Ladies and gentlemen, thank you for standing by, and I would like to welcome you to Arabian Drilling third quarter 2026 results conference call. I will now pass the line to Mr. Raed Maharmeh, Head of Treasury and Investor Relations . Please go ahead, sir.
Good afternoon, everyone, and welcome to Arabian Drilling's Q3 and nine-month 2026 earnings call. We announced our Q3 and nine-month 2026 results yesterday, and the earnings release and presentation will be available on our investor relations website after the call. Before we begin, please take a moment to review the disclaimer. Following the presentation, we will be pleased to take your questions. I would like to take a moment to introduce our speakers for today's call. First, we will hear from our CEO, Engineer Fahad Al-Bani, who will provide us an overview of our performance. Then our CFO, Mr. Farid Mustafayev, will then take us through the financial performance in more detail. I would like now to hand over to our CEO, Engineer Fahad Al-Bani.
Thank you, Raed. [Non-English content] and good afternoon, everyone. Before going into the details, I would characterize 2026 as a transition year for Arabian Drilling. We operated through a period of lower activity, especially offshore, while maintaining our focus on efficiency, cost discipline, and positioning the fleet for the next phase of growth. Third quarter marks a clear turning point. Activity recovered, profitability returned, margins strengthened, and our record backlog give us significantly greater visibility as we move into 2027. Third quarter provides clear evidence of the operational recovery. Revenue increased 6% quarter-on-quarter to SAR 811 million, reaching the top end of our guidance, primarily supported by the resumption of offshore operations. Importantly, the increase in activity translated strongly into earnings. EBITDA increased 27% to SAR 319 million, with the margin recovering to 39.4% compared with 32.8% in the second quarter.
We also returned to profitability with a net income of SAR 31 million compared with SAR 32 million loss in the previous quarter. The key message from third quarter is straightforward. Activity is recovering, our efficiency measures are working, and this is translating into stronger profitability and cash generation. Looking at the nine-month period provides important context. Revenue was SAR 2.4 billion, SAR 212 million below last year, reflecting the lower activity environment we have operated through during 2026. However, despite that revenue reduction, EBITDA was SAR 859 million, and we maintained a resilience margin of approximately 36%. To me, this demonstrates the resilience of the underlying business. We have managed through a difficult activity environment while protecting margins through operational efficiency and cost optimization. Also, the last two quarters demonstrate the strength of our diversified land and offshore model.
During the period of offshore weakness, land provides stability to the business. We are now seeing offshore recover while land performance also remains strong. As activity now recovers, we believe the benefit of these efficiency measures provide a stronger operational base going forward. Turning to our operational highlights, we continue to make good progress across the business. Our backlog reached a record of SAR 17.6 billion, up 60% year-on-year, providing significantly stronger long-term revenue visibility. Utilization recovered to 76.7%, up 500 basis points from the second quarter, supported by the resumption of offshore activity. We expect a meaningful step- up in fourth quarter as LSTK and Dorra rigs start operation. Operational discipline also remains strong. NPT continued to improve, safety performance remains strong, and average year-to-date rig move duration reduced from 14 days last year to 10 days in 2026, reflecting continued improvement in execution.
Commercially, this has been an exceptionally strong period of Arabian Drilling. As you have seen from our recent announcement, we secured three major contract awards, significantly strengthening our backlog and future activity visibility. Another development that happened post-quarter, but important to highlight, the rig for our Oman contract has also commenced operation in October. Finally, we continue to see tangible benefits from our cost optimization program started earlier this year. Together with recovery activity, this will support the improvement in profitability and margins. These operational improvements are important because we are entering a significant rig mobilization phase, and disciplined execution will be critical as we bring the newly awarded rigs into operation. The most important forward-looking development is the strength of our backlog. Backlog reached a record of SAR 17.6 billion, approximately 42% above year-end 2025.
What is important is not only the size of the backlog, but also its quality and visibility. During 2026, we managed to renew the 11 gas LSTK rigs contract, in addition to eight new gas LSTK contracts. On top of this, we managed to secure an additional four rigs from KJO Dorra project. These are contracted awards, and they provide a visible pathway from the recovery we are seeing today, significantly higher fleet activity as the rigs are progressively deployed. Our focus is therefore moving from winning the work to disciplined execution and converting this record backlog into revenue, earning, and cash flow. The strength of our backlog reflects the significant contracting momentum achieved during 2026. Over 2025 and 2026, we worked through a very significant renewal cycle, covering 45 contracts, and achieved a renewal and retention rate for more than 95% as of today.
With remaining two pending to be announced in due course, this demonstrates the strength of our customer relationship and competitive position. With that cycle now behind us, the renewal profile becomes much lighter, with only three contracts expiring in 2027 and five in 2028. Combined with our record backlog and the major awards secured this year, this provides strong revenue visibility and substantially de-risks the next two years. In 2029, the expiry profile increased to 12 contracts, but importantly, these are unconventional land rigs, where we have a strong market leadership position. We are now progressing the mobilization and onboarding of the newly awarded rigs in line with contracted start-up schedule. This represents an important transition for the business from meaningful lower activity and major renewal cycle during 2025 and 2026 to executing secured contracts that support high utilization, revenue, and earning growth.
With that, I will hand over to Farid to take you through our financial performance. Farid, please go ahead.
Thank you, Fahad. [Non-English content] and good afternoon, everyone. Let me take you through the financial performance in more detail. Q3 reflects a very clear improvement across our major financial indicators. Revenue increased 6% to SAR 811 million, while EBITDA increased significantly faster, 27.5% to SAR 319 million. As a result, EBITDA margin expanded by 660 basis points to 39.4%. This operating leverage is important. It demonstrates that as activity return, the benefits of the cost and efficiency measures implemented across the business translated directly into stronger profitability. Net income recovered to SAR 31 million, and operating cash flow before working capital changes increased 33% to SAR 324 million. Net debt increased 9.3% to SAR 2.6 billion, primarily reflecting the lower cash balance and higher lease liabilities. I will come back to the leverage position in more detail shortly.
Overall, Q3 provides tangible evidence that the business has moved into the recovery phase. Let me now turn to our nine months performance. Looking at the nine months performance, the picture reflects the transition we have experienced during this year. Revenue declined 8% to SAR 2.4 billion, primarily reflecting lower activity during the period. Against this backdrop, EBITDA was SAR 859 million, with a resilient margin of approximately 36%.
Over the past several quarters, a key focus has been aligning our cost base with the lower activity environment through our cost optimization program. The resilience of the nine months margin demonstrates the benefit of those actions, and as activity begins to recover, we are starting to see the benefit of operating from this more efficient cost base. Cash generation also remains strong, while operating cash flow before working capital changes was SAR 847 million. Net cash generated from operating activity after working capitals increased 10% to SAR 626 million from SAR 571 million last year, despite declining EBITDA.
This provides a solid financial foundation as we enter the next phase of fleet deployment and higher activity. Looking at the performance by segment, Q3 shows the recovery particularly clearly in offshore. Offshore revenue increased 33% quarter-on-quarter as suspended rigs returned to operation, with gross margin recovering strongly to 16% from - 6% in Q2. Land revenue remained broadly stable, while gross margin improved to almost 17%. The quarter benefited from better operational efficiency, cost optimization, and some one-off items. So we would not consider the Q3 margin fully representative of the underlying run rate. On a year-on-year basis, the revenue mix remained broadly stable. The lower gross margins reflect offshore contract mix and lower land utilization, partially mitigated by efficiency and cost optimization measures. Overall, Q3 shows improving profitability across both segments, with our land and offshore operations providing resilience to different activity cycles.
Let me now walk you through the key drivers behind the change in net income. We moved from a net loss of SAR 32 million in Q2 to a net profit of SAR 31 million in Q3. The largest driver was the resumption of offshore operations, partially offset by lower activity elsewhere in the fleet. Importantly, operational efficiencies and cost optimization provided further support. As activity recovered, we started to see the benefits of operating from the more efficient cost base we have established over recent quarters. Turning to liquidity. We started the quarter with SAR 489 million of cash and closed at SAR 327 million. Improved operating performance generated SAR 319 million of EBITDA during the quarter. Working capital was SAR 192 million outflow, largely reflecting collection timing. Importantly, approximately SAR 130 million of delayed quarter-end customer collections were subsequently recovered in October.
We also invested SAR 130 million in CapEx, primarily supporting our reactivation and onboarding program, while continuing to meet scheduled financing and lease obligations. Looking beyond the quarter, the year-to-date cash performance is particularly encouraging. Despite lower EBITDA, net cash generated from operating activities increased to SAR 626 million from SAR 570 million last year, supported by stronger working capital management, including 12-day improvement in year-to-date DSO and lower inventory levels. Cash generation remains solid, and we continue to manage liquidity carefully as we enter a more intensive mobilization phase. Let me spend a little more time on leverage given the movement during the quarter. Net debt increased from SAR 2.4 billion to SAR 2.6 billion, and net debt- to- EBITDA increased modestly from 2.2x to 2.3x . There are two important points behind this movement. First, approximately SAR 130 million of customer collections were delayed around quarter end.
This was timing-related and exceptional, and importantly, the amount was collected in October. Second, we recognized approximately SAR 170 million of additional lease liabilities following the commencement of a five-year charter arrangement. This increases reported net debt, but is non-cash in nature. While reported leverage increased to 2.3x , a meaningful part of the movement reflects quarter-end collection timing and the accounting recognition of the lease liability, rather than a deterioration in the underlying operating performance. Looking forward, we remain confident in the leverage trajectory. While the exact year-end level will depend on the timing of collections and the activity ramp-up, we expect leverage to progressively improve as EBITDA strengthens through Q4 and into 2027. The contracted activity coming online gives us good visibility on that improvement. That concludes the financial update. I will now hand over back to Fahad.
Thank you, Farid. Looking ahead, we expect the recovery to continue in the fourth quarter, with revenue increasing approximately 8%-10% quarter-on-quarter, primarily supported by the startup of recently awarded gas LSTK and KJO Dorra projects. We now expect full-year CapEx of SAR 750 million-SAR 800 million. The increase reflects accelerated reactivation and onboarding of rigs required to meet contracted startup schedule. Importantly, this investment supports secured growth, not expansion based on speculation. Looking onto 2027, we are optimistic on the activity outlook. Our record backlog and contracted deployment schedule provide strong visibility for higher fleet activity as these rigs progressively commence operation. In summary, we have managed through challenging activity environment, protected the underlying profitability of the business, and third quarter demonstrate the recovery is now underway.
Our focus is on disciplined execution and converting our record contracted backlog into sustainable earnings, cash generation, and shareholder value. Thank you, and we will now be pleased to take your questions.
Thank you very much. We will now move to the question and answer section. If you would like to ask a question, please press star two on your phone, that's star two on your phone, and wait to be prompted. If you're dialed in by the web, you can type your question in the box provided or request to ask a voice question. We will just wait a moment or two for the questions to come in. Our first question comes from Ricardo from Morgan Stanley. Your line is unmuted. You can go ahead.
Hello. Thanks for taking my question. If I may, just looking at the guidance for the fourth quarter, if you could help us bridge what is driving that revenue growth. I think more importantly, I know you haven't provided the guidance for 2027, but when you look at all of the moving parts and the recent tenders that you have won, how should we think about the starting running rate for 2027 to account for all of those new contracts? If I may, just a very specific question, just wanted to check, Farid, you mentioned on the collection, could you repeat what was the amount that got delayed to October? Thank you.
Hi, Ricardo. Thank you for the question. On the revenue guidance, basically 8%-10%, and it is based on the upcoming, on the mobilization of two projects, right? For KJO Dorra and gas LSTK. For Dorra, we expect one rig to start at the end of Q4, and other three will start early in Q2 next year. For gas LSTK, four rigs expected to start in November, towards end of November, and other four expected to start towards end of Q4. That's basically the reason for our guidance on revenue. As you rightly mentioned, we don't give guidance for the full year, so basically, we believe the guidance we give for Q4 and the fact that our utilization will be around 90% gives a good indication how next year will look like based on also on the backlog we have.
For the question you asked on collection, it's SAR 130 million collections, and we collected that already in October.
Okay. Thanks so much, Farid.
You're welcome.
Thank you very much. Our next question comes from Renison from Al Rajhi Capital. Your line is now open. You can go ahead.
Yeah. Hi. Am I audible?
Yes.
Yeah. Hi. Renison Macwan this side from Al Rajhi Capital. Thanks for taking my questions. I have two, please. I wanted to know about how many rigs should we assume for onshore segment from Jafurah project particularly in 2027 and 2028, and what would be the approximate day rates for these rigs?
Okay. Let me answer the first part from your question. The number of rigs in Jafurah would remain the same number as we stated before, 13 rigs. As we speak, we have 13 rigs in Jafurah. All of them are working, and we expect that it will continue working in 2027 and 2028 because it's still part of the contract. Daily rate, we don't disclose really daily rate for rigs.
Okay. That's fine. Thank you. The second question is, what would be the approximate onshore active rigs in fourth quarter?
For offshore rigs, we will be 100% utilization in offshore rigs actually. And for land, we will reach around, yeah, total is 90% actually, offshore and onshore.
Okay. Okay. Thank you. Thank you so much.
Thank you very much.
Thank you very much for your question. Our next question comes from Alex from JP Morgan. Sir, your line is now open. You can go ahead.
Yeah. Hello. I didn't quite hear Renison's question. Could you just tell me, of the rigs that, or the contracts you've recently signed, how many of those rigs are going to be active in Q4, and how many in total will we see in 2027?
Okay. Let me summarize it actually. We signed three contracts recently in 2026. One of them for 11 gas LSTK rigs. This is renew for the 11 rigs was working before, and now it's renew for another five years. All of them is working as we speak. Another contract for gas LSTK, second gas LSTK for eight rigs. Those, all of them are rigging up as we speak. Four of them will be working end of November, and the other four will work in December, in different timing in December. So all the eight rigs will be working before year end. So all 19 rigs, gas LSTK, will be working actually before this year ends. For Dorra project, first rig, also Dorra, we signed four offshore rigs, okay, contract for four years.
The first rig will start in end of November, and the other two rigs will start in the first quarter, end of first quarter, actually, 2027. The fourth rig will start in the second quarter of 2027. So this is the four rigs for Dorra. I hope I answered your question.
Yeah, that was very clear. Thank you very much.
Thank you.
Thank you very much. Just a small reminder, if you would like to ask a question, please press star two on your phone and wait to be prompted. If you are dialed in by the web, you can type your question in the box provided or request to ask a voice question. Our next question comes from Saleh from Artal Capital. Your line is now open. You can go ahead, sir.
[Non-English content]
[Non-English content]
Thank you very much for the detailed and informative presentation. This is Saleh Alrakaf from Artal Capital. I have two questions, if you allow me. First, if you can update us on the active number of offshore rigs during the third quarter, by the end of the third quarter.
Okay. Do you have another question or that's it?
Yeah, it is a follow-up actually.
Okay.
Yeah, you can go ahead.
By the end of this quarter, we will be 100% utilizing all of our offshore rigs.
I mean, for the third quarter.
No, for the third quarter, actually, only one rig was not working, which is now mobilizing to KJO. All the other rigs are—
So around eight?
Actually, we have 10 working, okay? Eight barge and two vessels.
Just to add one thing, on our presentation that we will share, you will have appendix with exact number of available fleet, active fleet, and inactive fleet. You can see what was in Q2 and Q3. You will have all that details as well. Just later on, you can refer.
Yeah.
This is for land and offshore.
Yes. My second question regarding the slide you just mentioned. In Q2, on the slide, we see offshore active rigs was four, and now it is standing at eight, excluding the SESV vessel rigs. We have roughly additional four offshore rigs. If you can just share with us, for how many days were these four additional rigs operational during Q3 and 2026 compared to Q2 2026? If there any pre-operational cost was associated with these rigs during the third quarter?
You are referring to that slide, right? So it's offshore went from four to seven, correct? Is that what you are referring to?
From what I understood, you reached around eight by the end of this quarter, right? Excluding the vessel rigs.
Yeah. So, basically, they started the resumption for those offshore rigs were at different times during the quarter. I will not be able to give you exact dates which rig when it started, but basically it was the startup of those rigs were aligned with our guidance we gave for the Q3. As we said that it will be between 4% and 6%, and revenue increase by 6%. Mainly this was driven by offshore resumption. So that is the main driver behind this increase. If you need any more details, particularly, probably we can take this question offline, and we can provide that information to you from our investor relations team.
Absolutely. Thank you very much. One last question is there any pre-operational cost were associated with these rigs before generating any revenues during the third quarter?
There is always reactivation costs related to the rigs as well. Some of them are going to P&L, some of them are capitalized as part of the reactivation process. They were all within the expected limits, expected budget. You have seen the offshore margins improve from - 6% last quarter to + 16% this quarter. There is no exceptional or substantial cost that impacted us in Q3 because of that reactivation.
Thank you very much. Wish you all the best.
Thank you.
Thank you very much. Just before we move on, ladies and gentlemen, we would like to take this opportunity to share on your screen a very brief survey. Your feedback will be greatly appreciated. Our next question comes from Ildar from HSBC.
Hello—
Your line is open.
Hello. Thank you so much. I have a couple of questions. First, I think Farid mentioned that during the third quarter, there were some one-off items supporting profitability. Could you mention, could you clarify what those items were and quantify them, please? Secondly, there have been reports about additional 15 onshore suspensions handed over in the market in Saudi Arabia in Q3, with some of the rigs becoming inactive in Q4. Are any of your rigs being affected by this? Thank you.
I will answer first question, and Fahad will answer on second one. Regarding exceptional costs, one of costs that mostly related to some P&L benefit from release of all the accruals is not significant, but it is in the range of up to [SAR 3 million]. This was the only exceptional item.
Thank you.
Okay, if you allow me to add to what Farid said. For the suspension, we are not impacted for the suspension because we have a new contract with gas LSTK for eight rigs. Any rigs that suspended actually from gas, actually directly it goes to the LSTK. So, we are not impacted at all with this suspension. Okay?
Interesting. Thank you so much.
Thank you very much. Our next question comes from Aqsa from Decimal Point Analytics. Can you give guide for CapEx for year 2027 and the sustaining CapEx?
Sorry, could you repeat the question, please?
Of course. Can you give a guide for CapEx for 2027 and the sustaining CapEx?
Okay. As you know, we are not giving guidance for the whole year. The only guidance we give is at the moment, only for the next quarter. But for 2027 Q4, or for 2026, we increased our guidance, right? The reason was the award of LSTK and Dorra project. Other than that, we don't expect any other increases for CapEx in Q4, and that's basically, we expect that CapEx mostly to be spent in Q4 as well.
Thank you very much—
Thank you.
Thank you very much. This is a final reminder. If anyone would like to ask a question, you can press star two on your keypad. If you are dialed in by the web, you can type your question in the box provided, or you can also request to ask a voice question. Thank you very much. I would just like to remind you to fill in the survey. It will only take less than a minute of your time. If you would like to ask any questions, please press star two on your keypad, or if you joined by the web, you could dial in, you could ask a voice question, or type your written question in the box provided. Our next question comes from Faras from Sabeen Investment Company. Sir, your line is now open. You can go ahead.
Hi. Is my voice clear?
Yeah, clear.
Yeah. This is Faras Aldahami from Sabeen Investments. Thank you, management, for the presentation. I would like to ask about your outlook for the upcoming jack-up day rates in the future, and how is the tendering process healthiness in the GCC region?
Okay. Thank you. That's all your question? Okay, let me —
Yes.
Okay. You [crosstalk] another question. The first part, the tendering, I think still we have good tendering because we still receive tenders for offshore, which is healthy. Actually, if you are asking for the daily rate for next year, still, we don't expect changes from what we have right now. We watch pricing trends, but our focus is now in contract quality and utilization.
Great. Thank you.
Thank you.
Thank you very much. One more time, if you would like to ask a question, you could press star two on your keypad and wait for your line to be prompted. Or if you are dialed in by the web, you could type your question in the box provided or request to ask a voice question. We will just wait a moment for more questions to come in. Our next question comes from Abhishek from Bank of America. Your line is now open. You can go ahead.
Thank you very much for the opportunity to ask this question. First of all, congratulations for taking some of the rigs back to work. My question is around the visibility on 2027 now. You had gone back to these quarterly sales projections because of the suspensions that has happened and a lack of visibility. So now we have very less gaps in terms of the number of rigs, et cetera. So should we expect company to go back to yearly revenue and EBITDA guidance from, say, 2027? Is that a fair ask?
Well, we are optimistic really on the 2027, hopefully, because you know that we have backlog. We have very high backlog, and we have secured contract. So we are optimistic, and our backlog will be materialized, and everything will be normal. This is for 2027. As we mentioned, really, we have just left with very few contracts to renew in 2027 and 2028. So all our contracts now is almost more than 95% secured. So we are okay with that, and we are very optimistic, and this will continue, and it will materialize in the few years coming back. For other, I let Farid go.
Yeah. Thanks, Fahad. Hi, Abhishek. For guidance, for now, we will continue like this. Indeed, we are giving on a quarterly, and this was based on the suspension, based on the regional situation. The situation is not completely resolved, and we will continue watching the situation, right? At a certain point, definitely, we will look going back to giving guidance for a bit longer period, but I do not think we will go to give. Maybe it will be only on revenue and CapEx, yeah? So that is what would be the next phase, whenever we are ready, or overall situation improves.
Yeah. Thanks. That's useful. The second question, if I may, I mean, given most of the rigs are coming back to work, et cetera, how should we think about your gross margins, both in the onshore business as well as offshore business? We would assume some operating leverage to kind of start playing out. So when do you think we can go back to the previous high level of margins, or given the time lag, I mean, the new base has shifted, and if you can provide any color on that?
Yes, Abhi. I'll provide some information again, just based on the improvements we've seen in Q3, yeah? We saw the land margins continue to improve. As you noticed, it is almost 17%. We're talking about gross margin now for land. I just would like to remind that we started the year, Q1, it was down to 2%. Then it improved to 14%. Now, 17% in Q3 is, as I mentioned, there was some exceptional impact in Q3 with one of provision releases. But generally, to expect 15%-16% is reasonable for land margin. When it comes to offshore is not fully yet recovered to the level, let's say, we had last year, if you compare Q3 last year to Q3 this year. But mainly because we haven't seen a full- quarter impact of offshore resumption.
It is significantly improved from - 6% in Q2 to - 16%. But it will continue to improve as we see a full quarter activity for our offshore fleet.
All right. Maybe, I mean, if I can push in one more question, is around the sukuk, which is coming up for refinancing next year. Any update on that you can provide in terms of when we should expect an announcement and the interest rates, how that is going to kind of play out on that?
Thank you, Abhi. It's a good question, but I won't be able, again, to give much information until we have all internal approvals are secured. But you rightly mentioned, it's maturing in February 2027. It's a key focus area. We have initiated a structured refinancing plan. We have appointed financial legal advisors. Everything is progressing according to our plan, and we remain confident that the refinancing will be completed ahead of maturity. Yes, I can mention also probably we see a potential to achieve funding cost savings as part of this refinancing exercise.
Okay. Thanks a lot for the answers. Very clear. I'll hand it back.
Thank you.
Thank you very much. Our next question comes from [Osama] from Arqaam Capital. The question says, "You have increased your 2026 CapEx guidance to SAR 750 million-SAR 800 million to support rig reactivation and new contracts. How do you expect this higher spending to affect your cash flow and debt levels, and when do you expect to see a clear improvement in returns from these investments?"
Yeah. This increase in CapEx was backed up by secured contracts, which already starting to generate cash in Q4 and in Q1. That is why, in terms of operating cash or liquidity, obviously there is no concerns, and we will start generating a strong cash flow stream. Even in Q3, you have seen the increase in operating cash flows. The same will continue into Q4. This is all factored in our numbers. What was the second point? I think, yeah, there was something what I missed. What was the initial question?
The second question was, when do you expect to see a clear improvement in returns from these investments?
Oh, okay. The clear returns already is materializing, basically, which is seen in our margins improvement. The LSTK project already returns will start in Q4, and the full returns on Dorra project will start seeing from Q2. From Q2 onwards, when four rigs all will be operating, we will see a full return.
Thank you very much. One last reminder for the survey. It will take less than a minute of your time. We appreciate your feedback. Looks like we have no further questions. Thank you, everyone, for your participation today. We will now conclude the call. Have a nice day.