Summary

Q3 revenue rose 27% organically and operating profit increased 33%, while record orders more than doubled the civil engineering backlog. Consulting remained weak, and Q3 free cash flow was affected by payment timing and working capital.๎ˆ‚๎ˆ‚๎ˆ‚๎ˆ‚

Erik Petersen
VP of Corporate Affairs and Investor Relations, NYAB

Hello, everyone, and welcome to NYAB's result presentation for the third quarter of 2026. With us in this call, we have the Group CEO, Johan Larsson, and CFO, Peter Franks. My name is Erik Petersen, and I am the VP of Corporate Affairs and Investor Relations at NYAB. Participants who wish to ask questions after the presentation are welcome to join the teleconference via the link in the invitation. You may also submit your questions in the chat, and you will find the chat under the presentation window on your screen. Now, to get started, I hand over to Johan, who will go through the results.

Johan Larsson
Group CEO, NYAB

Thank you, Erik. Yeah, well, yet another strong quarter. Now we are at second half, which are our earning quarters. Q3 started quite good. We have a strong revenue growth and a higher operating profit. Our operating margin is solid. Still room for improvement, but we are moving in the right direction. Civil engineering, as usually, drove the group revenue and earnings growth. We improved the operating margin in Sweden. In Finland, we had a record-high growth, very necessary for the future to even out seasonality. We know that we will have a stronger H1. Great steps taken and still with a margin of 7% during very strong growth. I am happy with that. The record order intake, it gets quite clear for everyone what we have seen and been talking about for some time, that there are heavy investments within the sectors we address, meaning energy, infrastructure, and industry.

Our order intake more than doubled the order backlog year-on-year. Revenue-wise, we had a strong growth. It is even more funny in the currency SEK. For the first time, we have a quarter with revenues exceeding SEK 2 billion, clearly, but EUR 190.2 million, and YoY, up 19%, rolling 12. Our operating profit, as you see, we have steady improvements. Now we are at 6.2% rolling 12, with a goal of 7.5%. We are moving in the right direction, and in the quarter, we grow the EBIT with 33% YoY. As I mentioned, I rushed a bit in the start. Our order intake record high. In the quarter, it was EUR 555 million, where a bit more than half is our part of the Uppsala Tramway project.

We see investment needs, heavy investment needs from the defense, from data centers, from infrastructure, both maintenance and new projects. Rolling 12, YoY, 107% book-to-bill, and it amounts to more than 1,000. Our order backlog more than doubled. We are a growth company. We have always had growth. We are accustomed and used to handling growth. We have tried to explain our business model, where we have less fixed costs, do less of the production ourselves. We lead it, and that is what makes both sustainable margins and growth over time possible. Some more new projects to exemplify. You see what we have been talking about for some time, our strength with being early in projects, participating in planning and designing of projects closely with our clients.

In the quarter, we signed the Uppsala Tramway, the phase II, of significant value. We are happy to continue our close collaboration with Svenska kraftnรคt. We signed the phase II order for Letsi-Svartbyn, where we also were at the early stage with the phase I to start the collaboration for this project. We have an early phase assignment for a steel coil logistics facility, an Early Works Agreement with SSAB that we entered into in July, part of SSAB's important and heavy long-term investments, building the next generation steel making in Luleรฅ. We can note that SSAB is a client of us also in Finland and in other geographies. When it comes to our long-term financial targets, these are of importance. We try to be as clear as we are allowed to. A revenue growth exceeding 10% annually. The outcome rolling 12 is 19%.

Usually, we do not have any difficulties with reaching that target. Profitability, more than 7.5% operating margin or EBIT. Here, we have been quite clear to the market that do not expect us to reach our target in 2025 and 2026 due to the dilution from the PP business, Portal Consulting. We are still at 6.2%, hoping to improve it further in the last quarter. Next year is a new game. Capital structure, a net debt in relation to EBITDA, less than 1.5 x. As you see, we have a negative net debt, so a lot of headroom and flexibility needed for a company like ours. So, check. The direct shareholder return, a dividend that exceeds 35%, nothing new, but we had a dividend of 47%. With that, I hand over to our permanent CFO. So, congratulations to NYAB and the shareholders. Peter.

Peter Franks
CFO, NYAB

Thank you, Johan. I will now take you through the financial highlights of the third quarter. As Johan said, the key messages this quarter are strong revenue growth, higher operating profit, and the net cash position. I will start with group revenue, profitability, and our financial position. Then I will move on to our two business segments, civil engineering and consulting. Let us start with revenue in the third quarter. Group revenue was EUR 190.2 million, up 27% on the same quarter last year. That growth is all organic. Civil engineering is the driver, with civil engineering revenue up 39%. However, consultancy revenue was about EUR 7 million lower. Two drivers sit behind the civil engineering revenue growth, higher production and a stronger starting point.

The civil engineering order backlog coming into Q3 was 18% higher than a year earlier, at EUR 502 million at the end of Q2 2026, against EUR 425 million at the end of Q2 last year. Large infrastructure projects in Sweden, the ramp-up of the Mikkeli data center in Finland, and projects moving from planning into construction all contributed to the growth in revenue in Q3. That momentum is being carried forward. Group order intake was a record EUR 555 million, of which civil engineering delivered EUR 542 million. The civil engineering backlog has more than doubled year-on-year to EUR 873.8 million from EUR 404 million in Q3 2025. Looking at the last 12 months, revenue grew 19% to EUR 606.6 million. Of that, 14% was organic and 5% came from acquisitions. The rolling 12 revenue split remains stable. Civil engineering is 84% of revenue and consulting 16%.

By country, Sweden is 64%, Finland 21%, and Norway 12%. 58% of our group revenue comes from the private sector and 42% from the public sector. The one shift is within sectors. Energy share of group revenue has fallen from 51% to 41%, while infrastructure share of group revenue has risen from 37% to 45%. That reflects project timing and our deliberate focus on infrastructure opportunities. Let's turn to profitability, where we delivered improved margins. Operating profit rose 33% year-on-year from EUR 11.3 million to EUR 15 million. The operating margin improved to 7.9% from 7.5%. Three things supported this. Firstly, the quarter's revenue growth. Secondly, continued solid profitability in the project portfolio. And thirdly, a revaluation gain on the total return swap connected to our long-term incentive plan. The increase in operating profit was driven by civil engineering, where operating profit grew 33%.

The consulting segment had EUR 1.1 million lower operating profit year-on-year. Together, these explain EUR 2.3 million of the EUR 3.8 million increase. The rest comes from group items, including the swap gain of about EUR 1.7 million, which also helped improve the margin. On a rolling 12-month basis, operating profit increased 24% to EUR 37.5 million at an operating margin of 6.2%. That reflects a healthy margin profile across the project portfolio. Net profit for the quarter was EUR 12.6 million, up 49% from EUR 8.5 million. Besides higher operating profit, we saw positive development in net financial items and in the share of results of associate and joint ventures. Now to our financial position, starting with free cash flow. Free cash flow for the quarter was minus EUR 6.2 million against EUR 9.3 million a year ago.

The main reason is timing with a customer payment of EUR 31 million arriving shortly after the quarter ended. Had it come in on time, free cash flow would have been around EUR 25 million. On a rolling 12-month basis, free cash flow was EUR 20.1 million, and the cash conversion rate was 45% of EBITDA. The cash conversion rate is below our historical levels due to the delayed receipt and the buildup of working capital in Q2 and Q3 for a strategic project with extended payment terms and compensating revenue adjustments. We foresee a significant reduction of working capital in Q4 in line with our invoicing and payment plans on that strategic project. We ended the quarter with a net cash position of EUR 5.2 million compared with net debt of EUR 1.8 million a year ago.

Net debt to EBITDA was minus 0.12 x against plus 0.05 x a year ago. That is less negative than the - 0.3 x at the end of Q2 2026 because of the cash flow timing I just described. We remain in a net cash position. Finally, return on capital employed on a rolling 12-month basis was 16.5%, and the equity ratio was 64.8%. Let me now turn to our largest business segment, civil engineering, which represents 89% of our Q3 revenue. I'll cover order intake and backlog first, then revenue and profitability. In civil engineering, long-term investment programs in energy, infrastructure, and industry continue to support demand. Order intake reached a record EUR 542 million. That is up EUR 375 million from Q2 2026 and 433% higher than a year ago. The increase was driven by phase II orders for major collaborative projects.

These include NYAB's share of phase II of the Uppsala Tramway joint venture project, with a combined contract value of SEK 6.5 billion. That is about EUR 574 million. The order intake and backlog also includes phase II of the Letsi-Svartbyn 400 kilovolt power line in Norrbotten for SEK 1.6 billion, or about EUR 140 million. On top of that, as Johan indicated, we signed an Early Works Agreement with SSAB for the Coils Hotel in Luleรฅ and added to the Mikkeli data center project in Finland. On a rolling 12-month basis, order intake is 1.9 x revenue. Order backlog grew to EUR 873.8 million, up 116% year-on-year. Beyond the reported backlog, we have several early phase assignments covering planning, engineering, and design. These may progress into significant execution contracts.

At the end of the quarter, the estimated value of those potential contracts was approximately EUR 200 million, compared with approximately EUR 600 million at the end of the previous quarter. That change reflects new assignments, revised estimates, and assignments that moved into order intake and backlog during the quarter. With that, let me turn to civil engineering's revenue and profitability. Civil engineering followed its expected seasonal pattern, with revenue increasing from Q2. Revenue rose 39% versus the same quarter last year to EUR 169.5 million. That reflects the improved order intake and backlog and the ramp-up of production-intensive infrastructure projects during the summer. In Sweden, revenue increased 12% year-on-year. In Finland, it increased 126%, driven by high construction activity on the Mikkeli data center project. Operating profit increased 33% to EUR 13.7 million from EUR 10.3 million. The operating margin contracted slightly to 8.1% from 8.4%.

By country, the margin in Sweden improved from 7.8% to 8.4%. In Finland, it fell from 8.3% to 7%, reflecting the quarter's project mix with a greater contribution from renewable energy projects and continued investments in new hires to enable the future growth of Finland. On a rolling 12-month basis, revenue grew 19% and operating profit grew 21%, at an operating margin of 7.3%. We now move to our consulting business segment, which represented 11% of the quarter's group revenue. I will cover revenue and profitability first, then order intake and the outlook. Consulting had a weak quarter. Revenue decreased 25% to EUR 21.1 million, and the operating margin was 0.6%, down from 4.5% year-on-year. Demand in the Norwegian offshore market stayed soft, and the number of consultants on assignments fell during the quarter. The appetite for new renewable energy investment projects also remained weak.

The revenue decline is mainly due to lower demand for project personnel services in Norway's offshore market and a more selective order intake. Order intake fell to EUR 13.4 million from EUR 16.7 million in the same quarter last year. That brings the rolling 12-month book-to-bill ratio to 0.7 x revenue. On a rolling 12-month basis, revenue was EUR 100.2 million at an operating margin of 1.5%. Looking ahead, the cost efficiency and business transition measures we took earlier in 2026, particularly in Norway, have yet to take full effect. Meanwhile, Dovre Solutions continues to build its presence in Sweden with an assignment for the early phase of a civil engineering project. That concludes the financial review of the third quarter. I will now hand over to Johan for the summary and closing remarks.

Johan Larsson
Group CEO, NYAB

Thank you, Peter. Great. Not much surprising in the summary. We had strong revenue growth and a higher operating profit with a solid operating margin. As you saw, the result actually grew with 46% in the quarter. Civil engineering growth with increased revenue and earnings in both Sweden and Finland, and as Peter mentioned, worth highlighting is Finland's growth with 126% in the quarter, still maintaining a quite decent margin of 7% in that heavy growth with ramp-up costs and other things. What is important for shareholders to understand about this is historically, we have had quite weak results in Finland in H1 due to too low volumes, meaning that the fixed costs has been a bit too high.

Now we are taking steps in the right direction, knowing that the coming H1 starts with a much better position, and hopefully this will help to have Finland quite significantly improve their margins on coming full-year basis. So, great performance there, and I am very happy with the Finnish performance. Record order intake. We have ensured that we will not break this record coming Q3. Impossible comparison period, more or less. But of course, it is controlled. We know what we are doing. It is partnering contracts, and we are looking forward to execute on this backlog. It is just not the volume of the backlog, it is the quality of the backlog that is satisfying and reassuring.

Phase II orders during the quarter, as I mentioned when we looked at the projects already, it demonstrates the value of early customer involvement, and it also demonstrates the value of our consulting business.

The solid financial position and focus on effective project execution and selective growth in niche segments with attractive margins. So, the work continues, steadily building a better and stronger company, looking forward for finishing the year and looking forward even more for coming year.

Erik Petersen
VP of Corporate Affairs and Investor Relations, NYAB

Thank you, Johan, and thank you, Peter. We will now open up the teleconference for questions.

Operator

If you wish to ask a question, please dial pound key five on your telephone keypad to enter the queue. If you wish to withdraw your question, please dial pound key six on your telephone keypad. The next question comes from Simon Jรถnsson from ABG Sundal Collier. Please go ahead.

Simon Jรถnsson
Analyst, ABG Sundal Collier

Hello, guys, and congratulations on the strong numbers, and thanks for taking my questions. I have a few. First, I want to start with the margins. I think you clarified a few things. I just have a follow-up on Finland here. Wondering if you can clarify a bit more what you said about how much of the lower profitability now is due to ramp-up costs compared to lower project margins in general, because you sounded a bit positive on margins in Finland for next year. Is it fair to assume that it's lower now due to ramp-up cost, or are there any changes in the project margins?

Johan Larsson
Group CEO, NYAB

No, it's fair to assume that. As Peter mentioned, it was also some old backlog works, finalizing a few renewable projects that has a bit tighter margins, but especially it's ramp-up costs. You can't grow with 126% in a quarter without having costs ahead. It's part of the ongoing movement. As a whole, I would say that with this growth, it's a strong margin to deliver 7% EBIT. As I tried to state with the history of Finland, we have had, since we did a reverse takeover of a Finnish-listed company, we have had too low volumes for being a public and listed company with the costs that are associated with it in H1. Finland has always performed quite well margin-wise and EBIT-wise in H2, but this puts us in a position to make the coming full years a lot better.

Simon Jรถnsson
Analyst, ABG Sundal Collier

I see. Thanks for that. Just one follow-up on that, regarding the projects you are finalizing, the more legacy, of the legacy kind. Are those completed now, or is it an ongoing finalization of those works?

Johan Larsson
Group CEO, NYAB

Quite close to finalized. After Q4, they are so finalized that you will not really trace them in the numbers as a whole.

Simon Jรถnsson
Analyst, ABG Sundal Collier

I see. Some of that is in Q4 as well, potentially, but then a bit more clear into next year.

Johan Larsson
Group CEO, NYAB

Yeah, but the difference with Q4 is that you will not have the same ramp-up costs in Q4 that you had in Q3, so it is two different variables, one working our way, one working against us, if you are talking about short-term margins.

Simon Jรถnsson
Analyst, ABG Sundal Collier

All right. Perfect. Are you seeing similar ramp-up costs in Sweden still, or are you more satisfied with those margin levels you have in Sweden right now?

Johan Larsson
Group CEO, NYAB

Yeah, we're satisfied. There's still room for improvement, but it's project business, and in a quarter, you can't take too much weight. You must see it over a bit longer time span. To get back to your question, we still have ramp-up costs. As long as we have this growth rate that we have within civil engineering, you have costs.

Simon Jรถnsson
Analyst, ABG Sundal Collier

Yeah, that makes sense. On consulting and the margins in that segment, it remains at a lower level. Are you seeing any change of pace or momentum into next year, or given that orders are also low here, should we expect that margins in consulting remains low into next year as well?

Johan Larsson
Group CEO, NYAB

I would say that, just to give you some context, we have two different business models within consulting. One is PP, project personnel, and one is consulting, traditional consulting. The traditional consulting has a lot of synergies with civil engineering and NYAB. The project personnel is more of a broker business, low margin. The entity that we divested in North America was PP business, the one who loses volumes in Q3, the decline with 25%. All of it comes from PP business due to decline in offshore market. With that said, we are taking measurements. The market works against us, and yet, of course, project personnel isn't a key part of NYAB's business as a whole.

Peter Franks
CFO, NYAB

Yeah, I think going into next year, we are already establishing our footprint in terms of consulting in Sweden, and we're starting to win projects within that part of our business, so there will be growth in the Swedish consultancy business. We're comfortable also with the growth of our consultancy business in Finland, and also the consultancy business in Norway has a sort of good market opportunity for us, and we're trying to capitalize on that at this point in time as well.

Johan Larsson
Group CEO, NYAB

Yeah. What we can say is that we have been quite clear mentioning to our shareholders and investors that we want to reach our EBIT margin goal of 7.5% in 2025 and 2026, due to the dilution of margin from consulting and the PP business. Our goal is to be as transparent and as close as possible when we are leaving this year about the outlook for 2027.

Simon Jรถnsson
Analyst, ABG Sundal Collier

I see. Thanks for that. On the order side, you mentioned the early phase assignments of, I believe, EUR 200 million or so. Is a large share of that the ongoing data center projects that you are working on but haven't received the full orders, or is this the project that you haven't started yet?

Johan Larsson
Group CEO, NYAB

It's other projects to a high extent, industry clients.

Simon Jรถnsson
Analyst, ABG Sundal Collier

All right. Perfect. On the cash flow side, you clarified a bit on the weaker cash flow here, mentioning timing, large payment, and so on. Is that the main reason, or are you also tying up some working capital in general due to the high growth?

Peter Franks
CFO, NYAB

Well, it's a natural part, of course, as you grow, that you tie up more working capital, so there is a piece of that. But of course, we also seek to get prepayments and timely payments as much as possible. But it's mainly, as I indicated, that we had EUR 31 million come in a couple of days later than was due, which sort of led to us having a negative free cash flow, but it would have been a very healthy, positive free cash flow if that had come in on time. Also, that we've got this strategic project that is taken up a level of working capital at this point in time, and we are working on the basis that it will be paid down during Q4, so we'll have a very healthy cash position at the end of this year.

Johan Larsson
Group CEO, NYAB

Yeah. I would say that historically, we have been on cash conversions levels in the region of 90%, and we see that underlying, there's not much difference from that. It's more timing effects.

Peter Franks
CFO, NYAB

Yeah.

Simon Jรถnsson
Analyst, ABG Sundal Collier

All right. A final one from me, a bit broader question, but as you subcontract most of the work, and now when we are seeing a pretty strong demand for infrastructure in the Nordics, has your ability to sign subcontractors with good terms, has that changed in any way, or do you see it changing, or can you elaborate a bit on your position there?

Johan Larsson
Group CEO, NYAB

No. I would say that if you look at the infrastructure market and market as a whole and its growth, the market doesn't grow that much, not to the extent that NYAB grows. So, our model is quite intact. We are, of course, monitoring it closely, especially for niche segments and niche subcontractors to ensure that we have the capabilities needed. But I would help you with the question you should ask instead, due to the worries in the world, on how do we handle the insecurity and the possible increase of uncertainty in different sorts, energy prices and such. Related to that, I would say that there are more fear there, but since we have the position we have, we have clients that we can put forward some of the risks to, and our subcontractors can absorb a lot of the risks as well.

I would say that it is more there we pay a real close attention going forward due to global uncertainties.

Peter Franks
CFO, NYAB

And maybe just-

Simon Jรถnsson
Analyst, ABG Sundal Collier

Yeah, sorry.

Peter Franks
CFO, NYAB

Yeah, just to supplement there as well in terms of, because we are doing the Early Works Agreement and we are sort of doing the project planning piece, we are very much working with the subcontractor community to sort of get them secured to deliver our projects. So, we know very clearly what the pricing is, their availability, before we sign up to contracts with our customers as well.

Simon Jรถnsson
Analyst, ABG Sundal Collier

All right. That was my follow-up. If you are seeing an impact on margins from higher material costs or worker costs.

Johan Larsson
Group CEO, NYAB

Yeah. We don't see an effect on the margin where we are now.

Simon Jรถnsson
Analyst, ABG Sundal Collier

Perfect. That's all from me. Thank you so much.

Johan Larsson
Group CEO, NYAB

Yeah. Thank you.

Erik Petersen
VP of Corporate Affairs and Investor Relations, NYAB

Thank you, Simon.

Operator

The next question comes from Christoffer Jennel from Inderes. Please go ahead.

Christoffer Jennel
Analyst, Inderes

Hello, Johan and Peter. I have a couple of questions. Take them one by one. Starting with the civil engineering margin, a follow-up on previous question. The margin fell to 8.1% from 8.4%, despite the very strong growth and your increasing niche projects with higher margins. Could you start by giving some extra color on this year-on-year drop in the civil engineering margins?

Johan Larsson
Group CEO, NYAB

Well, I would say that as you see Finland with 126% growth, and you see quite a hefty growth in Sweden as well, I would say that those are the main reasons.

Christoffer Jennel
Analyst, Inderes

All right. Okay. A bit broader question. On the works that you actually target, for instance, Trafikverket, Fingrid, are you seeing more bidders than a year ago, and is pricing holding? Has your win rate on bids submitted changed in any ways?

Johan Larsson
Group CEO, NYAB

No. I would say that we see less competition to a vast volume of our potential revenue, since it's quite complicated to have the There are not that many competitors that has the planning, projecting, early phase capacity that we have. In those kind of projects, the competition is clearly lower, and it's clearly less risk. We get to an early phase where the client has the maximum use and value of us, and we are rewarded of that. If you're talking about like the general contractor business, where we mainly do execution, I would say that it's pretty much the same. The competition there is pretty much the same.

Christoffer Jennel
Analyst, Inderes

All right. Got it. On cash flow, it seems like read that much into this negative cash flow in Q3 due to the timing. In general, maybe does the shift toward larger and longer contract bring weaker advanced payment terms than your historical mix?

Johan Larsson
Group CEO, NYAB

I wouldn't say that. It's different from time to time, but with the existing business model and with the business that we have now, it's all about timing effects. We have just moved a great FCF start to Q4, meaning that we have a great start on the FCF from Q4 instead of presenting it in Q3.

Christoffer Jennel
Analyst, Inderes

All right. Got it. If I recall correctly, in Q2, you mentioned that roughly 10% of the Mikkeli data center contract was in the backlog. Could you give any update on what that share is now in Q3?

Johan Larsson
Group CEO, NYAB

I know that it's clearly more, that we have received an order there, but I don't have the figure.

Erik Petersen
VP of Corporate Affairs and Investor Relations, NYAB

Yeah. It's slightly higher than that, but it's more around the 15%-20% mark.

Christoffer Jennel
Analyst, Inderes

All right. Thank you. The last one on this new works agreement for the data center contract in Utajรคrvi. Could you give any indication of the value on that execution phase?

Johan Larsson
Group CEO, NYAB

We cannot give any guidance on value agreement with the client.

Christoffer Jennel
Analyst, Inderes

Okay. All right. Thank you. That was all for me.

Johan Larsson
Group CEO, NYAB

Thanks.

Erik Petersen
VP of Corporate Affairs and Investor Relations, NYAB

Thank you.

Operator

As a reminder, if you wish to ask a question, please dial pound key five on your telephone keypad. There are no more questions at this time, so I hand the conference back to the speakers for any written questions and closing comments.

Erik Petersen
VP of Corporate Affairs and Investor Relations, NYAB

Okay, great. Now let's move on to the questions in the chat. The first question, you have created a Marine division. Can you tell us anything about that division and how it is developing?

Johan Larsson
Group CEO, NYAB

Yeah, great. Actually, we did an acquisition of a company a few years back that is now integrated into NYAB and renamed to NYAB Marine. Quite a small business that we bought, and we've had very good progress there. It's seated mainly in the Mรคlardalen area. They do work, of course, in bigger geographies, but the growth there is quite heavy. I would say that it's approximately 10 times the revenue that it was when we did the acquisition, and it improves its margins. So, that is a part of us and one of the niches we are aiming for going forward. There will be a lot of waterworks, and the water market has an increasing demand.

Erik Petersen
VP of Corporate Affairs and Investor Relations, NYAB

Thank you, Johan. That question came from Jan Hedebary. Second question from the chat comes from Lucas. "What would you say are the main aspects of your business model that people don't appreciate enough or have issues understanding?

Johan Larsson
Group CEO, NYAB

Yeah. I would say that it's a very traditional business and industry itself. We have been building and constructing both roads and buildings for quite some time. The difference with us is that we have more focus on planning, designing in many forms, and we have a focus on project management, leading the projects, meaning that we have to be very skilled with both contract law and construction law. The production itself is more made by subcontractors, meaning that clearly less than 10% of our production is made by NYAB itself, although we own the production. That means that we have a low fixed cost business, a low CapEx business, meaning that we are very flexible and we can scale it. That's where our growth really comes from. It's the business model that allows this.

That is a bit difficult to understand because we get into being some sort of hybrid between a traditional consulting company and an infrastructure company.

Erik Petersen
VP of Corporate Affairs and Investor Relations, NYAB

Thank you, Johan. The last question is on share buybacks. Is this in plans? If so, what are you then going to do with them?

Johan Larsson
Group CEO, NYAB

First of all, we need a mandate to buy back shares, and we haven't gotten that mandate to be formal. But it opens a lot of possibilities, the changes now that are expected to take place December 5th, and we will see how we would handle them. We won't give them to key persons, of course, but in the context of a long-term incentive plan related to a very good performance, that could be part of their compensation.

Erik Petersen
VP of Corporate Affairs and Investor Relations, NYAB

Okay. Thank you very much, Johan, for those answers. The last questions came from Jan Hedebary. That's it for the Q&A. With that, we end that session. Next time we'll meet will be when NYAB releases its year-end report of 2026. That is February 25th of 2027. So for now, we thank everyone for participating and see you again next time.

Johan Larsson
Group CEO, NYAB

Thank you.

Peter Franks
CFO, NYAB

Thank you.