Operator

Good day, and thank you for standing by. Welcome to the Tritium full fiscal year 2022 earnings call. At this time, participants are in a listen only mode. After the speaker's presentation, there will be a question and answer session. To ask a question during the session, you will need to press star one on the telephone. Please be advised that today's conference is being recorded. I would now like to hand the conference over to speaker today, Michael Collins. Please go ahead.

Michael Collins
General Counsel and Company Secretary, Tritium DCFC

Thank you, operator, and good afternoon to everyone. We're glad you could join us today for Tritium's full fiscal year 2022 earnings conference call. Delivering prepared remarks on today's call are Chief Executive Officer Jane Hunter and Chief Financial Officer Michael Hipwood. Incoming CFO Rob Topol will also be available during the Q&A session. Tritium has issued its results in a press release that can be found on the investor section of our website at tritiumcharging.com. As a reminder, participants on this call include forward-looking statements which are subject to various risks and uncertainties. Statements may be based on certain assumptions and thus could cause actual results to differ materially from those predicted in the forward-looking statements.

Any forward-looking statements that we make on this call are based on assumptions as of today, and we undertake no obligation to update these statements as a result of new information or future events. Factors that could cause actual results to differ materially can be found in today's press release and other documents filed with the SEC by the company from time to time, including our forthcoming report on Form 20-F. A recording of this call will also be available on the investor section of our company website. With that, I'm pleased to turn the call over to Jane Hunter, Tritium's Chief Executive Officer.

Jane Hunter
CEO, Tritium DCFC

Thank you, Michael. Good afternoon, everyone, and thank you for joining us for Tritium's first earnings call. I'll let Michael Hipwood run through the detailed financial results, but the headline is that today Tritium is reporting revenue results that reflect the best fiscal or calendar year in the company's history. For the fiscal year ended 30 June 2022, revenue was $86 million, a 53% increase over the prior fiscal year. This result was better than we expected in an environment of supply chain constraints, cost inflation and a tight labor market. We saw great enthusiasm for our products and a market where demand is outstripping supply for fast electric vehicle chargers. This resulted in record sales of $203 million, an increase of 232% over the prior fiscal year.

At 30 June, order backlog was a record $149 million. Tritium reports sales orders and backlog based on executed and contracted purchase orders, so those figures don't include potential volumes from memorandums of understanding or customer forecasts. It would be an understatement to say it's been an exciting year for Tritium. Since listing on the Nasdaq in January, the company has improved our business in a number of key areas. We've added several large new customers on global framework agreements. We've continued to innovate and expand our product line, launching our 150 kW PKM fast charger. We've added talented new executives to our team, and just a few weeks ago, we officially opened our Tennessee factory, which we expect to be a game changer for the business.

I'll expand on each of these topics, but suffice to say, Tritium's moving at an accelerated pace as we focus on operational excellence, scale to meet demand and position ourselves to take advantage of favorable legislation in the U.S. and globally. Recently, many analysts have made the call that the tipping point for EV uptake has been reached as more than half of global car buyers sought electric vehicles for the first time. Tritium is very well placed to take advantage of this historic disruption to transportation. We're among a handful of companies with a comprehensive fast charger product suite, a globally diversified revenue base and factories in the Asia Pacific and the U.S. Our products remain technologically differentiated from our competitors and are successfully winning tenders on the strength of low total cost of ownership and high reliability.

The success of our strategic positioning is evidenced by the strength of our new and existing customer base. Tritium's global framework agreements with BP, Shell, and Enel, a confirmation of the strength of our brand and customer trust in our products. Tritium is presently working with a number of prospective new customers across a wide range of geographies and solutions, and we expect to maintain and grow what we consider to be among the highest quality customer registry in the entire charging category. Major global and oil and gas companies are now preparing to sell to drivers electricity from their fuel forecourts and beyond. BP's initial order of nearly 1,000 chargers for their gas stations in the UK, Australia, and New Zealand demonstrates their aggressive global rollout strategy. We continue to progress our close partnerships with BP and Shell in support of their global electrification strategies.

We've entered into agreements to supply our fast chargers to multiple new and existing customers in the US, Europe, the UK, Canada, South America, Thailand, Australia and New Zealand with orders which will see us deploy thousands of fast chargers across those markets. We've secured US purchase orders from NLX, EV Charging Solutions, Nikola, Siemens, Blink, ChargeNet, Cruise, and EVgo, among others. Across Europe and the UK, we have orders from customers like BP, Motor Fuel Group, IONITY, OK, Shell, Aqua superPower, E.ON Charge, Liberty Charge, Iberdrola, and Osprey. We held a grand opening for the Tennessee factory last month, and we were honored to host dignitaries from the local, state, and federal governments, as well as Australia's ambassador to the United States and many valued customers, suppliers, and stakeholders. The opening of our factory in Tennessee will bring multiple business benefits to Tritium.

The factory will enable the company to increase our margins by reducing freight costs. From Tennessee, we'll be able to truck our charges across North America. We also expect to reduce our use of air freight with an expectation that we'll increasingly make use of sea freight to ship products to Europe from the East Coast ports of Savannah and Charleston at materially less expense and a reduced time at sea than sea freight from Brisbane to Europe. Over the past fiscal year, air freight to Europe from Australia has been as much as 12% of the sale price of a 75 kW charger and 13% of the sale price of a 350 kW charger. Time at sea from Brisbane to Amsterdam rose from six to seven weeks pre-COVID to eight weeks, and congested ports further extended transit times.

The expected time at sea from U.S. East Coast ports to the Netherlands is 10-15 days. In addition to the added time, the cost of moving goods increased substantially in the fiscal year. Inbound and outbound freight costs for Tritium to and from Brisbane increased 30% and 21%, respectively. Importantly, as Michael will detail, we see these inflationary pressures easing and the new factory is in an optimal location in terms of proximity to suppliers and customers. Building products in Tennessee will reduce our lead times for charging equipment for our U.S. and European customers, shortening our order to cash cycle and improving customer satisfaction. The Tennessee factory significantly increases our annual manufacturing capacity and associated revenue, supporting us to meet market demand and reduce backlog.

We also expect to see improved margins through factory layout efficiencies such as the co-located warehouse, a longer floor plate for more production line stages, which reduces complexity per stage and allows us to more rapidly onboard new staff, as well as separate end-of-line test bays per production line. These greenfield factory benefits, as well as the depth of the manufacturing talent base in the local region, are already paying off with record takt time hit at the facility in its third week of production. Our U.S. factory enables Tritium to take advantage of billions of dollars of U.S. federal government formula and grant funding allocated to the rollout of public charging on American highways and alternate fuel corridors via the Bipartisan Infrastructure Law.

We expect US demand for charging infrastructure to be further driven by the Inflation Reduction Act, tax credits for both EVs and EV chargers and associated site installation costs. Tritium is one of a handful of manufacturers building locally who will be able to build Buy America compliant chargers in 2023. The factory was completed within the planned budget of $8 million. There will be additional investment as we add production lines over the coming year. We took possession of the property on the first of March and were building our first chargers in July. Although this was an incredibly fast project from start to finish, we were 6 weeks behind our planned production ramp-up due to supply constraints and recruitment delays. Tennessee enjoys near record low unemployment across the state.

To put this in perspective, July and August recorded unemployment rates in Tennessee of just 3.3% and 3.4% respectively, just marginally higher than the all-time low of 3.2% set earlier this year. While over the long term, this broader employment backdrop creates precisely the type of communities in which we want our employees to work and live, it did result in the longer than expected onboarding of our workforce. We are delighted to report, though, that we're now enjoying our targeted staffing levels in Tennessee and the workforce is committed and talented. We're very proud of the positive impact that our new factory has had on the local community, and we've certainly received a very warm welcome there. To date, we've hired over 100 workers locally, and we're onboarding around 10 staff a week as our ramp up continues.

Although the six week delay commensurately pushes six weeks of planned builds and the associated $45 million of revenue into the first quarter of calendar year 2023. To date, we have not lost any of those purchase orders, and we expect to continue to fulfill our order backlog as production capacity increases and order fulfillment accelerates through the rest of this calendar year. As has been the plan, production capacity at Tennessee was designed and is expected to ramp up over the next 16 months. By the end of this calendar year, our Tennessee capacity is expected to be 6,000 units per year and by the calendar end of 2023, an expected 28,000 units per year. To put this in perspective relative to Tritium's legacy footprint, our existing Brisbane factory has a capacity of up to 5,000 charging units per year.

The scale-up is enormous. Although Europe remained our largest region for revenue in the fiscal year, our investment in Tennessee is in anticipation of substantial increases in market demand for North America. It will also better position Tritium for the freighter products to Europe in terms of price, time on the ocean, and availability. The new factory will only build Tritium's latest generation chargers. For this year and next, that will be our modular scalable RTM 50 and 75 kW chargers and our PKM 100 and 150 kW chargers. These modular products are faster to build, being designed for manufacture and service with 80% parts commonality across product lines. The modular design includes failover modes and easy field serviceability designed to provide world-class reliability and uptime.

We're now manufacturing and shipping our modular 150 kW charger, which uses our innovative DC microgrid architecture and which is planned to be NEVI and Buy America compliant in 2023. This architecture provides the flexibility for the charging site and the chargers to have power levels increased at a later date as site utilization and increasing car battery capacity drive up power demand, or as the site operator works with the local utility to increase their grid feed. Through this architecture, customers can lower their upfront capital investment and design their charging sites to be capable of scaling with their businesses. Our customers have embraced this architecture and model, and we have a significant backlog of orders for this new product.

Our next generation technology retains the best of Tritium's differentiated and patented designs, remaining the world's only fully liquid-cooled IP65-rated fast charging technology. Our technology roadmap sees us launching another Buy America- and NEVI-compliant fast charger in late 2023. Our modular and scalable charger, which is expected to be produced in large quantities in 2024. This model will allow customers to add 250 miles of range to their EV in about 10 minutes, which we expect to appeal not only to public charging network operators, but also to fleet and commercial customers. We're also pleased to report that we continue to progress our technology roadmap towards release of a 32 kW DC wall unit that we expect to be particularly suitable for fleets and car park applications, as well as our 1 MW charger for trucks, ferries, and buses.

We anticipate sharing more news on this effort in 2023. This fiscal year has been momentous for Tritium. As well as achieving record revenue, sales orders, and backlog, we secured Shell as a customer in August, listed the company on the Nasdaq in January, joined President Biden at the White House in February, onboarded our new U.S. General Counsel, Michael Collins, from onsemi in March, secured BP as a customer in April. The same month we welcomed our new Chief People Officer, Keith Hutchison from the National Grid. We started building and shipping our new PKM 150 kW chargers, and we executed a lease and built a factory in Tennessee, which started assembling chargers in July.

Throughout those milestones, we've remained 100% focused on operational execution, making incremental and sustainable changes to the business, which are planned to further improve our margins and increase our revenue in the coming fiscal year. We've remained focused on the prize of electrifying transportation, which remains our mission as it has been for Tritium throughout its 21-year history from its roots in solar racing. With that, I'll turn the call over to Michael Hipwood.

Michael Hipwood
CFO, Tritium DCFC

Thank you, Jane, and thanks to everyone for joining us. As Jane mentioned, Tritium's fiscal year ended 30 June 2022 results were the strongest in the company's history. The company achieved record results in sales orders, backlog, and revenue, with a significant increase to year-over-year margin. For the fiscal year 2022, the company recorded sales orders of $203 million, an increase of 232% over fiscal year 2021. Order backlog, as previously mentioned, was a record of $149 million, and revenue came in at $86 million, a 53% increase over the period ending 30 June 2021. This revenue is the highest in the company's history for both a fiscal and calendar year, driven by strong sales growth and improved operations and charger building times.

Gross margin for fiscal year 2022 was -0.4%, which was a 300 basis point improvement year-on-year. We were able to improve our margins despite the well-documented global supply chain issues and worldwide increases in inflation affecting companies across the manufacturing and electronics industries. We began to see improvements in our margins as we progressed our planned path to profitability. This path to profitability is based on two pillars. First, scaling our production capacity, and second, design improvements to our product lineup that feature greater standardization of components and design for manufacture. Of course, a discussion on profitability cannot be had by any manufacturer today without an acknowledgment of the incredible dual headwinds from inflation and incremental costs from supply chain disruptions. Inflation affected many components in a Tritium charger in the last fiscal year.

In particular, the global chip shortage has driven printed circuit board assembly prices up significantly, as well as materials for power conversion models. As an illustration. For our 75 kW charger, semiconductor parts increased in price by 27% year-over-year, while modular parts prices increased by 24%. These parts alone make up 30%-40% of components in a finished charger. These factors impact DC chargers more meaningfully than AC chargers due to the technological complexity of a DC fast charger. Outbound freight costs from Brisbane also increased by 27% over the same period, further compressing margins. Nonetheless, we are already seeing the green shoots of relief in some of these pressures. We expect a combination of factors to result in a continued upward trajectory for our gross margin, particularly in 2023 and 2024. These are firstly, reduced input price pressures and improved component availability.

Second, price increases that we've either implemented or are currently negotiating with our customers. Third, a material reduction in our freight costs as the bulk of our production shifts to Tennessee. Finally, a continued expansion in sales, production, and revenue that will allow a higher percentage of production overheads to be absorbed on a per charger basis. SG&A expenses were $74.3 million over the fiscal year. $28 million of those costs were related to stock-based compensation to staff on the accomplishment of the listing of the company on the Nasdaq. Going forward, we should see the SG&A base of $46 million increasing in line with inflation and wage growth now that the company is nearing the full complement of corporate staff, IT systems, professional advisors, and the necessary insurances for a global manufacturing business.

We have previously discussed our CapEx-light business model as a contributor to our long-term plan towards positive cash flow generation. Unlike other manufacturers, the cost to expand our production footprints and capacity is relatively modest, and our CapEx in 2022 was only $7 million. Going forward, we expect similar levels of CapEx, the majority of which would be committed to higher production capacity. Comprehensive loss for fiscal year 2022 was $120 million, which included $35 million in one-time stock-based compensation, fringe benefit tax, and listing costs, as well as investments in manufacturing capacity, sales, and field services. On September 6, 2022, Tritium announced that we had closed the refinancing of our existing $90 million credit facility held by our long-term financing partners, Cigna and Barings, entering into a new $150 million facility.

In addition, we announced the closing of a $75 million committed equity facility with B. Riley. Capital available to the company from these financings will be primarily used for working capital investments, particularly the purchase of long lead time components for our chargers and the material inventory ramp-up required to meet increased orders. Our overall outlook remains positive for the remainder of calendar year 2022. With our Tennessee facility now online and ramping to capacity, a large and growing backlog, and measures we are taking to overcome various supply challenges in the global economy, we are confident in the strong drivers supporting our revenue and gross margin progress as we look towards 2023.

In the near term, as a result of the six week delay in production in Tennessee, we now expect revenue for calendar year 2022 to be approximately $125 million, with the six weeks of delayed revenue of approximately $45 million moving to the first quarter of calendar year 2023. This adjustment reflects a change in timing rather than a change in expectations of business performance. With that, I thank you all again for joining Tritium's first earnings call. I will now turn the call back to Jane for closing remarks.

Jane Hunter
CEO, Tritium DCFC

Thank you, Michael. Before we open up the call for Q&A, I want to take a moment to thank the entire global Tritium team. Whether you've been working with us for years in Brisbane, Amsterdam, Los Angeles, the UK, Singapore, Denmark, or anywhere in the world, or you've only just joined the team in Tennessee, we appreciate all that you do every day to drive our company forward in our mission to electrify transportation. It was an incredible experience opening the Tennessee factory and meeting our wonderful new team there that just keeps growing every week. The skills and talent of that team will drive cross-jurisdictional knowledge share, and we expect our Brisbane team to be learning from the folk in Tennessee as much as our team at the new factory is learning from the old hands.

This fiscal year has been a validation of Tritium's tenacity and vision for fast charging everywhere. For Tritium has held an unwavering belief that the world's transport fleet will electrify, enabled by public fast charging everywhere. It's only in the last two years that that vision has become our shared future, and Tritium is in the driver's seat to deliver it. I'd like to conclude today's call by emphasizing how honored I am to lead Tritium during such a pivotal time in the company's history and at this historic moment for the electrification of global transport. Tritium's technology will help enable the rapid conversion of vehicles from combustion engines to electric motors, removing impediments concerning range, charge time, and the reliability of infrastructure.

The rollout of fast charging is a vital part of the EV transition now underway, which will reduce global emissions and hasten the renewable energy transition. Tritium is at the forefront of making that happen. With that, we'll open the call to questions.

Operator

As your reminder, to ask a question, you need to press star one one on your telephone. We request you limit questions to a maximum of two to allow time for others. Please stand by while we compile the Q&A roster. Our first question will come from the line of Steven Fox from Fox Advisors.

Jane Hunter
CEO, Tritium DCFC

Sure.

Operator

Your line is open.

Steven Fox
Founder and CEO, Fox Advisors LLC

Hi. Good afternoon. Thanks for taking my question. Congrats on your first earnings release.

Jane Hunter
CEO, Tritium DCFC

Thank you.

Steven Fox
Founder and CEO, Fox Advisors LLC

For first question, I was just curious. Based on the push out of revenues because of the timing with ramping the Tennessee plant, how do we start thinking about 2023 on top of this $45 million in revenues? Because you also have substantial orders on your books already, and then you also have a lot of customer announcements that I don't think are in the orders yet. Any sort of range you could put on what kind of growth do you think is reasonable to achieve in the current environment as we look out to next year? And then I have a follow-up.

Jane Hunter
CEO, Tritium DCFC

Yeah. We're very optimistic about the near and immediate term prospects for Tritium in 2023. Given that we're reporting fiscal years, I think importantly for today's release, we came in within 1% of planned revenue in the second half of FY 2022 and within 3% of plan for the full fiscal year 2022. You know, it's very good, very close to plan for the fiscal year. Absolutely, we've talked about this six weeks delay in the factory at Tennessee in terms of what we had planned to build there. Talking about that delay, again, it's worth reiterating that that's a calendar year measure, and we're reporting in fiscal years. We're forecasting that six weeks of revenue plan for the first two quarters of fiscal year 2023. That's the $45 million we'll push into the third quarter of fiscal year 2023.

Our COO, though, is operating on a plan to try and catch those six weeks up within the fiscal year 2023 state. There may be no impact on an annualized basis, but we'll be able to provide an update on that at our next half year release. I think though, in terms of the delay, there was, you know, as we mentioned, the component shortages, which had an impact on the end-of-line test equipment and the staff onboarding that didn't meet schedule. We don't believe the $45 million of revenue that's gonna shift to quarter three of financial year 2023 means that any of that revenue is lost because we don't need to make room for the shifted revenue. We expect to grow production capacity throughout 2023, and our objective and plan is not to be building at production capacity.

Steven Fox
Founder and CEO, Fox Advisors LLC

That's helpful. Then, as a follow-up, I was just curious if you could provide a little bit more insight into sort of the planning that goes on from here in Tennessee. It's still a substantial ramp in terms of your targets going towards the 28 or 30,000 units over the next 18 months or so. How do you sort of manage that dance between, 'cause there's been issues already between labor, components, shipments. Like, what do you have to do to sort of make sure that that's sort of a smooth and orderly ramp over the course of that time period? Thanks.

Jane Hunter
CEO, Tritium DCFC

Yeah. The ramp, as you said, is still quite steep. 6,000 unit capacity at Tennessee, plus the 5,000 in Brisbane by the end of this calendar year. Then we have to get to 28,000 by the end of calendar year 2023. That involves additional spend in the vicinity of around $6 million over the course of the year. The most difficult and significant aspect of that is simply the end-of-line test units, which are the only area where we usually experience shortages because they do have semiconductors in them. Now, for that, Steve, we've got a couple of mitigations in place in that we do have some end-of-line test bays in Brisbane that could be shipped over and repurposed, the same in Tennessee. We have some fallbacks in case we have ongoing issues getting the end-of-line test equipment there.

Otherwise, it's a relatively staggered ramp, with an additional, I think, eight bays of end-of-line test equipment to go in, and then the rest of the tooling being very standard COTS tooling and equipment that comes in quite rapidly. We don't particularly expect that ramp to be an issue. The labor obviously is an ongoing issue. We just saw the numbers this morning, in from Wilson County, and I believe they were as low as two point something percent in that particular county where we're operating as opposed to across the state of Tennessee, where they're 3.4%, still very low unemployment rates. We do seem, though, now to have a great word of mouth happening.

A lot of our staff know each other and are bringing each other into the business from automotive and other local electronics industries that were formerly operating there. We're operating out of a former Toshiba TV factory. That seems to have really given us a great head of steam in terms of onboarding staff, and we're now onboarding them at the rates that we'd hoped. It was slow to start, but it seems to have gathered a head of steam.

Operator

Thank you. One moment for our next question. Our next question comes from the line of Matt Summerville from D.A. Davidson your line is open.

Will Jellison
Analyst, D.A. Davidson

Hi, this is Will Jellison on for Matt Summerville today. I wanted to ask the first question about demand. You described pretty broad-based demand across a number of end-use cases by the end of the fiscal year in June. As we sit here in September, where are you seeing some of the most compelling inbound interest, and how has that inbound interest evolved at all in response to some of the recent legislative moves made in the United States in particular?

Jane Hunter
CEO, Tritium DCFC

Hi, Will. Yeah, thanks for the question. You're absolutely right. We are still seeing that demand is outstripping supply in this industry, and that has led to some reduction in pressures on price, so that customers have been relatively open to increases in pricing. In terms of where we're seeing the demand and what we might be seeing from NEVI and the Inflation Reduction Act changes is that, interestingly, we had a look at our top five customers by revenue for fiscal year 2022, and there's a really good mix of segments. We've always been segment agnostic.

We sell into all of the various market segments that are buying, but in our top five customers, we've got two fuel companies, so two global fuel companies, an energy company, a large American charge point operator, and IONITY, the largest public network operator in Europe who spans both the CPO segment as well as the car manufacturer, the EV car manufacturer segment. I think if we look then across those a little more deeply in terms of CPOs, we're seeing those large established charging networks like IONITY, EV Charging Solutions, Loop, Blink, in fuel, you know, BP, Shell, Applegreen, Motor Fuel Group, Liberty Charge, Circle K. We've got a number of utilities, vehicle OEMs, and then the starter fleet operators like Nikola, Revel, Port of Oakland, Port of Long Beach. There's a lot of demand coming from across different segments.

I do think at the moment we would probably say that fuel and utilities are the upcoming segments with fleet not too far behind it, and then the very large established charge point operators. Demand really is outstripping supply. You can see that from the amount of sales that we've got and the significant backlog that we're building. We'd love to get that backlog down to, you know, three to four months, which would be more normal. The only issue that there is, has been in reducing that backlog and just converting it straight away into revenue is simply the long lead time for parts, because you need to be planning your builds about 12 months out now. Some parts, some of the semiconductors have had 60-week lead times.

Those have had to be secured on the secondary market, or you've had to find alternates or redesigns, or even do away with the part entirely so that you can continue your builds. That's why there's a lag of some type between the large amount of sales at $203 million versus revenue at $86 million.

Will Jellison
Analyst, D.A. Davidson

Great. Thank you for that. As a follow-up to that, Jane, how do you think about prioritizing the investments that you make specific to the chargers themselves? In terms of which chargers do you decide are most important to make and ship amidst this situation?

Jane Hunter
CEO, Tritium DCFC

That's a question that we actually deal with on almost a day-to-day basis, Will. Our new Chief Sales Officer, David Nicholl, has established a series of principles, and we try to stick to those principles because otherwise you'll have, you know, whichever customer screams the loudest. The overarching principle, of course, is always first order, first order in, first order out. Around that, when we're doing our longer term planning, we're planning for high margin builds to be prioritized because they obviously are very supportive for us and of course your strategic customers.

The overarching principle is very much first order in, first order out, because that does allow all of the customers to be treated fairly, and they're very accepting of that, as opposed to one customer being prioritized over another customer who perhaps came in later.

Operator

Thank you. One moment for our next question. Our next question will come from the line of Rob Wertheimer with Melius Research. Your line is open.

Rob Wertheimer
Managing Director and Senior Equity Analyst, Melius Research

Hi, everybody. Congratulations on the report, and it's good to be able to catch up.

Jane Hunter
CEO, Tritium DCFC

Thanks, Rob.

Will Jellison
Analyst, D.A. Davidson

Thanks, Rob.

Rob Wertheimer
Managing Director and Senior Equity Analyst, Melius Research

My question's on gross margin. You gave some commentary on some of the obvious pressures that we see in the supply chain and with your, you know, I guess, longer position notions. Are you able to give any more clarity on what gross margin you might have been targeting? Whether there's pricing power there to achieve, you know, whatever margin you choose to specify, you know, if the cost overruns hadn't been there. I guess I'll just ask them all in one. It's just sort of the same theme. Your pricing strategy, does that assume that costs fall again or, you know, you're pricing for current costs and reaping the benefits, you know, if prices fall? Just balance the pricing power, targeted gross margin, what gross margin would have been without the overruns. Thank you.

Jane Hunter
CEO, Tritium DCFC

Yeah. Thanks, Rob. I think in terms of what we were targeting for gross margin, it's very product line and customer dependent. Usually lower gross margins targeted with large global customers that are buying orders in the vicinity of 1,000, than those that might be mid-tier with slightly smaller orders where we'll be targeting higher margins. The margins vary depending on whether it's a fast or an ultra fast. The 50-75 kW, you know, we'll target quite different margins than what we might target for the ultra fast, where we often target a higher margin. Overall, I would say that in any event, we're always targeting a minimum of a 20% margin, and that's our sort of baseline that we like to move from.

You know, from there, they can go up as high as sort of 35%, depending on the product that we're selling. Now, I do think your question is worthy of something of a slightly more detailed response though, because margins, you know, are very, very important. Having achieved, you know, a margin that was just sub-zero. I did want to touch on the fact that in the first quarter of 2021, immediately prior to our merger announcement, obviously the PPI topped out at 4.1%, which was a good indicator of trends. We saw it move higher to 11.7% annualized inflation within a year. Now, supply chain challenges for us had three key impacts which are fixable.

First, there was the high freight prices, which we talked about in our pre-prepared remarks, and the need that we had to use air freight to counter those very long lead times for customers who might have, you know, waited as long as a year for a product. At the end of that, we had to air freight the product. Secondly, there was that disruption of the free flow of parts to the production lines, causing the stop-start builds and labor variances. Of course, the need to source higher cost components on the secondary markets, particularly semiconductors. Lastly, those delays in builds, which significantly separated the delivery date from the order date, causing a lag in the price increases that we'd put into place becoming effective. Those long lead time components, especially electronics and specifically semiconductors, delayed final builds.

When you couple that with the freight and port delays, we were often fulfilling orders with product sale pricing that was negotiated 12 months before. The import prices in certain cases have gone up by 1,000 basis points or more. Simplistically, that lag between securing an order and fulfilling it when input prices climb dramatically does challenge your near-term margins, as does any day where production is disrupted by parts shortages. I think to emphasize in the face of that, we improved our gross margins year-over-year, and I think it is easy to imagine the kind of gross margin expansion we could have enjoyed if those challenges hadn't existed.

We've obviously detailed some of those increases that we experienced in categories like shipping and electronic componentry, and we don't expect to see the same level of inflation next year that we experienced in fiscal year 2022. We're expecting to see shortages ease over the course of calendar year 2023. We do have the margin benefits of the capacity increase that's enabled by the Tennessee factory. As the volumes increase and we produce and sell more, that has a significant benefit to the bottom line and improves gross margins. What we do find particularly promising is we just don't think we're gonna have the same kind of import price pressure escalation in 2023, and we expect those shortages to ease. Demand for our products is gonna grow, and average selling prices are not experiencing downward pressure.

We definitely see the path to expanding profit margins. You know, I think there's some quite easy wins for us on aspects like freight and the scale that comes from Tennessee. I think there was another aspect to your question, Rob, around pricing.

Rob Wertheimer
Managing Director and Senior Equity Analyst, Melius Research

Actually, Jane, I think that was really comprehensive. Yeah. Like, if costs do not sharply increase from here, are you able to price to a level that'll get you to the kind of gross margins that you desire? Do you see what I mean?

Jane Hunter
CEO, Tritium DCFC

Yeah, absolutely. We've already started to see some of those kick in that we've introduced new pricing, particularly, where we've negotiated new agreements, but also where we're amending pricing, which has come to an end of being fixed pricing. Already we're starting to see the flow through of some of those nice margins. We recently saw one as high as 40%, which we were all celebrating. I think we're starting to see the green shoots of those improved margins with the increased pricing for sure.

Operator

Thank you. One moment for our next question. Our next question comes from the line of Thomas Curran from Seaport Research Partners. Your line is open.

Thomas Curran
Senior Research Analyst, Seaport Global Securities

Good morning.

Jane Hunter
CEO, Tritium DCFC

Good morning, Tom.

Thomas Curran
Senior Research Analyst, Seaport Global Securities

Jane or Michael, if we were to return to Tritium's analyst day a year ago, you shared a revenue trajectory showing projections for calendar 2022 of $170 million, which, you know, you've addressed, and then for 2023 of $359 million. Excluding the $45 million of orders that have slid from calendar 2022 into calendar 2023. You know, acknowledging all of the macro challenges that have arisen over the past year, do you still believe that a top line around that $360 million level is achievable, especially given, you know, the much better clarity and detail you have on how Tennessee should ramp over calendar 2023?

Jane Hunter
CEO, Tritium DCFC

Yeah. Tom, I'll let Michael touch on some of that. As you pointed out, those were projections done back in 2021. You know, before we had listed and at this stage, you know, they're not guidance or forecast. I think the capacity and you'd be able to work that out of at 28,000 units times the average selling price could absolutely achieve that type of revenue. As you mentioned, $359 million was what we'd showed for 2023 calendar year. The question, though, is the plan that we have in terms of scale, and that involves, you know, purchasing and putting in purchase orders for parts now about, you know, a year ahead of where you wanna get to. Some of those were put in last year.

We're certainly planning to shoot for something quite significant in that vicinity. We're not putting out guidance, you know, similar to what we've had with most of our peers, EVgo, ChargePoint or Wallbox. With such a market with so many different inflationary and impacts that we're seeing from aspects relating to supply chain and freight and also such a growth market, we just don't feel that we're well served by putting out guidance at this stage for next year. Michael, do you want to expand on that?

Michael Hipwood
CFO, Tritium DCFC

Yeah. Yeah, thanks once again for the question. Yeah, just going back to, you know, the previous investor presentation. You know, if we look back to the one that was outlined in the SPAC. We needed to include that, just like all SPAC mergers. We expected to list a lot faster than what we did, and also that redemptions would have been not as bad as they were. You know, we're at peak redemptions. All that did was, like Jane said, you know, our business is on getting the parts in to meet demand and a lot of them are long lead items. You know, we then quickly raised some capital after that and got on with that. It was just delays.

I think, you know, that's the key there. We aren't giving guidance going forward. I think, you know, every analyst should be able to see from the amount of revenue that is from the six weeks delay that will move in. You know, everyone can extrapolate that math to have some idea of what we expect to be able to produce in 2023 and as revenue. You know, we're doing our best to catch up in Tennessee. We just don't want to, you know, put that extra pressure on us for this year. Hopefully that's answered the question.

Jane Hunter
CEO, Tritium DCFC

I think, Tom, too, it might be helpful in terms of the forward view. We think capacity and the average selling price figures are useful. Perhaps I'll just give a bit more detail on those because they're in the Form 20-F, which we only just lodged, and you wouldn't have had a chance to delve into that. We expect to finish the calendar year, as we said, with an annualized production capacity of 6,000 chargers ending next calendar year with 28,000 charger annualized production capacity. In last fiscal year, we sold 2,006 standalone chargers at an average selling price of $25,958, and we sold 216 sites of distributed chargers.

That's two chargers, one power unit in a site at an average selling price of $123,162. In fiscal year 2023, we do expect to sell more distributed chargers than we have in fiscal year 2022, but we do expect to sell those at a lower average selling price because as we phase out our current 350-kilowatt charger and sell more of our new modular 150-kilowatt chargers, they'll be available also in lower power configurations at a lower average selling price. Our new 400-kilowatt charger won't be available until late in the calendar year. We expect that to have little to no revenue flow through until 2024. Our revenue is not gonna be linear, which is why we focus on annual targets.

Nor do we expect to operate our facilities and production lines at 100% capacity, but we're building out the capacity for expectations in future periods, not just for tomorrow. Hopefully that's useful in terms of building a sound model to develop and assess the business, letting you form your own views on the impact of the global prevailing forces like inflation, foreign exchange volatility, any potential for a recession, the timing of those easing of supply chain constraints, and then also the benefits, though, to EV businesses in the States that flow from the Bipartisan Infrastructure Law and the Inflation Reduction Act, and some of the German government legislation that's been introduced that favors charger manufacturers.

Thomas Curran
Senior Research Analyst, Seaport Global Securities

Those metrics are very helpful. Thank you, Jane. I had not had a chance to dig into this 20-F and come across those yet. How should we think about how much of backlog exiting a quarter for a year should translate into realized revenue over the subsequent 12 months? At this point, are you expecting to reach sustained positive EBITDA more likely before the end of fiscal 2023, or would that be fiscal 2024?

Jane Hunter
CEO, Tritium DCFC

Yeah. In terms of backlog reduction, where we'd like to land at the three to four months of backlog is more likely to occur toward the end of the calendar year 2023, so the first half of fiscal year 2024. By the end of fiscal year 2023, so 30 June of next year, I think we'll still have, you know, a backlog which is going to be more material than three to four months. I think it'll be closer to still six to seven months at that time. It's going to be a sort of gradual burn down over the course of the 2023 calendar year to get that backlog in order. That's really going to be driven by securing of the semiconductor parts that we need more rapidly. We are finding a slight easing in that.

The flip side of the easing is that most of them are being secured still on the secondary market where they're needed, and so that can have an ongoing impact on your margins, but not nearly as material an impact as not being able to secure them. Securing them has a more minor impact. Not being able to secure them has a significant impact. In terms of being EBITDA positive, I think we had sort of talked previously in the past about at the start of the year about being free cash flow positive by late 2023, early 2024 calendar years, and that was the types of timing that we were talking about. That will completely and utterly be influenced by scale.

There was a delay, of course, in receiving the capital that we'd expected to receive at the listing in terms of the high levels of redemptions that we had, which were 85%-86%. That reduced capital influenced our ability to secure sufficient inventory for a very large ramp-up. What that will do is it will mean that we won't become free cash flow positive until we reach sufficient scale. Michael, you might want to comment on that.

Michael Hipwood
CFO, Tritium DCFC

Yeah. Obviously, becoming free cash flow positive is reliant on certain volumes of revenue and certain gross margins. I think James painted a very good picture of you know, what we expect in the coming year and two to achieve that. Once again, you know, without giving guidance, I think there's sufficiently strong tailwinds to show that we're definitely on a path to profitability in going forward. Like James said, you know, it will be a slow burn down of the backlog in terms of months of backlog, simply because we're seeing you know, as you've seen the sales grow and our productivity and it's just ramping up productivity to meet the growth in sales.

Operator

Thank you. One moment for our next question. Our next question comes on the line of Noel Parks from Tuohy Brothers. Your line is open.

Noel Parks
Managing Director, CleanTech and E&P, Tuohy Brothers Investment Research

Hi, how are you?

Jane Hunter
CEO, Tritium DCFC

Good, thank you, Noel. How are you?

Noel Parks
Managing Director, CleanTech and E&P, Tuohy Brothers Investment Research

Really good, thanks. Just had a couple questions. I was wondering if you could talk about the progress in the PKM150 sales. Thinking back to the formal launch of it, I'm just interested in, you know, how's the market reception been? What do you know, in the context of formal launch? I just was curious, maybe if you could characterize what maybe your largest order to date has been, of that product line as far as the number of units.

Jane Hunter
CEO, Tritium DCFC

Yeah. That's a good question, Noel. The PKM-150, at a high level, I would say, has been incredibly well received by customers. It would make up a material amount of that backlog. The customers have been very receptive, particularly to the DC bus architecture that it's built on, as well as to that ability to scale up. We're already seeing some customers wanting to take the PK 150 with less modules inside it so they can add modules later and increase their site utilization availability as they get.

Noel Parks
Managing Director, CleanTech and E&P, Tuohy Brothers Investment Research

Sure.

Jane Hunter
CEO, Tritium DCFC

You know, more drivers at the site. Definitely had a very strong reception. The ramp up of that product for us is still on, you know, what I'd call new product ramp. You know, you start with levels like eight a month, it goes up to 10, it goes up to 40, it goes up to 60. It's been a staggered ramp, and it does mean that it makes up a material amount of the backlog. Michael, I don't know if you have any of those sort of percentage figures to hand of how much backlog is made up of the PKM versus some of the other product lines.

Michael Hipwood
CFO, Tritium DCFC

Not at hand. I might be able to get that during the call.

Jane Hunter
CEO, Tritium DCFC

Yeah. Overall, I would say, Noel, very strong sales. It's going to be, I think, a very good product for us as part of the NEVI program. It's a product we expect to be both Buy America and NEVI compliant over the course of 2023. That will be our key NEVI product until we introduce our 400 late in 2023.

Noel Parks
Managing Director, CleanTech and E&P, Tuohy Brothers Investment Research

Okay, great.

Michael Hipwood
CFO, Tritium DCFC

Sorry?

Jane Hunter
CEO, Tritium DCFC

I think we mentioned also the largest sale that we had seen of the PKM150. That's a little bit of a tricky question. We have obviously one of the biggest sales that we saw last year in the fiscal year was the 1,000 sale to BP. I believe one of the recent ones that we had was made up of around two-thirds of that being RTMs and about 200 of those being PKM150s. Michael, do any other large PKM sales come to mind for you? Michael just said, suggesting that PKM looks like it makes up about close to coming up towards 20% of the backlog, Noel.

Michael Hipwood
CFO, Tritium DCFC

Yeah, sorry. 20% of the backlog.

Jane Hunter
CEO, Tritium DCFC

Currently making up.

Michael Hipwood
CFO, Tritium DCFC

Yeah, sorry, what was the question? Sorry, I was looking at the

Jane Hunter
CEO, Tritium DCFC

Just about any other very large sales or sort of single large sales that we've had of the PKM-150. One that came to mind for me was the recent sale of 200 of them. Was there any others that you've got to hand?

Michael Hipwood
CFO, Tritium DCFC

Pretty much all of our larger customers have put in orders for the PKMs, and then it's just their rollout. You know, some are purchasing 20 and then seeing how they go and some others, like Jane said, are purchasing 100 or so. But to have that 20% of the backlog already is a very good indication, seeing we've just started shipping them. These are mainly putting in orders literally sight unseen.

Noel Parks
Managing Director, CleanTech and E&P, Tuohy Brothers Investment Research

Okay.

Jane Hunter
CEO, Tritium DCFC

I think

Noel Parks
Managing Director, CleanTech and E&P, Tuohy Brothers Investment Research

Great. I'm sorry.

Jane Hunter
CEO, Tritium DCFC

I think, Noel, too, it's worth mentioning that the Shell, who have previously been rolling out our Veefil-PK 175, which is a 350 with half the modules in it, have started to shift all of their orders across to PKM 150s and Shell obviously being one of our very large fuel customers.

Noel Parks
Managing Director, CleanTech and E&P, Tuohy Brothers Investment Research

Oh, great. My second one is, I just wondered if you could maybe take a step back and talk about the supply chain challenges. You talked about the four different or three or four different parts of that. Do you have a sense that the worst is over with supply chain at this point? Is it sort of like a light at the end of the tunnel type situation? Or is it still kind of the visibility limited enough that it's really too early to say?

Jane Hunter
CEO, Tritium DCFC

I don't think it's over. I think we do see the light at the end of the tunnel. What we're seeing at the moment is that the market for semiconductors is still particularly tight. You can get almost all of those semiconductors on the secondary market. It's becoming more of a margin impact than it was before, where it was a line stoppage impact, which is much worse. The line stoppage impacts have the bigger impact for us because our labor variance has become very large and, of course, it just delays your builds. Whereas being able to buy them on the secondary market at a higher price is less of an issue for us.

Actually, I was just on a lengthy call with our buyers yesterday in that semiconductor category, and we have line of sight on the key semiconductors that we need from now to year-end, so September through December, with large numbers of those still coming from the secondary market. I think what I would say I've seen change is that there were periods where you just couldn't get them. There just weren't enough in any market, whereas now we do seem to be able to source them on the secondary market. I think what we saw across the industry was that a lot of those secondary buyers bought them up from the manufacturers at a price increase and are benefiting from that now.

Operator

Got it. Okay, thanks so much.

Jane Hunter
CEO, Tritium DCFC

Pleasure. Thanks, Noel.

Operator

Thank you. One moment for our next question. Our next question will come from the line of Christopher Souther, B. Riley, your line is open.

Christopher Souther
Senior Equity Analyst, B. Riley Securities

Hey, thanks for taking my questions here. Maybe just on the U.S. versus Europe, can you walk through the mix of the annual revenue versus what it looks like in the backlog? I just wanted to get a sense of the pace of the shift there.

Jane Hunter
CEO, Tritium DCFC

Yeah, I'm always interested in that, Christopher, and we follow that very, very closely. We had a slight change. I think last time we had publicly announced to the market we actually had totally equal revenue between Europe and North America. It was 43%, 43% in each region. For the end of this fiscal year 2022, there was a slight change that we made 46% of our revenue from Europe and 39% from the Americas. That's mainly North America, a little bit in Canada, a little bit in South America, but the bulk of it in the United States. And then we made 15% from the Asia Pacific, mainly Australia, New Zealand. Slight change in that we see a 7% pull ahead for us in Europe versus North America, which I think surprised all of us.

One of the ways we've been interpreting that is that we believe some of the U.S.-based demand is awaiting the NEVI and Inflation Reduction Act funding to start to flow, and that we should see a significant pickup as those funding sources begin to flow. Because they're so material, whether that's a tax credit that you can get under the Inflation Reduction Act for the rollout and for the site installation and in fact for maintenance, or whether it's grant funding that you're seeking under the $5 billion worth of formula funding or the $2.5 billion of grants. I believe that, you know, it makes so much business sense for charge point operators and businesses operating chargers to wait for that funding.

What we're expecting is we've seen perhaps a slight suppression, and then we'll see a really huge uptick in demand. The other missing piece in that too, Christopher, is we haven't seen fuel take off yet at all to the extent that we've seen it take off in Europe. I expect to see Shell and BP start their rollout plans in North America, which very much started in Europe. They've now started in Australia, New Zealand, and will expect fuel to start to open up in North America where it's been a minor channel.

Christopher Souther
Senior Equity Analyst, B. Riley Securities

Got it. The order book from some of those key fuels is really just mostly, you know, ex-US at this point. Is that a good way to think about?

Jane Hunter
CEO, Tritium DCFC

Yeah, the order, the back orders are almost all Australia, New Zealand, UK, and mainland Europe, with a lot in the UK and a fairly large amount in mainland Europe. Interestingly, some quite large plans for both of them in the backlog are in Australia, New Zealand in the latest orders that we've received. It seems to be moving across the globe. We are now seeing some activity from Shell Recharge in North America, and I think we'll start to see full rollout occur in North America that we haven't seen in the past.

Christopher Souther
Senior Equity Analyst, B. Riley Securities

Got it. No, that's really helpful. Maybe just to kind of put a bow on the gross margin trajectory, appreciate all the color there. I just wanted to get a sense. You called out a couple specific areas, quite a few, where there's room for improvements here. You know, maybe just on the shipping where you did quantify it, can you kind of walk through, you know, what percent of the costs you think you can get that down to out of Tennessee, be it, you know, increased US mix plus, you know, improved economics to Europe? Like, what would be kind of a steady state, you know, expectation for how much that should cost versus, you know, the numbers you quoted?

Any other ones you wanted to kind of quantify, I think, would certainly be helpful people with some of the walks there towards, you know, the next year or so.

Jane Hunter
CEO, Tritium DCFC

Yeah, absolutely. Over the past fiscal year, air freight to Europe from Australia, as I mentioned in the prepared remarks, has been as much as 12% of the sale price and 13% of the sale price of the 350. Those figures, when you translate them to gross margin, have still on particular charges, been as much as 9%-10% impact on margin. Sometimes lower than that, but as high as that for those particularly heavy high-volume charges. It could have an immediate impact of that significance. Michael, remind me of our preferred, where we like to see freight as an overall percentage in gross margin.

Michael Hipwood
CFO, Tritium DCFC

It would be relatively small. When we're talking about from Tennessee and trucking in the U.S., you know, across North America, it's under $1,000 a charger, and well under $1,000 a charger.

Jane Hunter
CEO, Tritium DCFC

The 2%- 3% , is that-

Michael Hipwood
CFO, Tritium DCFC

Yes. That's about the range because, you know, we would still sea freight to Europe from Tennessee, but no more than 2%-3% of margin where-

Jane Hunter
CEO, Tritium DCFC

Lower than that for trucking, Michael.

Michael Hipwood
CFO, Tritium DCFC

Oh, absolutely. Yeah. It's, as Jane said, it's a lot higher currently and from Brisbane. As we shift the center of gravity to Tennessee and as more and more U.S. customers come online, the gross margin will improve significantly due to freight alone.

Jane Hunter
CEO, Tritium DCFC

It wouldn't be as high as that for sea freight.

Michael Hipwood
CFO, Tritium DCFC

No.

Jane Hunter
CEO, Tritium DCFC

from Australia across to Europe, Christopher. It would have been more like, say, 6%-7%, but still a material impact, which is a really easy win. That's one of the easiest wins. I think the two easy wins are price increases, which is probably the easiest way to improve your gross margin, followed by these very simple fixes to freight, both of which have a really material impact.

Operator

Thank you. One moment for our next question. Our next question comes on the line of Pavel Molchanov from Raymond James. Your line is open.

Pavel Molchanov
Analyst, Raymond James & Associates

Thanks for taking the question. Let me zoom in on your home market. What's the latest on the electric car discount, the federal EV charging program, and anything else that the new Labor government has decided to provide for the EV market?

Jane Hunter
CEO, Tritium DCFC

Hi, Pavel. Yeah, in terms of Australia, we haven't seen what we've seen in the rest of the world, in Europe and North America. We have seen some improvements, as you've touched on under the Labor government, and we recently attended the first inaugural National Electric Vehicle Summit, which had Labor government senior officials present there. One of the issues we do see with the program at the moment in terms of the ability to get a discount on an electric vehicle or a tax credit is that it's still in the vicinity of around the AUD 3,500 mark, whether that's at the state or the federal level, and they can't be combined. That we see as quite low and not really enough in a market which actually has very high pricing for vehicles.

Because in fact all Australian vehicles are imported, they're expensive. You add a luxury vehicle tax to that, which occurs at, I believe, around the 70,000 AUD mark. Cars are really expensive in Australia, and 3,500 AUD is not much of a defrayal on a car that actually starts at the cheapest EV, being the formerly was the MG at 40,000 AUD. There's a couple of cheaper Chinese cars being imported now from BYD, which I think sit just slightly below that. Electric vehicles are incredibly expensive in Australia, and 3,500 AUD is not nearly enough to make a difference and bring them down towards price parity that you would see with some of the subsidies that you see in the United States.

In fact, I mentioned this publicly at the panel that I sat on at that inaugural forum, which was to say that in the States, under the Inflation Reduction Act, you get $3,500, and then another $3,500 if the components are mined in the United States and $3,500 if the battery's built in the United States, which is a $7,000 total. I think in a country where cars are already cheaper than they are in Australia, that's the type of commensurate reduction in the purchase price that you wanna see to make a difference. Because they sit completely and utterly outside the ability of an ordinary family to buy one of these cars.

A typical Australian family often buying a Japanese car like a Mazda or a Toyota or a Subaru for in the vicinity of, say, AUD 28,000-AUD 32,000. These are, you know, AUD 10,000 more. We're not seeing all that we need to see yet in Australia. We don't yet have a levy on dirty fuel, and so we're still seeing a lot of imports into Australia of cars which still have effectively no restrictions on the types of fuel that they and emissions that they can bring. That means we're becoming something of a dumping ground for dirty vehicles, which is something I do believe the Labor government will start to look at. They've decided to have a discussion paper on it, and that's the first time we've seen that open up.

Australia's still a long way behind North America and Europe, and I think the increase that we're starting to see in uptake in Australia is largely driven at the high end of the market. Tesla Model 3 drivers are the most common car.

Pavel Molchanov
Analyst, Raymond James & Associates

Okay. That's very interesting. A question about the competitive landscape. Because you sell so, you know, geographically widely, you're in a great position to comment on this. You know, there are plenty of Chinese manufacturers of charging equipment. To what extent are they trying to establish or succeeding in establishing a foothold outside of the domestic market in China itself?

Jane Hunter
CEO, Tritium DCFC

Yeah, Pavel, we're starting to see Chinese manufacturers becoming competitors. We have seen a handful in the U.K. of where we've seen CPOs purchase one European or even Tritium-built charger and one from China, and comparing the two. Interestingly, you know, without naming names of that particular customer, last time I was over there speaking to them, they had not been happy with the performance of their Chinese chargers, and I'm not sure that they'll continue with them. Where they're competing for drivers to come to their sites, and a driver may not come back to your site and then gives a whole lot of negative blogs about your site if the charger didn't work or was unreliable or was out of order, that I don't believe that that's currently worthwhile for our customers.

I think what we're gonna need to see from the Chinese manufacturers for them to become truly competitive is higher uptime and reliability and better servicing. Because one of the things you are gonna see with these DC fast chargers, because they're high-end power electronics and they break if you use them a lot. There's just like a car, you know, the longer you drive it, the more likely you are to have an outage. High utilization will lead to more outages as services are going to start to become the differentiator, not just mean time between failures. It's no good to have a very reliable charger with good MTBF if you can't resolve the problem very rapidly.

That's gonna be the next area of maturation that we'll see in the industry, is the need not just for free warranty with a reasonable amount of fixed time, but also a service agreement with fixed response and resolution times, much like you see in data centers and medical imaging. That just hasn't really occurred yet across the industry. We will see it occur because fuel is used to it, and that's how fuel's always operated. They have SLAs on the forecourt, they have four-hour turnaround times for fixes, and we're gonna see them pull the socks up in the industry, I think.

Operator

Thank you. I'm not showing any further questions in the queue. I would turn the call back over to our speakers for any closing remarks.

Jane Hunter
CEO, Tritium DCFC

Okay. In terms of wrapping up, I think what I, you know, would like to say is for the company overall, we think it's very important to say that today's release, we're very pleased to have come in within 1% of planned revenue for the half that we've just reported and 3% for the full fiscal year. We do suffer some challenges over the next half, but we're very buoyant about fixing that particular six-week delay over the subsequent half of fiscal year 2023 before the thirtieth of June in 2023. That's what both myself and our CEO, COO will be very focused on over the next half, is getting that fixed. I think one topic that we didn't touch on was services and software.

We should also note that although service and maintenance revenue does continue to be modest for Tritium, it improved from 4.6% of revenue in fiscal year 2021 to 5.8% of revenue in fiscal year 2022, and services and maintenance revenue increased by 92% compared to a 51% in hardware revenue. Services and maintenance for us generated a 24% gross margin in fiscal year 2022 from a negative gross margin in fiscal year 2021. We have spoken in the past about that boom echo effect of the hardware rollout generating ancillary revenue opportunities, and we continue to see that as a key strategy that we're developing.

We've always said we believe our hardware is a Trojan horse for that broader level of customer relationship, and we continue to believe that high-quality hardware with comparative to other categories, lower margins, is the ideal vehicle for growing a material services and software business. Our fast chargers have a 10-year operating life, so there's typically this eight year tail after the standard two year free warranty period for paid services like spare parts, service agreements, preventative maintenance and extended warranties. As the industry matures, we do see a material opportunity for service agreements to be in place from day one of operating a charger, not after the free warranty. Free warranties are reasonable efforts, no fixed resolution times. They're not gonna be suitable in the future for businesses that wanna operate high availability public and commercial charging fleets.

Of course, we do plan to use this lengthy ten-year period to sell software that brings benefits to our customers operating our hardware like advertising modules, predictive analytics, diagnostics tools, fleet management software, and those APIs for back-end integration. That's one of the reasons we've invested in Palantir. We now have state-of-the-art data coming in and being sucked in across all of our platforms directly from the chargers and also from all of our services and systems like Jira, NetSuite, Salesforce. What that's gonna allow us to do is really improve our predictive analytics and diagnostic tools. Again, there's this boom echo effect. The boom's happening right now with the hardware, and we expect to see over time, greater revenue contributions from services, maintenance and software.

That's a really key aspect of the business that I did wanna touch on that I don't think we did touch on. You know, the other thing I think I'd just like to wrap up with is Tritium is an investment for 2023, 2024 and beyond. This has always been the plan. Fiscal year 2022 was very much a set-up year. It was our first year of trading as a publicly listed company. We had to put in the scale in Tennessee, and we're so pleased that we have. That was a great call. The Inflation Reduction Act and the Bipartisan Infrastructure Law have come in since we made that plan, and we've been able to work with our landlord to increase the ability to scale at that site.

We have taken on a lease that starts small and has the ability to grow and grow and grow, so we don't actually have to pay for the space until we take up the space. We can be Buy America compliant ahead of many of our competitors and building in America at a time when the American market, I expect to go absolutely gangbusters. I think with that, we'll conclude the call.

Operator

You may now disconnect. Everyone, have a great day.