๐ŸŽ Black Friday: 50% off Unlimited and 30% off Pro annual plans
Lucara Diamond Corp. (TSX:LUC)
Canada flag Canada ยท Delayed Price ยท Currency is CAD
0.1150
-0.0050 (-4.17%)
Nov 20, 2026, 4:00 PM EST
โ† View all transcripts

Earnings Call: Q3 2026

Nov 16, 2026

Summary

Q3 revenue reached $61.5m, and 2026 revenue guidance rose to $140m-$160m after the sale of a 1,300-carat Type IIa diamond. Underground development advanced as stockpiles are expected to bridge operations to underground ore in 2027.

Operator

Welcome to the Lucara Diamond Q3 2026 results conference call. At this time, all participants are in listen-only mode. After the speaker presentation, there will be a question-answer session. To ask a question during the session, you will need to press star one one on your telephone. You will then hear an automated message advising your hand is raised. To withdraw your question, please press star one one again. Please be advised that today's conference is being recorded. I would now like to hand the meeting over to William Lamb, President and CEO of Lucara Diamond Corp. Please go ahead.

William Lamb
President and CEO, Lucara Diamond

Good morning, everybody. I would like to welcome you to Lucara Diamond's Q3 2026 results call. If we move through the slides, the first slide there is our cautionary statement. We are not going to go through this, but I would advise everybody to read through it at your leisure. When looking specifically at Q3 for Lucara, we actually had a really good quarter, recording $61.5 million worth of revenue in the quarter. This was on the sale of 113,000+ carats of diamonds, and more importantly, the sale of the 1,300-carat Type IIa stone, which was recovered in July. What we have done based on the results from our Q3 sales is we have increased our guidance for 2026. It originally was $100 million-$130 million. We are increasing that to $140 million-$160 million.

As most of you will know, the one thing that makes Lucara special is the continued recovery of special diamonds. And even as we have trended down in the open pit and started to process more stockpile material, we did record 163 specials, that is stones over 10.8 carats recovered during the quarter, including the 1,300-carat stone, so our 10th stone over 1,000 carats, which again, I think sets us apart compared to everybody else in the industry, and a further eight stones in excess of 100 carats. On the underground, we have now transitioned from the shaft sinking to lateral development. Group R are now on board, and they have really started to ramp up, and we are seeing very, very strong progress there. Significant milestones achieved during the quarter was the licensing of our conveyors and the rock winders.

That has obviously allowed us now to get all the equipment underground and really start at pace to do the lateral development towards the ore body. Moving on in terms of operations and recoveries, we recovered just over or just under 97,000 carats during the quarter. As I mentioned, 163 specials recovered. The open pit continued producing ore or continued mining in the open pit through Q3 2026. In October, we did celebrate the last blast of, I would consider, quite an era if you consider what that open pit has actually produced. The open pit is now completely depleted, and we are just looking at maintenance of pumping and water management services within the underground.

A small amount of open pit ore that we would see in Q4 2026, and the majority of material that we will mine between now and the end of the year is going to be coming from historically mined stockpile material. I just reiterate there, this is not material that has been processed already. It is run-of-mine material, which was mined and stockpiled in previous years. On the operating cost side, we did this year a significant decrease in our operating costs, and the guidance here is also being reduced to $24-$26 per ton, and this is primarily being driven by the increased throughput. As we mine and process more stockpile material, that material is weathered, and it goes through the plant extremely quickly.

Moving on in terms of the next slide, some notable recoveries, and these were stones recovered in the back end of Q3. Some significant stones there that you can see the quality of the stones, all Type IIa white stones. A 146-carat stone, very nice shape, so some significant volume which we expect to get from that one. The 316 carater, perfectly cleaved by our process plant, and then the 115 carats. These, in addition to the 1,300-carat stone, which we announced in July. I will hand over to Glenn to take us through the financial and operating results. Please, Glenn.

Glenn Kondo
CFO, Lucara Diamond

As William mentioned, a very strong quarter. Revenue for the period was $61 million compared with $51 million in the prior year, reflecting a strong sales performance that included the sale of the 1,300-carat diamond. This does bring our year-to-date revenue to $124 million. Q3 net cash generated from operating activities, including working capital movements, was $35 million compared to $15 million in the prior year. This brings year-to-date net cash generated from operating activities to $32 million compared to $28 million in the prior year. Importantly, the proceeds from the 1,300-carat diamond and the stones that William has just discussed have not been included in cash, and this is estimated to add to our cash balance by roughly $40 million. As William mentioned, in terms of cost control, it has been very, very strong.

We have improved, we have decreased our operating cost guidance, as William discussed, and this reflects the higher volumes that we have processed, cost control, and this has offset the higher fuel and power costs. Physicals, including ore processed, ore mined, and carats produced, are in line with forecast. Next slide, please. Pleasingly, project costs remain on budget and on schedule. Expenditures during the quarter were $40 million during the period, resulting in main costs of $245 million. Remaining expenditures are largely the contracted lateral development costs, equipment, and infrastructure procurement. William will now take you through further detail of the project.

William Lamb
President and CEO, Lucara Diamond

Thanks, Glenn. On the project, the very strong safety record has continued, recording a Total Recordable Injury Frequency Rate of 0.6, which is below our target of 0.9. Further to the project, on the next slide, we have I've already started and mentioned the shaft construction is now completed, and we've transitioned 100% over to lateral development. Key things that happened during the quarter, and one of the aspects which we're really focused on is, we will be developing on four different levels, 470, 310, 385, and the 245. Access to the 470 was critically important because that allows us to do the long hole drilling and get ahead of the process volumes which we're planning in 2028. The ore pass that goes from the 470 down to the 285 was obviously a critical component. We can't be mining there if there's nowhere to put the material.

That was actually completed in September, quite a bit ahead of schedule. Interestingly enough, anybody who's had access to almost 200-m-long raise bore, we were within half a meter of the target. So, a job very well done for the project team there. In terms of the shaft, that is now being completely handed over to operations. We are now operating those shafts, and as I mentioned, the Department of Mines has now licensed both the conveyances and the rock winders. Rock winders are running at 8 m per second. We have already done the DC magnetometer tests to 14 m per second. So we're operating those at eight at the moment, but during normal production, we're expecting to run those at 14 m a second, or let's call it 50 km an hour.

Really enabling us to get to the 3 million tons per annum from the underground, which is what the shafts can do. Subsequent to the quarter end, we also now have completed, and we'll show you in the pictures a couple of slides down, the surface ventilation that is now operating, which means that the conditions underground in terms of how quickly we can develop, we can now accelerate that because of proper ventilation and ventilation circulating underground. At the end of the quarter, we have already now completed more than 2,000 m of lateral development. We are now ramping that up to 400 m, 600 m, and then 800 m a month. Something's focused on there because that's really going to lead to getting access to the kimberlites, probably early in 2027, somewhere in Q1.

In terms of the orbital equipment, we've now got a whole fleet of equipment operating on those four levels underground. About 90% of the ancillary equipment is also now received. We're just waiting for things like Spraymec and an additional charge unit. For me, it's always easier to talk about pictures. Sorry, Hannah, if you could just jump one slide back. Thank you. The image that you see on the right-hand side of this slide actually shows the head frame on the production side with its shaft sinking configuration. You can see the chutes that come out to the right-hand side there. In preparation for normal production, all of that steel work has actually been stripped out. If we jump to the next slide, please. This slide now shows the shaft production configuration.

On the image on the left-hand side, it is the backside of the ore bin. You can see the chutes coming out at the top there. Image on the left-hand side is all the guides that now will run the two skips, the main conveyance, the auxiliary, and the counterweight. A lot of steel work. The bin configuration there alone most probably holds about 600 tons of steel, and that is really to take the forces as you are taking two to three seconds to discharge 21 tons from any of the skips. On the next slide, this actually shows, it is an image taken from within the head frame looking down the shaft, and you can see the volume of steel work in there.

The areas which look like they are rusted are the guides, and those are almost 15 mm thick steel guides, and those run all the way to the bottom of the shaft. I think it is also important for people to understand here, when you are commissioning and operating a production shaft, those guides, so 770+ m of guide, have a 4-mm tolerance, and that is across the conveyances. When you think of the skips running at 50 km an hour, you really do not want a lot of variance in those guides because it causes oscillations within the skip. The fact that we are now licensed by the Department of Mines to run our conveyances at that full speed, and the rock winders currently at 8 m per second, shows you the quality of the shaft, the final shaft setup and configuration.

As I mentioned, the post-quarter end, we have now completed the ventilation or the surface ventilation. Images starting on the left there, it is a 6 m diameter pipe that comes up from underground. You can see the elbow being put on there, the image on the bottom left. That is now fully completed, so it is not a small pipe. We put the image in on the top left to specifically show the scale and the size of the structure there. The two fans that we have in the back there, both capable of doing somewhere between 160 and 180, if not 200 cubic meters per second. We are currently only running one of those, and it is running sustainably at around about 160 cubic meters per second.

With the bulk cooler, bulk cooler sits at about 12 degrees Celsius, which is fantastic in the current 30+, actually 38+ degree Botswana weather. Comfortable working conditions underground average about 21 degrees Celsius. Next slide is the stations. Again, we are now getting ready for production. The concrete works at the stations, the rails to get things in and out of the shaft, really starting to look like an underground mine, which is a dramatic change from the shaft sinking configuration where it was, "Let us get the shafts in." We are now starting to look at everything and setting it up for actual operations. What you cannot see there, maybe a little bit on the right-hand side of the image on the left, is all the pressure reducing valves, et cetera.

A significant amount of additional piping, and it's high-standard piping to be able to handle water, et cetera, coming from almost 800 m above where we are now. Couple of just images from underground. Obviously, it's always nice to see equipment operating, support drilling on the image on the left, and then the 310 development. This is, we call it VDR1, which is ventilation drift one. It is the access that goes from the shafts all the way down to the kimberlite. Currently, we're about 300 m away from the shafts at the end of that drift. It just shows you again, I want to specifically point out there, we are in the granite contact area and the rock conditions, even though it was slated to be fair to poor, we are finding it in much, much better condition. The level of support is really starting to show.

Slide on the, or the image on the left-hand side there, this is in the pump chamber. It's about 7 m wide, excavation 5.5 high. Again, you can just see the quality of the rock really holding up and the blasting conditions that we're seeing underground, and actually the quality of the blasting is really looking good. The image on the right-hand side there, just the installation of services. A lot of people just think it's run, get the development in, but it's all these things that have to be done behind the face of the development to ensure that you can continue at pace. Group R and the owners team on site are doing a very good job there.

In terms of water management, in that VDR, and we can most likely jump back, or you can go back and have a look at the slide there, some water on the ground. That is obviously a lot of drilling water. We have, as we mine, we are probing ahead of the development phase, looking for any water structures. We have contacted water structures. Those have successfully been grouted, even up to 60 cubic meters an hour, and we've mined through those. So we are, I think in any underground mining, you are going to find these isolated water structures. We are putting in a more advanced dewatering campaign, an LM90 drill has been delivered to site, is already underground.

We should start drilling within the next few weeks with that, and that'll start to depressurize a cone of dewatering depression around the kimberlite, which will enable us to cross the kimberlite contact very, very easily. The images that you see here really lead from the dewatering campaign that we're looking at underground, which has got a temporary pump station, which is the image on the left there. By probably the end of the year, we'll have the first six SP200 pumps. These are single pumps that can pump up to 800 vertical meters, installed in the pump chamber, the image that you saw on the two slides back. Those will then be supplemented by a further six pumps in the first quarter of next year, really bringing our total pumping capacity to somewhere around the 300+ cubic meters per hour.

We will look to supplement that if we see any additional water structure. We are running those evaporators. We have two running at the moment. They are running 23 hours a day. The efficiency is around 50%-60%, each of them seeing about 110 cubic meters an hour, and we have a further four on order. Again, it is very salty water, so we cannot just discharge it to the environment. So looking after the environment there by having an active water management program. Just very, very briefly on the diamond market, I will leave everybody to read the slide. They will be available on our website. There was, however, an article earlier in the week which spoke to the sale of De Beers, the Botswana government involvement there.

If you read through that article, it was on Reuters, there were actually comments there around Element Six, which is the De Beers synthetic diamond manufacturing facility, signing an agreement with a Japanese company to build and participate in a synthetic fabrication works in the U.S. I found the story very interesting because what we are now starting to see is a lot, and I have seen reports on this in the past, we are now starting to see synthetic diamond producers shift away from manufacturing diamonds to go into jewelry because the margins are almost nonexistent, and start to move into the AI realm where diamonds are used as both chips and filters in the manufacturing of chips, et cetera. So we are starting to see alternative uses for these synthetic grown diamonds.

Our view is over the short to medium term, you are going to see people shifting away from the large volume that we see of synthetic stones in the market, and hopefully that will see people pivot back to natural stones. We are seeing some positive movement in the natural diamond market, and the fact that us together with one other producer of large stones have both increased our guidance definitely shows the resilience in the top end of the market. I think it is one of those things, again, that we cannot reiterate enough how positive the Lucara story is when you start to look at the production profile of the diamonds which we have. Last slide there is just to reiterate our guidance. As we mentioned, guidance for revenue for the year has increased by $30+ million to $140 million-$160 million for the year.

The other change in the guidance is the operating costs reducing that down to 24 to 26, primarily based on increased volumes as we process more weathered stockpile ore through the process plant. That draws us to the end of our conference call. I would like to hand it back to the operator for a Q&A question session, please.

Operator

Thank you. As a reminder, to ask a question, please press star one one on your telephone and wait for your name to be announced. To withdraw your question, please press star one one again. Please stand by while we compile the Q&A roster. Our first question comes from the line of Dawn Sauter with Pala Assets. Your line is now open.

Dawn Sauter
Analyst, Pala Assets

Hello. Hi, William. Thanks for the update, and congratulations on the results. I guess it's pretty encouraging to see that the Type IIa diamond that was discovered in July has already been sold in the same quarter. Could you give us an update on the blue diamond, the blue stone? Has this been already sold? When do you think we can expect the sales of that? Separately, I also see that in terms of pricing, compared to Q2, prices on a per-carat basis actually fell from $700 to $540. Just wondering if you could maybe give us a bit more color on that. Thank you.

William Lamb
President and CEO, Lucara Diamond

Thanks, Dawn. Just quickly on the 1,300, I think it's also important that the IPV, so the initial polished value for that stone has been agreed. We are also hoping to see an uplift on the value of that stone once the polish is sold. We'll keep everybody updated on how that progresses. On the blue stone, it has actually been polished. They got three stones out of it, the first one being a 10 carat, the second one a 5 carat, and there's a smaller one, 1.5 carat stone. The challenge there was always to get the highest color saturation. Sadly, the stone did not perform as well as what we wanted to. We only have a fancy stone there, where we were hoping for at least an intense. That will affect the value.

Those polished stones have not yet been sold, although the IPV would already be included in our probably Q2 to revenue numbers. On the overall sales value, I'd have to go back and have a look. I think we must probably have a call scheduled. I think Hannah did reach out to you. But I just need to go back and check to see the $700 versus $540, exactly what caused that. It might have something to do with the increase in the volume of diamonds sold during the regular tender. If we go back and have a look, the volume of stones sold on tender in Q2, I think it was only about 50,000 or 60,000, 57,000 carats, if memory serves me correctly. Whereas the number was much, much higher, over 100,000 carats in Q3.

The denominator there would have been so much larger, and that would have affected the overall dollar per carat average for the quarter.

Dawn Sauter
Analyst, Pala Assets

Yes, it is exactly as you said. In terms of the volume sold, it is almost double in Q3. Why is that? Is it because you are just processing and selling more, kind of like drawing from next year's production? Or is it more of just really the really small stones that you are just trying to get rid of, and perhaps there we can say that the sales price are more impacted by the synthetic market?

William Lamb
President and CEO, Lucara Diamond

No, I would not say that. It is purely that the denominator is larger. When we look at the regularity with which we have the regular tenders, a lot of the volume that is governed by that tender is based on just what we have recovered during those periods. There would have been a shorter period from where we closed the first tender to the first quarter tender to the second quarter tender. That is the reason why there are less stones there. We do try to push more stones into Q3 because it comes after the holiday break, where generally the inventories are lower, and we find that we get better pricing for the Q3. We generally try to push it a little bit longer to have more stones in that one.

I would not say that those numbers are reflective of any changes in the market due to synthetics or anything like that. It is purely volume-based.

Dawn Sauter
Analyst, Pala Assets

Okay. Thank you very much.

Operator

Thank you. As a reminder, to ask a question at this time, please press star one one on your touchtone telephone. Our next question comes from the line of Paul Zimnisky with PZDA. Your line is now open.

Paul Zimnisky
Analyst, PZDA

Yeah, thanks for doing the call, guys. Nice quarter all around. I had two operational questions and one on the big stone market. Initially, open-pit mining was expected to be exhausted in, say, early 2026. Now it's late 2026. I guess I'm curious why that is. Then, once open-pit mining does finally stop in a few weeks, how many months of direct ore feedstock do you think will be available for next year? I guess, theoretically, if you were to only run direct ore feed through the plant, just looking for some context there. Then, finally, on the big stone market, could you give an idea of who the primary buyers have been in, say, the $1+ million goods? Is it high jewelers, collectors, investors? Then what regions of the world are those buyers primarily in? Thanks.

William Lamb
President and CEO, Lucara Diamond

Thanks, Paul. The timing of the open pit was really affected by the volume of rains that Botswana experienced from probably starting the end of November last year through to the end of the first quarter. There were periods where, if you imagine you've got a hole which is 1 km by 800 m, if you have a downpour collect a fairly large amount of water, then the first thing that we would do is we would pull the mining crews out because the water collects very, very quickly in the bottom of the pit, especially because it's now a very narrow mining excavation. So, really what we did was we delayed the end of the pit, which, as you mentioned, would have been in the end of Q1, beginning of Q2 of this year.

We then mined, because we were in a very constrained area, we mined approximately 150,000- 170,000 tons per month from the open pit, and the open pit is now completely exhausted. We actually had the last blast with directors three weeks ago. The pit is now only there for pumping, and there is no more mining, no more mining equipment in the open pit, so that is fully exhausted. As far as the processing of run-of-mine material, we actually have the better part of 7 million- 8 million tons of run-of-mine material. I just need to reiterate here, when I say run-of-mine, this is not previously processed material. This is material that we stockpiled on surface while we moved around in the mine plan as far back as 2013, 2014, when we were looking for makeables and tender diamonds.

We have enough probably to run for a full two years. Obviously, we expect the underground to come on stream, starting to see material from the underground probably as early as Q3 next year. So we will start to supplement underground material for the stockpile material, but we do have plenty of stockpile material. Interestingly enough, the top three benches of the south lobe were, when we bought the asset from De Beers, were considered the low-grade material. That was all put onto what we call our life-of-mine stockpile. It ranges about 40 cpht, so fairly low. But the probability of recovering large stones from that is obviously very good, seeing as though the very first bench down that we mined in the south lobe, we recovered the first 239 carat stone, and it started from there.

So we do have high hopes that the stockpile material will continue to generate some significant recoveries as we head into 2027. In terms of the large stone market, we continue to see better buying out of the U.S. It is interesting that the U.S. seems to have gone both ways, buying lab-grown stones for your stones less than, say, three, maybe less than two carats. But the U.S. is still a significant market for buying these high-value stones. We are talking 20 carats and above. Most of those do seem to end up going into the U.S. market. I know that our partner spends a fairly large amount of time in New York facilitating sales there. Other than that, the Middle East continues to be a market for larger stones.

Probably not as many stones going to the Middle East, but I think we can also look at places like Sotheby's, who have now moved their main office for their jewelry section to Abu Dhabi, and that is obviously targeting the Middle East as a market for high-value and extraordinary jewelry.

Paul Zimnisky
Analyst, PZDA

Very clear. Thank you. Maybe just one for Glenn. Can you just reiterate the cash numbers that you gave on the call? I think it was, you said $32 million, then $40 million from the two large stones in additional cash. Is that correct?

Glenn Kondo
CFO, Lucara Diamond

Yeah. We are saying based on the stones that we just showed on the presentation, plus the 1,300, we have got roughly about $40 million that will come in. We are expecting to see that in Q4, so that helps prop the cash flow coming up to cover UGP costs coming up in Q4.

Paul Zimnisky
Analyst, PZDA

Perfect. All right. Thank you very much.

Operator

Thank you. I am currently showing no further questions at this time. I would now like to turn the meeting over to William Lamb for closing remarks.

William Lamb
President and CEO, Lucara Diamond

Thank you very much. Everybody that actually dialed in, I am pleased we got the Q&A to work this time. Thank you very much for taking the time to listen to our Q3 results. I think as we now see the next big milestone is going to be the completion of the underground. A lot of focus is going into that, and we will hopefully start to bring in additional quarterly, or let us call it mid-quarter progress results on how we are actually trending there. I think it is now the big thing that we need to keep the market updated on, so we will look forward to giving you regular updates on how that is progressing. Otherwise, thank you very much, everybody, for dialing in.

Operator

This brings to a close today's meeting. You may disconnect. Thank you for participating.