H1 adjusted operating profit reached £1.1bn as record investment drove network earnings growth and renewables and flexibility improved. FY27 and 2030 EPS guidance was reaffirmed, with transmission, electrification and data-center demand underpinning growth prospects.

Martin Pibworth
CEO, SSE

Good morning, and thank you for joining us for this presentation of our interim results. I am SSE's Chief Executive, Martin Pibworth, and I am here with our Chief Financial Officer, Barry O'Regan. We thought we would start today with that brief video taster of the fantastic progress our team is making on just one of the 11 major transmission projects we are delivering. Two years ago, we were preparing the ground. Today, as you have just seen, from converter stations to cable installation, things couldn't look more different. After a brief overview from me this morning, Barry will take us through our results for the first six months of the year, and I will then look at the significant progress we are making and the attractive future prospects we have before we take questions.

None of the numbers we are talking about today carry more weight than our principal safety performance metrics. I am pleased to say that through a period of accelerating construction, our total recordable injury rate has remained stable. This is consistent with a broader trend that we attribute in part to our investment in industry-leading immersive training for both employees and contract partners. This is an experience that around 15,000 colleagues and contractors have now benefited from. It is a year since we set out our GBP 33 billion investment program, our plan for seizing a once-in-a-generation opportunity to build homegrown, secure, and clean electricity infrastructure. Standing here today, with a year of momentum behind us, I am even more certain about the company's ability to deliver our plan. I am also increasingly confident about the scale of the opportunity that lies beyond it.

What is increasingly clear, domestically and internationally, is that homegrown electrification is the only route to economic growth, energy security, and climate change mitigation. It is also the sole pathway to sustainably lower bills. These things are not in competition. Upgraded networks reduce constraints and connect new demand faster. Renewables displace expensive imported gas. Flexible assets keep the system balanced and ensure resilience. These are all critical solutions for the energy system, and our plan is fast-moving from lines on maps to steel in the ground as we progress towards 2030. Our delivery mindset is accompanied by a restless eye on the long-term opportunities beyond, where we are continuously adding to a pipeline of highly attractive growth prospects right across the electricity transition.

In electricity networks, political consensus on the pressing need to expand and modernize the grid is opening up growth beyond our current transmission programs well into the 2030s. At the same time, electrification of the economy to match advancing demand curves and enable economic growth leads to a substantial step-up in distribution investment, starting with the ED3 price control and continuing for the decades beyond. In renewables, the economic realities of the relative cheapness of renewables-led energy systems means they are hardwired into U.K. and E.U. policies, with the North Sea creating offshore wind options for us, not just here in the U.K., but in other jurisdictions too. In flexibility, the need to both balance a volatile system and help meet growing demand from industry, households, tech, and AI is opening up further options for our existing thermal fleet alongside new low-carbon technologies.

In short, the system and societal need for these solutions is clear and growing. Delivery of our 2030 plan is accelerating, and the long-term structural growth opportunities associated with homegrown electrification are becoming ever more apparent. At the same time, every investment we make has to demonstrate lasting value for bill payers. Prolonged conflict in the Middle East has plunged much of the world back into an affordability crisis, showing once again the very real cost of an ongoing dependence on imported gas. Against that backdrop, electrification holds the key. Our published modeling shows how the benefits of electrifying our energy use will build over time and how investments in a modern electricity system can translate into lower costs for customers. Simply put, this approach is the quickest way to deliver more secure and sustainably lower consumer bills.

Electrification offers greater affordability and economic prosperity, with the benefits increasingly felt by consumers by the end of the decade, and SSE is uniquely placed to deliver it. Operational performance and strategic delivery are very much the theme of today. In networks, the record investment we have made in transmission is easing system constraints and helping bring down energy costs for consumers through innovative deployment of technology, such as dynamic line rating. At the same time, we are steadily securing consents, with construction now starting in full or in part on all 11 major transmission projects. Distribution teams have worked around the clock to restore and maintain supply through autumn storms. In the coming days, we will submit an ED3 business plan designed to deliver the local electrification and economic growth the government is so keen to drive.

Our energy businesses have also performed well for customers, both operationally and in terms of strategic progress. The efficiency and resilience of a diverse generation portfolio has shone through, with more than 90% plant availability in a period of highly volatile market conditions. We are making great strides in delivery of our flagship renewables projects, with turbine installation continuing at pace on Dogger Bank and Berwick Bank advancing towards FID. The performance and delivery we are talking about today underpins a fully funded plan that not only drives earnings but also offers clear visibility of long-term growth. The plan's strategic pivot to economically regulated and contracted assets that are index-linked gives us deep confidence in meeting our GBP 2.25 to GBP 2.50 earnings per share target by 2030.

That equates to a 10%-13% compound annual growth rate, which, together with our progressive dividend policy, delivers a highly attractive total shareholder return. We are delivering today while building the infrastructure for tomorrow. I cannot overstate the opportunity the energy transition presents for SSE or how well-placed we are to lean into it, thanks to the assets, options, people, and capabilities we have at our disposal.

I will now hand over to Barry.

Barry O'Regan
CFO, SSE

Thank you, Martin, and good morning, everyone. I will now take you through the financial performance of the group in the first half of the year. As Martin noted, we have delivered a very strong set of results today as accelerating delivery of our construction program has driven record investment and high-quality earnings growth. Capital delivery increased by over 60% to a first-half record of GBP 2.6 billion, with the majority of that investment delivered in transmission. This increased networks investment is growing our regulatory asset base and driving the significant increase in index-linked earnings we see today. Regulated networks delivered around 2/3 of the GBP 1.1 billion adjusted operating profit for the first six months. We have also seen increased profitability in our renewables and flexibility segments, demonstrating the benefit of our balanced business mix in a volatile operating environment.

Overall, this resulted in adjusted earnings per share of GBP 0.665 , in line with our expectations for the period. Taken together, these results demonstrate strong first-half execution and growing high-quality earnings contribution from our investment program. I will focus first on networks, where accelerating investment is translating directly into earnings growth, a trend we expect to continue. Combined networks adjusted operating profit increased to GBP 716 million, driven predominantly by a doubling of earnings in transmission as we begin T3 and in line with our increased investment profile. Delivery momentum also continues to build, with construction commenced in full or in part on all 11 major projects where consents have been received. This investment is growing the group's regulatory asset base and creating an increasing contribution from high-quality index-linked earnings.

Taken together, networks has delivered strong financial and operational progress during the period, with clear visibility of future earnings growth as investment scales. Moving now to renewables. Adjusted operating profit increased by around 20% to GBP 332 million. This was principally driven by higher output from more favorable weather, alongside contributions of new capacity from assets including Dogger Bank and Yellow River in Ireland. October saw a return to more normal weather conditions, although we have seen some impact from calmer and drier conditions across Northern Europe in November. Across the fleet, we are continuing to see strong operational performance supported by high levels of asset availability. Investment also increased in renewables during the period, with adjusted CapEx up 50% to GBP 528 million, reflecting delivery across our major projects.

Overall, renewables has delivered improved earnings in the first half of the year while continuing to invest selectively in a high-quality portfolio underpinned by a disciplined approach to returns. Turning to flexibility. Adjusted operating profit increased to GBP 103 million compared with GBP 13 million in the prior period. The largest driver was thermal, reflecting strong availability across the fleet and the business's ability to capture value during periods of market volatility. However, conditions for gas storage remain challenging, with summer-winter spreads not supporting these assets adequately. Energy Customer Solutions has made a small loss, principally reflecting lower wind-related contract revenues in Ireland and lower customer numbers. Energy Markets has performed well, reflecting strong trading performance while continuing to manage the group's commodity exposures and route-to-market activity.

Together, these three businesses have played a strategic role in managing volatility, supporting security of supply, and providing balance to the group's earnings. Looking now at net income. The 70% increase in operating profit has flowed through to earnings per share. Net finance costs and hybrid coupons increased to GBP 233 million, thanks to the successful use of hybrid capital to support the plan, partially offset by capitalized interest, which mechanically reflects the increased investment. Meanwhile, the effective current tax rate has reduced to 6.3% due to the use of capital allowances associated with increasing network investment. After these items, adjusted earnings per share increased to GBP 0.665 for the period. In line with our dividend policy, the board has declared an interim dividend of GBP 0.229 , being one-third of last year's full dividend.

Turning finally to the balance sheet. Adjusted net debt and hybrid capital increased by GBP 1.3 billion over the last six months to GBP 11.4 billion. This reflects the significant investment delivered during the period, alongside the group's underlying cash generation and full-year dividend payments. We have raised GBP 3 billion of new debt and hybrids so far this financial year at an average rate of 5.1%, slightly below the assumptions underpinning our investment plan. Since the half year, we have received GBP 237 million of disposal proceeds in October from repayments of the OVO loan note. We also have liquidity covering around 15 months of financing needs, while around 85% of our debt is held at fixed rates, limiting our exposure to movements in interest rates.

Overall, the balance sheet remains strong, with competitive funding, substantial liquidity, and clear headroom to deliver our investment plan while maintaining strong investment-grade credit ratings. I will finish now on the financial outlook, both for this year and for 2030. When we first announced our GBP 33 billion investment plan, I noted that the growing regulated index-linked earning base will give us greater resilience through periods of macroeconomic, political, and regulatory uncertainty. The strong results we have delivered today, backed by record levels of investment that have exceeded our profits, demonstrate the benefit of that regulated earnings base. We expect this strong investment delivery momentum, particularly across networks, to continue through the second half, with total investment of over GBP 5 billion expected for the year.

Turning to earnings, with November's weather conditions and the key winter months still ahead, we believe it is appropriate to maintain our GBP 1.68 to GBp 1.93 range for now. That said, our confidence in delivering a strong FY 2027 performance is unchanged. We also reaffirm our long-term 2030 targets of GBP 2.25 to GBP 2.50 , which is backed by a consistent outlook for our business units and the assumptions underpinning our long-term plan, which remain appropriate despite volatile markets. Accelerating delivery, record investment, strong balance sheet, high-quality earnings growth. Our investment plan is gaining momentum, and the evidence can be clearly seen through our first-half results today.

I will now hand back to Martin for the operating review.

Martin Pibworth
CEO, SSE

Thank you, Barry. Let's now look at each part of our integrated portfolio and how each is increasingly playing its part in the execution of the group's refreshed purpose of making electricity clean, affordable, and available for all. Transmission is one of the most exciting parts of our story. We're building one of the fastest-growing electricity networks in the world, and for a very practical reason. We need to get more homegrown renewable power to the customers who require it. That will mean fewer constraints, more renewable generation connected, and ultimately, a more affordable and productive energy system. Ofgem estimates that around GBP 60 of investment from households today in ASTI and LOTI infrastructure should translate to around GBP 80 of savings by the end of the decade. Yes, we have to invest in the network, but doing so will leave customers better off.

In addition, by enabling homegrown renewables, we boost energy independence and security. For bill payers, this means a near-term financial upside alongside a much-needed upgrade in grid quality and resilience. For SSE, transmission is the engine room at the heart of our investment program, and it shows no signs of slowing. These are enormous infrastructure projects, and we're moving through major delivery milestones right across the program. Earlier this month, we received consent for the EGL3 marine license. We now have 27 of the 34 consents needed for ASTI and LOTI, and construction has commenced in full or in part on all 11 major projects where consents have been received. As I said earlier, these are more than just maps and presentations. The majority are now construction sites.

Some of you will have seen our delivery capability at firsthand on EGL2 and the Netherton Hub when you joined our Capital Markets Day in September. If you were to return there today, you'd see just how much these projects have progressed. Successful completion of horizontal directional drilling works has significantly de-risked EGL2, and the handover of substation and converter station platforms has marked a key milestone for the Netherton Hub. Planning, of course, is critical. Consent has been secured for Cambushinnie Substation, and we are optimistic that the majority of the seven outstanding consents for projects in delivery will be determined in the coming weeks and months, and the remainder are expected by the first half of 2027.

Full construction activity across all projects will quickly follow consenting, and we expect all, with the known exception of the Peterhead to Humber link, to be fully underway by the end of 2027. Slightly further out, we expect to see energization on projects starting in 2029, with Orkney, EGL2, and Argyll, and the others following in line with their target dates. The value of these investments for the country is immense. Our GBP 22 billion transmission investments will support 50,000 U.K. jobs, help to reduce electricity bills, and materially grow the Scottish and broader U.K. economies. Our immediate focus is clearly on driving the 11 system-critical projects through to completion. Barry talked about how T3 earnings are beginning to come through. The RAV is also building and promises a roughly threefold rise to around GBP 30 billion by the end of the decade.

In addition, the system operator sees the need for Scottish transmission investments well into the 2030s. Their Beyond 2030 plans and their summer update show further potential investments in our license area, with Shetland 2, EGL5, EGL6, and a new 400 kV line, alongside three other substantive upgrades. These will enable a further 21 GW of affordable offshore wind generation. The need is there, and we expect further information as the government's Strategic Spatial Energy Plan comes forward. All this underlines the point. Electrification is becoming fundamental to economic growth, energy security, and lower bills. More renewables to power a cleaner, more affordable system will require a stronger grid. New sources of demand need connections, and a more electrified economy needs greater capacity, resilience, and flexibility. Those needs don't end with the current investment cycle. Make no mistake, our network growth does not stop in 2030.

Our pivot to secure regulated earnings isn't just about transmission. Britain needs far greater capacity in its distribution networks to manage an estimated doubling of demand by 2050. Our business plan for the next price control will be submitted in the coming days, so I will not detail it today beyond saying that I feel it meets the challenges of our time, enabling new generation, connecting customers sooner, and creating a modern and flexible grid, which ultimately supports lower, more affordable bills. It will meet the resilience challenge by reinforcing assets against unpredictable weather patterns, investing in a data-led, targeted manner, and readying the network for the future. We are seeing 2.7 GW of data center demand with already accepted connections, and we're expecting more than 2 million new EVs on our networks.

Ultimately, that accelerating demand trend calls for a surge in activity right across ED3, and we anticipate an increase of around 50% in baseline expenditure and uncertainty mechanisms compared to ED2. Our plan will enable this investment at the lowest sustainable whole system cost by investing in the right place at the right time. We're also investing in the business itself, modernizing systems and processes, ensuring that the data and technological foundations are being put in place to unlock efficiencies and performance improvements over the next few years. Overall, distribution promises to drive growth for us well into the 2030s and 2040s as it responds to the multi-decade electrification opportunity.

As I said earlier, renewables will be the foundation of the future global electricity system, and in the course of our 2030 plan, we will complete major projects like Dogger Bank, which are backed by long-term, high-quality, and index-linked CFD contracts. We have now installed around 150 turbines across all phases of Dogger Bank, maintaining a much faster installation rate we noted six months ago. The first phase of that project experienced some well-publicized teething problems, and remediation works are well underway to ensure those early turbines meet our required quality and reliability standards. Meanwhile, Dogger Bank B is going well, and we have now reached around 100 turbines commissioned across all phases of the project and generated well over 1 TWh in the first half of the year. This remains a project with strong equity returns above our hurdle rates.

We were also delighted to secure an AR7 contract for Berwick Bank B, and the project has made strong progress. We have now signed preferred supplier agreements with prices locked in and confirmed Siemens Energy as our turbine supplier, which puts us well on track for reaching FID in the second half of 2027. Berwick Bank B will generate 6 TWh of clean power for consumers at less than half of the current energy price. Looking further out, we see more than 5 GW of pipeline opportunities, including Berwick Bank A and C, Arklow Bank, and Coire Glas . Meanwhile, we continue to explore opportunities to deploy our expertise in offshore wind in carefully selected markets, such as those in Northern Europe and Japan.

As we seek a viable route to market for our Netherlands projects, we are exploring other opportunities in Northern Europe as the technology expands under increasingly attractive CFD regimes. Further ahead, a stream of auctions over the next decade could provide an opportunity to export our proven developer capabilities and create value for the group. But as always, we will apply capital discipline and will only invest where projects meet our strict returns criteria. There is more to renewables than offshore wind. Our hydro fleet is a critical and sometimes overlooked part of our business model. These are clean, dispatchable assets with exceptionally long lives, and their value really comes through in volatile markets like these. The fleet is performing very well, responding across balancing and intraday markets while providing valuable flexibility and risk management to the wider portfolio.

As you can see here, that flexibility allows us to respond to conditions flexing down as wind volume steps up and then turning back up to meet peak demand needs. That has helped us achieve an average price capture of 110% in the first half of the year. As the system becomes increasingly wind-led, the need for that flexibility will only grow. With that in mind, at 1.4 GW, Coire Glas remains one of the most compelling infrastructure projects in the G.B. energy system due to its scale, longevity, and flexibility. We are committed to its development, but we will only build where we meet hurdle rates, and we are yet to see whether Ofgem's long-duration storage framework will adequately support the technology. But opportunities like this do not take our focus away from maximizing the value of our existing portfolio.

Whilst around half of our onshore wind fleet is less than 10 years old, we are also taking steps today to unlock further value in coming years through life extensions and repowering of existing assets when larger turbines can create additional value. Our thermal business remains core to the energy transition and has provided essential security of supply for consumers over the last six months. We have seen market disruption from extreme weather, both in terms of demand through increased use of air conditioning and on the supply side due to generation failure. Against that backdrop, the availability and responsiveness of our thermal fleet is providing a vital service, and this is increasingly driving our earnings potential for this asset class.

Alongside that potential for earnings outperformance, we clearly also retain our stable foundation of capacity income, with around GBP 100 million of increased revenue over the next two years. Beyond our strong-performing existing fleet, we continue to make progress on delivery of more than 5 GW of pipeline of opportunities. Construction is progressing well in Ireland at both the Tarbert and Platin sites, with full commercial operations expected in 2027 and 2028 respectively. Across both G.B. and Ireland, we have market-leading options for life extensions as well as new build opportunities, some of which will also play into the data center potential I will come on to in a moment. We provide much-needed capacity and system balance at a time when society and markets increasingly require it.

With sector-leading availability and efficiency, our fleet stands ready to support security of supply over the key winter months ahead. Our assets and capabilities give us a differentiated position to capture opportunities from growing data center demand. We see three complementary ways of creating long-term value to enable, to connect, and to supply data centers. Through powered land and development, we can bring together strategically located sites with access to power and the infrastructure required to accelerate developments. This allows customers to secure viable sites and move more quickly towards operation. Through power infrastructure, we can develop and operate the connections and private networks required to serve large-scale data center demand. We are already engaged in this capability in networks such as Slough and at Imperial Park.

Finally, through integrated power and clean energy solutions, we can combine generation, storage, and long-term energy arrangements, including CPPAs, to provide customers with the scalable, resilient, and increasingly low-carbon power they require. These are complementary rather than mutually exclusive opportunities. Our ability to combine land, connections, infrastructure, and generation means we can participate across the value chain while remaining disciplined about where we deploy capital. Historically, we have been deliberately cautious in talking about data centers, but we have a strategically advantageous position and a number of valuable options to enable, connect, or supply hyperscalers. Our discussions in this space are advancing, and we expect credible and tangible possibilities to emerge in due course. Our message this morning is clear.

We are delivering today and building for tomorrow, and we have every confidence in our earnings outlook. The operating environment is not straightforward, but our business model is at the heart of the drive to electrification, which we see replicating in other markets around the world. SSE's strategic focus on networks, renewables, and flexibility continues to align perfectly with policy in our home markets and gives us a fantastic opportunity to drive growth through the energy transition by delivering much-needed large-scale electricity infrastructure. Societal value also equals commercial value. Our business mix, pipeline, and capital strength mean we offer a compelling combination of resilience and value for today, alongside hugely exciting structural growth for decades ahead. A year ago, we said our GBP 33 billion investment plan opened the way to the best possible pathway to an electrified economy driven by a more secure, more affordable energy system.

Today, you can visit more and more sites and see that plan in action. At Netherton in Kintore, at Spittal in Argyll, right through the Highlands, across in Ireland at Tarbert and Platin, 150 km out in the North Sea, or at Imperial Park in Cardiff and at Iver in Slough. All are in construction, and all are aimed at lowering bills, building energy security, and increasing system resilience. We have steel in the ground, supply chain contracts secured, high-quality jobs, deep engagement with local communities, a continuous stream of planning consents, nationally critical assets taking shape, and return on investments in the form of both shareholder value and lower customer bills. With billions to invest right across the energy transition, we are just getting started.

Barry and I would now be very happy to take any questions.

Operator

Thank you. To ask a question, you will need to press star, one, and one on your telephone and wait for your name to be announced. To withdraw your question, please press star, one, and one again. We will now go to the first question. Your first question today comes from the line of Mark Freshney from UBS. Please go ahead.

Mark Freshney
Analyst, UBS

Hello. Thank you for taking my questions. Firstly, Martin, just on data centers, you have always been quite cautious, and I think you might be a little bit less cautious today. I mean, there is a lot going on in the portfolio. You are very well positioned, and particularly the extra capacity on the private loops that you have got, which is invaluable, I suppose, in this market of tight grid connections. Can you talk about how you might start to monetize the data center story in G.B., in the same way that you have monetized it in Ireland? Secondly, regarding offshore wind, it is interesting that you mentioned IJmuiden and you mentioned the potential further projects in Northwest Europe. Would you be able to do two or three projects back-to-back, Berwick and a couple of others, or would it be one or the other?

Martin Pibworth
CEO, SSE

Thanks, Mark. Appreciate the questions. Look, first, on data centers, you are right. Historically, we have been cautious. Just to remind people on the call, there have been two good reasons for that. Firstly, there is obviously a big trend in the U.S., and we were concerned that people might wrongly extrapolate that across to our home markets. Secondly, when we put out our plan last November, we were very keen to emphasize that a data center trend was not included in that plan. It was not reliant on that. Today, what we are saying, we also said that we would update when we saw further market trends. Today, what we are saying is that we are seeing more credible and more tangible possibilities on the ground, certainly opportunities for us to invest in and work with hyperscalers on.

That stretches right across the piece, right across our portfolio. You rightly mentioned, and we mentioned it in the presentation, the two private networks we have at Slough and at Imperial Park. It also goes to CPPA sales opportunities for new renewable additionality, and of course, powered land against legacy sites we have, particularly in the thermal business. You are also right to point out that we have extremely strong relationships with those hyperscalers, not least through our presence in Ireland, where Airtricity has been supplying 80% of their demand for a decent time now. We need to see how all of those things piece together. The second point on this, of course, is the macro points. Most people expect an uptick in data center demand that could be significant. Should that happen from a macro perspective, of course, that would be very good for our distribution network.

We talked today about the 50% increase in data center connections in the south there. It would also be extremely good from a kind of perspective of more renewable generation coming on to deal with that demand, which obviously then would flow through to our transmission networks, you would expect. There is, of course, an angle here for consumers too, where that demand will absorb more of the fixed cost and works to bill payer advantage. We are pleased to be in that space, and we will see how those possibilities emerge. Then on offshore, you are right. I mean, we obviously have a decent home pipeline. We have the Dutch project, which we have always said we will only take FID if we can effectively bring a supply chain price to a CPPA buying interest that makes sense against financial criteria we have laid out before.

It is obvious that there are good possibilities in offshore wind in other countries emerging. I think we have proven time and time again that should we have the possibility of doing more than a couple of projects simultaneously, we are able to firstly attract the resource into the organization. Transmission is a very good example of that. But also redeploy existing skills and expertise to wherever the focus is. We are comfortable on that.

Mark Freshney
Analyst, UBS

Thank you.

Operator

Thank you. Your next question today comes from the line of Peter Bisztyga from Bank of America. Please go ahead.

Peter Bisztyga
Analyst, Bank of America

Yeah. Good morning. Two questions from me, please. First of all, one regarding your guidance. You had extremely strong net income growth of GBP 400 million year-on-year in the first half. If I am right, you seem happy with where consensus is for the full year, which would imply around GBP 100 million net income growth in the second half year-on-year. I was hoping you could help me understand what you expect to slow down quite so materially in the second half of the year. That is my first question.

Then secondly, on Dogger Bank A, could you just help us understand how many turbines are affected by the issues that you have described? Are these issues isolated just to those turbines? Is there any risk that we could see similar issues during the commissioning of Dogger Bank B when that comes around? Any risk actually that Dogger Bank A COD could slip even further? Thank you.

Barry O'Regan
CFO, SSE

Yeah. Good morning, Peter. Thank you for the questions. Look, in terms of us comparing the year-on-year, I suppose, look, if you look at it on an EPS basis, obviously, we have different share counts, obviously, given we did the equity raise last year. I think more importantly, what you see is there is less seasonality in the numbers this year as well. I think the half-year numbers this year will represent slightly north of 35% of the full-year profits, and you are seeing that because the transmission earnings coming through with the investment there.

Look, I mean, we still expect, as I said in the script, we still expect a strong second half of the year, and ultimately, with key winter months to come, weather will dictate a lot of where we end up in that. But ultimately, I wouldn't expect any change to consensus for where we are today.

Martin Pibworth
CEO, SSE

And hi, Peter, I'll take Dogger Bank. On Dogger Bank, right now, we have 150 turbines roughly installed. Of those, 100 are operating. Obviously, what we're pleased to report today is the progress on Dogger Bank B is strong. It is installing at pace and commissioning well, and we expect that to extrapolate across to Dogger Bank C because we're seeing good advancement from GEV in terms of process, skill, and expertise. The issue on Dogger Bank relates to a few dozen turbines, and there's different elements of that. And some will need repairs, some need some component exchanges. And we're obviously working with our contract partner to make sure we do those as completely as possible.

Obviously, we want and we expect to be handed over a project and an asset base that has very good reliability and has commissioned well. That's obviously the ultimate aspiration here, and we'll keep going on that basis. Just one thing to maybe put out there, this is a 35-year asset. It will produce roughly 18 TWh per annum. In the greater scheme of things, the Dogger Bank A non-material delay we've announced is relatively insignificant against the progress of the entire project. And we are looking forward to presenting all three phases in line with the guided dates we've given today going forward.

Peter Bisztyga
Analyst, Bank of America

Okay. Sorry, can I just ask one very quick follow-up? When you say Dogger Bank A will be substantially available by the end of the first quarter next year, what does substantially available mean?

Martin Pibworth
CEO, SSE

Well, it means substantially available. I mean, if you look back at our other offshore wind projects that have neared completion in the past, there is always kind of snagging issues to do on various turbines. That relates as much to Seagreen and Beatrice historically as it would to Dogger Bank A.

Peter Bisztyga
Analyst, Bank of America

Okay. Thank you very much.

Operator

Thank you. Your next question today comes from the line of Rob Pulleyn from Morgan Stanley. Please go ahead.

Rob Pulleyn
Analyst, Morgan Stanley

Hi. Yeah, good morning, everyone. Thanks for all the comments so far. If I could firstly just ask a little bit more on the consenting. When you very kindly took us up to Peterhead, I think you mentioned there were four consents that were outstanding, for which you hoped to receive two in October and two by the end of the year. Obviously, the marine has come through for EGL3. So just wondering on the status of the other three and whether we are on track for the end of the year. Secondly, Martin, just talking about post-2030 growth, which of course was a key feature of that particular trip, and I think something we will see.

Trying to reconcile this obviously with the NESO presentation, which actually will begin shortly after your call, because you mentioned EGL6, which of course is also on that list for early competition, and how we sort of reconcile the strong outlook for transmission with, of course, the potential risks around CATO on the transmission side. Thank you very much.

Martin Pibworth
CEO, SSE

Yeah. Thanks, Rob, and morning. As you say, we needed 34 consents for our ASTI and LOTI projects. We have 27 as we speak. We are waiting on four substations. Three we're hoping to come through in relatively short order, and we have three overhead lines as well that we're waiting for Scottish government decisions on. They're in basically consultations. The margin of a couple of things here, Scottish government has committed itself to 12-month windows on consenting and has actually put in a significant amount of resource to help with that. I think the importance of these projects, firstly to the consumer and allowing currently constrained renewables onto the system as quickly as possible is not lost on anybody in authority. Also, I think the importance of those projects to the Scottish economy is also well understood.

Obviously, we're in the hands of a process, but as we stated this morning, we're hopeful that we'll get those through in early next year. Then in terms of the post-2030 possibilities, I mean, all I would say on that is, I think our transmission business is the best performing TSO. We have a record of doing very complicated, very big infrastructure projects in a very good, very efficient manner. Obviously, the scale and size of ASTI and LOTI has enabled us to recruit superb capability into the teams, and we've talked before about how transmission has grown from 500 people to 3,000 people. We've also talked before about how that scale and size has allowed us to develop first-class Tier 1 supply chain relationships, which serve these projects incredibly well.

Obviously, going forward into Beyond 2030, I think we stand up as a very good TSO into those processes. The other thing I'd say is, obviously the discussion that I think you're going on to the call later that you referenced to, obviously just underlines the need for this additional transmission network. I mean, the ASTI and LOTI projects we are building out will enable significantly more renewables onto the system, but it doesn't completely constrain, and it certainly doesn't necessarily look after the new renewables that will need to come on to provide that security of supply and energy affordability to consumers.

Rob Pulleyn
Analyst, Morgan Stanley

Thank you very much. I'll turn it over.

Operator

Thank you. Your next question today comes from the line of Pavan Mahbubani from J.P. Morgan. Please go ahead.

Pavan Mahbubani
Analyst, J.P. Morgan

Hi, team. Good morning, and thank you for taking my questions. My questions relate mostly to offshore wind, Martin. Firstly, you talked about opportunities in the North Sea, and you mentioned your Netherlands project. Can you give maybe some more color on any other geographies you're looking at or maybe any auctions that you're looking at for next year or timelines in terms of what you'd be interested in and when we could get an update there, please? Secondly, last week we saw the U.K. and Japan sign an offshore wind industrial compact. Does that change for you the attractiveness of developing the options that you have in Japan, and can you remind us of what those options are and, again, potentially a possible timeline of when we could see an update on those projects, please? Thank you.

Martin Pibworth
CEO, SSE

Yeah. Thanks, Pavan. There's nothing specific here apart from we're recognizing for Europe, firstly the Hamburg agreement, about 300 GW of offshore wind in the North Sea. We're recognizing the fact that we have real referenceability in terms of our ability to develop and build out offshore wind. We've done some of the most complicated projects in the world, and of course, given our skill set, you would expect us to naturally look at the possibilities elsewhere. But beyond the Netherlands, there's nothing specific that we are thinking about in any imminent way apart from looking at these markets with interest. I guess the other thing we should probably say is, it's become very apparent in Europe that the move to offshore wind has become very big with probably increasingly attractive CFD frameworks. That also provides a further appeal for us to have a look.

Then in terms of Japan, you are right, we have been there for several years. This has always been a long-term development business. We have a number of colleagues on the ground who are building relationships, trying to understand the market, helping METI, the ministry responsible, develop and devise the frameworks that will get offshore wind invested in in Japan. Obviously, it has gone a bit slower perhaps than people thought, but there is a clear energy need in Japan, and it is a clear policy priority. And of course, we are interested in where that leads, and we will be supporting METI in terms of how it tries to bring projects to market.

Pavan Mahbubani
Analyst, J.P. Morgan

Thank you.

Operator

Thank you. Your next question today comes from the line of James Brand from Deutsche Bank. Please go ahead.

James Brand
Analyst, Deutsche Bank

Good morning. Thank you for the presentation. I had two questions. The first is on the wholesale CfD. It seems like it is obviously fairly early days, although it seems like the government is pretty keen to kind of move forward with it. But it could be a pretty big opportunity for you. I was just wondering whether you could share some thoughts on whether you are excited about it or not, and how confident you are in it going forwards. That is the first question. And then the second one is on thermal generation. You highlighted that there have been more volatility in the last kind of six months or so.

Are there any reasons to think that that more volatile environment will not continue, particularly given the expectation as we will start to see more power demand growth coming through, and not a huge amount of flexible generation being added to the system? And then also, if you could just remind us how you are hedged on spark spreads going forward, to the extent you are able to, obviously, some commercial sensitivities possibly around that. But if you could remind us, that would be great. Thanks very much.

Martin Pibworth
CEO, SSE

Yep. So, look, first on the wholesale CfD. I think I am right in saying that we were one of the first companies to suggest it back after the last energy crisis started after the Russian invasion of Ukraine. We see it as a good policy choice, partly because obviously it helps lower bills, and obviously from our perspective, it helps stabilize revenue streams. It is in consultation. Clearly, given we are one of the first proponents of the idea, we would be actively engaged and constructively engaged in those consultations. My understanding is that because it is good policy, I think I have got decent confidence that it should come forward. But obviously, it is probably fair to say that different renewable sites have different dynamics and different kind of economic fundamentals, not least including wind speed, noise, et cetera.

T here is a little bit of complexity in how this might be done, but we will be engaging with governments constructively on that. Then in terms of thermal generation, I think we have always described a market, energy transition market, as it is going to have some natural volatility just through kind of meteorological outcomes. And we have always described our thermal fleet as offering good risk management protection to the portfolio and to the wider market. And of course, in the last few weeks, we have seen some pretty big storms and heavy wind outcomes during October, and then not very much wind at all in the first couple of weeks of November. And of course, market prices have shaped according to that, and our thermal fleet will have responded accordingly.

I think there is probably an expectation that volatility will be a feature of the market going forward as it goes through transition. But obviously, it is a bit difficult to kind of describe to you exactly how that flows through, apart from we like having a vertically integrated fleet that offers us portfolio protection against different outcomes. And then on spark spread hedging, we do not disclose that.

James Brand
Analyst, Deutsche Bank

Great. Thank you very much.

Operator

Thank you. The next question comes from the line of Ajay Patel from Goldman Sachs. Please go ahead.

Ajay Patel
Analyst, Goldman Sachs

Good morning, and thank you very much for the opportunity to ask a question. I have two elements that I wanted to kind of focus on. The first one is on capital allocation. It seems clear from the presentation, as well as maybe just observing the wider market, that renewables looks a better market for you. Clearly, when you set out your original plan, there was GBP 4 billion allocated to renewables. I guess my question here is that, if the opportunities just increase, thinking Coire Glas and a number of the offshore, and obviously the successful auction at the beginning of the year, is the aim to reduce in other areas to fund that new opportunity, and therefore the amount of capital allocated to renewables stays unchanged and in line with what you highlighted last year?

Or as those opportunities emerge, you have flexibility in balance sheet to take advantage, and therefore the balance of the business can be maybe a little bit more tilted to renewables than maybe you would have thought of 12 months ago? The second one is just on the data center side. Really compelling slide. I just wondered how much of this is still very early stage, or is there any sort of timeframe you can give us in regards to planning permissions? Just a better sense how big the opportunity can be in gigawatt terms on the power land side, and how mature is this opportunity as it stands today? Is it something that it take a few years before we get a real sort of sense of materiality, or is it something that could be more imminent? Thank you.

Barry O'Regan
CFO, SSE

Yeah. Well, I'll happily take the first one, and good morning. In terms of capital allocation, we knew 12 months ago when we set out the plan, we have a wealth of really attractive renewable opportunities in the pipeline. Apart from the capital we'd allocated to renewables, we also had GBP 3 billion of uncommitted CapEx in the plan. When we look at offshore wind and renewables, we also look at non-recourse project financing where the equity's back-ended as well. We had more than made allowances for the opportunities in our pipeline from that perspective. The beauty of having a diverse portfolio is we can be quite selective in where we target that and target at the best returning projects. We're well set in that regard.

Martin Pibworth
CEO, SSE

Yeah. On data centers, Ajay, morning by the way, it's kind of slightly difficult to answer that. Again, I remind you and others, we've been historically cautious. We're probably showing a bit more optimism for that now because we are seeing things on the ground. In terms of timescales, it's a bit difficult to kind of lock anything down. There's some macro trends which I'd point to. Firstly, the Chancellor standing up and referencing accelerated connections for strategic demand, including data centers, feels positive policy support. Then we have the reality that in our distribution networks, we're seeing a big increase in connected demand for data centers or connections for data centers.

Plus, you've also have the NESO talking out there very openly about their expectations for increased demand coming from data centers. Given we have options right across the pieces we outlined in the presentation, I won't repeat that, it should feel like there should be something for us against that trend. To be specific in time frames at this point would not be right. Happy to present perhaps a bit more optimism than we've previously had, or at least articulated.

Operator

Thank you. We will now go to the next question. Your next question comes from the line of Bartek Kubicki from Bernstein. Please go ahead.

Bartek Kubicki
Analyst, Bernstein

Morning, and thank you for taking my questions. Just two very quick ones. Firstly, in your results announcement, you are talking about decommissioning your gas assets, gas storage assets. I know they are not significant in terms of the numbers, but I just wonder what decommissioning really means. Will it kind of translate into extra costs, extra cash outflows, and what kind of number we are talking about here? Secondly, whether this also translates into some opportunities. For instance, there is a cushion gas sitting in the storage assets which you can extract and sell on the market for extra profit. So that will be the first one.

The second one, maybe you can share with us your views and feelings about the upcoming T-1 and T-4 auctions in winter. Thank you very much.

Martin Pibworth
CEO, SSE

Yeah, look, maybe, so, the T-1, T-4 capacity mechanism auctions I will deal with first. I mean, obviously, they are going to become live processes, so it is very difficult for us to speak about it. But again, I would remind you, Bartek, of things we have talked about very openly before. The need for flexibility on the system is clear. That will include CCGTs that are aging and therefore have potentially quite significant CapEx requirements. As with everything we ever do, we will bid in a disciplined way. But we will see how that moves forward in the new year. Maybe on the gas storage piece, I will take the kind of practical market piece and then hand the financial piece over to Barry.

I mean, essentially, we are talking about, just to be very clear here, we have two gas storage interests. The first one that we are talking about here is Atwick, and that is basically a gas storage asset that works on seasonal spreads. It injects in the summer, withdraws in the winter, and does not have the opportunity to maybe churn too many times. We also have Aldbrough, which is fast flexibility and can turn over multiple times. We are talking about Atwick here, and fundamentally, markets have changed and shifted given LNG deliverability, so those seasonal spreads are not there for the asset to remunerate itself against. On that basis, that is why we have announced what we have announced today.

Just to be clear, from a physical perspective, that is re-watering of caverns and therefore the closure after 50 years of fantastic service by the operations and by the team. It does not impact Aldbrough.

Barry O'Regan
CFO, SSE

Yeah, look, on the cost, Bartek, obviously, we need to work through this over the next couple of years, but clearly, we will have a full decommissioning provision made for this already. As you rightly said, there is the cushion gas there, which will probably come out over the next two financial years as well, which will offset any of that cost there. So that won't be an impact for us.

Bartek Kubicki
Analyst, Bernstein

Thank you.

Operator

Thank you. Your next question comes from the line of Jenny Ping from Citi. Please go ahead.

Jenny Ping
Analyst, Citi

Thanks very much. Three questions from me, please. Firstly, just going back to the private network agreements that you have signed, for example, the one in Slough. Can you just talk to us a bit around the remuneration model for this agreement and whether that acts as a blueprint for future opportunities in this side of the DC development? Secondly, you talked to the opportunities around life extension and repowering. Can you just put a little bit meat on the bone around that in terms of the scale of CapEx, the gigawatts available that could potentially be repowered or see life extension being applied to in the thermal side? So a bit of meat on the bone, as they say.

Thirdly, a very specific one, probably one for Barry. Just in your thermal division, I think there was a timing benefit linked with the storage asset in the GBP 77 million that you reported in the first half that will reverse in the second half. Can you just give us what that number is so we can understand how much of that is due to reverse in the second half? Thank you.

Martin Pibworth
CEO, SSE

Thanks, Jenny. Morning. Look, first on the private network side, it won't surprise you to hear that we're not going to disclose private commercial arrangements. It's just to point shareholders to the fact we have these two big plays in Slough and Imperial Park. We have very good relationships, very good understanding, and obviously, as that data center trend plays out, both those sites are very well and strategically placed. Also on the life extension, again, it's very difficult to comment on that given the commercial sensitivity, but only to say that the need for CCGTs to offer extended longevity is evident in the market.

Our fleet is incredibly well-engineered, has proved itself to be very reliable, very efficient, and very good at responding flexibly to system demands and the number of stop-starts, that is, per year. We'd expect to be engineering them into the future on that basis.

Barry O'Regan
CFO, SSE

Morning, Jenny. Yeah, on the gas storage, I'd expect pretty much all of that to reverse. I think what we said earlier on in the script that the economics for gas storage at the moment are quite challenging, but Martin talked about the summer-winter spread not being there. I think for the full year, I'd expect gas storage to be making a small loss on an absolute basis, so.

Jenny Ping
Analyst, Citi

Sorry, did you give a number in terms of what's in the GBP 77 million that's going to come out?

Barry O'Regan
CFO, SSE

Yeah, I think a lot of that will all come back out, Jenny, and I think on an absolute basis, gas storage will make a small loss this year, which will be immaterial to the overall group perspective.

Jenny Ping
Analyst, Citi

All right, thank you.

Operator

Thank you. As a reminder, if you wish to ask a question, please press star, one, and one on your telephone keypad. That is star, one, and one to ask a question. We were sent a written question, and the question comes from Harry Wyburd from Exane. Given the announcements already made at the Labour Party conference and alongside the budget, do you expect any further material measures on energy and power as part of the 10-year plan announcement due from the government before the Christmas recess?

Martin Pibworth
CEO, SSE

Thank you, Harry. Look, very obviously, the Labour government is consulting on a number of policy areas right now, and we are constructively engaged in all of those. I mean, you've got to say the Labour government obviously started off with a Clean Power 2030 plan and has delivered significant elements of that plan through the last 2.5 years of its tenure, and that includes the AR7 auction result, which was obviously very strong, but also includes investing in wider spaces, carbon capture, SMRs spring to mind.

I think there's good progressive policy signals there that you can see, and of course, right across the policy space, which is fairly complicated and there are multiple areas for us to focus on, we will be very constructively engaged as we help government decide the next round of policy measures to enable clean power. I would remind everyone on the call, it was one of the first statements the Chancellor made in his budget speech recently about the commitment to Clean Power ambition.

Operator

Thank you. Your next question today comes from the line of Ahmed Bilal Farman from Jefferies. Please go ahead.

Ahmed Bilal Farman
Analyst, Jefferies

Yes. Hi. Thank you for your questions. Thank you for taking the questions and the presentation. A few from my side. I was thinking if you could talk a little bit more about the ED3 process from here onwards, maybe by contrasting it with ET3, as I remember some of the bigger debate points in ET3 were more around cash flow profiling, returns, and I guess incentives and risk sharing. Maybe that's the same set of things applies here, or maybe the ET3 template means that maybe there's more comfort around the returns. I will be interested in your thinking around that.

Then a question on AR8, and I appreciate there's maybe some sensitivities around it, but again, thinking around any thoughts or color you can share on the AR8 opportunity for the sector as a whole versus AR7. Obviously, it's in a backdrop of new leadership in the government and affordability backdrop. Any color you can state there or what you may want to see in terms of upcoming data points, that would be helpful. Then finally, the milestones from here to get to the FID on Berwick Bank would be helpful. Thank you.

Martin Pibworth
CEO, SSE

Okay. Look, it is difficult to comment on a few of these things, but I will give you what we can. ED3, obviously, we are saying we are going to be publishing an ambitious business plan, one that supports electrification and economic growth. It is also one that is inclusive of the need for data center demand to be honored and has gone through extensive customer and stakeholder engagement, including with local authorities. That will go in on Friday, and then, of course, we are in a round of discussions all the way through until draft determinations next summer, and it is a bit difficult to comment on those until that process starts.

We will see how that goes through, but again, the reminder, we think the need for distribution investment is significant, not least because we think an electrified economy is one that not only offers consumers better affordability prospects, but also de-risks the system from international gas supply. For AR8, again, a bit difficult to comment. I understand there is various speculations about size of auction, size of government ambition. Again, I would remind people on the call that the government still remains committed to clean power as an ambition. I would also remind listeners to recall that about a year ago, we had similar discussions about AR7, and then the government contracted a record amount of volume, including over 8 GW of offshore wind.

Let us just see how that plays out. Of course, though, we are bidding into auctions, very aware of the affordability context and our role in helping with that, but also against 20-year CFDs, which is obviously helpful. Then, sorry, the third question was on-- Barry, milestones. I mean, nothing much to say here either, I am afraid, apart from obviously we have announced the turbine agreement with Siemens, and things are progressing well. Our target dates we outlined in the presentation are unchanged from when we won the contract back last January.

Ahmed Bilal Farman
Analyst, Jefferies

Thank you.

Martin Pibworth
CEO, SSE

Thanks.

Operator

Thank you. Your next question today comes from the line of Louis Boujard from ODDO BHF. Please go ahead.

Louis Boujard
Analyst, ODDO BHF

Yes, hi. Thank you, and good morning, and thank you for the presentation. Maybe three questions on my side, please. The first one will be related to the transmission business in the 1H. Your operating profit doubled in this period, and I would like to know if it is possible for you to break down a little bit the increase between the underlying RAV growth, the fast money, the upfront recovery mechanism, and the other T3 revenue effects that are embedded into it, or maybe also the base of comparison on this.

The second part, and the second question would be regarding your 2030 target. If only one of the remaining major projects were delayed by a consent decision, for instance, could the impact on the group earnings be material, or do you think that regarding your 2030 target, it would still be okay because it could be absorbed due to the diversification of your different projects?

The last question would be on the upside for the 2030 targets. You identified potential in additional investments in EGL5, six, Greens to Harburn, et cetera. Could this project create material CapEx evolution and extension beyond the GBP 22 billion program already announced? Thank you very much.

Martin Pibworth
CEO, SSE

What was the last question? Sorry, would you mind repeating? We did not hear the third question properly. Do you mind repeating the third question? Sorry.

Louis Boujard
Analyst, ODDO BHF

Sure, sure. No, no problem. Regarding the 2030 target again, I think there is some additional investment programs that are possible with EGL5, EGL6, Greens to Harburn, et cetera, and these projects are not yet part of the GBP 22 billion investment program. Do you think that if there were some evolution into this project, that could be included into the GBP 22 billion investment program by 2030, and hence having some implication to the potential upgrade in the EPS? Thank you.

Martin Pibworth
CEO, SSE

Thank you. I think Barry will take this.

Barry O'Regan
CFO, SSE

Yeah, no, absolutely. Look, in terms of transmission profit in the year, we do not break it out, but I mean, I think the key piece is you see the big increase in the RAV growth. I think in September 2025, the RAV was about GBP 8 billion in transmission. It is now up to GBP 10.8 billion. So that will drive a big part of that earnings growth in the period. In terms of the upside to 2030 targets, I mean, if your question is specifically around EGL5 and EGL6, they will come post-2030, so that would all fall into that post-2030 piece. So, that would have no impact on the CapEx up to that piece.

And then the second question?

Martin Pibworth
CEO, SSE

Consents, delays to consent, and does it affect the plan?

Barry O'Regan
CFO, SSE

Does delays to consent affect the plan? No. Look, that was all part of the stress testing that we would have done 12 months ago as part of the plan. We made sure we had sufficient allowance for all the consents and for them to move a bit. We are exactly where we expected to be right now, and as Martin said, with seven to go, three expected relatively soon, and then the rest in early 2027, that is all in line with our expectations. We have, rest assured, built in some buffer as well.

Louis Boujard
Analyst, ODDO BHF

Okay. Thank you very much.

Martin Pibworth
CEO, SSE

Thank you.

Operator

Thank you. We will now take our final question for today, and the final question comes from the line of Richard Alderman from BTIG. Please go ahead.

Richard Alderman
Analyst, BTIG

Hi. Excuse me. Hi. Just a quick question. I am conscious everyone wants to get onto the next call. Just following up on Bartek's comments about gas storage, can you just confirm whether the government has given you any reaction to the announcement? If not, had you had any discussions with them on the ongoing subject of the U.K.'s lack of gas storage? I am conscious, obviously, of the Rough news from Centrica, or at least the statement that they would have to close it by March next year if they do not get any regulatory support.

Martin Pibworth
CEO, SSE

Yeah. Thanks, Richard. Hi. Look, we talk to government about all sorts of things all the time, so of course, we will have made them aware about the situation with Atwick. It is a reminder, though, that, just to repeat what I said, Atwick is a seasonal storage facility. Aldbrough is fast cycle, and the seasonal spreads just are not there for Atwick. In fact, I think summer 2027 is more expensive than winter 2027 on the gas market right now, and we have just been very open with government on that. Our expectation is to go ahead with re-watering. Obviously, it is not for me to talk about Rough and Centrica. But again, just to make sure everyone is clear on the call, this does not affect Aldbrough.

The fast cycling Aldbrough storage site remains valuable to the portfolio and important to risk management for us and indeed for the system as a whole.

Richard Alderman
Analyst, BTIG

But if you had some regulatory support, you could reconsider keeping it open, I guess?

Martin Pibworth
CEO, SSE

Look, we discuss things with governments all the time, so of course, we would be open to that discussion. But the plan we have laid out today is effectively what we are working to the engineering for.

Richard Alderman
Analyst, BTIG

Okay. Thanks very much.

Martin Pibworth
CEO, SSE

Thank you.

Operator

Thank you. That was our final question. I will now hand the call back for closing remarks.

Martin Pibworth
CEO, SSE

Well, thank you again for joining us today. Thank you for your questions. Hopefully, this morning underlined just how excited we are about the momentum we have behind our plans and how resilient we are as a business to macro events in the world around us. We look forward to seeing many of you in the coming days. Thank you.