Earnings Call: Q3 2025

Nov 5, 2025

Summary

Q3 revenue reached KRW 959.7bn and operating profit KRW 149.9bn, with Indonesia investments driving earnings. Q4 outlook includes Green Eco Nickel consolidation, higher precursor sales, and lower depreciation expense.

We will now begin Ecopro's 2025 third quarter earnings conference call. Following the presentation of the third quarter results, we will provide an overview of the outlook for the fourth quarter and next year, and then proceed to the Q&A session. While the earnings presentation will be interpreted simultaneously, business outlook and Q&A will be interpreted consecutively. Now, we will begin Ecopro's presentation. Good morning. Thank you for taking the time out of your busy schedule to join Ecopro's earnings conference call. For today's call, we have from Ecopro, CFO Park Jae-ha, Kim Sun-joo, Managing Director of Finance. From Ecopro Materials, Lee Sung-joon, Head of Business Management. From Ecopro HN, Choi Jin-young and Kim Seung-wook. Please note that the earnings presented today may change subject to independent auditor's review. We will now begin Ecopro's presentation on the 2025 third quarter results. Good morning. I am Kim Sun-joo, Managing Director of Finance. Please refer to the earnings presentation materials that were previously distributed. For today's earnings call, we will begin with an overview of the business results of Ecopro's three listed family companies, followed by a Q&A session. The key takeaways from Ecopro's Q3 earnings presentation are entry into the second phase of the Indonesia investment and key product strategies for each segment of the battery materials market. As previously mentioned in the last earnings call, Ecopro has completed its phase 1 investment in the IMIP smelting project in Indonesia and has now entered phase 2 investment in the IGIP project. In phase 1, IMIP, all four investment projects have ramped up and started full-scale production, completing a nickel production structure with an annual capacity of 150,000 tons. Ecopro has secured offtake rights for around 30,000 tons of that output. Expected annual profit contribution from IMIP include KRW 100 billion in consolidated profit from Green Eco Nickel, KRW 50 billion in equity method gains from the other three projects, and KRW 30 billion from metal trading, totaling around KRW 180 billion in annual profit contribution. Phase 2, IGIP project will proceed in two stages. In the first stage, with participation from Indonesian state-owned mining company Vale, Ecopro will hold a 20% stake, while in the second stage, Ecopro will hold a majority stake and take the lead as the largest shareholder. Once both stages are complete, IGIP will have a total nickel metal production capacity of 130,000 tons, and Ecopro plans to secure offtake rights for about 50,000 tons. As with phase 1, we expect a much larger profit contribution through consolidated earnings, equity method gains, and metal trading. At the final stage of investment, we aim to integrate smelting and cathode materials production to achieve synergies and produce the world's lowest-priced products. Next, Ecopro's key product strategy by market segment within the battery materials business. In the high-nickel segment, where Ecopro holds a strong technological edge, we will leverage our Indonesia operations to produce world's lowest-price, non-China products for premium EVs, high-performance ESS, and the rapidly growing robotics sector. As the EV market continues to expand, the volume EV, expected to represent a larger portion of future demand, will be targeted through high-voltage mid-nickel products. Ecopro has already secured performance in single crystal and is refurbishing its mass production lines in collaboration with customers. For mid-nickel, by securing a production base and resources in Indonesia, Ecopro plans to achieve cost competitiveness comparable to Chinese peers and gain a leading position in the market. In response to the growing demand for LFP batteries in entry-level EV and ESS market, Ecopro has completed a non-China precursor-free process to secure near-mass production capacity. We are in close discussions with customers. For sodium-ion batteries, we are developing products with energy density comparable to LFP. These can be manufactured using existing ternary plants, enabling rapid market response in the future. Ecopro, through its high-nickel technology and Indonesia-based cost competitiveness, plans to reinforce its market position by expanding into mid-nickel products. As the market continues to evolve, we will also actively respond to customer needs in the LFP and sodium-ion battery segments. Please turn to page seven for Ecopro HN's business results. In Q3, due to slowdown in the petrochemical and steel industries and delayed facility investments by water treatment and semiconductor customers, Ecopro HN recorded sales of KRW 28.4 billion, down 27% QoQ, and operating profit of KRW 2.3 billion, down 36% QoQ. While sales in the chemical filter segment remained stable, revenue declined in project-based businesses such as fine dust and greenhouse gas reduction and water treatment solutions. Looking ahead, with the boom in semiconductor industries, sales of chemical filters are expected to rise, and demand for greenhouse gas reduction projects to increase. The fine dust reduction business by entering power plant and cement markets aims to seek customer diversification and secure new order momentum for next year. Please turn to page eight for the financial overview. At the end of Q3 2025, total assets stood at KRW 432 billion, down 1.3% QoQ. Total liabilities were KRW 132 billion, down 6.1% QoQ, and total shareholders' equity was KRW 300.1 billion, up 0.9% QoQ. The debt ratio stood at 44%, and the current ratio at 419%, maintaining a sound financial position. Please turn to page nine for Ecopro Materials business results. In Q3, Ecopro Materials precursor sales increased 13% QoQ, driven by shipments to new customers, but total sales declined 19% QoQ to KRW 63.2 billion due to lower product sales. As a result, operating loss remained similar to the previous quarter at KRW 25.1 billion. However, following the completion of the acquisition of a high value-added nickel smelter, Green Eco Nickel in Indonesia, Ecopro Materials recorded a KRW 164.3 billion increase in net income due to bargain purchase gain. In Q4, with greater captive sales, precursor sales volume and amount are expected to increase sharply. With Green Eco Nickel completing ramp-up in September and commencing full-scale mass production, we expect a positive contribution to consolidated earnings, along with additional benefits from securing offtake volumes and byproducts of rare metals such as cobalt, manganese, copper, and scandium, whose prices have recently surged. Please turn to page 10 for the financial overview. At the end of Q3, total assets stood at 1 trillion KRW 809.2 billion, up 7.8% QoQ, total liabilities at KRW 556.3 billion, down 5.5% QoQ, and total shareholders' equity at 1 trillion KRW 252.9 billion, up 15% QoQ. Due to the Green Eco Nickel acquisition payment and CapEx, cash and equivalents decreased by KRW 106.2 billion. However, the company secured about KRW 350 billion in credit line, and with improved earnings, the debt ratio declined to 44%. Now, please turn to page 11 for the consolidated results of Ecopro, the holding company. In Q3 2025, Ecopro recorded consolidated revenue of KRW 959.7 billion, up 3% QoQ, and operating profit of KRW 149.9 billion, up a significant 824% QoQ. This was driven by profit increases from the acquisitions of Indonesia's Green Eco Nickel and ESG Equity, and higher precursor and lithium sales from new customers. Although there were some inventory adjustments for EV cathodes in Europe, NCA cathode sales for ESS rose 103% QoQ to KRW 165.4 billion. Looking ahead, consolidated revenue and profit are expected to improve further as Green Eco Nickel ramps up production, while normalized depreciation periods across group companies will also support earnings growth. Despite the US EV tax credit expiration, demand remains strong for AI data center and UPS-used ESS cathodes, as well as for non-China precursors, supporting continued earnings momentum. In Q4, through the completion of the erection plant in Hungary and establishment of a new European entity in Germany, the company plans to expand its European customer base. Please turn to page 12 for results of the holding company's standalone and unlisted businesses. Ecopro standalone business revenue was KRW 64.5 billion in Q3, up 48% QoQ. With the completion and full operation of four IMIP smelters, equity method and trading profits are expected to increase gradually. In Q3, as previously announced, Ecopro initiated phase II IGIP stage 1 investment, which is expected to drive business portfolio diversification and synergy with existing businesses. The lithium business posted a loss of KRW 60.5 billion in Q3, but improvement is expected in Q4, driven by higher sales and inventory valuation reversal. Please turn to page 13 for the consolidated financial overview. At the end of Q3 2025, total assets stood at KRW 8 trillion 782.7 billion, down 0.8% QoQ. Total liabilities were KRW 4 trillion 568 billion, down 4.5% QoQ, and total shareholders' equity was KRW 4 trillion 214.7 billion, up 3.7% QoQ. Due to bond repayment and the Green Eco Nickel acquisition, cash and equivalents decreased by KRW 258.4 billion, and inventories declined 16% QoQ through ongoing rationalization efforts. The consolidated debt ratio improved to 108.4%, and the Ecopro group continues to manage its debt ratio around 100%. With the holding company's KRW 800 billion stake sale and completion of PRS contract in October, further improvement in financial structure and liquidity is expected in Q4. Please refer to the following slide for your reference, and we will now move on to the business outlook and Q&A session. This concludes our earnings presentation. Next, business outlook for Q4 and next year. ์—์ฝ”ํ”„๋กœ ์žฌ๋ฌด๊ด€๋ฆฌ๋ณธ๋ถ€์žฅ ๋ฐ•์žฌํ•˜์ž…๋‹ˆ๋‹ค. ์—์ฝ”ํ”„๋กœ ์ง€์ฃผ์‚ฌ์˜ ์‚ฌ์—… ์ „๋ง์— ๋Œ€ํ•ด์„œ ๋ง์”€์„ ๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. I am Park Jae-ha, Head of Business Management of Ecopro. Let me present the business outlook for Ecopro Holding Company. ๋จผ์ € ์ด๋ฒˆ ๋ถ„๊ธฐ์—๋Š” ์•ž์„œ ์„ค๋ช…์„ ๋“œ๋ ธ์ง€๋งŒ ์—์ฝ”ํ”„๋กœ ๋จธํ‹ฐ๋ฆฌ์–ผ์ฆˆ์˜ ๊ทธ๋ฆฐ์—์ฝ”๋‹ˆ์ผˆ ํ”„๋กœ์ ํŠธ ์ง€๋ถ„ ์ธ์ˆ˜์™€ ํ•จ๊ป˜ ์ธ๋„๋„ค์‹œ์•„ 1๋‹จ๊ณ„ ํˆฌ์ž๊ฐ€ ์„ฑ๊ณต์ ์œผ๋กœ ๋งˆ๋ฌด๋ฆฌ๋˜์—ˆ๋‹ค๋Š” ์†Œ์‹์„ ์ „ํ•ด๋“œ๋ฆด ์ˆ˜ ์žˆ๊ฒŒ ๋˜์–ด์„œ ๋งค์šฐ ๊ธฐ์˜๊ฒŒ ์ƒ๊ฐํ•ฉ๋‹ˆ๋‹ค. ์ง€๋‚œ ๋ถ„๊ธฐ์—๋Š” BM ์ฃผ๋„๋กœ ์ธ์ˆ˜ํ•œ ESG ํ”„๋กœ์ ํŠธ๊ฐ€ ์žˆ์—ˆ๋Š”๋ฐ์š”. ์ด์™€ ๋งˆ์ฐฌ๊ฐ€์ง€๋กœ ์ด๋ฒˆ์—๋„ ํšŒ๊ณ„์ ์œผ๋กœ ํฐ ๊ทœ๋ชจ์˜ ์—ผ๊ฐ€ ๋งค์ˆ˜ ์ฐจ์ต์„ ์ธ์‹ํ•  ์ˆ˜ ์žˆ์—ˆ์Šต๋‹ˆ๋‹ค. ์ด๊ฒƒ์€ ์ด๋ฏธ ๊ณ ๋ถ€๊ฐ€๊ฐ€์น˜๋ฅผ ์ฐฝ์ถœํ•˜๊ณ  ์žˆ๋Š” ์ œ๋ จ์†Œ์˜ ์ง€๋ถ„์„ ์ €ํฌ๊ฐ€ ์ „๋žต์ ์œผ๋กœ ์œ ๋ฆฌํ•œ ๊ฐ€๊ฒฉ์— ์ธ์ˆ˜ํ–ˆ๊ธฐ ๋•Œ๋ฌธ์ž…๋‹ˆ๋‹ค. First of all, as was mentioned during the earnings presentation, we are very pleased to inform you that Ecopro Materials' equity acquisition of Green Eco Nickel Project and phase 1 investment in Indonesia have been successfully concluded. Just like the ESG project led by EcoPro BM in the prior quarter, we were able to recognize significant gain from bargain purchase because we acquired a stake in a smelter that was already generating high value added at a strategically advantageous price. ์ด๋ฟ๋งŒ ์•„๋‹ˆ๋ผ ๋‹ˆ์ผˆ MHP ํŠธ๋ ˆ์ด๋”ฉ ์ด์ต๊ณผ ๋˜ ์ง€๋ถ„๋ฒ• ์ด์ต ๋“ฑ์œผ๋กœ ์ธํ•ด์„œ ์ธ๋„๋„ค์‹œ์•„ ํ”„๋กœ์ ํŠธ๋Š” ์ˆ˜๋…„ ํ›„๊ฐ€ ์•„๋‹Œ ์ง€๊ธˆ ๋‹น์žฅ์˜ ์†์ต์— ๊ธฐ์—ฌํ•˜๊ณ  ์žˆ๋Š” ์ƒํ™ฉ์ž…๋‹ˆ๋‹ค. ์—์ฝ”ํ”„๋กœ ๊ฐ€์กฑ์‚ฌ์˜ ์ง€์†์ ์ธ ์„ฑ์žฅ์„ ์ด๋Œ๊ณ  ๋˜ ์‹œ์žฅ๊ณผ ํ•จ๊ป˜ ์„ฑ๊ณผ๋ฅผ ๊ณต์œ ํ•  ์ˆ˜ ์žˆ๋Š” ์‚ฌ์—…์ž…๋‹ˆ๋‹ค. ๊ทธ๋ฆฌ๊ณ  ๋˜ ํ•œ ๊ฐ€์ง€๋Š” ์ œ๋ จ์—…์ด๋ผ๋Š” ์‹ ๊ทœ ์‚ฌ์—… ์˜์—ญ์„ ์ถ”๊ฐ€ํ•œ๋‹ค๋Š” ๊ทธ๋Ÿฐ ์˜๋ฏธ๋„ ๊ฐ–๊ณ  ์žˆ๋‹ค๊ณ  ํ•  ์ˆ˜ ์žˆ๊ฒ ์Šต๋‹ˆ๋‹ค. Furthermore, the Indonesia project is already contributing to the P&L right now through profit from nickel MHP trading and equity method gain. This project is a way to achieve sustained growth of the Ecopro Group companies and share results with the market. It is also meaningful that we are adding smelting as a new business domain. 1๋‹จ๊ณ„์— ์ด์–ด์„œ 2๋‹จ๊ณ„๋„ ์ง€๊ธˆ ์ˆœ์กฐ๋กญ๊ฒŒ ์ง„ํ–‰์„ ํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ํŠนํžˆ 2๋‹จ๊ณ„๋Š” 1๋‹จ๊ณ„ํ•˜๊ณ  ๋‹ค๋ฅด๊ฒŒ ์ €ํฌ ์—์ฝ”ํ”„๋กœ๊ฐ€ ์ฃผ๋„์ ์œผ๋กœ ํ”„๋กœ์ ํŠธ๋ฅผ ์ด๋Œ์–ด๊ฐ€๋Š” ๊ตฌ์กฐ์ด๊ณ , 2๋‹จ๊ณ„ ์ค‘์— 1๊ธฐ๋Š” ์ธ๋‹ˆ ๊ตญ์˜ ๊ด‘์‚ฐ ๊ธฐ์—…, ๋˜ ์ธ๋‹ˆ์˜ ๊ตญ๋ถ€ํŽ€๋“œ ๋“ฑ๊ณผ ํ•จ๊ป˜ ์ €ํฌ๊ฐ€ ์•ฝ 20% ์ •๋„ ์ง€๋ถ„ ์ฐธ์—ฌํ•˜๋Š” ๊ฒƒ์œผ๋กœ ๊ทธ๋ ‡๊ฒŒ ๊ฒฐ์ •์ด ๋˜์—ˆ๊ณ , ๋˜ 2๊ธฐ๋Š” ์—์ฝ”ํ”„๋กœ๊ฐ€ ์ตœ๋Œ€ ์ฃผ์ฃผ๋กœ์„œ ์ง€๋ถ„ 50% ์ด์ƒ์˜ ์ฐธ์—ฌ๋ฅผ ๊ณ„ํšํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์ด์™€ ๊ฐ™์€ ๊ฒฐ์ •์€ ๊ธฐ์กด์— ๊ตฌ์ถ•๋œ ์ €ํฌ ์ค‘๊ตญ GEM๊ณผ์˜ ํƒ„ํƒ„ํ•œ ํŒŒํŠธ๋„ˆ์‹ญ์„ ๋ฐ”ํƒ•์œผ๋กœ ์ด๋ฃจ์–ด์ง„ ๊ฒƒ์œผ๋กœ ์–‘์ชฝ ์‹œ์žฅ์— ๋Œ€ํ•œ ์ €ํฌ์˜ ๊ณต๋™ ๋น„์ „ ๊ทธ๋ฆฌ๊ณ  ๋˜ ์ดํ•ด๊ด€๊ณ„๊ฐ€ ์ผ์น˜ํ–ˆ๊ธฐ์— ๊ฐ€๋Šฅํ–ˆ์Šต๋‹ˆ๋‹ค. ์ด๋Š” ๊ตญ๋‚ด ํƒ€ ๊ธฐ์—…์ด ๊ฒฐ์ฝ” ๋”ฐ๋ผ์˜ฌ ์ˆ˜ ์—†๋Š” ๊ทธ๋Ÿฐ ๊ตฌ์กฐ์ด๋ฉฐ ์—์ฝ”ํ”„๋กœ๋งŒ์˜ ์ „๋žต์ ์ธ ๊ฐ•์ ์ด๋ผ๊ณ  ํ•  ์ˆ˜ ์žˆ์„ ๊ฒƒ ๊ฐ™์Šต๋‹ˆ๋‹ค. Following the successful completion of phase 1, phase 2 investment is well underway. I would like to note that unlike phase 1, in phase 2, Ecopro is taking the lead in the project. For stage 1, our equity participation has been decided at around 20% together with a state-owned mining company and a sovereign wealth fund of Indonesia. For stage 2, Ecopro plans to assume a much more than 50% stake as the largest shareholder. These decisions have been made thanks to the existing strong partnership with Chinese green eco manufacturer based on well-aligned interests and a common vision for the cathode market. This is a structure that no other domestic company can match, and it is Ecopro's unique strategic strength. ์˜ˆ, ์ด๋Ÿฐ ํ”„๋กœ์ ํŠธ๋กœ ์ธํ•ด์„œ ์˜ˆ์ƒ๋˜๋Š” ์—ฐํ‰๊ท  ์ด์ต ๊ทœ๋ชจ๋Š” 1๋‹จ๊ณ„๊ฐ€ ์•ฝ 1,800์–ต ์› ์ •๋„ ๊ทœ๋ชจ์ธ๋ฐ์š”. 2๋‹จ๊ณ„๋Š” ์ด๋ณด๋‹ค ํ›จ์”ฌ ํฐ 3,000์–ต ์› ์ด์ƒ์ด ๋  ๊ฒƒ์œผ๋กœ ๊ธฐ๋Œ€ํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์ด๋Š” ์—ฐ๊ฒฐ ์ด์ต๊ณผ ํŠธ๋ ˆ์ด๋”ฉ ์ด์ต ๋“ฑ์„ ํฌํ•จํ•œ ๋ณด์ˆ˜์ ์ธ ์ถ”์ •์น˜์ด๊ณ  2030๋…„๊นŒ์ง€ ๋‹ˆ์ผˆ ๊ฐ€๊ฒฉ์„ ํ‚ฌ๋กœ๊ทธ๋žจ๋‹น 16๋‹ฌ๋Ÿฌ ์ •๋„๋กœ ๊ฐ€์ •ํ•œ ์ˆ˜์น˜์ž…๋‹ˆ๋‹ค. ์—ฌ๊ธฐ์„œ ์ƒ์‚ฐ๋˜๋Š” ๋‹ˆ์ผˆ์„ ์ „๊ตฌ์ฒด ๋˜ ์–‘๊ทน์žฌ์— ํˆฌ์ž…ํ•  ๊ฒฝ์šฐ์— ์ œํ’ˆ์— ๋”ฐ๋ผ ์ฐจ์ด๋Š” ์žˆ๊ฒ ์ง€๋งŒ ์›๊ฐ€๋„ ์•ฝ 20์—์„œ 30% ์ ˆ๊ฐํ•  ์ˆ˜ ์žˆ๊ณ , ์ด๋ฅผ ํ†ตํ•ด์„œ ์ „ ์„ธ๊ณ„ ์–ด๋””์„œ๋“  ์ค‘๊ตญ๊ณผ ๋™๋“ฑํ•œ ์ˆ˜์ค€์˜ ๊ฒฝ์Ÿ๋ ฅ์„ ํ™•๋ณดํ•  ์ˆ˜ ์žˆ์„ ๊ฒƒ์œผ๋กœ ์ €ํฌ๋Š” ๊ธฐ๋Œ€ํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. Annual profit from phase 2 is projected to be more than KRW 300 billion on average, far exceeding KRW 180 billion of profit expected from phase 1. This number is indeed a conservative estimate, including consolidated profit and trading profit, based on the assumption that nickel price would be $16 per kilogram by 2030. If nickel that is produced here is added to precursors and cathodes, we anticipate cost saving of around 20%-30% depending on products, and we expect to be able to secure the same level of competitiveness as Chinese anywhere in the world. ๋„ค, 4๋ถ„๊ธฐ ์ „๋ง์— ๋Œ€ํ•ด์„œ ์ถ”๊ฐ€๋กœ ์ข€ ๋ง์”€์„ ๋“œ๋ฆฌ์ž๋ฉด, ์•ž์„œ ๋ง์”€๋“œ๋ฆฐ ๊ทธ๋ฆฐ์—์ฝ”๋‹ˆ์ผˆ ํ”„๋กœ์ ํŠธ๊ฐ€ ์ €ํฌ ๋จธํ‹ฐ๋ฆฌ์–ผ์ฆˆ์— ํšŒ๊ณ„์ ์œผ๋กœ ์—ฐ๊ฒฐ์ด ๋˜๋ฉด์„œ ํ”„๋กœ์ ํŠธ ์ „์ฒด ์ด์ต์ด ๋จธํ‹ฐ๋ฆฌ์–ผ์ฆˆ, ๋˜ ๊ทธ๋ฆฌ๊ณ  ์ง€์ฃผ์‚ฌ ์˜์—…์ด์ต์— ๋ฐ˜์˜๋  ์˜ˆ์ •์ด๊ณ , ๋˜ ๋‹ค๋ฅธ 3๊ฐœ ํ”„๋กœ์ ํŠธ๋„ ๋ณธ๊ฒฉ ๊ฐ€๋™์ด ๋˜๋ฉด์„œ ์ง€๋ถ„๋ฒ• ์ด์ต์ด ๋”์šฑ ์ฆ๊ฐ€ํ•  ๊ฒƒ์œผ๋กœ ๋ณด์ž…๋‹ˆ๋‹ค. ๊ทธ๋ฆฌ๊ณ  ๋˜ ํ•œ ๊ฐ€์ง€ ๋ง์”€๋“œ๋ฆด ๊ฒƒ์€ ๋ณ€ํ™”๋œ ๊ฒฝ์ œ ํ™˜๊ฒฝ์— ๋”ฐ๋ผ์„œ ์œ ํ˜•์ž์‚ฐ ๋‚ด์šฉ์—ฐ์ˆ˜๋ฅผ ์ €ํฌ๊ฐ€ ์žฌ์ถ”์ •ํ•˜๋Š” ๊ณผ์ •์— ์žˆ๋Š”๋ฐ์š”. ์ด๋กœ ์ธํ•ด์„œ 2025๋…„ ์ „์ฒด ์ƒ๊ฐ๋น„๊ฐ€ ๋Œ€ํญ ๊ฐ์†Œํ•  ๊ฒƒ์œผ๋กœ ์ง€๊ธˆ ์˜ˆ์ƒํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์˜ˆ๋ฅผ ๋“ค์–ด์„œ ์ƒ์‚ฐ์„ค๋น„ ๊ฐ™์€ ๊ฒฝ์šฐ์— ์ด์ œ๊นŒ์ง€ ๋‚ด์šฉ์—ฐ์ˆ˜๋ฅผ 10๋…„์œผ๋กœ ์„ค์ •ํ•ด ์™”๋Š”๋ฐ ์‹ค์ œ๋กœ๋Š” 15๋…„ ์‚ฌ์šฉ์ด ๊ฐ€๋Šฅํ•ฉ๋‹ˆ๋‹ค. ์ด๋ฏธ ๋™์ข…์—…๊ณ„์—์„œ๋„ 15๋…„ ๊ธฐ์ค€์œผ๋กœ ์ƒ๊ฐํ•˜๊ณ  ์žˆ์–ด์„œ ๊ธฐ์—… ๊ฐ„์˜ ๋น„๊ต ๊ฐ€๋Šฅ์„ฑ๋„ ๋†’์ผ ์ˆ˜ ์žˆ์„ ๊ฒƒ์œผ๋กœ ๊ธฐ๋Œ€ํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์ด๋Ÿฐ ๋‚ด์šฉ์„ ์ €ํฌ ํšŒ๊ณ„๋ฒ•์ธ, ๋˜ ์„ค๋น„์—…์ฒด ๋“ฑ ์ „๋ฌธ๊ฐ€๋“ค์˜ ๊ฒ€ํ† ๋ฅผ ๊ฑฐ์ณ์„œ ์—์ฝ”ํ”„๋กœ ๊ฐ์‚ฌ ๋ชจ๋‘ ๋™์ข…์—…๊ณ„ ์ˆ˜์ค€์œผ๋กœ ๋ณ€๊ฒฝํ•˜๊ณ  ์ด๋ฅผ 4๋ถ„๊ธฐ์— ๋ฐ˜์˜ํ•  ์˜ˆ์ •์ž…๋‹ˆ๋‹ค. Moving on to the outlook for the fourth quarter, Green Eco Nickel will be consolidated to Ecopro Materials from the fourth quarter, so the profit from the project will be fully reflected in the operating profit of Ecopro Materials and the holding company as well. As the other three projects are put into full operation, equity method profit is expected to increase further. In addition, in the process of re-estimating the useful life of tangible assets on the back of the changed economic environment, the overall depreciation expense in 2025 is expected to decrease significantly. For example, the useful life of production equipment has been set at 10 years, but it can be used for 15 years. Since the 15-year criterion is already used widely in the industry, this change will improve comparability between companies. After review by experts from accounting firm and equipment providers, the adjustment to the useful life will be applied to all Ecopro Group companies starting from the fourth quarter. ๋„ค, ๊ทธ๋ฆฌ๊ณ  ์ง€๋‚œ์ฃผ์— ์–ธ๋ก ๊ณผ ๊ณต์‹œ๋ฅผ ํ†ตํ•ด์„œ ํ™•์ธํ•˜์…จ๊ฒ ์ง€๋งŒ, ์ €ํฌ๊ฐ€ 8,000์–ต ์› ๊ทœ๋ชจ์˜ PRS ๊ณ„์•ฝ์„ ์ฒด๊ฒฐํ•ด์„œ ์ธ๋„๋„ค์‹œ์•„ ํˆฌ์ž์™€ ๋˜ ๋ฏธ๋ž˜ ์ค€๋น„๋ฅผ ์œ„ํ•œ ์ž๊ธˆ๋„ ์ถฉ๋ถ„ํžˆ ํ™•๋ณด๋ฅผ ํ–ˆ์Šต๋‹ˆ๋‹ค. ๋Œ€์™ธ์ ์œผ๋กœ ๋ถˆํ™•์‹คํ•œ ํ™˜๊ฒฝ์ด ์ง€์†๋˜๊ณ  ์žˆ์ง€๋งŒ ์ €ํฌ ์—์ฝ”ํ”„๋กœ๋Š” ํ”๋“ค๋ฆผ ์—†์ด ์ฐจ๋ณ„ํ™”๋œ ์ „๋žต์„ ๊พธ์ค€ํžˆ ์‹คํ–‰ํ•ด ๋‚˜๊ฐ€๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ํ•ญ์ƒ ์ง€์ผœ๋ด ์ฃผ์‹œ๊ธฐ๋ฅผ ๋ถ€ํƒ๋“œ๋ฆฝ๋‹ˆ๋‹ค. ๊ฐ์‚ฌํ•ฉ๋‹ˆ๋‹ค. Also, as you may have seen in the media and through our disclosure last week, we signed a PRS contract worth KRW 800 billion to secure funds for the investment in Indonesia in preparation for the future. Although the uncertain external environment continues, Ecopro is steadily implementing differentiated strategies. We ask for your continued support and interest. Thank you. ๋„ค, ์—์ฝ”ํ”„๋กœ ๋จธํ‹ฐ๋ฆฌ์–ผ์ฆˆ ๊ฒฝ์˜๊ด€๋ฆฌ ๋‹ด๋‹น ์ด์„ฑ์ค€์ž…๋‹ˆ๋‹ค. ์—์ฝ”ํ”„๋กœ ๋จธํ‹ฐ๋ฆฌ์–ผ์ฆˆ 4๋ถ„๊ธฐ ์‚ฌ์—… ์ „๋ง์— ๋Œ€ํ•ด ๋ง์”€๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. This is Lee Sung-joon, Managing Director of Business Management for Ecopro Materials. Let me present the Q4 business outlook for Ecopro Materials. ๋จผ์ € ๋ณ„๋„ ๊ธฐ์ค€์œผ๋กœ ์ด์•ผ๊ธฐ๋“œ๋ฆฌ๋ฉด, ๋จธํ‹ฐ๋ฆฌ์–ผ์ฆˆ๋Š” 4๋ถ„๊ธฐ์— ์บกํ‹ฐ๋ธŒ ๊ณ ๊ฐ์‚ฌ์˜ ๋ถ๋ฏธํ–ฅ ์ „๊ตฌ์ฒด ์žฌ๊ณ  ํ™•๋ณด๋กœ 3๋ถ„๊ธฐ ๋Œ€๋น„ ์œ ์˜๋ฏธํ•œ ํŒ๋งค๋Ÿ‰ ์ง„์ „์ด ์žˆ์„ ๊ฒƒ์œผ๋กœ ์ „๋งํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ๋˜ํ•œ ์ตœ๊ทผ ์ฝ”๋ฐœํŠธ ๊ฐ€๊ฒฉ์ด 10์›” ๋ง ๊ธฐ์ค€ ํ‚ฌ๋กœ๊ทธ๋žจ๋‹น $48 ์ •๋„๋กœ ์ƒ์Šน์„ ํ•˜์˜€๋Š”๋ฐ, 9์›” ๋ง ํ‚ฌ๋กœ๊ทธ๋žจ๋‹น $34์™€ ๋น„๊ตํ•˜์˜€์„ ๋•Œ ํฐ ํญ์˜ ์‹œ์„ธ ์ƒ์Šน์ด ์žˆ์—ˆ์Šต๋‹ˆ๋‹ค. ์ด๋Ÿฌํ•œ ์ถ”์„ธ๊ฐ€ ์ตœ๊ทผ ์ง€์†๋˜๊ณ  ์žˆ์Œ์— ๋”ฐ๋ผ์„œ ๋‹น์‚ฌ์˜ ๋ฉ”ํƒˆ ํŒ๋งค์— ๋Œ€ํ•œ ์ˆ˜์ฃผ ์‹ค์ ์ด ๋ฐœ์ƒํ•˜์˜€๊ณ , ์ถ”๊ฐ€ ์ˆ˜์ฃผ๋„ ์˜ˆ์ƒ๋˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์ด๊ฒƒ์ด ์ˆ˜์ต์„ฑ ๊ฐœ์„ ์— ๋„์›€์ด ๋  ์ˆ˜ ์žˆ์„ ๊ฒƒ์œผ๋กœ ์ „๋งํ•ฉ๋‹ˆ๋‹ค. On a separate basis, in the fourth quarter, meaningful sales volume growth is expected QoQ as captive customers secure precursor inventory for North America. Also, cobalt price has risen significantly from $34 per kilogram at the end of September to $48 as of the end of October. On the back of this upward trend, we have secured orders for metal sales, and we expect additional orders going forward, which is expected to further improve our profitability. ์—ฐ๊ฒฐ ๊ธฐ์ค€์œผ๋กœ๋Š” ๊ทธ๋ฆฐ์—์ฝ”๋‹ˆ์ผˆ์ด 4๋ถ„๊ธฐ๋ถ€ํ„ฐ ์—ฐ๊ฒฐ ์‹ค์ ์œผ๋กœ ๋ฐ˜์˜๋˜๊ฒŒ ๋˜๋ฉด์„œ ๋งค์ถœ๊ณผ ์ˆ˜์ต์„ฑ ์ธก๋ฉด์—์„œ ์ƒ๋‹นํ•œ ๊ฐœ์„  ํšจ๊ณผ๊ฐ€ ๋‚˜ํƒ€๋‚  ๊ฒƒ์œผ๋กœ ์ „๋งํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ๊ทธ๋ฆฐ์—์ฝ”๋‹ˆ์ผˆ์€ ์—ฐ์‚ฐ 2๋งŒ ํ†ค์˜ ๋‹ˆ์ผˆ MHP ์บํŒŒ๋ฅผ ๋ณด์œ ํ•˜๊ณ  ์žˆ์œผ๋ฉฐ, ํ˜„์žฌ ๋ฉ”ํƒˆ ์‹œ์„ธ ๊ธฐ์ค€์œผ๋กœ 20์—์„œ 30% ์ •๋„ ์ˆ˜์ต์„ฑ์„ ๋‚ผ ์ˆ˜ ์žˆ๋Š” ํšŒ์‚ฌ์ž…๋‹ˆ๋‹ค. ํ•ด๋‹น ์ œ๋ จ์†Œ๋Š” 9์›”๋ถ€ํ„ฐ ๋žจํ”„์—…์ด ์‹œ์ž‘๋˜์—ˆ๊ธฐ ๋•Œ๋ฌธ์— 4๋ถ„๊ธฐ๋ถ€ํ„ฐ ์œ ์˜๋ฏธํ•œ ์‹ค์ ์ด ๋ฐ˜์˜๋  ๊ฒƒ์œผ๋กœ ์˜ˆ์ƒ๋˜๋ฉฐ, ํŠน๋ณ„ํ•œ ์ด์Šˆ๊ฐ€ ์—†๋Š” ๊ฒฝ์šฐ ์—ฐ๊ฒฐ ๊ธฐ์ค€ ํ‘์ž ์ „ํ™˜์„ ํ•  ๊ฒƒ์œผ๋กœ ์ „๋งํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. On a consolidated basis, Green Eco Nickel will be consolidated starting from Q4, which is expected to result in meaningful improvements in terms of revenue and margin. Green Eco Nickel's annual nickel MHP production capacity is 20,000 tons, and it can record 20%-30% margin at the current metal price levels. Since this smelter started ramp up in September, meaningful results are expected from Q4, and we expect to turn a profit on a consolidated basis if there are no special issues. ๋‹ค์Œ์œผ๋กœ ์˜์—… ์‚ฌํ•ญ์— ๋Œ€ํ•ด์„œ ๋ง์”€๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. ๋‹น์‚ฌ๋Š” ์ด๋ฒˆ 3๋ถ„๊ธฐ ์ค‘ ์‹ ๊ทœ ๊ณ ๊ฐ์‚ฌ ํ–ฅ์œผ๋กœ ์ „๊ตฌ์ฒด ์ถœํ•˜๋ฅผ ์‹œ์ž‘ํ•˜์˜€์œผ๋ฉฐ, ํ˜„์žฌ ๋ณต์ˆ˜์˜ ๊ณ ๊ฐ์‚ฌ์™€ ์ถ”๊ฐ€์ ์ธ ํ”„๋กœ์ ํŠธ์— ๋Œ€ํ•ด ์ง€์†์ ์œผ๋กœ ๋…ผ์˜ ์ค‘์ž…๋‹ˆ๋‹ค. ๊ธฐ์กด์— 4๋ถ„๊ธฐ์— ๊ณ„ํšํ–ˆ๋˜ ์‹ ๊ทœ ๊ณ ๊ฐ์‚ฌ ํ–ฅ ํ”„๋กœ์ ํŠธ๋Š” ๋ถ๋ฏธ OEM ์žฌ๊ณ  ์ด์Šˆ๋กœ ์ผ๋ถ€ ์ˆœ์—ฐ๋  ๊ฐ€๋Šฅ์„ฑ์ด ์žˆ์Šต๋‹ˆ๋‹ค๋งŒ, ํ˜„์žฌ ์‹œ์ ์—์„œ ์ „์ฒด ํ”„๋กœ์ ํŠธ ๊ธฐ์ค€์œผ๋กœ ๋ณด๋ฉด ๋‚ด๋…„๊ณผ ๋‚ดํ›„๋…„ ์–‘์‚ฐ ๊ธฐ์ค€์œผ๋กœ 7๊ฐœ์—์„œ 8๊ฐœ ์ •๋„์˜ ํ”„๋กœ์ ํŠธ๋“ค ๊ณ ๊ฐ์‚ฌ๋“ค๊ณผ ํ˜‘์˜ ์ค‘์— ์žˆ์Šต๋‹ˆ๋‹ค. Moving on to sales, we started precursor shipment to a new customer in the third quarter, and we are currently discussing additional projects with multiple customers. The project for a new customer originally planned for Q4 may be delayed due to the inventory issues of OEM in North America, but we are currently talking with customers about seven, eight projects for mass production in the next year and the year after. ๋‹น์‚ฌ๋Š” ๋ณต์ˆ˜์˜ ํ”„๋กœ์ ํŠธ๋“ค์— ๋Œ€ํ•œ ์ง„์ž… ์‹œ๊ธฐ์— ๋งž์ถ”์–ด ๊ฑด์„ค์ด ์ˆœ์—ฐ ์ค‘์ธ 3๋งŒ 3์ฒœ ํ†ค ๊ทœ๋ชจ์˜ CPM3 ์ „๊ตฌ์ฒด ๊ณต์žฅ์„ ์ค€๊ณตํ•  ์˜ˆ์ •์ด๋ฉฐ, 2026๋…„ ํ•˜๋ฐ˜๊ธฐ๋ฅผ ๊ธฐ์ ์œผ๋กœ ์œ ์˜๋ฏธํ•œ ๊ฐ€๋™๋ฅ  ๊ฐœ์„ ์„ ๊ฐ€์ ธ๊ฐˆ ์ˆ˜ ์žˆ์„ ๊ฒƒ์œผ๋กœ ์ „๋งํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์ด์ƒ์ž…๋‹ˆ๋‹ค. We plan to finish the construction of CPM3 precursor plant with a capacity of 33,000 tons, where capacity expansion is progressing in line with the launch schedules of multiple projects. Starting from the second half of 2026, meaningful utilization improvement is expected. Thank you. ์—์ฝ”ํ”„๋กœ์—์ด์น˜์—” ๊ฒฝ์˜๊ด€๋ฆฌํŒ€์žฅ ์ตœ์ง„์˜์ž…๋‹ˆ๋‹ค. ์—์ฝ”ํ”„๋กœ์—์ด์น˜์—”์˜ 25๋…„ 4๋ถ„๊ธฐ ์ „๋ง์— ๋Œ€ํ•ด ๋ง์”€๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. This is Choi Jin-young, Team Leader of Business Management at Ecopro HN. Let me present the fourth quarter outlook for Ecopro HN. 4๋ถ„๊ธฐ์—๋„ ํ™˜๊ฒฝ ์‚ฌ์—… ์ „๋ฐฉ ๊ณ ๊ฐ์‚ฌ๋“ค์˜ ํˆฌ์ž ์†๋„ ์กฐ์ ˆ ๊ธฐ์กฐ๋Š” ๊ณ„์†๋  ๊ฒƒ์œผ๋กœ ์˜ˆ์ƒ๋˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์ˆ˜์ฃผ ์‚ฐ์—… ํŠน์„ฑ์ƒ 4๋ถ„๊ธฐ์— ๋งค์ถœ ์ธ์‹์ด ์ง‘์ค‘๋˜๋Š” ๊ฒฝํ–ฅ๋„ ์žˆ์œผ๋‚˜, ํŠนํžˆ ์ˆ˜์ฒ˜๋ฆฌ ๋ฐ ๋ฏธ์„ธ๋จผ์ง€ ์ €๊ฐ ๋ถ€๋ถ„์— ์ „๋ฐฉ ์‚ฐ์—… ์ˆ˜์š” ๋‘”ํ™”์™€ ๊ณ ๊ฐ์‚ฌ๋“ค์˜ ์„ค๋น„ ํˆฌ์ž ๊ทœ๋ชจ ์กฐ์ •์œผ๋กœ ์ธํ•ด์„œ ๋งค์ถœ ๋ฐ ์ˆ˜์ต์„ฑ ํšŒ๋ณต์„ธ๊ฐ€ ์กฐ๊ธˆ์€ ๋”๋”˜ ์ƒํ™ฉ์ž…๋‹ˆ๋‹ค. ๋‹น์‚ฌ๋Š” ์ด๋Ÿฌํ•œ ์‹œ์žฅ ๋ถˆํ™•์‹ค์„ฑ์— ๋Œ€์‘ํ•˜์—ฌ ์ˆ˜์ต์„ฑ ์ค‘์‹ฌ์˜ ์‚ฌ์—… ๋‚ด์‹คํ™”์™€ ํ•ต์‹ฌ ์ˆ˜์ฃผ ํ™•๋ณด ์ด๋ ฅ์„ ๊ธฐ์šธ์—ฌ์„œ ๊ฐ€์‹œ์ ์ธ ์„ฑ๊ณผ๋ฅผ ์ฐฝ์ถœํ•  ์ˆ˜ ์žˆ๋„๋ก ๋…ธ๋ ฅํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. The trend of moderated investment by downstream customers of the environment business is expected to continue in the fourth quarter. Given the nature of order-based business, sales tend to be recognized more in Q4, but due to the slowdown in demand in the downstream industry in terms of water treatment and fine dust reduction business, and the adjustment of CapEx by customers, the recovery of sales and profitability has been a bit slow. In response to this market uncertainty, we plan to make every effort to create tangible results by focusing on profitability-oriented business improvement and securing key orders. ๊ฐ ์‚ฌ์—…๋ถ€๋ณ„๋กœ ์ผ€๋ฏธ์นผ ํ•„ํ„ฐ ์‚ฌ์—…์€ ๋ฐ˜๋„์ฒด ๋ฉ”๋ชจ๋ฆฌ ์—…ํ™ฉ ํ˜ธ์กฐ๋กœ ์ƒ์‚ฐํŒน์˜ ๊ฐ€๋™๋ฅ ์ด ๋†’๊ฒŒ ์œ ์ง€๋˜๊ณ  ์žˆ์–ด์„œ ์˜ฌํ•ด 4๋ถ„๊ธฐ์—๋Š” ์•ˆ์ •์ ์ธ ์ˆ˜์š”๊ฐ€ ๊ธฐ๋Œ€๋˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ๋ฏธ์„ธ๋จผ์ง€ ์‚ฌ์—…์€ ์‹œ๋ฉ˜ํŠธ ๋ถ„์•ผ์˜ ๋ฐฐ์ถœ ๊ทœ์ œ ์œ ์˜ˆ ๊ธฐ๊ฐ„์ด ์ข…๋ฃŒ๋ผ ๊ฐ€๋ฉด์„œ ๋ฏธ๋ค„์™”๋˜ ํ™˜๊ฒฝ ์„ค๋น„์— ๋Œ€ํ•œ ํˆฌ์ž๊ฐ€ ์„œ์„œํžˆ ๋ณธ๊ฒฉ์ ์œผ๋กœ ์ด๋ฃจ์–ด์งˆ ๊ฒƒ์œผ๋กœ ๋ณด๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์˜จ์‹ค๊ฐ€์Šค ์ €๊ฐ ์‚ฌ์—…์€ ๊ตญ๋‚ด ์ „๋ฐฉ ๊ณ ๊ฐ์‚ฌ์˜ ๊ณต์‚ฌ ์žฌ๊ฐœ๋กœ ์ค‘๋‹จ๋˜์—ˆ๋˜ ์„ค๋น„ ๋‚ฉํ’ˆ์ด ์ ์ง„์ ์œผ๋กœ ๋Š˜์–ด๋‚  ๊ฒƒ์œผ๋กœ ์˜ˆ์ƒ๋˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. For chemical filter business, we are seeing high utilization rates of production fabs thanks to an upturn in the semiconductor cycle, so we expect a stable demand trend to continue in the fourth quarter as well. As for the fine dust reduction business, on the back of the end of the grace period for emissions regulations in the cement sector, we expect that much delayed investment in environmental facilities will be gradually made in earnest. Regarding greenhouse gas reduction business, with the resumption of construction by downstream customers, the supply of equipment is expected to resume and increase gradually. ์ „์ง€ ์žฌ๋ฃŒ ์‚ฌ์—… ๋ถ„์•ผ์—์„œ ๋„ํŒํŠธ๋Š” ์™ธ๋ถ€ ์‹ ๊ทœ ๊ณ ๊ฐ 2๊ณณ๊ณผ ์ œํ’ˆ ํ…Œ์ŠคํŠธ๋ฅผ ์ง„ํ–‰ํ•˜๊ณ  ์žˆ๊ณ , ๋„๊ฐ€๋‹ˆ๋Š” NCA ์†Œ์„ฑ์šฉ ์žฅ์ˆ˜๋ช… ์ œํ’ˆ์ด ๋ชฉํ‘œ ์ˆ˜๋ช…์— ๋„๋‹ฌํ•˜์—ฌ ์ฆ๋Ÿ‰ ํ‰๊ฐ€๋ฅผ ์ค€๋น„ํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์ „ํ•ด์•ก ์ฒจ๊ฐ€์ œ๋Š” ๊ฐœ๋ฐœ ์ œํ’ˆ์ด ์ฃผ์š” ์ „ํ•ด์•ก ์—…์ฒด๋“ค์˜ ์ข…ํ•ฉ ํ’ˆ์งˆ ๊ฒ€์‚ฌ๋ฅผ ํ†ต๊ณผํ•˜์—ฌ 26๋…„ ์ƒ๋ฐ˜๊ธฐ์ฏค์—๋Š” ์‹ ๊ทœ ์ˆ˜์ฃผ๋ฅผ ์˜ˆ์ƒํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์ด์ƒ์ž…๋‹ˆ๋‹ค. In the battery materials business, dopants are currently undergoing product testing with two new non-captive customers. For crucibles, long lifetime products for NCA calcination have reached their target lifespan, and preparations are underway for capacity evaluation. As for electrolyte additives, the developed products have passed comprehensive quality testing conducted by major electrolyte manufacturers, with new orders expected in the first half of 2026. Thank you. ์ด์ƒ์œผ๋กœ ์‚ฌ์—… ์ „๋ง ์„ค๋ช…์„ ๋งˆ์น˜๊ณ  ์งˆ์˜์‘๋‹ต ์‹œ๊ฐ„์„ ๊ฐ–๊ฒ ์Šต๋‹ˆ๋‹ค. ์งˆ๋ฌธ์„ ๋ฐ›๊ธฐ์— ์•ž์„œ ์‚ฌ์ „์— ์ ‘์ˆ˜๋œ ์งˆ๋ฌธ์— ๋Œ€ํ•ด ๋จผ์ € ๋‹ต๋ณ€๋“œ๋ฆฌ๊ณ  ์งˆ์˜์‘๋‹ต์„ ์ง„ํ–‰ํ•˜๋„๋ก ํ•˜๊ฒ ์Šต๋‹ˆ๋‹ค. We would now like to address the questions that we received in advance. ์ฒซ ๋ฒˆ์งธ ์‚ฌ์ „ ์งˆ๋ฌธ์€ ๋ฆฌํŠฌ ์‚ฌ์—…์˜ ์›์žฌ๋ฃŒ๋ฅผ ์–ด๋””์„œ ์†Œ์‹ฑํ•˜๋Š”์ง€์— ๋Œ€ํ•ด์„œ ๋ฌธ์˜ ์ฃผ์…จ์Šต๋‹ˆ๋‹ค. ํ•ด๋‹น ์งˆ๋ฌธ์€ ์—์ฝ”ํ”„๋กœ ์ธก์—์„œ ๋‹ต๋ณ€๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. ๋„ค, ์—์ฝ”ํ”„๋กœ ๊ฒฝ์˜๊ด€๋ฆฌ๋ณธ๋ถ€์žฅ ๋ฐ•์žฌํ•˜์ž…๋‹ˆ๋‹ค. The first question that we collected was about sourcing for raw materials for lithium business, and Ecopro will address this question. ๋„ค, ์—์ฝ”ํ”„๋กœ ๊ฒฝ์˜๊ด€๋ฆฌ๋ณธ๋ถ€์žฅ ๋ฐ•์žฌํ•˜์ž…๋‹ˆ๋‹ค. ์งˆ๋ฌธ ์ฃผ์‹  ์ฃผ์š” ์›์žฌ๋ฃŒ ๊ด€๋ จ ์†Œ์‹ฑ ๋ฐฉ๋ฒ•์— ๋Œ€ํ•ด ๋ง์”€์„ ๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. ๋ฆฌํŠฌ์€ ์–‘๊ทน์žฌ๋ฅผ ๊ธฐ์ค€์œผ๋กœ ํฌ๊ฒŒ ๋‘ ๊ฐ€์ง€ ๋ฐฉ๋ฒ•์œผ๋กœ ์กฐ๋‹ฌํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ๋จผ์ € ์—์ฝ”ํ”„๋กœ ์ด๋…ธ๋ฒ ์ด์…˜์„ ํ†ตํ•ด ์กฐ๋‹ฌํ•˜๋Š” ๋ฐฉ๋ฒ•์ธ๋ฐ์š”. ์ด๋…ธ๋ฒ ์ด์…˜์€ ๋ฆฌ์‚ฌ์ดํด ๊ณต์ •์„ ํ†ตํ•ด์„œ ํšŒ์ˆ˜ํ•œ ํ™ฉ์‚ฐ๋ฆฌํŠฌ ์šฉ์•ก์ด ์žˆ๋Š”๋ฐ ์ด๊ฒƒ์„ ํ™œ์šฉํ•ด์„œ ์›๋ฃŒ๋ฅผ ์ƒ์‚ฐํ•˜๋Š” ๋ฐฉ์‹๊ณผ ํ•จ๊ป˜ ๋˜ ์žฅ๊ธฐ ๊ณต๊ธ‰ ๊ณ„์•ฝ์„ ํ†ตํ•ด์„œ ์ง€๊ธˆ ์•„๋ฅดํ—จํ‹ฐ๋‚˜์‚ฐ ํƒ„์‚ฐ๋ฆฌํŠฌ์ด ๋“ค์–ด์˜ค๊ณ  ์žˆ๋Š”๋ฐ ์ด๊ฒƒ์„ ์ˆ˜์‚ฐํ™”๋ฆฌํŠฌ์œผ๋กœ ์ „ํ™˜ํ•˜๋Š” ๋ฐฉ๋ฒ•์„ ์‚ฌ์šฉํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์ด๋ ‡๊ฒŒ ์ƒ์‚ฐ๋œ ๋ฆฌํŠฌ์„ ์—์ฝ”ํ”„๋กœ BM๊ณผ EM์—๊ฒŒ ์•ˆ์ •์ ์œผ๋กœ ๊ณต๊ธ‰ํ•˜๊ณ  ์žˆ์œผ๋ฉฐ ๋˜ ์™ธ๋ถ€ ๊ณ ๊ฐ์‚ฌ์—๊ฒŒ๋„ ํŒ๋งคํ•˜๊ณ  ์žˆ๋Š”๋ฐ ์ตœ๊ทผ์—๋Š” SK์˜จ๊ณผ์˜ ๊ณต๊ธ‰ ๊ณ„์•ฝ ์ฒด๊ฒฐ ๋“ฑ์„ ํ†ตํ•ด์„œ ์ง€์†์ ์œผ๋กœ ์™ธ๋ถ€ ํŒ๋งค๋Ÿ‰์„ ํ™•๋Œ€ํ•ด ๋‚˜๊ฐ€๊ณ  ์žˆ๋Š” ์ƒํ™ฉ์ž…๋‹ˆ๋‹ค. This is Park Jae-ha, Head of Business Management at Ecopro. Let me address this question. Currently, there are two main ways to source lithium for cathode. The first way is direct sourcing through Ecopro Innovation. Ecopro Innovation uses LSS, lithium sulfate solution, recovered through a recycling process to produce raw materials, as well as sourcing lithium carbonate from Argentina through a long-term supply contract and converting it to lithium hydroxide. Lithium produced this way is being stably supplied to Ecopro BM and Ecopro EM, as well as non-captive customers. Recently, we've been seeing the increase in non-captive sales volume through a supply contract with SK On. ๋„ค, ๊ทธ๋ฆฌ๊ณ  ๋‘ ๋ฒˆ์งธ๋กœ ๊ณ ๊ฐ์‚ฌ์™€์˜ ํ˜‘์˜ํ•˜์— ์กฐ๋‹ฌ์ฒ˜๋ฅผ ์ง€์ •๋ฐ›๋Š” ๋ฐฉ๋ฒ•์ด ์žˆ์Šต๋‹ˆ๋‹ค. ์ด ๊ฒฝ์šฐ์—๋Š” ์ฃผ์š” ๊ณ ๊ฐ์‚ฌ๋กœ๋ถ€ํ„ฐ ํ˜ธ์ฃผ ๊ด‘์‚ฐ์ด๋‚˜ ๋˜ ์น ๋ ˆ ์—ผํ˜ธ์—์„œ ์ƒ์‚ฐํ•œ ๋ฆฌํŠฌ์„ ๊ณต๊ธ‰๋ฐ›์•„ ์‚ฌ์šฉํ•ฉ๋‹ˆ๋‹ค. ์œ ๋Ÿฝ ๋“ฑ ์ผ๋ถ€ ์ง€์—ญ์˜ ๊ฒฝ์šฐ์—๋Š” ๊ณ ๊ฐ์‚ฌ์˜ ์š”์ฒญ์— ๋”ฐ๋ผ์„œ ์ค‘๊ตญ์‚ฐ ๋ฆฌํŠฌ๋„ ์ผ์ • ๋ถ€๋ถ„ ํ™œ์šฉ ์ค‘์— ์žˆ์Šต๋‹ˆ๋‹ค. ์ด์ƒ์ž…๋‹ˆ๋‹ค. The second way is that suppliers are often designated in consultation with our customers. Mostly, lithium from Australian mines and Chilean salt flat is sourced. In some regions such as Europe, upon customer request, Chinese lithium is used to a certain extent. Thank you. ๋‘ ๋ฒˆ์งธ ์‚ฌ์ „ ์งˆ๋ฌธ์€ AI ๋ฐ์ดํ„ฐ ์„ผํ„ฐ์šฉ ESS ์ˆ˜์š” ํ™•๋Œ€์™€ ํƒˆ์ค‘๊ตญ ๋ฐธ๋ฅ˜์ฒด์ธ์— ๋Œ€ํ•œ ๊ด€์‹ฌ์ด ๋†’์•„์ง€๋Š” ํ™˜๊ฒฝ์—์„œ ํšŒ์‚ฌ์˜ ESS ์ค€๋น„ ์ƒํ™ฉ์— ๋Œ€ํ•ด ๋ฌธ์˜ ์ฃผ์…จ์Šต๋‹ˆ๋‹ค. ํ•ด๋‹น ์งˆ๋ฌธ์€ ์—์ฝ”ํ”„๋กœ ๋จธํ‹ฐ๋ฆฌ์–ผ์ฆˆ์—์„œ ๋‹ต๋ณ€๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. The second question we collected in advance is on our ESS readiness in the current environment where the demand for ESS for AI data centers is expanding and interest in supply chain diversification away from China is increasing as well. This question will be responded by Ecopro Materials. ์—์ฝ”ํ”„๋กœ ๋จธํ‹ฐ๋ฆฌ์–ผ์ฆˆ ๊ฒฝ์˜๊ด€๋ฆฌ ๋‹ด๋‹น ์ด์„ฑ์ค€์ž…๋‹ˆ๋‹ค. ์งˆ๋ฌธ ์ฃผ์‹  ESS ๊ด€๋ จ ๋จธํ‹ฐ๋ฆฌ์–ผ์ฆˆ์˜ ๋Œ€์‘ ๋ฐฉ์•ˆ์— ๋Œ€ํ•ด์„œ ๋ง์”€๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. This is Lee Sung-joon, Managing Director of Business Management at Ecopro Materials. Let me respond to your question on our responses to ESS. ์ „๊ตฌ์ฒด์˜ ๊ฒฝ์šฐ์— ๋‹น์‚ฌ๋Š” ESSํ–ฅ์œผ๋กœ ์‚ผ์›๊ณ„์™€ ์†Œ๋“ ๋‘ ๊ฐ€์ง€ ํŠธ๋ž™์„ ์ค€๋น„ ์ค‘์— ์žˆ์Šต๋‹ˆ๋‹ค. ๋จผ์ € ์‚ผ์›๊ณ„ ์ „๊ตฌ์ฒด์˜ ๊ฒฝ์šฐ ๋ถ๋ฏธํ–ฅ ์™ธ๋ถ€ ๊ณ ๊ฐ์‚ฌ๋ฅผ ๋Œ€์ƒ์œผ๋กœ ํ€„ ํ…Œ์ŠคํŠธ๋ฅผ ์ง„ํ–‰ ์ค‘์— ์žˆ์Šต๋‹ˆ๋‹ค. ์ตœ๊ทผ ํ•ด๋‹น ๊ณ ๊ฐ์‚ฌ๋Š” ๋น ๋ฅด๊ฒŒ ์ฆ๊ฐ€ํ•˜๋Š” ESS ์ˆ˜์š”์— ๋Œ€์‘ํ•˜๊ธฐ ์œ„ํ•˜์—ฌ ๊ธฐ์กด์˜ ์ „๊ธฐ์ฐจ ๋ผ์ธ์„ ESS๋กœ ์ „ํ™˜ํ•  ๊ณ„ํš์ด ์žˆ๊ณ , ๊ณ ๊ฐ์‚ฌ๋Š” OBBBA ๋ฒ•์•ˆ์— ๋”ฐ๋ฅธ ์ƒ์‚ฐ์„ธ์•ก ๊ณต์ œ์ธ AMPC๋ฅผ ์ˆ˜๋ นํ•˜๊ธฐ ์œ„ํ•ด ํƒˆ์ค‘๊ตญ ์†Œ์žฌ ์ค‘ ํŠนํžˆ ์ „๊ตฌ์ฒด๊ฐ€ ํ•„์ˆ˜์ ์ธ ์‚ฌํ•ญ์ž…๋‹ˆ๋‹ค. ๋จธํ‹ฐ๋ฆฌ์–ผ์ฆˆ์˜ ESS์šฉ ์ „๊ตฌ์ฒด๋Š” ์ฐจ๋…„๋„๋ถ€ํ„ฐ ๊ณต๊ธ‰์„ ํ•  ์ˆ˜ ์žˆ์„ ๊ฒƒ์œผ๋กœ ์ „๋งํ•ฉ๋‹ˆ๋‹ค. As for precursors, we are working on two tracks, ternary and sodium, for ESS application. First, in the case of ternary precursor, quality test is underway for a non-captive customer targeting North America. This customer is planning to convert their EV line to ESS line to meet the rapidly growing demand for ESS. Among non-Chinese materials, they need to secure non-Chinese precursor to be eligible for advanced manufacturing production credit under OBBBA. We are expected to be able to supply precursors for ESS starting from 2027. ์บกํ‹ฐ๋ธŒ ๊ณ ๊ฐ์‚ฌ์™€ ์…€์‚ฌ์™€ ํ˜‘์—…ํ•˜์—ฌ ๊ตญ๋‚ด ESS ํ”„๋กœ์ ํŠธํ–ฅ ์ถœํ•˜๋„ ์ค€๋น„ํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ํ•ด๋‹น ํ”„๋กœ์ ํŠธ๋Š” ์˜ฌํ•ด ์ •๋ถ€๊ฐ€ ์ถ”์ง„ํ•œ ESS 1์กฐ ์›์˜ ์ž…์ฐฐ์—์„œ ํ•ด๋‹น ์…€์‚ฌ๊ฐ€ 80%๋ฅผ ์ฐจ์ง€ํ–ˆ์œผ๋ฉฐ, ๋‚ด๋…„๋ถ€ํ„ฐ๋Š” ์ž…์ฐฐ ๊ทœ๋ชจ๊ฐ€ ๋” ์ปค์งˆ ๊ฒƒ์œผ๋กœ ์ „๋งํ•˜๊ณ  ์žˆ์–ด ํŒ๋งค๋Ÿ‰ ํ™•๋ณด์— ์ถ”๊ฐ€์ ์ธ ๊ธฐ์—ฌ๋ฅผ ํ•  ๊ฒƒ์œผ๋กœ ์ „๋งํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. We're also collaborating with a captive customer and a cell company to prepare for shipment to domestic ESS projects. The cell company secured 80% in the government ESS bid, which is worth about KRW 1 trillion, and the bidding size is expected to continue to grow even further starting from next year. It is expected to contribute further to our sales growth. ๊ทธ๋ฆฌ๊ณ  ์ค‘์žฅ๊ธฐ ๊ณ„ํš์œผ๋กœ ๋‹น์‚ฌ๋Š” ์†Œ๋“ ์ด์˜จ ๋ฐฐํ„ฐ๋ฆฌ์šฉ ์ „๊ตฌ์ฒด๋ฅผ ์ค€๋น„ํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ํ•ด๋‹น ์ „๊ตฌ์ฒด๋Š” ESS๋ฟ๋งŒ ์•„๋‹ˆ๋ผ EV ์‹œ์žฅ ๋‘˜ ๋‹ค๋ฅผ ๋ฐ”๋ผ๋ณด๊ณ  ์ค€๋น„ํ•˜๊ณ  ์žˆ์œผ๋ฉฐ, ๊ตฌ์ฒด์ ์œผ๋กœ๋Š” ๊ฐ€์กฑ์‚ฌ์™€์˜ ๊ธด๋ฐ€ํ•œ ํ˜‘๋ ฅ์„ ํ†ตํ•ด NFM, ๋‹ˆ์ผˆ ์ฒ  ๋ง๊ฐ„ ์ „๊ตฌ์ฒด๋ฅผ ๊ฐœ๋ฐœํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. In the medium to long run, we're preparing for precursor for sodium-ion battery. This precursor is targeting both the ESS and the EV market. More specifically, we are developing NFM precursor in close cooperation with our group companies. ํ˜„์žฌ ์‹œ์ ์—์„œ๋Š” ๋ณธ๊ฒฉ์ ์ธ ์ƒ์šฉํ™”๋Š” ์ง€์—ฐ๋˜๊ณ  ์žˆ์œผ๋‚˜ ํ–ฅํ›„ LFP ๋Œ€๋น„ 20% ์ด์ƒ ๋ฐฐํ„ฐ๋ฆฌ ๊ฐ€๊ฒฉ์ด ์ €๋ ดํ•  ๊ฒƒ์œผ๋กœ ์ „๋งํ•˜๋ฉฐ, ์ค‘๊ตญ ๋ฐธ๋ฅ˜์ฒด์ธ ์œ„์ฃผ๋กœ ํ˜•์„ฑ๋œ ESS LFP ๋ฐฐํ„ฐ๋ฆฌ์˜ ์ „๊ตฌ์ฒด ์ด์Šˆ ๋˜ํ•œ ํ•ด๊ฒฐํ•  ์ˆ˜ ์žˆ์–ด์„œ ํƒˆ์ค‘๊ตญ์— ์šฉ์ดํ•˜๊ฒŒ ๋Œ€์‘ํ•  ์ˆ˜ ์žˆ์„ ๊ฒƒ์œผ๋กœ ์ „๋งํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ๋‹น์‚ฌ๋Š” ๊ฐ€์กฑ์‚ฌ์™€ ํ•จ๊ป˜ 2027๋…„์„ ์–‘์‚ฐ ๋ชฉํ‘œ๋กœ ๋ฉด๋ฐ€ํ•œ ํ˜‘์˜๋ฅผ ์ง„ํ–‰ ์ค‘์— ์žˆ์Šต๋‹ˆ๋‹ค. ์ด์ƒ์ž…๋‹ˆ๋‹ค. At this point, commercialization full scale is rather delayed, but going forward, NFM battery is going to be more than 20% cheaper than LFP battery, and it can address the issue of too much dependence on China for precursor for ESS LFP value chain. Therefore, it is going to help diversify the value chain away from China. Ecopro Materials is working closely with our group companies with the target of mass production from 2027. ์„ธ ๋ฒˆ์งธ ์‚ฌ์ „ ์งˆ๋ฌธ์€ ํ™˜๊ฒฝ ํ”Œ๋žœํŠธ ์‚ฌ์—…์˜ ์‹ ๊ทœ ์ˆ˜์ฃผ ๊ฐ€๋Šฅ์„ฑ์— ๋Œ€ํ•ด ๋ฌธ์˜ ์ฃผ์…จ์Šต๋‹ˆ๋‹ค. ํ•ด๋‹น ์งˆ๋ฌธ์€ ์—์ฝ”ํ”„๋กœ HN์—์„œ ๋‹ต๋ณ€๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. The third question that we collected in advance is about the possibility of new orders for environment plant business. This question will be addressed by Ecopro HN. ์—์ฝ”ํ”„๋กœ HN R&BD ๊ธฐํšํŒ€์žฅ ๊น€์Šน์šฑ์ž…๋‹ˆ๋‹ค. ํ”Œ๋žœํŠธ ์‚ฌ์—…์˜ ์‹ ๊ทœ ์ˆ˜์ฃผ ๊ฐ€๋Šฅ์„ฑ์— ๋Œ€ํ•ด์„œ ๋ง์”€๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. This is Kim Seung-wook, Head of R&BD at Ecopro HN. Let me address this question. ์˜ฌํ•ด ํ˜„์žฌ๊นŒ์ง€์˜ ํ”Œ๋žœํŠธ ์‚ฌ์—…์€ ๋ฐ˜๋„์ฒด, ์„์œ , ์ œ์ฒ  ๋“ฑ ์ „๋ฐฉ ๊ณ ๊ฐ์‚ฌ๋“ค์˜ ํˆฌ์ž ์†๋„ ์กฐ์ ˆ๋กœ ์ธํ•ด์„œ ๋งค์ถœ์ด ์Šฌ๋กœ์šฐํ•œ ๋ชจ์Šต์„ ๋ณด์ด๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ํ•˜์ง€๋งŒ ๋‚ด๋…„์—๋Š” ๋ฐ˜๋„์ฒด ์‹œ์žฅ์ด ํ™œ์„ฑํ™”๋˜๊ธฐ ์‹œ์ž‘ํ•˜๋ฉด์„œ ๊ตญ๋‚ด ๋ฐ ํ•ด์™ธ ๋ฐ˜๋„์ฒด ํ–ฅ์œผ๋กœ ์˜จ์‹ค๊ฐ€์Šค ์ €๊ฐ ์„ค๋น„ ์ˆ˜์ฃผ๊ฐ€ ์ด์–ด์งˆ ๊ฒƒ์œผ๋กœ ์˜ˆ์ƒ์„ ํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. This year, sales for plant business have been slow due to the moderation of investment pace by downstream customers such as semiconductor, oil, and steel companies. However, with the revitalization of the semiconductor market next year, additional orders are expected for greenhouse gas reduction facilities for domestic and overseas semiconductor companies. ๋ฏธ์„ธ๋จผ์ง€ ์ €๊ฐ ์‚ฌ์—…์€ ๊ตญ๋‚ด ์ „๋ ฅ ์ˆ˜๊ธ‰ ๊ณ„ํš์— ๋”ฐ๋ผ์„œ ํ†ต์˜ ๋ฐ ๊ด‘์–‘์˜ ์ง๋ถ„์‚ฌ ๊ธฐ์ˆ ์„ ํ™œ์šฉํ•œ ๋ฐœ์ „์†Œ ์˜์—…์„ ํ˜„์žฌ ํ™œ๋ฐœํžˆ ์ง„ํ–‰ํ•˜๊ณ  ์žˆ๊ธฐ ๋•Œ๋ฌธ์— ํ•ด๋‹น ๋ถ„์•ผ์—์„œ ์ˆ˜์ฃผ๊ฐ€ ๋‚˜์˜ฌ ๊ฐ€๋Šฅ์„ฑ์ด ๋†’๋‹ค๊ณ  ์˜ˆ์ƒํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์ด์ƒ์ž…๋‹ˆ๋‹ค. Regarding fine dust reduction business, sales activities are being conducted for power generation using direct injection technology in Tongyeong and Gwangyang areas according to the domestic power supply and demand plan. So we believe that there is a high possibility of receiving orders from this field. Thank you. ์ด์ƒ์œผ๋กœ ์‚ฌ์ „ ์งˆ์˜์‘๋‹ต์„ ๋งˆ์น˜๊ณ  ์งˆ์˜์‘๋‹ต ์‹œ๊ฐ„์„ ๊ฐ–๊ฒ ์Šต๋‹ˆ๋‹ค. Now we would like to accept questions from the participants. [Foreign language] Now Q&A session will begin. Please press star three, that is star and three, if you have any questions. Questions will be taken according to the order you have pressed the number star three. For cancellation, please press star four, that is star and four, on your phone. The first question will be provided by Minwoo Joo from NH Investment & Securities. Please go ahead with your question. ๋„ค, ์•ˆ๋…•ํ•˜์„ธ์š”. ์งˆ๋ฌธ ๊ธฐํšŒ ๊ฐ์‚ฌํ•ฉ๋‹ˆ๋‹ค. ์ €๋Š” ๋จธํ‹ฐ ๊ด€๋ จ๋œ ๋‘ ๊ฐ€์ง€ ์งˆ๋ฌธ ๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. ์ฒซ ๋ฒˆ์งธ๋Š” ์ž‘๋…„ ์ดˆ์— ๊ณต์‹œํ•˜์…จ๋˜ ๋ฏธ๊ตญ OEM ๊ณ ๊ฐ์‚ฌ ๊ด€๋ จ ์ง„ํ–‰ ์ƒํ™ฉ ์—…๋ฐ์ดํŠธ ๋ถ€ํƒ๋“œ๋ฆฌ๊ณ ์š”. ๋‘ ๋ฒˆ์งธ๋Š” ๊ทธ๋ฆฐ์—์ฝ”๋‹ˆ์ผˆ ์ œ๋ จ์†Œ ์ธ์ˆ˜ ์™„๋ฃŒํ•˜์…จ๋Š”๋ฐ, ์—ฌ๊ธฐ์„œ ๋‚˜์˜ค๋Š” MHP๋Š” PFE์— ์ €์ด‰๋˜์ง€ ์•Š๋Š”์ง€ ๊ถ๊ธˆํ•ฉ๋‹ˆ๋‹ค. ๊ฐ์‚ฌํ•ฉ๋‹ˆ๋‹ค. This is Minwoo Joo from NH Investment & Securities. Thank you for this opportunity. I have two questions regarding Ecopro Materials. First of all, I'd like to get some update on the order that you received from an American OEM that you disclosed early last year. Also, I'd like to understand if the Indonesian-made MHP will be eligible for PFE or not regarding the Green Eco Nickel. Thank you. ์—์ฝ”ํ”„๋กœ ๋จธํ‹ฐ๋ฆฌ์–ผ์ฆˆ ๊ฒฝ์˜๊ด€๋ฆฌ ๋‹ด๋‹น ์ด์„ฑ์ค€์ž…๋‹ˆ๋‹ค. ์งˆ๋ฌธ ์ฃผ์‹  ๋ฏธ๊ตญ OEM ๊ด€๋ จ ์ง„ํ–‰ ์ƒํ™ฉ์— ๋Œ€ํ•ด ๋‹ต๋ณ€๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. This is Lee Sung-joon, Managing Director of Business Management at Ecopro Materials. Let me respond to your question on our U.S. OEM related business. ๋จผ์ € ๋ฏธ๊ตญ OEM์˜ ์ง๋‚ฉ๊ณผ ๊ด€๋ จํ•ด์„œ๋Š” ํ˜„์žฌ ํƒ€๊ฒŸํ•˜๊ณ  ์žˆ๋Š” ์ฐจ์ข…์˜ ํŒ๋งค ๋ถ€์ง„์œผ๋กœ ๋‚ฉํ’ˆ์ด ์ง€์—ฐ๋˜๊ณ  ์žˆ๋Š” ์ƒํ™ฉ์ž…๋‹ˆ๋‹ค. ๋‹ค๋งŒ ๋‚ด๋…„๋„์—๋Š” ์ถœํ•˜๋ฅผ ํ•˜๋Š” ๊ฒƒ์œผ๋กœ ๋ชฉํ‘œ๋กœ ํ•˜๊ณ  ์žˆ์œผ๋ฉฐ, ์†Œ๋ฆฝ ์ „๊ตฌ์ฒด ๊ธฐ์ค€์œผ๋กœ๋Š” ๋‚ด๋…„๋„ ์ถœํ•˜ ๋ชฉํ‘œ, ๋Œ€๋ฆฝ ๊ธฐ์ค€์œผ๋กœ๋Š” ๋‚ด๋…„ ๋ง ๊ฒฝ์„ ๋ชฉํ‘œ๋กœ ๊ณ ๊ฐ์‚ฌ์™€ ๋ฉด๋ฐ€ํ•œ ์†Œํ†ต์„ ํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. Regarding direct supply to the U.S. OEM, delivery has been delayed due to sluggish sales of the target vehicle models, but we aim for shipments next year. We're closely communicating with our customer with the goal of shipments of fine precursor in 2026 and coarse precursor around the end of 2026. Thank you. ๊ธฐ์กด ํ”„๋กœ์ ํŠธ์™€ ๋ณ„๊ฐœ๋กœ Ecopro Materials๋Š” ์ง๋‚ฉ ์™ธ์˜ ๋ฐฉ๋ฒ•์œผ๋กœ ์•„์‹œ์•„ ์…€ ์—…์ฒด๋ฅผ ํ†ตํ•ด์„œ ํ•ด๋‹น OEMํ–ฅ ์ „๊ตฌ์ฒด ๋‚ฉํ’ˆ์„ ์ค€๋น„ ์ค‘์— ์žˆ์Šต๋‹ˆ๋‹ค. ๋‹น์‚ฌ๋Š” ํ•ด๋‹น ํ”„๋กœ์ ํŠธ์— ๋Œ€ํ•ด ๋‚ด๋…„๋„ 2๋ถ„๊ธฐ์— ๋‚ฉํ’ˆ ๋ชฉํ‘œ๋กœ ๊ณ ๊ฐ์‚ฌ์™€ ํ˜‘์˜ ์ค‘์— ์žˆ์œผ๋ฉฐ, ์‹คํ˜„๋  ๊ฒฝ์šฐ ํฐ ํญ์˜ ์‹ค์  ๊ฐœ์„ ์— ๋„์›€์„ ์ค„ ์ˆ˜ ์žˆ์„ ๊ฒƒ์œผ๋กœ ์ „๋งํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. In addition to the existing project that we announced, Ecopro Materials is preparing for precursor delivery to this OEM through a cell company in Asia. For this, we are discussing with the OEM customer with the goal of delivery in the second quarter of next year. If this happens, it is expected to help significantly improve our earnings. ๊ทธ ์™ธ์—๋„ ์ตœ๊ทผ OBBBA ๋ฒ•์•ˆ์— ๋”ฐ๋ฅธ ํ•ด๋‹น ๊ณ ๊ฐ์‚ฌ์˜ ํƒˆ์ค‘๊ตญ ๋ฐธ๋ฅ˜์ฒด์ธ ํƒˆํ”ผ ์ธ์ง€๊ฐ€ ๊ฐ•๋ ฅํ•œ ์ƒํ™ฉ์ด์–ด์„œ ์ถ”๊ฐ€์ ์ธ ํ”„๋กœ์ ํŠธ์— ๋Œ€ํ•ด์„œ๋„ ๋…ผ์˜๋ฅผ ์ง€์†ํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์ถ”ํ›„ ์ข‹์€ ์†Œ์‹ ๋“ค๋ ค๋“œ๋ฆด ์ˆ˜ ์žˆ๋„๋ก ํ•˜๊ฒ ์Šต๋‹ˆ๋‹ค. ์ด์ƒ์ž…๋‹ˆ๋‹ค. In addition, with the recent passing of the One Big Beautiful Bill, this customer needs to diversify its value chain away from China, and this need is very strong. We are discussing additional projects as well. We hope to be able to announce good news very soon. Thank you. ๊ทธ๋ฆฌ๊ณ  ์ด์–ด์„œ GEN์˜ PFE ์ ์šฉ ๊ฐ€๋Šฅ์„ฑ ์—ฌ๋ถ€์— ๋Œ€ํ•ด์„œ ์ถ”๊ฐ€ ๋‹ต๋ณ€๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. Let me also address your question on the eligibility of GEN Indonesia and MHP's PFE status. ๋‹น์‚ฌ๋Š” ์ง€์ฃผ์‚ฌ์™€ ํ•จ๊ป˜ ์ธ๋„๋„ค์‹œ์•„ ๊ทธ๋ฆฐ์—์ฝ”๋‹ˆ์ผˆ ์ œ๋ จ์†Œ ์ง€๋ถ„ 38%๋ฅผ ํ™•๋ณดํ•˜์˜€์œผ๋ฉฐ, ์ง€์ฃผ์‚ฌ์™€ ํ•จ๊ป˜ ์ฃผ์š” ๊ฒฝ์˜๊ถŒ์„ ํ™•๋ณดํ•˜์˜€์Šต๋‹ˆ๋‹ค. ๋‚˜๋จธ์ง€ ์ง€๋ถ„์˜ ๊ฒฝ์šฐ GEM์„ ํฌํ•จํ•œ ์ค‘๊ตญ๊ณ„ ํšŒ์‚ฌ๊ฐ€ ์•ฝ 52%, ๊ทธ ์™ธ ๊ธฐํƒ€ ์ง€์—ญ์˜ ๋ฒ•์ธ์ด 10%๋ฅผ ๋ณด์œ ํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. Together with the holding company, Ecopro Materials has secured 38% equity in Green Eco Nickel smelters in Indonesia and secured major management rights as well. As for the remaining equity stake, several Chinese companies, including GEM, hold about 52%, while companies in other regions hold 10%. ํ˜„์žฌ ๋ฏธ๊ตญ์˜ PFE ๊ทœ์ •์— ๋”ฐ๋ฅด๋ฉด ๋‹จ์ผ ์™ธ๊ตญ ๋ฒ•์ธ ๊ธฐ์ค€์œผ๋กœ๋Š” 25%, ๋ณต์ˆ˜ ์™ธ๊ตญ ๋ฒ•์ธ ๊ธฐ์ค€์œผ๋กœ๋Š” 40%๋ฅผ ์ดˆ๊ณผํ•˜์ง€ ์•Š์•„์•ผ ํ•ฉ๋‹ˆ๋‹ค. ๋ณธ ๊ทœ์ •์„ ์ค€์ˆ˜ํ•˜๊ธฐ ์œ„ํ•˜์—ฌ ์ค‘๊ตญ๊ณ„ ์ง€๋ถ„์„ ๋‚ฎ์ถ”๋Š” ๊ณ„ํš์„ ์ถ”์ง„ํ•˜๊ณ  ์žˆ์œผ๋ฉฐ, ์ด๋ฅผ ํ†ตํ•ด PFE ์š”๊ฑด์„ ์ถฉ์กฑํ•  ์˜ˆ์ •์ž…๋‹ˆ๋‹ค. ๋˜ํ•œ ํ–ฅํ›„์— SFE ๋ฐ FIE ๊ทœ์ • ๋ณ€๊ฒฝ๊ณผ ๊ฐ™์€ ๋Œ€์™ธ์ ์ธ ํ™˜๊ฒฝ ๋ณ€ํ™”๊ฐ€ ๋ฐœ์ƒํ•  ๊ฒฝ์šฐ ๋ถ๋ฏธ ์‹œ์žฅ ์ง„์ถœ ๋ฐ ์‚ฌ์—…์˜ ์•ˆ์ •์„ฑ์„ ์œ„ํ•ด ์œ ์—ฐํ•˜๊ณ  ์„ ์ œ์ ์œผ๋กœ ๋Œ€์‘ํ•  ๋ฐฉ์นจ์ž…๋‹ˆ๋‹ค. ์ด์ƒ์ž…๋‹ˆ๋‹ค. Under the current U.S. Prohibited Foreign Entity regulations, ownership by a single foreign entity must not exceed 25%, and combined ownership by multiple foreign entities must not exceed 40%. To comply with this regulation, we are planning to lower the Chinese ownership level. Going forward, in the event of a change in the external environment, such as SFE and FIE regulation changes, we will respond flexibly and proactively to enter the North American market and maintain business stability. Thank you. ์˜ˆ, ๋‹ค์Œ ์งˆ๋ฌธ ๋ฐ›๊ฒ ์Šต๋‹ˆ๋‹ค. We will accept the next question. [Foreign language] The following question will be presented by Yu Shin Park from HSBC. Please go ahead with your question. ๋„ค, ์•ˆ๋…•ํ•˜์„ธ์š”. HSBC ์ฆ๊ถŒ ๋ฐ•์œ ์‹ ์ž…๋‹ˆ๋‹ค. ์งˆ๋ฌธ ๊ธฐํšŒ ๊ฐ์‚ฌํ•ฉ๋‹ˆ๋‹ค. ์—ผ๊ฐ€ ๋งค์ˆ˜ ์ฐจ์ต ๊ด€๋ จ๋ผ์„œ ๋‘ ๊ฐ€์ง€ ์—ฌ์ญค๋ณด๊ณ  ์‹ถ์€๋ฐ์š”. ์˜ฌํ•ด ๊ฝค ํฐ ๊ทœ๋ชจ์˜ ์—ผ๊ฐ€ ๋งค์ˆ˜ ์ฐจ์ต ๊ทœ๋ชจ๋ฅผ ์ธ์‹ํ•˜์…จ๊ณ , ํ–ฅํ›„์— ๊ณ„์† ์ธ๋„๋„ค์‹œ์•„ ํ”„๋กœ์ ํŠธ๋“ค ์ง„ํ–‰ํ•˜์‹ค ํ…๋ฐ ์ด๋Ÿฐ ์—ผ๊ฐ€ ๋งค์ˆ˜ ์ฐจ์ต์ด ํ–ฅํ›„์—๋„ ๋ฐœ์ƒํ•  ์ˆ˜ ์žˆ๋Š”์ง€ ์ผ๋‹จ ์ฒซ ๋ฒˆ์งธ๋กœ ๊ถ๊ธˆํ•˜๊ณ ์š”. ๋‘ ๋ฒˆ์งธ๋กœ๋Š” ์—ผ๊ฐ€ ๋งค์ˆ˜ ์ฐจ์ต์ด ์ง€๊ธˆ Ecopro์—์„œ๋Š” ์˜์—…์ด์ต์œผ๋กœ ๋ถ„๋ฅ˜๋œ ๊ฒƒ ๊ฐ™์€๋ฐ, ์–ด๋””์—์„œ๋Š” ์˜์—…์™ธ์ˆ˜์ต์œผ๋กœ ๋ฐ˜์˜๋ผ์„œ ํ˜น์‹œ ๊ทธ ์ฐจ์ด ํ•œ๋ฒˆ ์„ค๋ช… ๋ถ€ํƒ๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. ๊ฐ์‚ฌํ•ฉ๋‹ˆ๋‹ค. ๋„ค. This is Yu Shin Park from HSBC. Thank you for the opportunity. I would like to ask two questions regarding gains from bargain purchase. My first question is that you have recognized a sizable gain from bargain purchase this quarter, and going forward with your project in Indonesia, I would like to understand if there are additional possibility for such gains to be recognized going forward. And the second question is that this particular gain was recognized and treated as non-operating profit for Ecopro Materials, while it is operating profit for Ecopro. So can you explain the difference between the two? Thank you. ๋„ค, ์—์ฝ”ํ”„๋กœ ์žฌ๋ฌด๊ด€๋ฆฌ๋ณธ๋ถ€์žฅ ๋ฐ•์žฌํ•˜์ž…๋‹ˆ๋‹ค. ๋จผ์ € ์งˆ๋ฌธ ์ฃผ์‹  ์—ผ๊ฐ€ ๋งค์ˆ˜ ์ฐจ์ต์˜ ์ถ”๊ฐ€ ๋ฐœ์ƒ ๊ฐ€๋Šฅ์„ฑ์— ๋Œ€ํ•ด์„œ ๋‹ต๋ณ€์„ ๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. I am Park Jae-ha, Head of Business Management at Ecopro. Let me first respond to your first question regarding the possibility of additional bargain purchase gains in the future. ํšŒ๊ณ„ ๊ธฐ์ค€์— ๋”ฐ๋ฅด๋ฉด ์ €ํฌ๊ฐ€ ์ง€๋ถ„์„ ์ธ์ˆ˜ํ•  ๋•Œ, ์ธ์ˆ˜ํ•œ ์ง€๋ถ„์˜ ์ˆœ์ž์‚ฐ ๊ณต์ • ๊ฐ€์น˜๊ฐ€ ์ €ํฌ๊ฐ€ ์‹ค์ œ๋กœ ์ง€๋ถˆํ•œ ์ธ์ˆ˜ ๋Œ€๊ฐ€๋ณด๋‹ค ๋†’๊ฒŒ ํ‰๊ฐ€๋˜๋Š” ๊ฒฝ์šฐ์— ๊ทธ ์ฐจ์ต์„ ๋‹น๊ธฐ์ˆ˜์ต์œผ๋กœ ์ฒ˜๋ฆฌํ•˜๋„๋ก ํ•˜๊ณ  ์žˆ๊ณ , ์ด๋ฅผ ์—ผ๊ฐ€ ๋งค์ˆ˜ ์ฐจ์ต์œผ๋กœ ์ธ์‹ํ•ฉ๋‹ˆ๋‹ค. ์•ž์„œ ๋ง์”€๋“œ๋ฆฐ ๋ฐ”์™€ ๊ฐ™์ด ์ €ํฌ๊ฐ€ ์ธ๋‹ˆ ํ”„๋กœ์ ํŠธ์˜ ์ œ๋ จ์†Œ๋“ค ๊ฒฝ์šฐ์—๋Š” ๊ฐ’์‹ผ ๋‹ˆ์ผˆ ์›๊ด‘, ๋˜ ์šฐ์ˆ˜ํ•œ ์ œ๋ จ ๊ธฐ์ˆ ์„ ๋ฐ”ํƒ•์œผ๋กœ ํ•ด์„œ ๋†’์€ ์ด์ต๋ฅ ์ด ๊ธฐ๋Œ€๋˜๋Š” ๋ฒ•์ธ์ด๊ณ , ๋˜ ์ค‘๊ตญ GEM๊ณผ์˜ ์žฅ๊ธฐ์ ์ธ ํŒŒํŠธ๋„ˆ์‹ญ๊ณผ ๋ฏธ๋ž˜ ์ „๋žต์„ ๋ฐ”ํƒ•์œผ๋กœ ํˆฌ์ž๊ฐ€ ์ง„ํ–‰๋˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. According to accounting standards, if the fair value of the net assets acquired is valued higher than the acquisition price, the difference is recognized as a bargain for the current period and is booked as bargain purchase gain. As was mentioned earlier, smelters in our Indonesian project are expected to be highly profitable based on cheap nickel ore and excellent smelting technology. An investment is underway based on future strategy and long-term partnership with Chinese GEM. ๊ทธ๋ฆฌ๊ณ  2๋‹จ๊ณ„ IGIP ํ”„๋กœ์ ํŠธ ํˆฌ์ž๊ฐ€ ์ˆœ์ฐจ์ ์œผ๋กœ ์ง„ํ–‰๋˜๋Š” ๊ณผ์ •์—์„œ ๋งŒ์•ฝ ํšŒ๊ณ„ ๊ธฐ์ค€์— ๋”ฐ๋ผ์„œ ์•ž์„œ ๋ง์”€๋“œ๋ฆฐ ๊ฐ€์น˜๊ฐ€ ์ถ”๊ฐ€๋กœ ์‹๋ณ„์ด ๋œ๋‹ค๋ฉด ํ•ด๋‹น ์ด์ต์ด ์ธ์‹๋  ์ˆ˜๋„ ์žˆ์Šต๋‹ˆ๋‹ค. ์ด๋Ÿฐ ๊ฒฝ์šฐ์— ๋‹น์‚ฌ์˜ ์ธ๋„๋„ค์‹œ์•„ ํˆฌ์ž๊ฐ€ ์–ผ๋งˆ๋‚˜ ์šฐ์ˆ˜ํ•œ ํˆฌ์ž์ธ์ง€ ์™ธ๋ถ€์—์„œ๋„ ๊ฐ๊ด€์ ์œผ๋กœ ๋‹ค์‹œ ํ•œ๋ฒˆ ํ™•์ธํ•  ์ˆ˜ ์žˆ๋Š” ๊ทธ๋Ÿฐ ๊ณ„๊ธฐ๊ฐ€ ๋  ๊ฒƒ์œผ๋กœ ์ƒ๊ฐ๋ฉ๋‹ˆ๋‹ค. Currently, phase 2 IGIP project investment is well underway, and in this process, if additional value is identified according to the accounting standards I just mentioned, bargain purchase gain can be recognized again. I believe that this will be an opportunity to objectively confirm once again from the outside that our investment in Indonesia is an excellent one. ๋„ค, ๊ทธ๋ฆฌ๊ณ  ์ด์–ด์„œ ์—ผ๊ฐ€ ๋งค์ˆ˜ ์ฐจ์ต์˜ ํšŒ๊ณ„์ ์ธ ์ด์ต ๋ถ„๋ฅ˜์— ๋Œ€ํ•ด์„œ ๋ง์”€๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. Let me now comment on the classification of profit from bargain purchase. ์ €ํฌ๋Š” ์ž˜ ์•Œ๋ ค์ง„ ๋ฐ”์™€ ๊ฐ™์ด ์ง€์ฃผํšŒ์‚ฌ๋กœ์„œ ํˆฌ์ž ๊ด€๋ จ ์‚ฌ์—…์„ ์ฃผ์š” ๋ชฉ์ ์œผ๋กœ ํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ๊ทธ์ค‘์—๋Š” ์ง€๋ถ„ ํˆฌ์ž์™€ ๊ด€๋ฆฌ, ๋˜ ์ง€๋ถ„๋ฒ• ์ด์ตํ•˜๊ณ  ๋ฐฐ๋‹น ์ˆ˜์ต ํ™•๋ณด, ๋˜ ์ด์™€ ์—ฐ๊ณ„๋œ ํˆฌ์ž ์ˆ˜์ต ์ฐฝ์ถœ ๋“ฑ์ด ์ €ํฌ ์‚ฌ์—… ์˜์—ญ์— ๋‹ค ํฌํ•จ๋˜์–ด ์žˆ์Šต๋‹ˆ๋‹ค. ์—ผ๊ฐ€ ๋งค์ˆ˜ ์ฐจ์ต ์—ญ์‹œ๋„ ์ด๋Ÿฌํ•œ ํˆฌ์ž ํ™œ๋™์˜ ์ผํ™˜์œผ๋กœ ์—์ฝ”ํ”„๋กœ์˜ ์˜์—…์— ํฌํ•จ๋˜๊ธฐ ๋•Œ๋ฌธ์— ์˜์—…์ด์ต์œผ๋กœ ์ธ์‹์„ ํ•ฉ๋‹ˆ๋‹ค. ํ•œํŽธ, ๋จธํ‹ฐ๋ฆฌ์–ผ์ฆˆ์˜ ๊ฒฝ์šฐ์—๋Š” ์ง€๊ธˆ ํ˜„์žฌ๋Š” ์ „๊ตฌ์ฒด ์‚ฌ์—…์„ ์ฃผ๋กœ ์˜์œ„ํ•˜๋Š” ํšŒ์‚ฌ์ด๊ธฐ ๋•Œ๋ฌธ์— ์ง€๋ถ„ ํˆฌ์ž์™€ ๊ด€๋ จ๋œ ์ˆ˜์ต์„ ์˜์—…์™ธ์ˆ˜์ต์œผ๋กœ ๋ถ„๋ฅ˜ํ•˜๊ฒŒ ๋˜์—ˆ์Šต๋‹ˆ๋‹ค. As you may know, Ecopro is a holding company that carries out investment business, which includes equity investment and management, securing of equity method profit and dividend income, and generation of investment profit from related activities. Gain from bargain purchase is part of such investment activities, which constitutes Ecopro's operation, so it's been treated as operating profit. On the other hand, Ecopro Materials mainly conducts precursor business, so profit arising from equity investment is classified as non-operating profit. ์˜ˆ, ๋‹ค์Œ ์งˆ๋ฌธ ๋ฐ›๊ฒ ์Šต๋‹ˆ๋‹ค. We'll take the next question. [Foreign language] The following question will be presented by Wooho Noh from Meritz Securities. Please go ahead with your question. ๋„ค, ์•ˆ๋…•ํ•˜์„ธ์š”. ๋ฉ”๋ฆฌ์ธ ์ฆ๊ถŒ์˜ ๋…ธ์šฐํ˜ธ์ž…๋‹ˆ๋‹ค. ์งˆ๋ฌธ ๊ธฐํšŒ ์ฃผ์…”์„œ ๊ฐ์‚ฌํ•ฉ๋‹ˆ๋‹ค. ๋‘ ๊ฐ€์ง€ ์งˆ๋ฌธ์ด๊ณ ์š”. ์•ž์„œ์„œ ์—์ฝ”ํ”„๋กœ ์ชฝ์—์„œ ๋‚ด๋…„๋„ ์‚ฌ์—… ์ „๋ง์œผ๋กœ PRS ์กฐ๋‹ฌ ๊ด€๋ จ ์ด์•ผ๊ธฐ ์ฃผ์…จ๋Š”๋ฐ, ๊ตฌ์ฒด์ ์œผ๋กœ ์ž๊ธˆ ์‚ฌ์šฉ ๊ณ„ํš ๊ณต์œ  ๋ถ€ํƒ๋“œ๋ฆฌ๊ณ ์š”. ๋‘ ๋ฒˆ์งธ๋Š” ์—์ฝ”ํ”„๋กœ ๋ฐ ๊ทธ ๊ฐ€์กฑ์‚ฌ ๊ด€๋ จํ•ด์„œ ์ด๋ฒˆ์— ๊ฐ๊ฐ€์ƒ๊ฐ ๊ด€๋ จ ๋‚ด์šฉ์—ฐ์ˆ˜ ๋ณ€๊ฒฝ ์ด์•ผ๊ธฐ ์ฃผ์…จ๋Š”๋ฐ, ์ด ๋ถ€๋ถ„์€ ๊ธˆ์•ก์ ์ธ ํšจ๊ณผ๋„ ์–ด๋А ์ •๋„์ผ์ง€ ๊ณต์œ  ๊ฐ€๋Šฅํ•˜์‹ค์ง€ ์งˆ๋ฌธ๋“œ๋ฆฝ๋‹ˆ๋‹ค. ์ด์ƒ์ž…๋‹ˆ๋‹ค. I'm Wooho Noh from Meritz Securities. Thank you for the opportunity. I would like to ask two questions. The first question is that in discussing the Ecopro's business outlook, you mentioned of PRS, and I'd like to understand how you're going to use the PRS proceed. The next question is about change of use life for depreciation, and I'd like to understand the amount impact on your earnings. Thank you. ์˜ˆ, ์—์ฝ”ํ”„๋กœ ์žฌ๊ฒฝ์‹ค์žฅ ๊น€์ˆœ์ฃผ์ž…๋‹ˆ๋‹ค. ์งˆ๋ฌธํ•ด ์ฃผ์…จ๋˜ ๋ถ€๋ถ„ ์ค‘์—์„œ PRS ์ž๊ธˆ์˜ ์‚ฌ์šฉ ๊ณ„ํš์— ๋Œ€ํ•ด์„œ ์„ค๋ช…๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. I'm Kim Sun-joo, Head of Finance and Accounting at Ecopro. Let me address your first question on our PRS-related plan. ์ด๋ฒˆ์— PRS๋ฅผ ํ†ตํ•œ ์žฌ์› ๋งˆ๋ จ์€ ๊ทธ ๋ชฉ์ ์ด ํฌ๊ฒŒ ๋‹น์‚ฌ์˜ ๋ฏธ๋ž˜๋ฅผ ์œ„ํ•œ ์ „๋žต์ ์ธ ํˆฌ์ž, ๊ทธ๋ฆฌ๊ณ  ์žฌ๋ฌด ๊ฑด์ „์„ฑ ์œ ์ง€๋ผ๋Š” ๋ถ€๋ถ„์—์„œ ์ถ”์ง„์ด ๋˜์—ˆ์Šต๋‹ˆ๋‹ค. ๋‹น์ดˆ ๊ณ„ํšํ–ˆ์—ˆ๋˜ ๋Œ€๋กœ ์•ฝ 8,000์–ต ์› ๊ทœ๋ชจ์˜ ์ž๊ธˆ์„ ์•ˆ์ •์ ์œผ๋กœ ํ™•๋ณดํ•  ์ˆ˜ ์žˆ์—ˆ๊ณ , ์ด๋ฅผ ํ†ตํ•ด์„œ ์•„๊นŒ ๋ง์”€๋“œ๋ ธ๋˜ ๊ทธ๋Ÿฌํ•œ ๋ชฉ์ ๋“ค์„ ๋‹ฌ์„ฑํ•˜๋Š” ๋ฐ ์–ด๋ ค์›€์ด ์—†๊ฒŒ ๋˜์–ด์„œ ๋‹คํ–‰์œผ๋กœ ์ƒ๊ฐํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. Financing through PRS aims to secure funds for strategic investments for the future and maintain financial soundness. We were able to secure about KRW 800 billion of fund as planned, so we're pleased that we can achieve these objectives. ์šฐ์„  8,000์–ต ์ค‘์—์„œ 2,000์–ต ์› ๊ทœ๋ชจ ์ •๋„๋Š” ์˜ฌํ•ด ๋ง๋ถ€ํ„ฐ ์‹œ์ž‘์ด ๋  ํ…๋ฐ, ์˜ฌํ•ด ๋ง๋ถ€ํ„ฐ ๋‚ด๋…„๊นŒ์ง€ ์ง„ํ–‰๋˜๋Š” ์ธ๋„๋„ค์‹œ์•„ ํ”„๋กœ์ ํŠธ, ์ €ํฌ๊ฐ€ ์ถ”๊ฐ€๋กœ ํ•˜๊ฒŒ ๋˜๋Š” IGIP ํˆฌ์ž์— ํˆฌ์ž๊ธˆ์œผ๋กœ ์‚ฌ์šฉํ•  ์˜ˆ์ •์ด๊ณ , ๋˜ ์ผ๋ถ€๋Š” ๋‚ด๋…„์— ๋„๋ž˜ํ•  ์ฐจํ™˜ ์ˆ˜์š”์— ๋Œ€ํ•ด์„œ ์œ ๋™์„ฑ์— ๋ฌธ์ œ๊ฐ€ ์—†๋„๋ก ๋Œ€๋น„ํ•  ์˜ˆ์ •์ž…๋‹ˆ๋‹ค. ๊ทธ๋ฆฌ๊ณ  ๋‚จ์€ ๊ธˆ์•ก์€ ํ–ฅํ›„ 2๊ฐœ๋…„๋„ ๋™์•ˆ ๊ฐ€์กฑ์‚ฌ์˜ ์ž๊ธˆ ์ˆ˜์ง€ ๊ณ„ํš์— ๋”ฐ๋ผ์„œ ํšจ์œจ์ ์œผ๋กœ ์šด์šฉํ•  ์˜ˆ์ •์ด๊ณ , ์ถ”๊ฐ€๋กœ ๋ง์”€๋“œ๋ฆฐ๋‹ค๊ณ  ํ•˜๋ฉด ๊ธˆ๋ฒˆ์— ์ฃผ์‹์„ ๋งค๊ฐํ•˜๊ณ  PRS ๊ณ„์•ฝ์„ ํ•จ์— ๋”ฐ๋ผ์„œ ๋ฒ•์ธ์„ธ๊ฐ€ ๋ฐœ์ƒํ•  ์˜ˆ์ •์ธ๋ฐ, ๋‚ด๋…„ ์ดˆ์— ํ•œ 2,000์–ต ์›๊ฐ€๋Ÿ‰ ๋ฒ•์ธ์„ธ๋ฅผ ๋‚ฉ๋ถ€ํ•  ๊ฒƒ์œผ๋กœ ์ „๋งํ•˜๊ณ  ์žˆ์Šต๋‹ˆ๋‹ค. ์ด์ƒ์ž…๋‹ˆ๋‹ค. Of this amount, about KRW 200 billion will be used for the Indonesia project, IGIP project, that will start later this year as well as into the next year. Some of the funds will be used to meet refinancing needs next year to maintain liquidity levels. The remaining amount will be used efficiently in accordance with the financing situations of the group companies for the next two years. In addition, corporate income tax arising from the sale of shares for this PRS contract, as well as some local tax, will have to be paid next year, which is projected to be about KRW 200 billion. Thank you. ๊ฐ๊ฐ€์ƒ๊ฐ ๋‚ด์šฉ ์—ฐ์ˆ˜ ๊ด€๋ จํ•ด์„œ๋Š” ์ œ๊ฐ€ ๋‹ต๋ณ€๋“œ๋ฆฌ๊ฒ ์Šต๋‹ˆ๋‹ค. ์—์ฝ”ํ”„๋กœ ๊ฒฝ์˜๊ด€๋ฆฌ๋ณธ๋ถ€์žฅ ๋ฐ•์žฌํ•˜์ž…๋‹ˆ๋‹ค. I'm Park Jae-ha, Head of Business Management at Ecopro. Let me address your question on the useful life change. ๊ฐ๊ฐ€์ƒ๊ฐ ๋‚ด์šฉ ์—ฐ์ˆ˜ ๋ณ€๊ฒฝ์€ ๊ณผ๊ฑฐ ์žฌ๋ฌด์ œํ‘œ๋ฅผ ๋‹ค์‹œ ์ˆ˜์ •ํ•˜๋Š” ๊ฒŒ ์•„๋‹ˆ๋ผ ๋ณ€๊ฒฝ ์ดํ›„๋ถ€ํ„ฐ ์ƒˆ๋กœ์šด ๊ธฐ์ค€์„ ๊ณ„์‚ฐํ•ด์„œ ํšŒ๊ณ„ ์ฒ˜๋ฆฌ๋ฅผ ํ•˜๊ฒŒ ๋ฉ๋‹ˆ๋‹ค. ๋”ฐ๋ผ์„œ ์˜ฌํ•ด 2025๋…„์— ๋ฐ˜์˜๋  ๋ณ€๋™ ํšจ๊ณผ๋ฅผ 4๋ถ„๊ธฐ์— ์ธ์‹ํ•˜๊ณ , ๋˜ ๋‚ด๋…„๋ถ€ํ„ฐ๋Š” ๋ณ€๊ฒฝ๋œ ๋‚ด์šฉ ์—ฐ์ˆ˜๋ฅผ ๊ธฐ์ค€์œผ๋กœ ๋‚จ์€ ๊ฐ€์•ก์„ ์ƒ๊ฐํ•˜๋Š” ๋ฐฉ์‹์œผ๋กœ ๋  ์˜ˆ์ •์ž…๋‹ˆ๋‹ค. ๋‹ค๋งŒ ํ˜„์žฌ ์ €ํฌ ๊ด€๋ จ ํšŒ๊ณ„์ ์ธ ์ž‘์—…์ด ์ง„ํ–‰ ์ค‘์ด๊ธฐ ๋•Œ๋ฌธ์— ๊ตฌ์ฒด์ ์ธ ์ˆซ์ž๋ฅผ ์•„์ง ๋ง์”€๋“œ๋ฆด ์ˆ˜๋Š” ์—†๊ณ , ๋‹ค์Œ ๋ถ„๊ธฐ์— ๋ณด๋‹ค ์ƒ์„ธํ•˜๊ฒŒ ๋ง์”€๋“œ๋ฆด ์ˆ˜ ์žˆ๋„๋ก ํ•˜๊ฒ ์Šต๋‹ˆ๋‹ค. ๊ฐ์‚ฌํ•ฉ๋‹ˆ๋‹ค. Change in the useful life for depreciation purpose does not involve any changing of the past financial statements, but rather a new criterion will be applied from the point of such change that is applied. Therefore, the effect of change attributable to the fiscal year 2025 will be recognized in the fourth quarter, and the remaining value will be depreciated based on the changed useful life from next year. However, we are currently working on this change, so we are not able to share any specific numbers. Please understand. We will be able to share them with you next quarter. Thank you. ์‹œ๊ฐ„ ๊ด€๊ณ„์ƒ ์ด์ƒ์œผ๋กœ ์‹ค์  ๋ฐœํ‘œํšŒ๋ฅผ ๋งˆ์น˜๋„๋ก ํ•˜๊ฒ ์Šต๋‹ˆ๋‹ค. ์ฐธ์„ํ•ด ์ฃผ์‹  ๋ชจ๋“  ๋ถ„๋“ค๊ป˜ ๋‹ค์‹œ ํ•œ๋ฒˆ ๊ฐ์‚ฌ์˜ ๋ง์”€์„ ๋“œ๋ฆฝ๋‹ˆ๋‹ค. Now we would like to conclude the earnings presentation for 2025 fourth quarter. Thank you very much for your participation.