Good morning, ladies and gentlemen.
Good morning.
Welcome to the 2026 Q3 Results Conference Call of Photon Energy Group. We will run you through the presentation as usual, together with Stanislav Zeman, our CFO. Those of you who are repeat attendants will know the structure. We will first run you through our business results, then the financial results, which Stanislav will do. Today we will also focus on the topic of our group restructuring and all aspects, both operational and in relation to our outstanding bond. At the end, there will be space for your questions, which we will try to answer as best possible as we can. Starting with our most significant division in terms of EBITDA generation investments, which consists of our power plants. The revenues are generated from the production and sale of electricity.
At the end of the third quarter, our portfolio amounted to 126.8 MWp after we successfully sold 7.6 MWp of operational assets in Slovakia and two small power plants in the Czech Republic. There is a decline in the size of the power plant. We sold assets which, from our point of view, had a finite outlook in terms of their future potential, in particular beyond the feed-in tariff period. Just a short explanation. The regulatory framework in Slovakia is very complicated. By the end of this year, the extension of the feed-in tariff, which was agreed in 2021, or rather imposed in 2021 by authorities in Slovakia, required us to make additional CapEx by the end of this year.
The rules for this were quite fluid, so the risk of us not having all this CapEx recognized by authorities and with negative impact on the remaining feed-in tariff period until 2030 and 2031, depending on the respective power plants, was very significant. Beyond that, due to limitations in relation to the extraction of land from the Agricultural Land Fund in Slovakia, the outlook for a true repowering of these assets after the end of the feed-in tariff period was also very slim. After very detailed analysis, and we have been monitoring this, well, monitoring it for all our power plants, but we did this exercise in great detail for our Czech and Slovak assets. Here, our Slovak portfolio, the utility-scale portfolio has a much better outlook after the end of the feed-in tariff period.
This is why the Slovak assets, with a relatively short remaining feed-in tariff period and significant additional CapEx needs, but very limited outlook for creating value beyond the feed-in tariff period, this is why these Slovak operating assets have been a good candidate, a chosen candidate for disposal and actually reducing our portfolio risk. As we sold these power plants still with existing project financing, as you will see then also in the financial results, it also led to or contributed to a reduction in our interest-bearing debt in the third quarter. Coming back to the generation here, electricity generation here, we have had a very positive quarter with almost 57 GWh of produced electricity, which is a 14% year-on-year increase. That is partially driven by good weather, but also with now essentially all our power plants generating and supplying electricity into the grid.
In the same period last year, we had some of our Romanian power plants switched off for regulatory reasons. This has disappeared as a hindrance to our production. These two factors combined have led to this increase in terms of volume. As you can see, the split between merchant power plants, merchant means that we are selling the electricity into the day-ahead market, and this relates to some of our Hungarian power plants and all our Romanian power plants, versus power plants that are in a support scheme, mostly in the form of a feed-in tariff, still remains around the 50/50 mark after the disposal of the Slovak assets. This split, as you can see, has changed a little bit on the base, and these numbers are based on the installed capacity. It is now slightly more merchant.
The increase in production was more geared towards the merchant portfolio, which is that now all our Romanian power plants, as opposed to the same period last year, are selling into the markets. On the topic of generation licenses in Romania, at this point in time, all power plants are generating electricity and supplying, and we have received generation licenses on all power plants with the exception of the power plant in Făget. We have three power plants there, we refer to it as Făget 3, where it is a very long story, but we are currently finalizing the conformity testing, which the finalization is at this point somewhat weather dependent, as we need four consecutive days with a certain irradiation.
But as soon as these tests have been completed, we will be applying for the license to the regulator, which then will require us to switch off the power plant during the approval period, which by law is 30 days. From our experience, including then the registration with the trader, we are probably looking at around 45- 50 days of non-production until we reconnect and we start supplying to the market on the basis of the issued license. Our goal is to complete this in the first quarter, where production volumes are still very low, so that we can hit the high production season with a license. This power plant is a very well-performing power plant, so it will generate significant cash flow.
In the chart at the bottom right, you can see the split by country, which just reflects what I just mentioned before, year-on-year, a significant increase, and that is owed to the fact that now, and in Q3, all our power plants were fully operational. Looking at revenues, this increase in volume has also translated into a more significant increase in revenues year-on-year, and that is a function of the higher production volume, but also higher realized prices in the merchant part of our portfolio. As you can see, there was an 11% increase in the average price in our portfolio to EUR 182 per megawatt.
This average number is slightly, I do not want to call it meaningless, but it is, of course, the weighted average of significantly a very wide range of realized prices, as you can see in the second right chart at the bottom. It also includes the feed-in tariff in the Czech Republic, which stands at almost EUR 700, but it also includes the merchant assets, which generate somewhere between EUR 100 in the case of Romania and EUR 125 in Hungary. So it is a weighted average of a relatively wide range of numbers, but clearly an increase in this number is a positive thing.
The strongest improvement in terms of market we recorded in Romania, and that is mostly owed to the fact that some of the power plants that in the same period last year were in the offtake mechanisms with Transelectrica, which have an EUR 88 cap, which by the way is also the mechanism under which Făget 3 is currently supplying electricity, has been removed, and we are selling on the basis of the energy license, and we are realizing the market prices. So, looking at the energy market as a whole, Q3 definitely for us saw a positive development. This is continuing now also in the fourth quarter. I guess those of you who look at the energy market can see that gas prices have gone up significantly. That, of course, drives electricity prices.
In the fourth quarter, we have seen the market prices that are well above those observed in the last couple of years, with the exception of 2022. Looking at the current gas price, the gas supply dynamics in Europe, and as a result, the future prices on the EEX, we do expect this elevated price level to continue well into 2027. There we definitely have some tailwind for our business. Looking at EBITDA, this part of our company, of course, is the strongest contributor. As you can see, we managed to translate this 24% increase in revenues into a 21% increase of EBITDA. Moving on to our operations and maintenance segment, this is a business that continues growing quarter by quarter in terms of assets under management. At the end of the third quarter, we have 1.3 GW peak of PV assets under management.
Since April of this year, we are also taking care of our first BESS project, not through operations and maintenance activity, so technically, but as an asset manager. This asset management service is something that we have so far been able to establish and expand in the Hungarian market, and we are working on providing these asset management services to PV, but going forward also the owners of PV owners, but also to BESS assets across all five markets where we provide our O&M services. This business, as you can see today, relies mostly on external. Our internal portfolio represents 9% of the installed base we are taking care of, and the remainder are all external power plants. In terms of revenue, you can see that we have seen a 31% increase year-on-year, and the EBITDA has declined in the third quarter on a year-on-year basis.
However, it is important to point out that this EBITDA is based on an exclusion of the intergroup assets. If we add them back, then this business line is profitable. This negative EBITDA is partially also explained seasonally, so we had some higher cost in the third quarter, some of which we expect to unwind in Q4. In technology trading, which has been on a strong growth trajectory in the last couple of quarters, we have had a rather weaker quarter, where the volume of components declined year-on-year by around 50% in terms of modules, but also a reduction in the volume of battery energy systems traded. Year-on-year, we have a decline by over 50%, where EBITDA is more or less the same level as last year.
Here, we have also, on one hand, we have seen over the summer a slowing market, but at the same time, also the liquidity constraint in the group has had an impact. In the third quarter, we also had to close the working capital line that has been financing this business segment. These are things we are currently in the process of resolving, and we continue seeing a lot of potential as we look at 2027. What you do observe is, not only in this wholesale business, but also in our EPC business, a renewed interest and demand in building new PV assets, of course, to a very large degree driven by the increase in energy prices. This leads us to the new energy segment, which is under restructuring.
As you are aware, we had to put our Polish capacity market business, which also held an electricity trading license, into bankruptcy. We filed at the end of March. To this day, the court has not decided on the bankruptcy of this entity. Since the end of March, we have been working diligently to wind down this business. We have discontinued the activities. We have handed back the electricity trading license to the regulator. We have unwound some of the capacity market contracts, partially by selling them to other players in the market. And at the end of the third quarter, we also disposed of this entity outside the group. At this point in time, it is essentially just a shell company waiting for the ruling by the bankruptcy, sorry, by the court, and a bankruptcy coordinator to be appointed.
This part of the business has been wound down, but we have, of course, continuing activities. And at this point, it is mostly the electricity trading in Hungary and the Czech Republic, where we offtake electricity from our own PV assets, but also of other renewable energy sources, both solar and wind, from outside customers. And at the same time, we also have a supply business where we have around 25 SME-sized customers in Hungary that we supply with electricity. However, this is an activity we are discontinuing as of the end of this year. There, all our supply contracts are based on their market prices, and given the increase in electricity prices, we see a growing credit risk. We decided to not renew the supply contracts with our customers.
As of January 1, we will only be in the business of offtaking electricity from renewable energy sources. In addition, we are working on still providing Ancillary Services in the Hungarian market, and we are also working on starting them in the Polish market in the first half of next year. In terms of numbers, the development has led to a decline in revenues from EUR 8.9 million last year to EUR 4.8, but still a positive EBITDA in the third quarter, but of course, at only one-third of the level recorded last year. One business line that is undergoing restructuring, but which, as I mentioned before, based on demand we see a lot of potential, is engineering. That means the construction of PV assets, but also BESS systems, both behind the meter, that means for the local consumption of mostly corporate customers, but at the same time, utility scale.
I mean, this is a segment where we have had a difficult time over the last year and a half, two years, with the Pukenui project in New Zealand turning out to be loss-making. And we have also terminated the EPC project for external customer in Romania. However, we are currently, and we will also talk about our efforts to sell project rights in Romania. So wherever it will be possible, we are trying to offer them on a turnkey basis to investors. That means including the construction of the respective power plants. One important part of this business is, of course, the construction of PV and BESS behind the meter. And here, we now see a very dynamic development in the Czech market.
We are also focusing more on the Slovak market, and also want to increase our activities in the Romanian market, where we have seen an uptick in demand from corporate energy users. This is all from the business side, so I am handing over to Stanislav to walk you through the financial results.
Okay. Thank you, Georg. Let me start with our results for the third quarter. As you can see on this slide, total revenue was EUR 19.1 million. This was 21% lower than last year. Our electricity business did well. Revenue from electricity sales grew by 24% to EUR 9.6 million. We also cut costs. Staff costs fell by 46%, and other operating costs fell by 53%. Because of this, EBITDA grew by 44% to EUR 6.5 million. Last year, it was EUR 4.5 million. We made a net profit of EUR 6.2 million. Last year, we had a loss of EUR 2.7 million. The profit includes about EUR 5 million of one-time gains, mainly from asset sales and changes in the group. In short, our cost cuts are working. We are becoming a more efficient company. Regarding balance sheet. Let us look at our balance sheet.
At the end of September, total assets were about EUR 249 million. At the end of the last year, they were EUR 272 million. The decrease mainly came from selling power plants, changes in asset values, and changes in our group. Our equity was EUR 51.1 million. Long-term liabilities fell by about EUR 15 million to EUR 154.6 million. This reflects asset sales, changes in the group, and loan repayments. Short-term liabilities also fell by about EUR 5.4 million. We had about EUR 9 million in total liquid assets at the end of September 2026. Overall, we are making our group simple and reducing our liabilities. Now let me talk about our cash flow. Our operating cash flow was EUR 8.9 million. Last year, it was only EUR 2.3 million. This is a strong improvement. We collected more money owed to us and managed our working capital better.
Cash flow from investing was positive at about EUR 700,000. Asset sale helped this result. Cash flow from financing was negative at about EUR 9.5 million. This mainly reflect debt repayment and changes in the group. Even after these payments, our cash level stayed almost the same. We ended September with about EUR 2.5 million in cash and about EUR 9 million in total liquid assets. We generated cash from our businesses while reducing debt. This is the key message. Thank you for your attention.
Okay. Talking about the group restructuring, we just already alluded, has helped in improving our numbers, even on smaller revenues. This, for most of you who are following us closely, will be essentially a reminder, but maybe in our own words. At the beginning of this year, we essentially saw three areas and key areas of our business being in trouble. One is our business in Australia and New Zealand, which have not been able to turn or had accumulated losses, and now I am talking mainly about Australia, which we have not been able to turn around. On top of that, we had this EPC project in New Zealand, which ended up with a loss. This is a part of our business where we had to make the decision to essentially let it go.
Secondly, we had the situation in Poland escalating based on some of our clients, not, at least in the eyes of the Polish TSO and the regulator, not meeting emissions limits in 2024, requiring us to return significant revenues. The final decision on this return of revenues being accelerated by the TSO, by starting offsetting additional or new revenues against this EUR 3.2 million deemed receivable by the TSO. This forced us to file for bankruptcy in the company. On top of that, we had a situation where a significant part of our power plants that we built and financed in Romania were not operating for an extended period of time during last year. Of course, also putting a lot of strain on our assets.
Plus, we have invested a lot of money in project development, and those projects became very difficult for us to realize, on one hand, ourselves, with limited or no access to project financing, and also was a very bad moment to sell those project rights to other investors, as demand was low and a lot of projects were on sale in the market. Three areas got into trouble at the same time, and I would describe what we have been trying to do here since as triage. Each of these business lines we tried to address as best as we could, which in the case of Australia and New Zealand, but also Photon Energy Trading in Poland, has been a question of winding those businesses down.
In the case of our Romanian assets, basically getting as many licenses as quickly as possible, getting those power plants to generate, but also finding ways how to unlock the significant capital we invested into development assets in Romania and turn them into cash. Unfortunately, timelines for these are very long. At the same time, we had to manage a significant reduction in the size of our organization, and also, of course, manage our cash flow. This has been very challenging. As a result, we had to suspend the payment of our coupons, which we are, the coupons of our bond, which is something we are in the process of addressing, but more on that in a minute. As you can see, we had quite a lot of entities in Australia that we put into administration.
Also, our entity in New Zealand, the junior entity, and we managed to sell one of our entities in Australia to a third party in October in a rather minor transaction. As I mentioned before, on Photon Energy Trading PL, the entity is waiting for the final ruling, but we transacted essentially the shell company at this point out of the group so we could deconsolidate this entity. In terms of cash generation initiatives, we have sold, as mentioned before, our Slovak power plants, where I would say the proceeds from the sale, of course, were very important to us.
At the same time, as I mentioned before, these regulatory risks, which have now crystallized in a much more significant way than we anticipated even at the beginning of this year, were a very good reason to sell those assets and reduce the risk profile of our portfolio on assets that had very limited, if any, upside potential after the end of the feed-in tariff period. We are progressing with our initiative to sell assets, particularly development assets. Of course, our main focus is to sell assets that are not contributing to the revenues and the earnings of our group. By definition, these are project rights, so ready-to-build projects. Of course, there are also some other assets in the balance sheet. I can see there's also one of the questions that has been posted here relates to RayGen, which is also such an asset.
Coming back to the current priorities, they are to turn our development assets in Romania to cash and potentially also some of our operating power plants, where, however, we want to keep those sales to an absolute minimum, in order not to reduce our cash generation capacity going forward. We are looking in all directions, in all parts of our balance sheet, but where the main attention is now is to also use the positive dynamics in the electricity market and the high prices, which have reignited interest in ready-to-build projects and power plants across Europe, and that includes, of course, Romania, and use this window to monetize our past investment into project development. What you can see here is just some of the parameters that hopefully can show you what we have so far achieved.
Here, I would like to say that, of course, this is not the end of the road. We are constantly looking and reevaluating and calibrating our business, and particularly the cost base, so that we can show our investors, and this is both our bondholders, other creditors, and our shareholders, that we are turning this company not only around, but we're making it fit for purpose and sustainably profitable going forward. I think starting with our headcount, we have managed to reduce over the last 12 months very drastically, by over 40%. Here, I would like to point out that the high point in terms of FTE was in mid-2023, where we had in total 366 staff, or full-time equivalent. That had dropped to 305 a year ago, but we're now at less than half of our high point. A significant headcount reduction.
As you can see, there has also been a significant reduction in our personnel costs, from EUR 4.2 million in the third quarter 2025 to approximately EUR 2.3 million in the third quarter of this year. So a slightly higher percentage, and that is the result of reductions. For example, in Australia, where, of course, relative to the other countries where we operate, salary levels were significantly higher. So we have really, I think, managed to significantly reduce our cost base.
The same applies to other expenses, where you can see that the drop, particularly from the fourth quarter of last year to the first quarter of this year, has been very significant. The increase since Q1 is, to a very large degree, driven by expenses that we are incurring in relation to the ongoing restructuring process. So we have more advisory costs and related costs that we have been incurring in Q2 and Q3.
But as you can see, a significant reduction in other expenses. We have also started a reduction in our financial debt, which may not look very pronounced, but as you could see in the cash flow slide, maybe just, sorry, just as a quick reminder. We have been able to reduce our financial debt by around EUR 9 million in the third quarter of this year. So, one important element of this was the sale of the Slovak assets, which rid us of EUR 4.1 million in project financing debt, but also the repayment of the working capital line for Photon Energy Technology. And of course, also the ongoing repayment in the project financings of our various PV plant portfolios, particularly in Hungary and Romania. We are reducing our financial debt, and this, of course, is the number one focus going forward.
The goal will be to reduce our financial debt dramatically over the next couple of quarters and years. In line with that, as you can see, over the last five reporting periods, quarterly reporting periods, we have managed to, in Q2 and Q3, to increase our EBITDA on a year-on-year basis and be well above our interest expense. So, I would say in conclusion that we are at an inflection point. This year has been a very, very difficult one, as is obvious from our reports and messages, but a lot of effort has gone into this. Again, I will use this word, this term, triage. So it was multiple crises that we tried to contain while ensuring the going concern of our various business lines and, of course, also the entire group. A few words on the ongoing restructuring efforts in relation to our Green Bond.
Here, I would like to point out that Photon Energy N.V., so the parent company of the group, has at this point in time around EUR 4 million in financial debt to a financial institution that is related to some asset financings. But the other financial debt item is our Green Bond. So this is, of course, the main focus of restructuring. On the 30th of July, we published an invitation to a bondholder meeting where we made several proposals. This whole process is based on the German Bond Act, where one of, essentially, the main points of this bondholder meeting was supposed to be the appointment of a joint representative who represents the bondholders towards the issuer, that means the group, and who would be a conduit between us as a company and the relatively wide net of our bondholders.
We also asked for a waiver on the equity ratio and some other elements. On 1 September, we published the termination of the vote, and that was based on several objections raised by some of our largest bondholders, but we also saw that the support for our proposed agenda was not there. However, that does not mean that there's nothing happening. Quite the opposite. We are proceeding according to what you would call the standard process in these restructuring situations in the German bond market. We commissioned the preparation of an Independent Business Review. This is prepared by EY-Parthenon, which is a firm specialized in restructurings in general, but also prepares these IBRs on a regular basis.
Work on this commenced at the end of August, and the outcome of this exercise and some related tasks are supposed to form the basis of then a structured discussion with the bondholders, with the goal of finding a positive outcome for the bondholders, but of course, also the company and its shareholders. This process is ongoing, and we have been and we will continue informing the market about the steps and the potential outcomes of this process. We have received several questions from investors, some of them ahead of time and some of them now freshly. I will start with questions that we've received beforehand from one of our investors, where the first question related to the bond restructuring and potential dilution.
The first question is, "What restructuring options are currently being considered following the Independent Business Review?" As I just said before, the IBR is the generally accepted basis for evaluating potential restructuring options and discussions between the bondholders and/or their representative and advisors with the company. It is something where the results of this exercise will probably then determine what options are available, and then it's a matter of constructive negotiations where I think we have so far tried to be very constructive in our interaction with bondholders. The next question, this is something that, this is a bridge that we will have to cross once we have the IBR results available.
The next question is, "Is the company considering converting any part of the outstanding bond principal or deferred coupon payments into equity?" Again, this is something that is too early to, well, not know the answer, but even consider, because again, the options that we have, how to deal with this restructuring of the bond will be determined by the outcome of the IBR. The related question is, "If a debt-to-equity conversion is considered, can existing shareholders expect significant dilution? Would current shareholders be given any preferential rights or protection?" There, again, the answer is the same, cannot answer. And obviously, there's probably a million ways how a company's finances can be restructured, and probably the list is very long and does include the items mentioned in this question, but it cannot answer this at the moment.
The next question is the company also considering extending the bond maturity beyond November 2027? Again, the outcome will depend on the result of the IBR, but an extension of the maturity is probably one of the more likely elements than maybe some of the other that have been mentioned before. The next questions relate to liquidity and outstanding coupon payments. The company has deferred four consecutive quarterly coupon payments amounting to approximately EUR 5.1 million. What is the current plan for settling these outstanding payments? These deferred coupon payments, for which we are as a company very sorry that has happened, will also be subject to the discussion with the bondholders after the IBR, and will be addressed in the finally adopted solution of the restructuring.
The next question is that cash and cash equivalents at the end of the third quarter amounted to approximately EUR 2.5 million. Does the company currently have sufficient liquidity to maintain operations and meet its obligations over the coming months? First of all, this EUR 2.5 million are freely available cash. You've seen the bigger number, close to EUR 9 million.
The difference is what is referred to as restricted cash, and the vast majority of that is our reserve accounts held as part of the project financing of our power plant portfolio, where at various points in time, we are able to convert that or some of this restricted cash into freely available cash by the distribution of dividends or share the payments. This is essentially excess cash generated by these power plants that, in accordance with the financing conditions with the various project lenders, becomes available to us. This EUR 2.5 million is, I would describe it as at the bottom end of our operational necessity. Of course, a legitimate question is if there's EUR 2.5 million in cash available across the group, why wouldn't we pay a coupon?
This is at the bottom range to keep. We're talking as of the end of the third quarter, of course, but this is at the bottom end to meet our ongoing obligations and working capital needs. The next question is, are further asset disposals, new equity financing, or additional borrowing necessary to secure the company's liquidity? As I mentioned before, we are in the process of selling assets with a focus on those that don't generate liquidity. We do see an increase, almost thanks to the high energy prices in cash generated by our power plants. This year, as again, I'm repeating myself here, has been a very difficult year. Yes, certain asset disposals were necessary to keep the lights on.
But I think we are now getting to a point where our operating costs, we are and will be able to meet from our operating cash flows. Of course, we are a business that is quite seasonal, so during the winter, there is less electricity and therefore revenue generation. But the goal is, and I think as we could show before, we have come a long way in reducing our cost base, increasing our EBITDA, and becoming, for our ongoing operations, independent of asset sales. However, these asset sales are very important to monetizing our investment, particularly in project development assets, is absolutely crucial, not least because those development assets also have a limited lifetime.
So when we talk about a ready-to-build project for a PV plant, that means that consists of a grid connection contract, some rights to land, construction permits, and they are typically, particularly the grid connection permits and construction permits, are time-limited. So it is necessary to commence construction within a predefined amount of time. So those assets have expiry dates, and this is why an operating power plant, of course, is a self-contained asset. That is not the case for development assets, and this is why we are putting a lot of focus on using this time window that has been created through the high energy prices. And of course, the cash generated from that will definitely play a role then in addressing our financial indebtedness. The next questions are about the IBR and the restructuring timeline.
The question is whether the IBR will be completed by the end of November, which is the timeline we have communicated to the market. We have not communicated anything else, so this information still holds. When can shareholders expect concrete information about the proposed restructuring plan and its potential impact on existing equity holders? Again, the IBR will be from the basis of negotiations with the bondholders, and then any information to the market is, of course, subject to our regulatory requirements, and this information will be published as soon as it is available, and we have to inform the market. But again, the IBR is the basis. There will be discussions. Once there is an agreement, then the market will get informed.
The next question is, "Will the company publish a detailed update immediately after receiving the IBR conclusions?" Once the IBR is obtained, we will, subject to confidentiality, and some of the elements of the IBR may also constitute the inside information. We do expect that we will publish something in relation to the results of the IBR itself, but what form it will take, we cannot say at the moment. And then, as the process after the IBR continues, that means we will have discussions, we will inform the market when appropriate. The next set of questions relates to the operating performance and financial outlook. "In Q3, EBITDA improved significantly while revenues declined. To what extent does management believe this EBITDA improvement is sustainable in the coming quarters?" I think I alluded to this slightly before. We have reduced our cost base. We continue doing so.
We continue finding areas of improvement. At the same time, and I think this is also very important to note, we do see positive developments potentially in all our business lines. We do have currently tailwind in terms of high energy prices. How long they will be at this elevated level, of course, we cannot know. The best guess or the best reflection of a future scenario are futures prices for electricity, which, of course, we look at very closely. They do indicate higher energy prices for next year, and by this time already 2028, than what we have seen in the last two, three years. That is what I called a tailwind before. Clearly, that is a positive outlook, but we do see continued interest among asset owners to give us their assets for O&M going forward for asset management.
I mentioned before that we have a growing pipeline of particularly behind-the-meter EPC business, but we also see continued growth in our water business. The signs are positive. I think our biggest issue remains cash and, of course, a resolution to the restructuring of our bond. In terms of operating performance, we do believe that the trend is positive, and we're doing everything we can to make it also sustainable long term.
The next question is, "How much of the reported Q3 net profit was attributable to the gain on the sale of investments, and what level of recurring operating profitability does management expect going forward?" On this gain of in total, or this one-off gain of EUR 5 million, about EUR 1.4 million relates to the sale of Slovak assets, and that mainly relates to a deferred tax liability which has been eliminated as a result of this asset sale, and the remainder relates to the consolidation of our Australian and New Zealand entities. The last question is, "Is that about the company's priorities to restore stable cash generation and reducing financial leverage?" I think we have already alluded to that. CapEx has been put to zero or near zero. I mean, of course, in some areas, we have replacement CapEx, but these are relatively small numbers.
We are not developing any new projects on a large scale. We are not building any power plants for our portfolio, and any free cash will go towards debt service and the reduction of financial debt in the foreseeable future. The last question is about our annual report and the audit. We have announced that there's still a delay in the publication of our annual report and discussions about the remaining items, but also the timing ongoing with the bondholders. My apologies, the auditors. We will inform the market as soon as we have an update. This is one set of questions from one of the investors. There are more questions that have come in during the call.
Given that Photon Energy Trading PL has filed for bankruptcy, does Photon Energy intend to continue pursuing the legal claim against PSE? The company that has the legal claim against PSE is Photon Energy Trading PL. Assuming that bankruptcy will be declared and the company will get a bankruptcy trustee, that will be up to the bankruptcy trustee to decide whether he wants to continue in this court case against PSE. So at this point in time, this is already something we are not involved in. The next question relates to the IBR and its timing, so I think I answered that already. We have published the expected date for the IBR completion, which again forms the basis for further discussions. Whenever there is something that we can and or have to, from a regulatory point of view, publish, we will do so.
The next question is, how does management intend to protect the interests of existing shareholders during negotiations with bondholders? Would any concessions granted to bondholders be conditional on additional capital contribution from existing shareholders or new investors? Again, this is a question we cannot answer at this point. I think I said before that there is a long list of tools that can be used in a situation like this, all of them mentioned here and many others. We really try to approach it, and I think also the bondholders are trying to approach it in a very pragmatic way. So we will see what the IBR shows. It is a third party analyzing our business, establishing how our company can perform going forward and meet its obligations, most likely on the new terms. The next question relates to the sale of the solar power plants.
The question is, how much cash has become available to the group as part of the sale, where we announced the EUR 5.6 million enterprise value and the EUR 4.1 million of project debt that has been essentially deconsolidated as part of the sale? So the difference of approximately EUR 1.5 million is the cash that has become available to the group. The related question is, are further asset disposals being considered? I believe that this is a question I already answered before. So yes, we are, of course, looking at liquefying what particularly assets that are on our balance sheet that into which we invested and which are not adding to the cash flow of the group at this point in time. So mostly development assets. The next question relates to the appointment of Andrej Horansky and his departure 14 days later.
Given that his appointment was based partly on his experience in corporate restructuring, liquidity management, capital structure optimization, could management explain the circumstances behind this unusually short tenure? I think I agree it is an unusually short tenure. We have made an announcement, communication to the market upon his departure, and there is nothing else we can add to this. Then the question is, what are the main reasons why the 2025 annual report has not yet been published?
Is it related to the audit process, the group's financial position, the ongoing debt restructuring, or any disagreements with the external auditor? First of all, what is important to point out is that when auditors form an opinion on financial results, they do not only look at the period that they are auditing or to which their financial statements relate, but of course, they also look at what has happened between the end of that period and the date of the audit. However, they also look to the future. So basically, when they make assumptions about going concern, they look 13 months ahead. And, given all the changes and the financial conditions which this has put our group into, there is a lot of question marks, both past but also future-looking.
Of course, also at this point in time, in this 13 months outlook falls the due date of our Green Bond, which raises the question how that will get addressed. So, we are in a situation where the audit and restructuring and some other aspects of our business are interrelated. It is definitely not a plain vanilla situation, but we are doing our utmost to resolve this. And of course, we are aware of the regulatory requirements that we have to publish audited results. We are very committed to resolving this as quickly as we can. And we will inform the market once we have better visibility on the timeline. The next question relates to RayGen, cooperation with RayGen, commercial benefits, and potential divestment. Can management provide an update on the current cooperation with RayGen?
Has the partnership generated any measurable financial or operational benefits for Photon Energy so far, such as revenue, cost saving, or access to new technologies? Further, the question is about the contribution to the financial performance of the group from this investment, and whether we would consider selling all or part of the equity stake in RayGen, and what would be the value in it. So, in a nutshell, we have not invested into RayGen itself, so Photon Energy still has around 5% of the equity of the shares in RayGen, but we have also developed the Yadnarie project, which has been an additional investment funded from our own resources. This project has been sold to AGL, where, through the payments we have received so far from AGL, we have recovered around 50% of the capital that we deployed into this project development.
And the full cost recovery plus profit depends on the project being realized. So, all the project rights have been transferred to AGL, and the trigger for the next milestone payment is what AGL refers to as their final investment decision, which, in a different setting, would probably be the equivalent of financial closing. Based on current information, we can expect this to happen at the end of the third quarter, beginning of the fourth quarter next year. It is an educated guess. Of course, this is completely an internal process of AGL. And if AGL decides to go ahead with the first phase of the Yadnarie project, then we stand to receive another AUD 3.5 million for the project rights, and there are potentially two additional stages, expansion stages, which could rather happen with the RayGen technology.
In theory, that location and the grid capacity could also be used for PV plus BESS. We will also get compensated if AGL decides to execute stages two and three with different technology, and there, we stand to receive an additional up to AUD 6 million. From today's point of view, if this happens, that would happen at a later point in time, so not next year. But the situation may be dynamic. This is what is coming back from the investment into not so much RayGen itself, but the Yadnarie project. We are developing one large project in South Africa, which was originally The original plan was to use the RayGen technology. However, this delays in getting Yadnarie approved has an impact on the bankability of the technology.
Essentially, AGL, a major energy player investing into a RayGen plant, is essentially the precondition for wider bankability of the technology. We have changed this project to PV plus BESS, and are also looking at potentially selling this development asset. I think from a project development point of view, in the short to medium term, rather limited potential. Selling our shares in RayGen is not an easy process. The company is also trying to raise capital at this point in time, which theoretically could provide a window to maybe sell some shares, but it is, at this point in time, rather difficult. We do expect that a significant improvement in the possibilities or options to liquefy this investment around the FID of the Yadnarie project.
Having said that, RayGen also has some interesting and very promising spin-off applications of the technology, which may also lead to a different and faster liquidity outcome. But now I'm speculating. It is definitely an interesting company to be invested in. We still believe in the potential of the technology. Long-term storage remains a big topic. In the right markets, this technology definitely has a lot of advantages. But of course, given our current situation, a long-term investment that cannot be turned into cash quickly does pose some issues for us. Having said that, we believe in the long-term value and further value development potential of this investment. But commercially, the potential of a major contribution is rather limited. The next question is, "Is the news that the coupon is once again not being paid naturally affects the company's overall creditworthiness? That is unfortunate.
You're failing to pay the coupons even though liquidity is available and you are contractually obligated to do so. Why not at least purchase some of the bonds on the open market to reduce your debt? Given the current figures, why would the bondholders agree to any changes? What would you offer the creditors?" Yes. It is unfortunate that we have not been in a position to pay what is now, well, still the last three coupons, but we have announced yesterday that we will not be able to make the coupon payment due on the 23rd, so Monday. This is something that will need to get addressed as part of the overall restructuring process. I think I answered the question about liquidity. Yes, there's, of course, liquidity.
Of course, we have some cash in the bank account, but we are essentially at or very close to our operating minimum, so we are not in a position to pay what would now be EUR 1.28 million for a coupon. We are doing our utmost to restore that capability to serve that financial debt going forward as quickly as possible. I think on all the other topics, I cannot comment, or we cannot comment at this point in time. The next question is, "Can you provide some detail of the objections from the large bondholders you mentioned?" I am not sure I caught that. Did you say an extension of the bond is more likely than a debt-for-equity swap? The first question is, we do have that on the website.
There is a section related to the bond and bond restructuring, and there you can see all information related to the bondholder meeting and the objections by the bondholders. It is a rather long document, so I would like to refer you to that. I hope I did not make any comment indicating of anything being more or less likely. I suggest to conclude the answer, the Q&A session has had more questions. The IBR is the basis. It is something that, in German, there is this nice word, [Non-English content ]. That means we will see what comes, what the result will be. Of course, we are doing our utmost and of the firm belief that this company can not only be turned around, but also become very successful.
To that effect, I think we have shown that we have managed to reduce our cost base, made changes where it is necessary. However, I think in many of our activities, we are in good market positions. Here, I would also like to point out that in our industry at this point in time, we are not the only company that is in a difficult situation. We firmly believe in our turnaround. Of course, towards the bondholders, this needs to be confirmed by an independent third party. That is what the IBR is for, so that we all have the same information, and it comes from a trusted third party. That is EY-Parthenon. On that basis, we will have a discussion, ultimately a negotiation. What the outcome is something that we do not see at that point in time.
We would like to thank you very much for your attention and also your active participation through your questions, which we have hopefully been able to answer satisfactorily. I guess this is our last earnings call for this year. I would like to wish you all, maybe a little bit prematurely, but Merry Christmas and a Happy New Year. We are looking forward to welcoming you on our next earnings call in February next year, when we will be presenting our Q4 quarterly results and preliminary full-year results. Thank you very much. Thank you. Have a great day. Thank you. Bye-bye.