity expansion and the shift toward eco-friendly vessels, a solid level of new orders is expected to persist.
In the tanker segment, vessel supply remains constrained as the U.S. and Europe continue to expand the sanctions on Russia, Iran, and Venezuela. Combined with OPEC+'s production increase, this has pushed crude tanker rates higher sharply. With firm freight rates and low order backlogs, tanker new building activity is expected to gradually increase. For VLGCs and PCTCs, ordering activity has eased following several years of exceptionally strong demand. However, once the current wave of vessel deliveries is absorbed, replacement needs for aging fleets and tightening emission regulations are expected to drive a rebound in new building demand. Following the IMO's recent failure to finalize the net zero framework, there are growing concerns that the resulting regulatory gap could dampen the investment sentiment for new buildings and alternative fuels.
Nevertheless, the IMO's net zero target remains in place, and the industry broadly expects the long-term decarbonization trajectory to stay unchanged. Consequently, companies that delay participation in the clean fuel transition are likely to face increasing cost burdens over time. In this context, the group will continue to strengthen its technological leadership. In addition, given the ongoing market volatility driven by U.S.-China strategic tensions and various geopolitical uncertainties, the group will continue to closely monitor market conditions and pursue a selective profitability-focused order strategy. Amid the rapidly changing global shipbuilding and shipping environment, KSOE remains committed to sustainable growth and shareholder value enhancement, striving to take a significant step forward as a global industry leader. This concludes our Q3 2025 results presentation. Thank you very much for your attention. Moving on, we're going to have Sohn Daejun from Offshore and Energy. Good afternoon.
This is Daejun Sohn from Offshore and Energy. I'd like to present a performance review for the offshore division. Then share our outlook for the business. Our offshore business is actively participating in FEED and EPC dealings for various offshore projects currently being prepared in regions such as the Middle East, including the UAE, Qatar, and Kuwait, as well as Australia and the Americas. Among these, Middle Eastern projects have adjusted their schedules, with contract signing now targeted for early 2026. Renewable energy business, particularly offshore wind power, is actively involved in the FEED process for offshore substations and domestic projects and is making efforts to expand into full EPC contracts. Using our proprietary floating structure model, we are also engaging with multiple developers to participate in floating wind projects in Korea's east coast to Scotland and Taiwan.
In addition, our in-house offshore substation platform model recently received an AIP or approval in principle from a classification society. Which we plan to apply to upcoming FEED projects to further broaden our participation opportunities in offshore wind business. We are currently carrying out TerraPower's SMR demonstration project in Wyoming, the U.S., and conducting joint research with the company to support SMR commercialization. Through these efforts, we aim to strengthen our technological capabilities and expand future business opportunities. Next, market conditions. As oil prices remain above break-even levels, the overall offshore plan market is not overheated but remains generally favorable. Meanwhile, demand for crude oil and natural gas for power generation is expected to continue rising. Energy security is emerging as a key issue for many countries.
Major oil companies are focusing investments in high-return regions such as Guyana, Brazil, and Africa, while national oil companies and IOCs in the Middle East, Australia, and North America are gradually expanding CapEx for domestic offshore oil and gas developments. In the Middle East, including Qatar, the UAE and Saudi Arabia, and Kuwait, offshore gas field development is accelerating with large-scale projects planned. The market expected to stay active. The offshore wind market is seeing some short-term slowdown due to policy changes in the U.S., but mid- to long-term investment and capacity expansion are expected to continue. In Korea, government-led initiatives are increasing expectations for market growth, along with a stronger domestic turbine supply chain. Especially, we are expecting a structural change occurring across the industrial ecosystem here in Korea.
Based on these conditions, we are pursuing a balanced approach across offshore wind, and SMR businesses, focusing selectively on projects that ensure profitability and stable execution. That concludes our remarks on the Q3 performance and market outlook. Thank you very much.
[Foreign language] Now Q&A session will begin. Please press star 3. That is star and 3 if you have any questions. Questions will be taken according to the order you have pressed the number star 3. For cancellation, please press star 4. That is star and 4 on your phone. [Foreign language] The first question will be provided by Lee Dong-heon from Shinhan Investment & Securities. Please go ahead with your question.
μλ νμΈμ. μ νμ μ΄λνμ λλ€. μ€λͺ μ λ€μμ΅λλ€. μ’μ μ€μ μΆνλ립λλ€. μ§λ¬Έμ μΌνμ±μ λ¨μ λΆλΆμ΄ μλμ§μΈλ°μ. 2νΈμ KiwiRail νλ‘μ νΈλ λ§λ¬΄λ¦¬κ° λ κ² κ°κ³ , 3νΈμ λ³μ μ 볡ꡬ λΉμ©μ μΌλΆκ° 보ν νκΈ κ°μ κ² μλ κ±΄μ§ κΆκΈν©λλ€. νμμ 250μ΅ κ΄λ ¨ν΄μ κ³Όκ±° μ΄λ€ 곡μ¬μλμ§, κ·Έλ¦¬κ³ μΆκ°μ μΈ λΉμ©μ΄ λ λ°μν μ μλμ§, μ΄λ κ²κΉμ§ μ€λͺ λΆνλλ¦¬κ² μ΅λλ€. κ°μ¬ν©λλ€.
Your excellent presentation. Congratulations on very positive performance. My question is about any remaining one-off costs that might incur. It seems like the KiwiRail settlement is almost completed, and I'm wondering whether there are any remaining costs that could be incurred due to the transformer fire incident affecting Samho. As to that KRW 25 billion offshore project, can you tell us about what the project is, and any additional costs that you're expecting to incur from these KRW 25 billion offshore projects?
λ€, λ΅λ³λλ¦¬κ² μ΅λλ€. μΌλ¨ μΌνμ± λ¨μ λΆλΆμ μ€νλ € KiwiRail μͺ½μμ μμ£Ό μμ λ¬Όλμ΄μ§λ§, μ‘°κΈ λ νμ κ°λ₯μ±μ΄ μ‘°κΈ μκ³ μ. 4λΆκΈ° μ λμ. κ·Έλ¦¬κ³ HD Hyundai Samhoλ μΆκ° λΉμ© μμ΅λλ€. μκ³ , κ·Έλ¦¬κ³ μ§κΈ κ³΅μ¬ μ§ν μ λκ³ μκ³ μ. κ·Έλ€μμ ν΄μνλνΈ λΆλ¬Έμμλ P-78 νλ‘μ νΈκ° 98% μ§νμ΄ λκ³ μμ΅λλ€. Shenandoahκ° 99% μ§νμ΄ λκ³ μ. κ·Έλμ μ΄ μμͺ½ λΆλΆμμ μ½ 250μ΅ μ λ λΉμ©μ΄ μΌλΆ λ°μμ νμ΅λλ€. μλ§ μΆκ° λ°μμ κ±°μ μλ€κ³ μ§κΈ μ΄μΌκΈ°λ₯Ό νκ³ μμ΅λλ€.
κ°μ¬ν©λλ€.
Thank you for your question. As to that one-off cost for the KiwiRail settlement case, we're expecting a bit more funds to be coming into our book, and that may happen in Q4. As to the Samho transformer fire incident, we do not expect additional costs that would incur, and construction is going on very smoothly. As to that offshore project, we have P-74 with 98% completion. P-78 with a completion ratio of 98%, and Shenandoah 97%. We do not expect any sizable additional costs that will be occurring.
λ€, μ§λ¬Έ λ°κ² μ΅λλ€.
[Foreign language] The following question will be presented by Daol Investment & Securities, Choi Gwang-sik. Please go ahead with your question.
λ€, μλ νμΈμ. LNG μμ₯ μ’ μ¬μκ² μ΅λλ€. μ΅κ·Όμ λͺ¨μ λΉν¬ λ€μ νννλ€κ³ ν΄μ 3νΈμ μ¬λ‘―λ λ€μ μ’ μ±κΈΈ κ² κ°μλ°, λ μ§κΈ FID λ°μ£Όλ νλ‘μ νΈ λ§μμ 2029λ μ¬λ‘―μ μ°λ¦¬λ μΌμ±μ΄λ ννμ€μ λ³΄λ€ λ°μ£Όκ° λ λ§μ κ²μΌλ‘ μ λ μμμ λλλ°, κ·Έλμ λ΄λ μ LNG λ°μ£Ό μ λ§κ³Ό λ μ΄λ° νκ²½μμ μ κ°μ λν΄μλ μ’ μ λ§μ μ¬μκ² μ΅λλ€.
My question is about LNG market outlook. This concerns Mozambique and Samho's slots. It seems like compared to Samsung and other competitors, I think in 2029 you may have more slots to use. My question is, what do you think of the order outlook for LNG ships, and what would be the vessel prices that you're anticipating for next year?
λ€, μ μ 무λ μ΄λ¬Έμ μ λ¬΄κ° λ΅λ³λλ¦¬κ² μ΅λλ€. μμλ λ°μ κ°μ΄ LNGμ μ μ‘° μμ₯ μ¬ν΄ μλΉν 침체, μΉ¨μ μμ€μ΄μλλ°, λ€νν νλ°κΈ° λ€μ΄μλ©΄μ μ΅κ·Ό λ―Έκ΅ Trump νμ λΆμ LNG μμΆ μΉμΈ νλ‘μ νΈ μ¬κ°κ° λλ©΄μ μ΅κ·Όμ λ―Έκ΅μμλ§ 5κ° νλ‘μ νΈκ° μΉμΈλκ³ , μ μΈκ³μ μΌλ‘ 6κ° νλ‘μ νΈ, μ΄ μ κ° μκΈ°λ‘ 5,700λ§ ν€μ΄ μ κ· μμκ° 2029λ λΆν° λμ¬ κ²μΌλ‘ μμμ νκ³ μμ΅λλ€. κ·Έμ λ°λΌμ LNG λΆλ¬Έμ λν΄μ μ μΈκ³μ μΌλ‘ κ΄μ¬μ΄ μ§κΈ λμ΄λκ³ μκ³ , κ·Έμ λ°λΌμ μ μ‘° μΈμ½°μ΄μ΄λ¦¬λ λ§μ΄ λμ΄λκ³ μλ μν©μ λλ€. κ΄λ ¨ν΄μ λͺ μ²μ΄ λ°μ£Όκ° λ κ²μ΄λ? κ·Έλ° κ±°μ λν΄μ μ¬μ€ λν μΌν κ²μ μ μ μμ§λ§, λλ½ λ²μΌλ‘ μ ν¬κ° ν΅μ μκ³ μλ κ²μ 100λ§ ν€μ νλ μ² μ λ, μ§κΈ 5,400, 5,600λ§ ν€μ΄λΌκ³ νλ©΄ μ¬μ€μ μΌλ‘ κ±°μ 100μ² μ΄μμ΄ μμκ° λμ€μ§ μμκΉ? κ·Έλ° μμλ νκ³ μμ΅λλ€. μ κ° κ΄λ ¨ν΄μλ μ΄λ° μμλ₯Ό λ°νμΌλ‘ ν΄μ νμ¬μ μ κ°κ° μ§κΈ λ°ν μ΄λΌκ³ μ μ¬λ€μ΄ μΈμνκ³ μλ κ² κ°μ΅λλ€. λ°λΌμ ν₯νμ μ΄λ° λ¬Όλλ€μ΄ λμ€κ² λλ©΄ λ΄λ μλ LNGμ λΆλΆ μ κ°κ° μ μ§μ μΌλ‘ μ¬λΌκ° κ²μΌλ‘ μμμ νκ³ μμ΅λλ€. μ΄μμ λλ€.
Thank you for your question. About LNG new build.
In fact, this year was quite disappointing. Starting from the second half, thanks to the resumption of approval on the part of the U.S. Trump administration, that's the approval of export projects. We have five relevant projects that have been approved in the United States. Worldwide we have six LNG projects. That is translated into 57 million tons. Such orders would be realized from 2029, I think. Globally, we have increasing interest in LNG with increasing inquiries about new builds. As to the exact number of vessels, I cannot give any definitive answer. As a rule of thumb, 1 million ton is translated into two vessels. Thinking of 56 million ton, that would be more than 100 vessels.
As for the vessel prices, based on the demand, I think now ship owners believe the vessel prices are bottoming out, which means the vessel prices may increase gradually.
λ€, λ€μ μ§λ¬Έ λ°κ² μ΅λλ€.
λ€μμΌλ‘ μ§λ¬Έν΄ μ£Όμ€ λΆμ λ©λ¦¬μΈ μ¦κΆμ λ°±κΈ°μΈ λμ λλ€. μ§λ¬Έν΄ μ£Όμμμ€. The next question will be provided by Baek Gi-yeon from Meritz Investment Securities. Please go ahead with your question.
λ€, μλ νμΈμ. λ©λ¦¬μΈ μ¦κΆ λ°±κΈ°μΈμ λλ€. μ΄λ¬Έμ μ 무λκ» μΌλ° μμ μͺ½ μ§λ¬Έ μΆκ°μ μΌλ‘ μ¬μκ³ μΆμλ°μ. 컨ν μ΄λμ λ΄λ μλ μΉνκ²½ μ λ μ νμ μν΄μ μ£Όμ λΌμ΄λλ€ μ€μ¬μΌλ‘ λ°μ£ΌμΈ μ§μλ μ μλ€λ μ·¨μ§λ‘ λ§μ μ£Όμ ¨λλ°, μ΄λ² μμ κ΅λ©΄ λμ μ ν¬κ° μλ λ§μ κ³μ½ λ±μ λ³΄λ€ λ³΄λκΉ μ΄λ° κ²λ€μ΄ λ΄λ μλ μ§μλ μ μλμ§μ λν΄μ νμ μ΄ νμν μν©μΈλ°, νΉμ μ ν¬κ° μΌλ§ μ μ λ΄μ€λ λ§μ΄ λμ€λ κ² κ°λλ° μ£Όμ μ μ¬λ€μ΄λ μμ£Ό λ¬Έμλ inquiryλ μ΄λ° λΆλΆ, μμ λμ΄ μλ λΆλΆ, μ΄λ° κ²λ€μ΄ μμ§ λ§μ΄ λ¨μ μλ€κ³ 보μλμ§ λ€μ νλ² μ¬μκ³ μΆκ³ μ. νΉμ μΆκ°μ μΌλ‘ λ΅λ³ κ°λ₯νμλ€λ©΄ LPGμ κ°μ κ²½μ°μλ μ΄λ―Έ λ§μ΄ λμ¨ κ²λ€μ λν΄μ μΈλκ° μ΄λ μ λ ν΄μλ μ΄νμ μλ‘μ΄ μ κ· λ°μ£Ό μμκ° μμλλ€κ³ λ§μ μ£Όμ ¨λλ°, κ·Έ νμ΄λ°μ μ΄λ μ λμ μκΈ°λ‘ λ³΄μλμ§ λ§μ λΆνλλ¦¬κ² μ΅λλ€. κ°μ¬ν©λλ€.
I have two questions. My first question is about commercial ships. As to the container ships, you mentioned that liners would continue to place orders because of the transition into greener ships and greener fuels coming into next year. There have been so many contracts that have been awarded already. As an analyst, we need a bit of confidence about whether this trend towards the green transition would continue next year as well. It has been already covered by several news articles, but I am wondering whether you are getting inquiries from key liners. How many inquiries are you actually getting? My second question is about LPG. So many LPG vessels have been delivered. You mentioned that new ship build orders may come out after such deliveries are all made. What would be the timing of these new LNG, LPG orders coming?
μ, λ΅λ³λλ¦¬κ² μ΅λλ€. 컨ν μ΄λμ κ°μ κ²½μ°λ μ£Όλ‘ λν 컨ν μ΄λμ μμ£Όλ‘ ν΄κ°μ§κ³ λΌμ΄λλ€μ΄ μΈνλΌμ€νΈλμ²λ‘ μΈμνκ³ μκ³ , μΈνλΌμ€νΈλμ²μΈ λ§νΌ κ²½μμ ν΄μΌ λλ μν©μ λλ€. λ°λΌμ λ μ’μ λ°°, λ μΌ λ¨κ°λ₯Ό κ°μ§κ³ μλ λ°°λ₯Ό μ§μμ μΌλ‘ λ°μ£Όν΄μΌ λ μμκ° μμ΅λλ€. μ€μ λ‘ μ ν¬κ° λν λΌμ΄λ μ μ¬λ€νκ³ κ³μ νμλ₯Ό νκ³ μκ³ , μμΈν λ΄μ©λ€μ λν΄μλ μ ν¬κ° confidentiality λλ¬Έμ ꡬ체μ μΌλ‘ λ§μλ릴 μλ μμ§λ§, κ³μν΄μ λ€μμ λΌμ΄λλ€μ΄ μ μ‘°λ₯Ό κ³ννκ³ μκ³ , κ·Έλ° λΆλΆλ€μ λ΄λ μ λ¬ΌλμΌλ‘ λμ¬ κ²μΌλ‘ μμμ νκ³ μμ΅λλ€. κ·Έλ€μμ LPGμ μ λν΄μ μ¬μ€λ³΄μ ¨λλ°μ. μ§κΈ μ ν¬κ° LPGμ κ°μ κ²½μ°μ 2028λ λΆν° λ©κΈ°κ° κ°λ₯ν©λλ€.
μ§κΈκΉμ§ λ€ μμ£Όκ°, λ°μ£Όκ° λμκ³ , μ΅κ·Ό LPG μ΄μμ΄ μ½κ° νν₯μΈλ‘ λμμλ©΄μ λ λμκ°μ μ§κΈ λν LNG, LPGμ κ°μ κ²½μ°μλ μλͺ¨λμλ₯Ό νκ²μΌλ‘ ν΄μ λ°μ£Όκ° λλλ° μλͺ¨λμ μ°λ£ μμκ° μ’ λ¦κ² μ€λ λ°λμ μλͺ¨λμ λ°°λ‘ λ°μ£Όλ λ°°λ€μ΄ LPGμ μμ κ²½μν΄μΌ λλ μν©μ΄κΈ° λλ¬Έμ κ·Έλ° λΆλΆμ΄ κ°μμ΄ λμ΄κ°μ§κ³ μ§κΈ μΆκ°μ μΈ μμκ° μ λμ€κ³ μλ μν©μΈλ° μ ν¬ νλ¨μΌλ‘λ μ¬ν΄λ₯Ό μ§λκ³ λ΄λ νλ°κΈ° μ λ λλ©΄ κ·ΈλλΆν°λ μΈλκ° λλ©΄μ μΆκ° LPGμ μ λν΄μ μμκ° λμ€μ§ μμκΉ, κ·Έλ κ² μμμ νκ³ μμ΅λλ€.
Thank you for your question. As to container ships, they are primarily large-scale container ships. Liners perceive these large container ships as their infrastructure, which means it is a tool for successful competition. Liners believe they need better ships at more affordable prices. We are making consultations with large liner companies, but details are confidential, so I cannot share any details. What I can say is numerous, a large number of liners are planning new builds, and maybe the volume may emerge starting from next year. As to your question about LPG, we can deliver starting from 2028. As you mentioned, many vessels have been already ordered, and in fact, LPG freight rates are going down.
As to large LPG ships, we also have demand for ammonia fueled ships as well, but such ammonia fuel demand has come rather late, which means now LPG and ammonia are in competition. We do not see additional demand immediately. Starting from the second half of 2026, we would be able to start delivery, and then we will see LNG demand coming and emerging.
λ€, λ€μ μ§λ¬Έμ΄μ.
[Foreign language] The following question will be presented by μ΄λν from Shinhan Investment & Securities. Please go ahead with your question.
μ§λ¬Έ κ°μ¬ν©λλ€. νΉμμ μ§λ¬ΈμΈλ°μ. νΉμμ λ°νκ° λ°λ‘ μμΌμ κ² κ°μμ μ§λ¬Έμ΄ κ°λ₯νμ§ λͺ¨λ₯΄κ² μ΅λλ€. ν λΆκΈ° λμμ MASGAλ ν΅μΆμ§ μ μν¨ μ΄μΌκΈ°λ λμκ³ λ€μν νΈν₯λ€μ΄ λμλλ° κ΄λ ¨ν΄μ νμ΄λΌμ΄νΈ ν΄ μ£Όμ€ λΆλΆ μμΌμλ©΄ λ§μ λΆνλλ¦¬κ² μ΅λλ€. κ°μ¬ν©λλ€.
My question is about special ships, naval ships, because I don't really see any noticeable announcements about special ships. I'm wondering whether I can ask any questions about naval ships. There have been a lot of news about the so-called MASGA initiative, as well as nuclear-powered submarines. Can you share with us any highlights about your special ship business?
νΉμμ μ λ§ μ±μ°μ λλ€. μ§λ¬Έ μ£Όμ κ±° μΌλ¨ MASGAνκ³ ν΅μΆμ§ μ μν¨ κ΄λ ¨ν΄μ μ§§κ² κ³΅μ λ₯Ό λ리면, μΌλ§ μ μ μΈλ‘ μ λ§μλλ¦° κ²μ²λΌ μ ν¬λ μ€μ§μ μΈ λ―Έκ΅ λ΄ νλ‘μ νΈμ μ§μ€μ νκ³ μκ³ μ. 첫 λ²μ§Έ λμ μ¬μ μΌλ‘ λ―Έ ν΄κ΅°μ μ°¨μΈλ κ΅°μ μ§μν¨ νλ‘μ νΈμΈ NGLS μ¬μ μ μ§μ€μ νκ³ μμ΅λλ€. λ³Έ μ¬μ μ κ·Έλμ μ ν¬κ° νλ ₯μ νκ³ μλ Huntington Ingalls Groupνκ³ κ³΅λμΌλ‘ νμ¬ μ μμ μ°Έμ¬ μ€μ΄κ³ μ. μλ λΉμ΄ 10μ λ§ μ μΆ λ§κ°μ΄μλλ° κ·Έκ² μλ§ νμ§μμ 2μ£Ό μ λ μΌμ μ μ°κΈ°ν κ²μΌλ‘ μκ³ μκ³ , μ ν¬κ° 11μ μ΄μ μ€λΉ λ§λ¬΄λ¦¬ν΄κ°μ§κ³ λ³Έ μ¬μ μΆμ§ μμ μ μμ΅λλ€. κ·Έλ¦¬κ³ ν΅μΆμ§ μ μν¨ κ΄λ ¨ν΄μλ μ§λλ² ν리μμ 건쑰νκ² λ€λ Trump λν΅λ Ή λ°νλ μμλλ° μλ§ μ΄ λΆλΆμ λν΄μλ μκ΅ κ°μ μ‘°κΈ λ ν μκ° μ΄μ΄μ§ κ²μΌλ‘ λ³΄κ³ μμ΅λλ€. μ ν¬λ μΌλ¨ μ΄ ν΅μΆμ§ μ μν¨ νμλΌκ³ νλ κ²μ΄, Trump λν΅λ Ήμ΄ λ°ν λ°λ‘λ λ―Έκ΅ λ΄μμ 건쑰λ₯Ό ν΄μ μ΄κ±°λ₯Ό ꡬ맀νλ νμμΌ ν λ° μ΄λ¬ν μ μν¨ λμ λ°©μμ λν΄μλ μλ§ μκ΅ κ° μ΄κ²¬μ΄ μμ κ²μΌλ‘ λ³΄κ³ μκ³ μ.
μ ν¬λ μ΄μ° λλ μ΄κ² μ΄λ€ ν μ‘°μ μμ κΈ°μ μ μΈ μλμ΄λ μΈλ ₯μΌλ‘λ λμμ΄ λΆκ°λ₯ν κ΅μ₯ν λκ·λͺ¨ μ¬μ μ λλ€. κ·Έλμ κ΅μ± μ¬μ μΌλ‘ μΆμ§νλ €λ κ²μ κ³ λ €νκ³ μκ³ , κ·Έλ₯Ό μν΄μ μ ν¬κ° μΌλ§ μ μ ν©λ³μ ν΅ν΄μ μ ν¬ μ체μ μΈ κ±΄μ‘° μΊνκ° λμ΄λ¬μ΅λλ€. κ·Έλμ μ ν¬ κΈ°μ‘΄μ κ°κ³ μλ νΉμμ μ¬μ λΆμ 건쑰 μμ€μ κΈ°μ‘΄μ νκ΅ ν΄κ΅°μ μ μν¨μ΄λ κ·Έλ¦¬κ³ κ·ΈλΏλ§ μλλΌ μ΄λ¬ν μ μν¨, μΊλλ€ μ μν¨κ³Ό ν΅μΆμ§ μ μν¨ λ±μ κ³ λ €ν΄μ μ μν¨ κ±΄μ‘° μΊνλ₯Ό λν νμ₯ν κ³νμ κ°κ³ μκ³ , κ·Έλ κ² μΆμ§ν μμ μ λλ€. κ°μ¬ν©λλ€.
Thank you for your question. As to the MASGA initiative, the nuclear-powered submarines, as you have witnessed and heard from news media articles, currently we are focusing on a project within the U.S. We are focused on building Next Generation Logistics vessels for the U.S. Navy. For this project, we are working with Huntington Ingalls Industries. We are participating together. We are working together with Huntington Ingalls to jointly make a proposal for this project. Initially, the deadline was the end of October, but there was a two-week delay in the U.S. The process, the preparation, and the proposal process will be completed, I believe, by early November. That's what we are working for right now. As to the nuclear-powered submarines, you may have heard that the Philly Shipyard would be constructing such submarines, according to President Trump's announcement.
There would be complications ongoing between the two countries, ROK and the U.S. As to such submarines, what President Trump said is such submarines would be constructed on U.S. soil, U.S. territory, and then it would be purchased later. About exactly how this project will be executed, I believe there would be disagreements between the U.S. and Korea, and such a big project cannot be executed by any single shipyard in terms of capabilities or workforce size. Such a big project, I believe the nuclear-powered submarine, would be a national project. I'd like to tell you that recently we have merged with MEPO, significantly increasing our construction capabilities. We already have a construction capabilities and facilities for the ROK Navy. We also think of Canadian Navy as well.
In preparation, we have significantly expanded and scaled up our construction capabilities for special ships.
μ΅ν볡 μ무μ λλ€. μΆκ°λ‘ λ§μλλ¦¬κ² μ΅λλ€. μ°μ μμ μ λν κ΄μ¬μ΄ λ§μλ°
μμ μ λν΄μλ μ¬μ€μ μ§κΈ κ°λ° λ¨κ³λΌκ³ μλ €μ‘μ§λ§, μ¬μ μ΄ λ³Έκ²©νλλ©΄ μλΉν λ§μ μμ§λμ΄λ§ μλμ΄ νμνκ³ κ·Έμ λ°λ₯Έ ν΅ν©λ μΈλ ₯μ΄ νμνλ°, κ·Έλμ μλ§ κ΅μ μ μ¬μ μ΄λΌλ μ΄μΌκΈ°κ° λμ¨ κ²μ νΉμ νμ¬ λ¨λ μΌλ‘λ κ·Έλ° μλμ λ€ ν¬μ ν μ μκΈ° λλ¬Έμ μλ§ λ²λΆμ² λ μ‘°μ ν΄μ λΆλΆλ μλ§ μλ μ‘°μ μκ° μ μν¨ κ±΄μ‘° λ₯λ ₯μ κ°μ§κ³ μκΈ° λλ¬Έμ κ·Έλ° ν©λλ νλ‘μ νΈκ° νμνμ§ μμκΉ. κ·Έλμ κ΅μ μ¬μ 체 μ΄μΌκΈ°κ° μ§κΈ λμ€κ³ μμ΅λλ€. μ ν¬λ€μ κ·Έ μ¬μ μ΄ λ§μ½μ 본격νλλ©΄ κ΅μ μ¬μ μ°Έμ¬λ₯Ό μ€λΉλ₯Ό νκ³ μλλ° λ¬Έμ λ λ―Έκ΅ νμ§ κ±΄μ‘° λ°©μμ΄ λλ€λ©΄ μλΉν κ΅λ΄ μ°κ΅¬κ°λ° μ¬μ μΌλ‘ λ²μμ΄ μ΄λ ΅μ΅λλ€. κ·Έλμ μ§λμ£Ό κ΅μ κ°μ¬ μ’ ν©κ°μ¬ν λλ μμλ€μ΄ κ΅λ°©λΆλ₯Ό μλλ‘ λ§μ μ§λ¬Έμ νλλ° μ¬μ€μ λ―Έκ΅ νμ§ κ±΄μ‘° λ°©μμ λν΄μλ μλΉν μ€μ§μ±μ΄ λ§μ΄ λ¨μ΄μ§λ€. κ·Έλμ μμΌλ‘ νλ―Έ μ λΆ κ°μ κ·Έλ° λΆλΆμ λν΄μ μΆ©λΆν λ Όμκ° νμνλ€λ μ΄μΌκΈ°κ° μμμ΅λλ€. μ λ μ΄ λΆλΆ ν΅μλκ³ λλ©΄ λλ¨Έμ§ νΉμμ μ¬μ μ λν κ²μ κ°λ¨νκ² μΆκ°λ‘ μ€λͺ λλ¦¬κ² μ΅λλ€.
I'd like to make some additional comments about nuclear-powered submarines. This is an issue which is receiving plentiful interest these days. You may think this is in the development phase, but once this project begins at full scale, it's going to require tremendous engineering capabilities, and especially combined and integrated capabilities. That is why at the National Assembly, this project is considered a national project, because no single shipyard would be sufficient in terms of putting in all its resources. It's a pan-ministry or a pan-government project, and we have two major shipyards here in Korea capable of constructing submarines. This is going to be a joint project, I believe, if it is ever realized. Someday, we are making preparations to participate in this project if it starts.
About the local construction in the United States, it's not a domestic R&D project or initiative anymore. Last week when we had a national audit, there were a lot of questions that were posed to the Ministry of National Defense. If such submarines are constructed within the United States, this project would lose its feasibility to a significant extent. There will be a lot of exchanges between the U.S. and Korean governments. I'd like to provide part two of my answer.
μΆκ°λ‘ λ§μλ리면 μ€λ 보λμλ£κ° λκ°λλ° μ ν¬λ€μ΄ ν루 SIMA μ‘°μ μμ μ μν¨ κ³΅λκ°λ°μ λν΄μλ LOIλ₯Ό 체결νκΈ° λλ¬Έμ κ·Έλ€μ λ¨κ³λ κ³μ½μΌλ‘ λ€μ΄κ°λλ€. κ·Έλμ μ ν¬λ€μ SIMA μ‘°μ μμ μ μν¨ κ°λ°μ λν μ€μ μ κ°μ§κ² λλ©΄ μμΌλ‘ μ μΈκ³λ₯Ό λμμΌλ‘ μμΆμ© μ μν¨μ λν νλ ₯μ λ°μ κ²μΌλ‘ λ³΄κ³ μκ³ , λ μ λΆλ₯Ό λμμΌλ‘ νλ μμ£Ό μ¬μ μ΄λ€ 보λ μ€λ λ°νλ μ λμ§λ§ μ μ¬μ μΌλ‘ μ§ν μ€μΈ κ·Έλ° μ¬μ λ€μ΄ μ°λ§ λλ λ΄λ μ΄μ 체결λ κ°λ₯μ±μ΄ μμ΅λλ€. κ·Έλμ λ€μ λΆκΈ°μλ νΉμμ λΆμΌλ λ³΄λ€ λ μ§μ λ κ·Έλ° μ€μ μ λ§μλ릴 μ μκ² μ΅λλ€.
We have just made a press release this morning, which is we're going to work with SIMA shipyard in Peru to jointly develop submarines. The letter of intent has been signed, and we'll move on to the next contracting phase. This means we're going to be able to build our track record in submarine development. Globally, we will be able to target the submarine export market as well. Such a project is working with national government. Even though it has been announced yet, there are more potential projects that could be leading to the next phase of project development. These projects will be announced at the end of this year or early next year, I believe.
In the next quarter, when we have an earnings release next quarter, I hope we will be able to share even more tangible progress as to our special ship business.
λ€, μΆκ° μ§λ¬Έ λ°κ² μ΅λλ€.
[Foreign language] The next question will be presented by μ μ°μΉ from NH Investment Securities. Please go ahead with your question.
λ€, μλ νμΈμ. NHν¬μμ¦κΆ μ μ°μΉμ λλ€. λ°©κΈ μ‘°κΈ λ§μν΄ μ£Όμ λΆλΆμ΄ μκΈ°λ νλ°, μλ νΉμμ μͺ½μμ κ΅λ΄λ λ―Έκ΅ λ§κ³ λ λ€λ₯Έ λλΌμμ μ§νλκ³ μλ μμΆκ±΄μμ μ‘°κΈ λ λ§μν΄ μ£Όμ€ μ μλ λΆλΆμ΄ μλμ§, λλ¨μλ λ¨λ―Έ μΈμλ μ λ½μ΄λ μ΄λ° κ±°μμ μ΄μκ° μμμ§ μ‘°κΈ λ μλ €μ£Όμλ©΄ μ’μ κ² κ°κ³ μ. νΉμ μ ν¬λ μ μν¨ μͺ½μ μ’ λ λ§μ΄ μ΄μΌκΈ°κ° λμ€κΈ΄ νλλ° μ¬μ€ μμν¨ μͺ½μ μλ κ°μ μ κ°μ§κ³ μμ΄μ μμν¨ μͺ½μμ νΉμ μ‘°κΈ λ μ΄μΌκΈ°ν΄ μ£Όμ€ μ μλ λΆλΆμ΄ μμΌμ μ§ μλ €μ£Όμλ©΄ κ°μ¬νκ² μ΅λλ€.
I have two questions. The first question is about special and naval ships. In addition to the U.S. and Korea, can you share with us any export market projects that are ongoing, for example, in the Southeast Asia, Latin America, and Europe as well? Second of all, we are still focused on submarines these days, but I know that your company has strength in building surface ships as well. Anything more that you can share concerning your surface ship business?
μ μμλ κ²μ²λΌ ν리νκ³Όλ ν리ν ν΄κ΅° μΈλκ° κ³νμ΄ κ³μ μ§ν μ€μ΄κ³ , κ·Έμ λ°λΌ μΆκ°λ‘ λμ¨ λ°μ£Ό 건μ λν΄μ μ ν¬λ€μ΄ μ§κΈ νμ μ€μ μμ΅λλ€. μλ§ μ°λ¦¬κ° ꡬ체μ μΌλ‘ λ§μλ리기λ κ·Έλ μ§λ§, κ°μ₯ λ¨Όμ μμμ λ릴 μ μλ κ²μ ν리ν νΈμν¨ μ¬μ μ΄ λ κ²μΌλ‘ λ³΄κ³ μκ³ , λ ν루μ ν리ν μ€μ μ κΈ°λ°μΌλ‘ λλ¨μμ λ€λ₯Έ κ΅κ°μμλ μ§κΈ μ°λ¦¬ νΈμν¨ μ¬μ μ λν΄μ κ΄μ¬μ κ°μ§κ³ μμ΄μ λͺ κ° κ΅κ°μ μ§κΈ νμκ° μ§ν μ€μ΄κ³ , λ¬Όλ‘ κ·Έ λΆλΆμ μ λ½μ΄λ λ€λ₯Έ λλΌμ κ²½μ κ΄κ³μ μμ΅λλ€. μ½μ§λ μμ§λ§ μ ν¬λ€μ΄ μ΄λ―Έ μ€μ¦ λͺ¨λΈμ κ°κ³ μκΈ° λλ¬Έμ κ·Έλ° λ°μμ μλΉν κ°μ μ΄ μμ΅λλ€. μ μν¨μ μμ λ§μλλ¦° κ²μ²λΌ ν루 μ μν¨ λͺ¨λΈμ΄ κ°λ°λΌμ μ€μ μ΄ λ§λ€μ΄μ§λ©΄ ν¬λ₯΄ν¬κ°μ΄λ λ€λ₯Έ λλΌμμλ κ΄μ¬μ κ°μ§κ³ μκΈ° λλ¬Έμ μ΄μ 2,000-ton μ΄ν μ μν¨ μμ₯μμ μ°λ¦¬κ° μλΉν μμΆ κ²½μλ ₯μ κ°μ§ κ²μΌλ‘ λ³΄κ³ μμ΅λλ€.
Thank you for your question. Currently, the Navy modernization project is ongoing with the Philippine Navy, and for additional orders, negotiations are ongoing. We cannot disclose details, but if we share any news for the first time about our export cases, then it's going to be the Philippines and especially frigates for the Philippine Navy. Once we build a track record working with Peru and the Philippines, then we will be able to advance into Southeast Asia and other countries, because there are countries interested in our frigate construction capabilities. The consultations are ongoing, but in this sense, we're in competition against our European competitors. It's not easy, but we already have a demonstration model. In that sense, we have strength.
As to submarines, once we develop submarines and demonstrate the submarines while working with Peru, we already have Portugal, which is interested in our projects, and especially it's below 2,000-ton submarines. In that sense, I think we can build our competitive edge for 2,000-ton and below submarines.
λ€, μΆκ°λ‘ μΊλλ€ μ μν¨ μ¬μ κ³Ό ν΄λλ μ μν¨ μ¬μ μ One Team MOU μ μ μ λ°λΌ μμ¬κ° κ°μ΄ μλμ ν΅ν©ν΄μ λμ μ€μ μμ΅λλ€. λ΄λ μ μ’μ μμμ΄ μ λ¬λλ©΄ μ’κ² μ΅λλ€.
As to submarines, potential submarine projects with Canada and Poland under the One Team spirit, both companies are responding to potential project needs, integrating our capabilities. I hope that I can share good news next year.
λ€, μΆκ° μ§λ¬Έ λ°κ² μ΅λλ€.
[Foreign language] The following question will be presented by Kang Kyung-tae from Korea Investment & Securities. Please go ahead with your question.
λ€, μλ νμΈμ. μ νν¬μ κ°κ²½νλΌκ³ ν©λλ€. μ§λ¬Έν΄ μ£Όμ μ κ°μ¬λ립λλ€. μ μ μ§λ¬Έμ HDνλλ―Έν¬μ μ λ° μμ£Ό κ΄λ ¨ν λ΄μ©μ λλ€. λ―Έν¬κ° ν©λ³ λ§μΆ° μ μ΄λ‘ ν΄μ 3λΆκΈ°λ§ 보μλ©΄ κ±°μ μμ£Όκ° λ©μΆ° μλ μνμ΄κ³ , κ°μμΌλλ₯Ό μ΄κ΄ν΄μ μμ΄μμ μ€λ¦Όμ€κ° μν©μμ μ§κΈ λνμ‘°μ λ μ λΆ μΆμλ‘ λΉ μ Έλκ° μλλ°, νΉμ μ§κΈ μμμ μΌλλ HDνλλ―Έν¬μ μΈμ° μΌλλ κΈ°λ₯ λ°°λΆμ΄ μ§κΈ μ΄λ―Έ μ΄λ£¨μ΄μ Έμ μμ£Όκ° κ·Έλ κ² λλ μ Έμ μ΄λ£¨μ΄μ§κ³ μλ κ²μΈμ§, HDνλλ―Έν¬ μΈμ° μΌλμμ MR ν±μ»€λ νΌλμ μμ£Όκ° μ΄μ λ©μ·λ€κ³ 보면 λλμ§ νλ² λΆνλλ¦¬κ³ μ. μ¬ν΄ λͺ©ννμ ¨λ LNG bunkering vesselλ μ°λ¦¬ μ μμλ μ§κΈ λ λ€μ΄μ€κ³ μλ κ² κ°μ΅λλ€. ν©λ³ νμ HDνλμ€κ³΅μ ν©λ³ λ²μΈμ μ κ΄ μͺ½ λ§€μΆ μΆμ μ μν΄μ μ¬μ€λ³Έ κ²μ΄κ³ , κ΄λ ¨ν΄μ λ΅λ³ λΆνλλ¦¬κ² μ΅λλ€.
Commercial ship exports of Mipo, because before and after the merger, seems like all the activities of Mipo have virtually stopped. Mipo has a shipyard in Ulsan, my question is about the division of labor, I would say, or functionalities, because when I look at mid-range tankers and feeder ships, seems like all the activities have, again, almost stopped. As to LNG bunkering vessels, I think we have less volume this year. What's happening to Mipo as to commercial ship exports?
μ΄μ΄μ λΆμ¬μ₯λ, λλ΅λλ¦¬κ² μ΅λλ€. λ―Έν¬ μμ μ κ΄ν΄μ λ§μλ리면 ν©λ³νκ³ λ―Έν¬ μμ νκ³ λ κ΄λ ¨μ΄ μμ΅λλ€. λ―Έν¬ μμ μ΄ νμ¬ μ μ²΄λΌ μλ κ²μΌλ‘ 보μ΄λ κ²μ μ€μ λ‘
μ€νμ λΆλΆμλ μκΉ λ§μλλ¦° λ°μ κ°μ΄ μ¬ν΄ μ λ°μ μΌλ‘ μμ£Όκ° λν μ€μ΄λ€μμ΅λλ€. μλ μ λ° μμ€μΌλ‘ μ€μ΄λ€μκ³ μ. λ―Έν¬ κ°μ κ²½μ°, μ€νμ κ°μ κ²½μ°μλ νΉν μλ μ λλμΌλ‘ λ°μ£Όκ° λλ λ°λμ MR κ°μ κ²½μ° μλ μ μ ν΅κ³ μ«μμ λ°λ₯΄λ©΄ 157μ²μ΄ λ°μ£Όκ° λμκ³ , ν΅μμ μΌλ‘ νκ· 48μ² μ λκ° λ°μ£Όκ° λλλ° κ·Έλ κ² μκ°ν΄ 보면 μλ μ λ§μ΄ λ°μ£Όκ° λ κ² λ§λ κ±°μμ. κ·Έλ€μμ μ¬ν΄ κ°μ κ²½μ°μλ MR κ°μ κ²½μ°μ 36μ²μ΄ λ°μ£Όκ° λ κ²μΌλ‘ μ§κΈ νμ μ΄ λκ³ μμ΅λλ€. κ·Έμ€μ 10μ²μ Philly Shipyard κ±°κ³ μ. λ°μ§κ³ 보면 μλ μ λΉν΄μ 23% μμ€. μ€νμ κ°μ κ²½μ°μλ μμ₯ μμκ° λ λ§μ΄ μ€μ΄λ κ·Έλ° λͺ¨μμ΄κΈ° λλ¬Έμ λ°μ£Όκ° μ λ λͺ¨μμΌλ‘ μ΄λ κ² λ³΄μ¬μ§λ κ² κ°κ³ μ. MRμ κ·Έλ κ³ , νΌλλ νμ¬ μ ν¬κ° μ¬ν΄ μλ°κΈ°μ λλΆλΆ 20μ²μ λ©κΈ° λ€ νμμ΅λλ€. μ§κΈ μ ν¬κ° κ°λ₯ν λ©κΈ°κ° 28λ μ΄κ³ νλ€ λ³΄λκΉ μ무λλ μμ λ°°λ€μ μ½λͺ¨λν° μ±κ²©μ΄ κ°νλ€ λ³΄λκΉ λ©κΈ°κ° λ€λ‘ λΉ μ§κ² λλ©΄ κ²½μλ ₯μ΄ μ’ λ¨μ΄μ§κ³ μ νΈλκ° λ¨μ΄μ§λ μν©μ λλ€. κ·Έλμ μ§κΈ νΌλμ μ΄ μμ£Όκ° μ’ μ’μ§ λͺ»ν μν©μ΄κ³ μ.
μ λ°μ μΌλ‘ μμ₯ μμ²΄κ° μ§κΈ μ’μ§ λͺ»ν μν©μ΄λΌμ μμ£Όκ° μ’ κ·Έλ° κ±°μ§, κ·Έκ² ν©λ³νκ³ μ°κ²°λμ΄ μκΈ° λλ¬ΈμΈ κ±΄ μλλλ€. μ΄μμ λλ€.
ν리.
ν리.
Thank you for your question. What I can say is the merger and HD Hyundai Mipo's operations are not related. These are two separate issues. It seems like HD Hyundai Mipo's operations are stagnant. It is because the mid-range ship market itself is stagnant. This year, it is true that orders have declined to half of last year. It is because last year in 2024, so many mid-range ships were ordered. Mid-range ships, around 157 mid-range ships were ordered last year. In fact, the average number is around 48. Many orders placed last year, and now this year, about 36 mid-range vessels were ordered, and 10 of them are for the Philly Shipyard of Hanwha. That is only 23% of 2024. The mid-range, the market demand itself is sluggish. It makes the situation look like HD Hyundai Mipo is not really receiving orders.
About the feeder market, in H1, in the first half of this year, we have filled all our delivery capacities already. We can deliver only after 2028. These small ships, they are perceived as commodities, which means if their deadline is postponed, then they will lose their preferences and competitive edge as well. It seems like order activity is stagnant. Again, I would like to say the market itself is sluggish and stagnant.
μΆκ°λ‘ λ§μμ λ리면, μ΄ ν¬κ΄μ‘°μ μ΄ 2025λ 12μ 1μΌλΆν° ν©λ³μ λμ§λ§, ν©λ³ μ΄νμ λ§€μΆμ λ³νλ 2028λ λΆν° λ°μν κ²μΌλ‘ μμμ΄ λ©λλ€. 2027λ κΉμ§ μ¬λ‘―μ΄ λ€ μ°¨ μλ μνκ³ , μ§κΈλΆν° μ ν¬λ€μ΄ μ λ΅μ μΌλ‘ μμ£Όνλ €κ³ νλ λΆλΆλ€, λ―Έκ΅μμ νλ €λ λΆλΆλ€μ΄ κ΅°μ¬ μ§μμ μ΄λ κ·Έλ€μ μ λ΅ νμ ν¨ κ°μ κ²λ€μ μ§κΈ μμ£Όλ₯Ό ν΄λ 2028λ λΆν° λ§€μΆμ΄ λ°μμ νκΈ° λλ¬Έμ ν©λ³ ν¨κ³Όλ‘ μΈν λ§€μΆ μ¦κ° ν¨κ³Όλ κ·ΈλλΆν° μ±λ¦½λλ€κ³ 보μλ©΄ λ κ² κ°μ΅λλ€.
12μ 1μΌ.
12μ 1μΌ.
The merger takes effect from November 1st of this year.
12μ 1μΌ.
December 1st of this year that the merger will take effect. Any change in revenue would be witnessed only after 2028. It is because the slots are already filled by 2027. If it is for strategic orders targeting the U.S., that would be referring to Next Generation Logistics Ships and strategic commercial ships. Even though we receive orders right now, these will be recognized as revenue only after 2028.
λ€, μ§κΈ μκ°μ΄ λ§μ΄ μ§λ¬λλ°μ. νλ κ°μ§ μ λ μ§λ¬Έ λ λ°κ³ λ§μΉλλ‘ νκ² μ΅λλ€.
λ€μμΌλ‘ μ§λ¬Ένμ€ λΆμ μΌμ±μ¦κΆμ νμμλμ λλ€. μ§λ¬Έν΄ μ£Όμμμ€. The following question will be presented by Han Young-soo from Samsung Securities. Please go ahead with your question.
λ§μ§λ§ μ§λ¬Έ κΈ°νμ¬μ μ λ λ κ°μ§ μ¬μ€λ³΄κ³ μΆμλ°μ. νλλ HDνλλ―Έν¬ μ΄μ΅λ₯ μ΄ λ§μ΄ κ°μ μ΄ λ κ² κ°μ΅λλ€. μλ νμ€μ΄λ ν©λ³νλ©΄ μ μ¬ μ΄μ΅λ₯ μ΄ ν¬μλ κ±° μ’ κ±±μ νμλ κ²λ³΄λ€λ κ³ λ¬΄μ μΈ λ΄μ©μ΄κΈ°λ νλ°, μ΄κ² λ―Ήμ€λ₯Ό 보면 λ―Έν¬λ μ΄λ²μ 2024λ μμ£Όμ λ§€μΆ λΉμ€μ΄ ν μ¬λΌκ°μ κ·Έλ° κ±°κ±°λ μ. κ·Έλμ λ―Έλμ κ·Έλ¦Όμ λ΄€μ λ νμ€νκ³ λΉκ΅νλ©΄ μμ¬μ μ΄μ΅λ₯ μ΄ ν₯νλ‘ λ―Έν¬λ λ κ°μ μ΄ λΌμ μλ ΄μ νλ κ·Έλ¦ΌμΌμ§, μλλ©΄ λ―Έν¬λ κ³ λ§μ§ μμ£Όκ° λ¨Όμ λ§€μΆμ λ°μμ΄ λΌμ μ¬λΌμκΈ° λλ¬Έμ λ―Έν¬λ μ΄ μ λ μμ€μμ μ μ§νλ©΄μ νμ€μ΄ λ μ¬λΌκ°λ κ·Έλ¦ΌμΌμ§, μμ¬μ ν₯ν λ§μ§μ λ°©ν₯μ±μ΄ μ΄λ»κ² λ μ§ μ‘°κΈ κΆκΈνκ³ μ. λ λ²μ§Έλ ν΄μ λΆλ¬Έ μμ£Όκ° μ’ λ§μ΄ λ¦μ΄μ§λ κ² κ°μμμ. μ΄κ² λλ¬Έμ ν₯νμ ν΄μ λ§€μΆμ΄ μ’ κ°μνλ ꡬκ°μ΄ νΉμ λ°μν 리μ€ν¬κ° μλμ§, νΉμ μλ€λ©΄ μΈμ κΉμ§ μ ν¬κ° ν΄μ μμ£Όλ₯Ό ν΄μΌ μ΄λ° μ°λ €λ₯Ό μ ν μ μλ 건μ§, κ·Έ λ§μ§λ Έμ κ°μ κ² μλμ§ κΆκΈν©λλ€. κ°μ¬ν©λλ€.
I have two questions. The first question is about the proportion of profit, I would say, between HD Hyundai Heavy Industries and Mipo. It seems like Mipo's profit margin has improved greatly. Initially, we were worried that this merger would rather dilute the overall profitability, but it seems like it's not the case, and this is highly encouraging. When we look at the overall picture, my question is, the profitability of these two companies would converge to quite an equitable level? Or is that HD Hyundai Heavy Industries margin would go up further, and Mipo would maintain the current level of profitability? The proportion of contributions, I would say, to the overall profitability between Mipo and HD Hyundai Heavy Industries. That's my first question. My second question is about offshore structure, because the order activities are being delayed, and we have worries that profitability may decline.
My question is, until when should you engage in ordering activities so that it will eliminate any worries or concerns about the profit of offshore structure business? To answer your first question, it's true that Mipo's OP margin has improved significantly to a close level, to almost equal level of HD Hyundai Heavy Industries. Of course, HD Hyundai Heavy Industries would have a higher OP margin overall compared to Mipo. In fact, the losses from offshore plant business was covered by engine business at HD Hyundai Heavy Industries. As to the commercial ships, actually the LPG proportion is higher within HD Hyundai Heavy Industries, so overall margin would be higher within HD Hyundai Heavy Industries compared to Mipo. I think next year, OP margin of both companies would rather converge to quite a similar level.
As to the offshore structure business, our Trion project is accelerating and the Ruya project has just begun. If we continue with our ordering activities until the first half of 2026, then at least on revenue basis, we won't have declines happening. In fact, biddings are mostly concentrated in the first half of next year. You may look forward to this market. I'd like to make one correction. When I answered your first question, I mentioned LPG, but it's not LPG, but LNG. That's one correction that I'd like to make.
Due to technical glitch, we couldn't really receive this question. We would like to entertain one final question. The final question will be presented by Lee Dong-heon from Shinhan Investment & Securities. Please go ahead with your question.
μ°Έμ¬ κ°μ¬ν©λλ€. κ°λ¨ν κ² λ κ°μ§λ§ μ¬μκ³ λ§λ¬΄λ¦¬νκ² μ΅λλ€. μμ μ λ§€μΆ μ±μ₯ μλκ° μμλ³΄λ€ λΉ λ₯Έλ°, μ΄λ κ² λλ©΄ νμ μ 곡μ μ§ν μμ²΄κ° λΉ¨λΌμ Έμ λ΄λ λΆν°λ μ‘°κΈ° μΈλκ° λλ λΆλΆλ λμ¬ μ μλμ§ μ΄κ² ν κ°μ§κ³ μ. λ νλλ νΉμμ κ΄λ ¨ν΄μ λ―Έκ΅ λ²μΈμ μΈμ μ€λ¦½ν μ μμμ§ κ°λ₯μ΄ λλμ§ μ΄λ κ² μ§λ¬Έμ λλ€. κ°μ¬ν©λλ€.
Thank you for the opportunity. My first question is, I think your commercial business is experiencing quite rapid growth in revenue and sales. My question is about the possibility of early delivery of your commercial ships. The second question is as to your special ship business. When are you going to establish a corporation or subsidiary in the U.S.?
μΌλ¨ μ μλ λ§μλλ Έμ§λ§, μ§κΈ μλ νλ°κΈ°λΆν° μ ν¬λ€μ λ§€μΆ μ±μ₯ μλκ° μ‘°κΈμ© λΉ¨λΌμ§κ³ μμ΅λλ€. κ·Έλ§νΌ μ‘°κΈ° μΈλκ° μ΄λ£¨μ΄μ§κ³ μλ€λ μλ¦¬μ£ . κΈλ μλ μλ κ³ν보λ€λ μ§κΈ 10%, 15% μ΄μ λΉ¨λΌμ§κ³ μλ κ² κ°κ±°λ μ. κ·Έλ§νΌ μ‘°κΈ° μΈλκ° μ΄λ£¨μ΄μ§κ³ μκ³ , κ·Έλ§νΌ μ νκ° μ‘°κΈμ© λΉκ²¨μ§κ³ μλ€, μ΄λ κ² λ§μλ릴 μ μκ² μ΅λλ€. μλ§ λ΄λ μλ λ§μ°¬κ°μ§μΌ κ±°κ³ μ.
As to your first question, as you said, starting from the second half of last year, 2024, the pace of revenue generation is really speeding up and being accelerated. This is translated into early deliveries. This year, we already have 10%-15% acceleration. This is again, is translated into faster construction. That would happen this year and next year as well.
κ·Έλ€μ λ―Έκ΅ λ²μΈμ λν΄μλ μ‘°κΈλ§ κΈ°λ€λ € μ£ΌμΈμ. μ ν¬λ€μ΄ μ§κΈ μ€λΉλ₯Ό μ€μ λ‘ νκ³ μκ³ , μ μλ μ€λΉκ° μ λμλ€κ³ λ§μλλ¦°λ€λ©΄ μμΌλ‘λ λ―Έκ΅ μͺ½ κ³νμ λν΄μ μ€λΉκ° λλ λλ‘ ν¬κ² λ΅λ³μ λ릴 μ μλλ‘ κ·Έλ κ² ν κ²μ. μ§κΈμ μ€λΉ μ€μ μμ΅λλ€.
As to our U.S. subsidiary, please wait and see. Your patience would be greatly appreciated. We're making preparations. Previously, we told you that we are in the preparation phase. Now I hope we can share any updates that we make on our U.S. subsidiary as soon as we make them.