Q3 revenue rose 13% QoQ to $263.1 million and adjusted EBITDA reached $78.9 million. Nine contract commitments boosted backlog, while 2027 guidance remains cautious on utilization timing; the Prospector 5 loss and investigation remain significant uncertainties.

Operator

Good day and thank you for standing by. Welcome to the Borr Drilling Limited Q3 2026 results presentation conference call and webcast. At this time, all participants are in a listen-only mode. After the speaker's presentation, there will be a question-and-answer session. To ask a question during the session, please press star one one on your telephone. You will then hear an automated message advising your hand is raised.

To withdraw your question, please press star one one again. Please also note that today's conference is being recorded. I would now like to turn the conference over to your speaker, Mr. Bruno Morand, CEO. Please go ahead, sir.

Bruno Morand
CEO, Borr Drilling

Good morning, and thank you for participating in Borr Drilling third quarter earnings call. I am Bruno Morand, and with me here today is Magnus Vaaler, our Chief Financial Officer. I would like to remind all participants that certain statements made on this call are forward-looking and involve risks and uncertainties that could cause actual results to differ materially from those projected in these statements. For further details, please refer to our latest public filings.

Before I turn to the quarter, I want to speak about the Prospector 5 incident. On October 24, the Prospector 5 suffered a catastrophic loss of stability during pre-loading operations and subsequently sunk offshore Gabon while working for our customer, BW Energy. At the time of the incident, 115 people were on board, and 110 were brought safely ashore to Port Gentil. Sadly, four people lost their lives, and one person remains unaccounted for.

The search and rescue efforts are still ongoing. On behalf of Borr Drilling, I extend our deepest sympathy to the families, friends, and colleagues of those individuals who lost their lives and to the family still waiting for news. In the days after the incident, I traveled to Gabon to meet the crews, the families of those affected, and the team leading the emergency response efforts. The commitment and professionalism of individuals involved in the response efforts has been both touching and reassuring.

We are very grateful to each and every person supporting these efforts, the government of Gabon, BW Energy, and the broader offshore community for the extraordinary cooperation and support they have provided us during this difficult time. We have engaged DNV, a globally recognized classification society, to conduct an independent investigation to determine the root cause of the incident.

Early information from the site pointed to a possible punch-through event. Since then, we have reviewed additional information as it became available to us, including ROV survey data, video footage from BW Energy. That review has not confirmed a punch-through event, and the cause has not yet been established. The Prospector 5 has since been declared a total loss. The rig insured value is $200 million, with insurance payment date set for November 24th, 2026.

Additionally, we carry comprehensive third-party liability insurance, which includes coverage related to wreck removal and pollution. Together with BW Energy, we are evaluating preliminary solutions to enable a safe and efficient resumption of drilling activities at MaBoMo platform in the near term. This has been a tragic event for our company, and our priority remains supporting the affected families and everyone impacted. With that in mind, I will now turn the call to a quarterly update.

Our third quarter 2026 operations result in technical utilization of 98% and economic utilization of 97.3%. Revenues for the period were $263.1 million, with an average of 22.9 operating rigs. Third quarter adjusted EBITDA was $78.9 million, consistent with our expectations. Magnus will provide further details later. We currently anticipate Q4 adjusted EBITDA performance to be broadly in line with Q3, despite the Prospector 5 impact.

In September, as previously announced, we streamlined our operation in Mexico by divesting our interest in the Perfomex joint ventures. Together with our recent acquisition of five premium units from Fontis, this rationalization of Perfomex strengthened our local alignment and creates a more efficient structure, positions us for potential growth and deployment of further rigs as demand develops in Mexico.

On the contracting front, since our last quarterly report, we have secured nine new commitments in key geographies outside of the Middle East. These include an award to deploy the previously idle rig, Hild, offshore Nigeria, strengthening our presence in this growing market. These commitments added approximately $269 million in backlog and represents more than 1,950 days of additional firm work, bringing our coverage for 2026 and 2027 to 79% and 52%, respectively.

We are also seeing encouraging signs of shallow water activity, with increasing number of opportunities in Southeast Asia and West Africa in particular. Despite persistent disruptions in the Middle East, recent contract developments continue to strengthen market utilization for modern jack-ups, which now stands at 93% compared to around 90% nine months ago. This is already a tight market and provides a strong starting point for pricing to appreciate as incremental demand comes through.

Based on the current forward coverage, we anticipate full year 2027 adjusted EBITDA to be broadly in line with full year 2026, with expectations for Q1 2027 to be sequentially lower and a stronger ramp-up in Q4. These reflect the timing of the market recovery against our fleet availability, with a higher number of rigs open in the first half of the year.

That being said, we remain positive on the outlook for the jack-ups, and the same availability should position to capture upside as demand materializes through 2027. The company's strong liquidity position provides the financial flexibility to capitalize on opportunities as the market recovers.

For now, our near-term priority remains maximizing fleet utilization while maintaining a disciplined approach to long-term commitments to create sustainable shareholder value. I will walk you through the market and the fleet in more detail later in the call, but now I will hand the call to Magnus to discuss the third quarter financial results.

Magnus Vaaler
CFO, Borr Drilling

Thank you, Bruno. I will now go into some details on the financials of the third quarter. Total operating revenues for Q3 were $263.1 million, an increase of $30.8 million, or 13%, compared to Q2. Total operating revenues consisted of $216.8 million in day rate revenue, $36.4 million in variable charter revenue, and $9.9 million in management contract revenue.

The overall increase was primarily driven by $29.1 million increase in day rate revenue, mainly due to more operating days for the Sif, Natt, Skald, Idun, Gunnlod, and the Odin, in addition to increase in the amortization of deferred mobilization and demobilization revenue for the Odin. We also had $3.5 million increase in variable charter revenue, primarily due to the impact of the updated blended contractual rates associated with extensions of variable contracts in Mexico.

Included in total operating revenues for the third quarter is $16.4 million in reimbursable revenues, and included in total operating expenses is $10.1 million in reimbursable expenses. Total operating expenses were $228.2 million, a decrease of $3.9 million compared to Q2. The decrease was primarily due to a $4.6 million decrease in rig operating and maintenance expenses.

The decrease was primarily due to a $10.8 million reduction in the provision of credit losses compared to the prior quarter. This $10.8 million decrease is offset by higher operating costs due to more rigs operating in the quarter and in higher-cost jurisdictions such as West Africa and the U.S., in addition to higher insurance costs in the Middle East.

Loss from equity method investments for Q3 was $6.7 million, an increase in loss of $6.4 million compared to Q2, primarily due to the recognition of $4.7 million of losses attributable to our new joint venture. Total financial expenses net were $56.3 million, a decrease of $180.2 million compared to Q2. The decrease was primarily due to the $176.3 million loss on extinguishment of debt recognized in the prior quarter in connection with our refinancing.

Additionally, we had $3.7 million reduction in interest expense resulting from lower interest rates on the new debt. Net loss for Q3 was $38.7 million, a decrease in loss of $202.7 million compared to Q2. Adjusted EBITDA for Q3 was $78.9 million, an increase of $35.1 million, or 80%, compared to Q2.

Turning to liquidity, cash and cash equivalents as of September 30th, 2026, were $202.6 million, a decrease of $21 million from June 30th, 2026. In addition, we had $250 million of undrawn and available borrowings under our revolving credit facility, resulting in total liquidity of $452.6 million at the end of the quarter. Net cash provided by operating activities for Q3 was $31.6 million, which includes $6.3 million of income taxes paid.

Net cash used in investing activities for Q3 was $52.7 million. This consisted of $40.9 million of loans provided to our joint venture, BC Ventures, including the $25 million related to our share of the cash consideration for the Fontis acquisition. In addition, we had $11.8 million of additions to jack-up drilling rigs, primarily long-term maintenance costs and capital additions for drilling equipment.

Our liquidity position provides a strong foundation for the company and the financial flexibility to capitalize on opportunities as the market recovers. Changing topics to a few words on the financial aspects of the Prospector 5 incident. The rig has been declared a total loss, which resulted in the automatic termination of the drilling contract with BW Energy on October 24th. The remaining firm term backlog under that contract was approximately $45 million.

The net book value of the rig was approximately $95 million at the end of Q3. The company is continuing to evaluate the full consequences of the incident, including the resulting write-off of the rig, potential insurance recoveries, potential losses, contractual impacts, legal matters, or claims that may arise, and other related matters. As of the date of issuance of these financial statements, the ultimate financial impact of the incident cannot be reasonably estimated.

We have hull and machinery insurance coverage of $200 million for the Prospector 5, and payment is expected to be received at the end of November. The insurance proceeds will be applied in accordance with the requirements under our debt instruments and includes debt repayments, including scheduled amortization payments, capital expenditure payments, including regular CapEx and maintenance. Investments and a portion for all the general corporate purposes. With this, I will pass the word back to Bruno.

Bruno Morand
CEO, Borr Drilling

Thank you, Magnus. Today, 25 of our 28 rigs are either contracted or committed. Year- to- date, we have secured 30 contract commitments, adding approximately 6,300 days and $810 million of day rate equivalent backlog. As I mentioned earlier, since our last quarterly call, we have secured nine new commitments, which I will now walk you through. In Southeast Asia, the Idun was awarded a contract with PVEP Ho Chi Minh in Vietnam in direct continuation of the Hoang Long JOC contract.

As of today, the rig is mobilizing to PVEP Ho Chi Minh to commence a three-well campaign with an estimated duration of 130 days. Additionally, in the region, Vestigo Petroleum has exercised a one-well option on the Skald in Malaysia, keeping the rig contracted into January 2027. In North Africa, the Vali has received a contract extension with Mellitah Oil & Gas.

This well-based extension is estimated to keep the rig busy into September 2027. In Europe, the Joro was awarded an accommodation contract with an undisclosed operator in the U.K. The rig has commenced its mobilization in late October under mobilization rate and has a firm duration of 60 days starting from mid-November. This contract should keep the rig contracted in 2027 and also include price options with an additional duration of 56 days.

In the Netherlands, Eni exercised a nine-month option on the Bestla, extending the contract to September 2027. Eni maintains an additional fixed price option to extend the contract by a further nine months. We will assume operational management of the rig in December 2026, following the completion of the variable charter with the prior owner. In West Africa, the Norve was awarded a contract by Eni in Congo.

The contract is expected to commence by December 2026 and includes a firm scope of three wells, expected to keep the rig committed into August 2027. The contract also includes price options with an estimated duration of 175 days. In Nigeria, SNEPCO exercised a one-well option on the Natt. Based on the current well program, it is anticipated that the rig will remain contracted with the customer into August 2027.

Additionally, in Nigeria, the Hild has received a binding letter of award from an undisclosed operator. This one-year campaign is scheduled to commence in Q1 2027. In Americas, the Ran has received a 15-month extension with Eni offshore Mexico, which commenced in October. The initial six months of the extension covers drilling activity. Thereafter, the rig may undertake drilling or accommodation activities subject to the customer operational requirements.

Collectively, these awards demonstrate the strength of our commercial execution across diverse set of markets. Despite subdued contracting activity in the Middle East, we continue to add work at a pace that exceeds the backlog consumed, maintaining a positive book-to-bill ratio in 2026, both in days and in value. Importantly, these commitments have increased forward visibility across our portfolio. Following the recent awards, our 2026 coverage currently stands at 79% with an average day rate of approximately $133,000 per day.

Looking to 2027, we secured more than 50% of the contract coverage at an average day rate of approximately $137,000 a day. In the Middle East, the prolonged conflict and uncertainty surrounding has resulted in reduction in activity. Since the onset of the conflict, the count has declined by four rigs, excluding the impact of all suspensions of Saudi Aramco.

At the same time, important tender activities continue in the region. Several key tenders have recently progressed to award, while the Saudi Aramco tender remains ongoing. This demonstrates that customers remain shallow water portfolio, and substantial underlying drilling requirements remain in the region. However, while we expect recovery towards pre-conflict, the persistent conflict continues to lead the timing and pace of their recovery. In Southea st Asia, contract activity continues to develop positively.

Since the end of Q2, the count has increased by absorbing much of the previously idle supply. This is driven primarily by Vietnam, with contracting activities in Malaysia also beginning to strengthen. While competitive pressure on pricing remains, our team has done well filling near-term availability for continued deployment. Looking ahead, we anticipate some near-term availability on the Mist and the Skald as their current contracts conclude during our regional monsoon season.

However, we see a healthy pipeline of opportunities for both units as we move towards the middle part of the year. As broader market utilization continues to tighten, we believe the region has potential to support an improving rate environment through 2027. In Mexico, the contracted rig count has increased by six rigs since the end of Q2, with previously available rigs from local contractors now being largely absorbed.

Mexican oil production remains below the government's stated ambitions, reinforcing our views that additional drilling activity will ultimately be required. Our relationship with international operators, together with our strong local partnership, provide us with a solid position in a market that has further capacity to grow. Importantly, we have also made progress deploying our expanded fleet. Earlier this year, through BC Ventures, our joint venture with our local partners, we acquired five rigs from Fontis.

At the time of the acquisition, only one was employed. By the completion of the transaction in July, the joint venture had secured additional commitments, and today, three rigs are contracted for drilling, while a fourth is employed for accommodation, with line of sight to return to drilling work in the coming months. We expect these four rigs to remain contracted for most of 2027, while the fifth remains stacked, with active customer discussions around potential reactivation.

Elsewhere in Americas, the Skald is now expected to finish its campaign with Petronas in early 2027. While we are exploring multiple opportunities in the region, we expect idle periods for the rig following the Petronas campaign. In the North Sea, we now have all of our three rigs on contract. Operators in the region continue to navigate permitting and regulatory challenges, which limits visibility around meaningful new commitments.

Based on the current opportunity pipeline, we expect regional utilization to remain relatively stable through 2027. In West Africa, contract activity remains robust, with Nigeria continuing to drive demand for both international and indigenous operators. Our recent award for the Hild, which was previously idle, reflects the strength in demand environment. More specifically, we are tracking a substantial pipeline of opportunities in Nigeria that could represent incremental demand of more than five rigs.

While we do not expect every opportunity to materialize on schedule, the breadth of the pipeline gives us increased confidence that Nigeria market will require additional rigs by the end of 2027. We are also seeing [inaudible] investment activities elsewhere in North Africa, reinforcing our constructive view for the broader region. Turning to China, one of the largest consumers of modern jack-ups globally, with nearly 60 units contracted today.

Industry sources indicate a requirement for up to six incremental jack-ups for local deployment. With limited readily available domestic capacity and low new build order book, we anticipate most of this demand may need to be met acquiring modern jack-ups from the international fleet, which will be another positive catalyst for a ready tight in global market. Taken together, these developments reinforce our constructive view on the jack-up market.

Outside the Middle East, demand continues to improve and is steadily absorbing available capacity across several key regions. In the Middle East, underlying requirements remain, but the ongoing conflict continues to obscure the timing of that demand. Should it materialize, it will be further supportive to the pace of the global recovery.

From a macro perspective, based on industry research, the combination of depleted inventory, lower spare capacity, as well as persistent logistical and refining constraints has raised the structural floor for oil price, supporting future investments across the upstream sector. We believe shallow water resources are well- placed in this environment, given their economically attractive and short cycle barrels. With that, let me close with three key takeaways.

First, regarding the Prospector 5, our immediate priority remains supporting those affected by the incident. The independent investigation is ongoing, and we remain committed to understanding exactly what occurred, applying the findings appropriately across our organization, and sharing the learnings with the industry. Second, we remain positive on the outlook for jack-ups. Demand visibility is improving across several regions outside of the Middle East. Contract durations are lengthening, and available supply is gradually being absorbed.

Market utilization is already 93%, a healthy level that provides a strong starting point for pricing appreciation as further demand volume materializes. We remain cautious on the timing of this recovery given market volatility.

Our higher fleet availability in the first half of 2027 means near-term performance will lag, but it also gives us meaningful upside as the market tightens through the year. Third, the company's strong liquidity position provides the financial flexibility to capitalize on opportunities as the market recovers. With that, I will now turn the call over to Q&A.

Operator

Thank you. As a reminder, to ask a question, please press star one one on your telephone and wait for your name to be announced. To withdraw your question, please press star one one again. Once again, please press star one one on your telephone and wait for your name to be announced. To withdraw your question, please press star one one again. We are now going to proceed with our first question. The question comes from the line of Doug Becker from Capital One. Please ask your question.

Doug Becker
Analyst, Capital One

Thank you. Bruno, I would also like to extend my deepest sympathies to those affected by the Prospector 5 incident. With that in mind, insurance is set to pay out $200 million by late November this year. Could you just expand on the requirements to repay debt with some of those proceeds, and then the preliminary thoughts on applying payouts toward CapEx and investments going forward?

Bruno Morand
CEO, Borr Drilling

Very good, Doug. Thanks for joining the call, and thanks for the kind words. Definitely been a very difficult time for everyone involved. In relation to the insurance, I will let Magnus comment here a little bit more on the deployment of the proceeds. This is obviously something that we are still evaluating as we go along, and it is obviously a very recent aspect. But the proceeds in general would follow the same application of proceeds as you would normally have under the bond, similar to if the rig had been at sale. But let us allow Magnus maybe provide you a bit more color.

Magnus Vaaler
CFO, Borr Drilling

Yeah, that's correct. As Bruno states, it's following the requirement as with the sale. In summary, it gives us 365 days to apply the proceeds to either debt repayments, including the regular scheduled amortizations that we are due to pay in July. It would be CapEx, including investments or maintenance CapEx, which we typically have in a regular year as well, plus around 25% of the proceeds are free to use for other general corporate purposes.

So, I would say, in sum, it's relatively flexible as long as we keep within those buckets. It's a cost that we would have in a regular year as well. So, it is not a lot of restrictions compared to what we would normally pay.

Doug Becker
Analyst, Capital One

Got it. Then just quickly on the 2027 outlook, I thought it was interesting you said based on the current forward coverage. Does that mean that outlook is just based on the 52% contract coverage that's in-house today, or are there some assumptions about increasing demand later in the year? Just given your positive outlook, are there any day rate assumptions kind of baked into that outlook as well?

Bruno Morand
CEO, Borr Drilling

Yeah, no, thanks for the question. Again, when we look at our forecast for 2027, our outlook for 2027, at this stage, we anticipate that the level of activity that we'll see in 2027 is going to be comparable to what we have seen in 2026. So, let's say a number near 80% kind of coverage for the fleet. Obviously, this is based on what we see.

As I mentioned in earlier remarks, there are a couple of moving pieces that are very interesting here in terms of the recovery. Should those things start to materialize earlier than planned, including some of the demand in China, including some of the demand in Nigeria, I would expect that things could start to accelerate as we get to the second half of the year.

I think the way to think about it, Doug, I think we discussed this with the industry repetitively here during the year. I think that the sector utilization has been moving in the right direction, and I would say 93% has been an improvement. It's a pretty healthy level. I think what the space here needed more to see a stronger outlook, it's not so much a utilization play, it's more a forward coverage play.

I think because of the slowdown towards the Middle East, the general forward coverage has been coming down. The Middle East is one region that provides kind of very lengthy contracts, and that's been, I think, what has been affecting the dynamics in general.

In the last couple of months, I think we continue to see an acceleration of not only the tenders, but even the length of the tenders that are in the pipeline, and I think this is constructive. For now, I think we keep maybe a more sober view of the future. We recognize the uncertainties with the Middle East, and we would project utilization or coverage to be similar in 2027 and 2026, and hence our thought on the guidance. I think as the year progresses, hopefully some more good news come, and that could give us some upside potential.

Doug Becker
Analyst, Capital One

I think that makes a lot of sense. Thank you.

Bruno Morand
CEO, Borr Drilling

Thank you.

Operator

We are now going to proceed with our next question. The questions come from the line of Fredrik Stene from Clarksons Securities. Please ask your question.

Fredrik Stene
Analyst, Clarksons Securities

Hey, Bruno and Magnus. I would also like to express my sympathies after the incident and for all those involved. My question today, first one, appreciate you giving a soft guidance for 2027. Obviously, it is a bit lower than sell-side consensus had in their models, and you have given some color also through the prepared remarks on certain rigs that will idle periods, et cetera.

But if there's anymore color to give in the likes of average rigs in the quarters it will be very helpful. Also the recent contract awards since the second quarter results, I think average around $138 thousand per day, so rates definitely at solid levels already. This to me seems to be more like a utilization thing rather than a rate thing when we try to reconcile why this was a bit lower than what we had expected initially. Any additional color you can provide to help us kind of understand and think about this as we go forward would be very helpful. Thanks.

Bruno Morand
CEO, Borr Drilling

Very good. Thanks, and thanks for joining, Fredrik. We tried to include some comment in the prepared remarks to help the analysts and the community to understand what kind of utilization and coverage in the first half of the year looks like. I think the way to think about it at the moment, if you look across our rigs, we have two rigs available in the Middle East, or a second one to become soon available in the Middle East, and we have two rigs in the shipyard in Southeast Asia.

Obviously, the redeployment of those units are heavily dependent on first the situation in the Middle East and how quickly things resume in the Middle East, because that is, for now, a market that we see largely as being landlocked. The ones in Asia certainly would need an acceleration or maybe the realization of some of these larger demand pockets that we are talking about. You know that those four rigs are largely a risk for us, and that is a bit of the starting point.

Beyond that, we provide a bit of commentary. We have two rigs rolling off contract in Asia, the Mist and the Skald, that we see an interesting outlook for them as we kind of get through the middle part of the year, maybe into Q2. But inevitably, being monsoon season in that region, demand tends to kind of track a bit lower in the first part, in the first quarter of the year. I think that that is something that you should think about as having a potential exposure for the company.

In addition to that, I provided some comments on the Sif. I think we had a very interesting campaign with the Sif in Suriname. The rig has stayed there with the customer longer than we had initially anticipated. I like to think that going forward, there will be an interesting play for a rig of that kind of capability in that side of the world between Suriname and Venezuela and those markets.

But inevitably, I think by the timing of things kicking up, you will see, you will experience some idle time on those rigs. I think the broad commentary is, and maybe picking up from your statement, that you are just right. If you look at the recent fixtures that we have had, the day rate has been moving in the right direction, which is positive.

I think we are focused on that, but more importantly, we are focused on keeping coverage on the rigs, and that is kind of how we see. I think at the moment for us, as we look into 2027, as I mentioned in the prepared remarks, I think it is more a matter of timing and the lag that we will see as this demand materializes.

I think we saw into 2026, or we expect into 2026, that disruption in the Middle East to drive further demand across other regions. We see that happening. Allegedly, I would say, or admittedly, I would say that it has been slower than we expected. So that is a bit what is creating, I would say, this kind of pocket in Q1, Q2, that hopefully we will see improving as we get to Q3 and Q4.

I like the fact that when we started the year, and we were looking at the sector recovery, there was a lot of talk and a lot of questions about the Middle East and Aramco in particular, and clearly at that point, they were the keys to the recovery of the sector. I think we get now to the end of the year, and what is interesting is, I think the recovery is playing out, and despite all the Middle East, and I think despite the Middle East, which is interesting.

I think if the Middle East comes through in the next couple of months, if things stabilize, that could be a further catalyst to accelerate the recovery. But as I said in the remarks, we are sober here. I think we need to understand that these exposures exist in the near term. Hopefully, we will see some of this coming through in a brighter kind of second half of the year.

Fredrik Stene
Analyst, Clarksons Securities

All right, appreciate those details. Maybe trying to connect this, I would guess that you are going to prioritize in keeping utilization high on the rigs that are warm and working. Then you have the Groa, the Freyja, and the Var, which are idle at the moment with no future commitments. You also said that you had one contract, sorry, one rig in the BC Ventures that were kind of stacked at the moment.

Just as a side question in a way, you also mentioned, and we heard the same news, that China maybe through COSL is on the lookout to buy rigs, and some of those rigs definitely have to come from the international markets. Would you ever be willing to consider selling any of these stacked rigs?

Bruno Morand
CEO, Borr Drilling

Yeah, it's a good question, Fredrik. Indeed, I mean, I think we need to look at what is available to us and how that makes sense to the company. I think we've been fortunate to have been able to grow the fleet in the last year or so with good assets and attractive valuation. I think at one point in time, if we have the right offers and we feel that it's accretive to the shareholders, I think we will look at that.

I think what is very interesting about the Chinese demand, as we understand, it seems to be a demand that is focused exclusively in serving their local market. I think not only that could be an interesting look at how that transaction could be accretive, but there is a recognition as well that some of that capacity moving into China helps the international market.

I think that holds true whether we do something in that regard or whether it just it's rigs from the general fleet. I think what is important and interesting here is that if you see a demand of that size materializing, it's quite interesting for the sector. If you look at the modern jack-up space, we anticipate right now about 20 or low 20 rigs available across the globe, right?

Truly available across the globe. If you take six rigs off that pool, it helps quite a bit in tightening the market. So, we'll look at that in due course. I think that the dynamics of buying rigs at attractive price, and if you have the right price and to actually sell it onwards to a captive market, is not something that we rule out.

Fredrik Stene
Analyst, Clarksons Securities

All right, appreciate that. Thank you for good and detailed answers as always. I'll get back. Have a good day. Thanks.

Bruno Morand
CEO, Borr Drilling

Later.

Operator

We are now going to proceed with our next question. The question comes from the line of Greg Lewis from BTIG. Please ask your question.

Greg Lewis
Analyst, BTIG

Hey, thank you and good afternoon, or good evening, and thanks for taking my questions. I did want to go back to the guidance. I guess, we gave it, so we got to ask a lot of questions about it. Those three, I guess, hot, warm, stacked rigs, it does not look like, based on your comments around utilization, that those are any work in 2027 is contemplated in the existing guidance. Is that a fair statement?

Bruno Morand
CEO, Borr Drilling

Yeah, I would say in general, Greg, the anticipation in our statement that there's no meaningful amount of work that we put in our guidance for those rigs through the year. If I look at the Groa, it's a rig stranded in the Middle East at the moment. Obviously, the outlook for the rig to return to work is largely depending on the situation in the Middle East.

I think for the rigs in Asia, maybe slightly different, but as we said before, I think the focus is primarily at the moment in optimizing utilization for the rest of the fleet. So, you're right. I think when you look at our guidance, there's not a very large amount of assumption that goes as contributions for those rigs into the year.

Greg Lewis
Analyst, BTIG

Okay. I did want to follow up with that on those two rigs potentially. You did make some positive comments around West Africa. It seems like that market is an opportunity for growth. I think you mentioned there's a handful of potential rig jobs.

Is the right way to think about that just pretty much means that the utilization on our existing fleet in West Africa is going to tighten up here over the next couple quarters, and utilization's going to be pretty high in that market, o r was the read-through we could also actually see some incremental rigs, whether they're Borr's or others, going into that market?

Bruno Morand
CEO, Borr Drilling

Yeah, I think it's a good description, Greg. I mean, the West Africa market has been running pretty much at capacity, so there's not a whole lot of availability in that region other than rigs that just roll off contract in due course. If I speak for ourselves, our own fleet, I do think that the outlook for those rigs to remain contracted, despite or beyond the additional demand in Nigeria, is very true. The way we look at that is indeed, I think if there is a demand of reasonable size in Nigeria, which we have a strong confidence on, that is likely to demand more rigs coming into the region.

Exactly as you described, I think that is the sort of pocket that could create an opportunity to pull rigs that are currently in the sideline and readily available to come back into the active fleet. That all said, I remain cautious and optimistic, but cautious that we know that concluding arrangements for these awards in places like West Africa generally takes a little bit of time, and that means that I would not expect these rigs to be going to that market in Q1. I think this is probably more second half of the year. That's the way I would describe it.

Greg Lewis
Analyst, BTIG

Okay, great. Then just my last question around utilization. We just touched on West Africa, where it seems like rigs are going to move rolling from one contract to the other. Just backing into that, the 80% utilization guidance, what regions do you think we could see some off, or maybe on a relative basis, what regions do you think we could see more off-hire in between contracts on a relative basis, as we kind of look at the first half or the next three quarters in 2027?

Bruno Morand
CEO, Borr Drilling

I would say a lot of that exposure, Greg, sits in Southeast Asia, not because the overall demand is expected to come down. It's just because it is a market that, generally speaking, the contracts are a bit shorter in nature, and then obviously, not always you have this perfect continuation between the contracts. It is a market that has normally some seasonality relating to monsoon seasons.

Customers obviously prefer not to have rig moving risks or delay risks during the monsoon season, so that kind of creates a little bit of that. But as I said, I think that's a risk that is largely a timing issue. I don't see, I think, as much the opposite.

I think when we look at the actual demand in that space, we are quite encouraged to see Vietnam doing quite well, Indonesia kind of following the same footsteps, and even more recently, the demand in Malaysia. I think the demand there is good. I think there may be some timing constraints here that could cause some idle time.

Greg Lewis
Analyst, BTIG

Okay, super helpful. Thank you very much.

Bruno Morand
CEO, Borr Drilling

Very good. Thanks for joining, Greg.

Operator

We are now going to proceed with our next question, and the question comes from the line of Dan Kutz from Morgan Stanley. Please ask your question.

Dan Kutz
Analyst, Morgan Stanley

Hey, thanks. Good morning, and thoughts and prayers out to everyone impacted by the Prospector 5 incident. I just want to ask a couple of questions on the cash flow statement. I guess just first of all, maybe anything that you could share on the CapEx outlook for the balance this year for the fourth quarter, and any early thoughts on 2027?

I think, Magnus, last quarter you'd said that kind of $60 million-$70 million is sort of the normal CapEx range for the size of Borr's fleet. But you're trending, and absent, I guess, a year where there's higher SPSs, but 2026, and it looks like 2027, that's not the case. In fact, we look to be a little bit below normal from an SPS perspective. But yeah, just given that year-to-date CapEx is trending pretty far below that $60 million-$70 million range, and just any thoughts on 2027 CapEx. Thanks.

Magnus Vaaler
CFO, Borr Drilling

Hi, Dan. Thanks for the question. Indeed, we have been guiding to a normalized year of $60 million-$70 million. It's normalized CapEx levels and normal SPS year. As you stated, this year we're trending lower. So year- to-d ate, we have $27.5 million of jack-up additions or CapEx so far. So, I expect us to come in below $50 million for the full year, or around $50 million.

It is mainly attributable to, as you say, less SPSs than in your average year. I do expect that to normalize and actually be increasing next year. So, if you think about two years in a row, $70 million each year is $140 million total. So, if you get to around $50 million this year, I would actually expect it to be more on the $90 million level next year.

So, overall, two years, $70 million each on average, but lower this year and higher into next year because of the timings of when SPSs occur. Next year, we do have more SPSs, special periodic service, than in your regular year. So, that's the expectations.

Dan Kutz
Analyst, Morgan Stanley

Great. That is really helpful and very clear. Then maybe just on free cash flow, you kind of given us an outlook on relatively flat EBITDA sequentially in Q4 and year-over-year. Now, we have the CapEx component of the answer. Are there any other factors influencing free cash flow this year and next year that you would point to, or any kind of framework for free cash conversion, or just anything you could help with on what could improve the free cash generation potential for next year or so?

Magnus Vaaler
CFO, Borr Drilling

Yeah. I think from our fixed costs after EBITDA, they are relatively transparent and easy to follow. We do obviously have the CapEx that we just touched on. We have tax payments annually. I think for the past couple of years, we have been trending around $50 million-$60 million of tax annually, and that is obviously linked to earnings as well. Then we have our debt payments or interest payments, which is trending, or is expected to be $200 million into next year.

Additionally, we have amortization on the bonds. However, it does not start up until July, so there is a regular amortization payment of $50 million in July. That being said, I think we are, like I said in my remarks as well, we are in a very solid position when it comes to the liquidity. We have $200 million on the balance sheet on Q3.

We have a $250 million RCF facility, which is available to us. I think from the company's perspective, we are stronger than we have been in the past when it comes to a base liquidity balance to go through what we do see, as Bruno talked about, the softer first half of next year. We can get through that with the liquidity balance that we have comfortably.

Dan Kutz
Analyst, Morgan Stanley

Great. That is all really helpful. Thanks a lot. I will turn it back.

Magnus Vaaler
CFO, Borr Drilling

Thanks, Dan.

Operator

We are now going to proceed with our next question. The question comes from the line of Aaron Rosenthal from JP Morgan. Please ask your question.

Aaron Rosenthal
Analyst, JPMorgan

Hi, and thank you for the time. I echo the sentiments expressed earlier with respect to the loss of lives and the incident. I guess maybe trying to touch on the Prospector 5 dynamics one more time. Can you confirm if the $200 million is what you expect to receive next week? If you are able to elaborate on what material liabilities or other cash costs could remain afterward, whether it is around the wreck removal and/or the third-party claims?

Magnus Vaaler
CFO, Borr Drilling

Sure. Hi, Aaron. I think it is, like we said in our remarks, still too early to talk about the full impact of this incident. The starting point is the insurance payment that is coming in next week is for the insurance on the asset itself. We also have a comprehensive third-party liability insurance, P&I insurance, that we expect to cover anything around wreck removals, pollutions, and other third-party liabilities that will arise.

So, we have very good coverage when it comes to that insurance as well. I think on other potential losses or impacts or financial impacts from it is still too early to say. I think looking at historical similar incidents, our coverage should be very much sufficient to cover these type of situations. Every situation is obviously different from previous ones. So, a bit early to say, but we have good coverage.

Aaron Rosenthal
Analyst, JPMorgan

Okay, that's fair. I guess going back to the 2027 outlook, I think the implied $138,000 per day from the recent awards, that includes, I think, mob fees and other items. So, maybe if we can take a look at the Hild for some leading-edge dynamics. I guess, can you detail the economics on that award? What the mob fee is like?

Is there any CapEx to get the rig ready from, I believe, what was a stacked position in Mexico? Then, overall, what are you baking in for your per-day or per-rig OpEx assumptions? I understand that there's been some inflation this year, and with the insurance settlements, your per-day rig insurance might be going up as well. So, just had to think about that.

Bruno Morand
CEO, Borr Drilling

Very good, Aaron. Let me maybe take a stab into addressing your question specifically on the Hild. We have not disclosed specific economics for that contract, but we've been mentioning before that running rates in West Africa were, generally speaking, in 140, 160 range. That contract for the Hild is no different from that perspective. So, I think we're still tracking within what we think is being a good and maybe leading-edge rates in that area.

Inevitably, when you move a rig from across the world, you would have some CapEx associated with that. You have, let me rephrase, you have some expenses associated with that that go beyond just the scope of a heavy-lift vessel. There's always some country-specific compliance things that you have to do or some customer-specific aspect that you have to address.

That contract does include a pretty healthy mobilization that should cover, I would say, the general mobilization expenses to get the rig from Mexico to West Africa, but we will have some additional expenses on top, which is regular expenses where you prepare to start a new contract with a customer. I think that's the simple way to think about it.

So, I would say mobilization fee, I will guide you to think about a number that looks in the $7 million-$10 million as revenue coming out of that. Our expenses will be higher than that just because we, as I said, we have crew costs and other things that we have to go through before a rig is ready to go into operation.

Aaron Rosenthal
Analyst, JPMorgan

Okay. I guess, with respect to the range of day rates at 140, 160, I guess let's just pick the midpoint, 150, and then let's say $10 million of move fees. Is the clean rate 150, and then you net out the amortized 10, so it's like a 123, or is that kind of incremental?

Bruno Morand
CEO, Borr Drilling

No, no. As I mentioned, the rate ranges that we've seen in West Africa, that's really the run rate in country. That's not really with add-ons or mobilization. So that's the way I would describe it, Aaron.

Aaron Rosenthal
Analyst, JPMorgan

Okay. That's fair. Maybe just one more on the CapEx component. The roughly $90 million next year, I guess that incorporates some of the additional CapEx for in-country certifications on this rig. If you can confirm that's correct, does that also cover the capital needs for the JV rigs? I guess just overall at the SPS cadence, do you have more or less SPSs currently on the books for 2028 versus 2027?

Magnus Vaaler
CFO, Borr Drilling

I can answer that. The CapEx number we've mentioned now is more on a regular fleet CapEx, excluding any additional moving of rigs or preparation of rigs, activation of stacked rigs. That would, in that case, come as additional cost. So this is just regular maintenance and maintenance CapEx, as it is for the 28 rigs of our fleet.

The JV rigs would be outside of that, but we also expect the JV to be self-funded because of its contract structure soon, or all four rigs in four out of the five rigs in the JV is already contracted. So the working assumption there is that the JV is self-funded when it comes to OpEx and CapEx as well.

Aaron Rosenthal
Analyst, JPMorgan

Okay. Thank you.

Magnus Vaaler
CFO, Borr Drilling

Thanks, Aaron.

Operator

We will now be taking one last question. The last question comes from the line of Gregg Brody from Bank of America. Please ask your question.

Gregg Brody
Analyst, Bank of America

Good morning, guys, and thank you for your time, and my condolences on the loss of life recently. Just a few here. Aaron covered a lot of mine, but on the operating cost side, last quarter, there were some higher costs that were, some were rolling off, and how should we think about how much showed up in this quarter and if that should persist after going forward? I have one more after that.

Magnus Vaaler
CFO, Borr Drilling

Yeah, sure. We have had two quarters now with inflated, I would say, operating expenses due to the startup of the Odin, as we covered in our commentary in the previous quarter. That will normalize now. The Odin is up and running in the U.S. However, at a higher OpEx per day than in most other countries. Additionally, we have moved some rigs into West Africa, as we talked about, and the Hild is going over there, and West Africa is typically a higher operating cost area, especially with Nigeria.

If we previously the costs across regions are a bit different, but let's say that across the fleet as an average, I would probably say we're going to trend around $55,000 - $60,000 per day for every operating rig going forward, with the way that the rigs are deployed at the moment, so on an average basis. But the additional cost that occurred in this quarter and previous quarter for the Odin startup is not going to reoccur.

Bruno Morand
CEO, Borr Drilling

Greg, just to supplement what Magnus mentioned, one of the cost components that we've seen climbing over the last couple of quarters as well, worth mentioning, has been the insurance cost for our rigs in the Middle East. Obviously, until the conflict is resolved, this is a cost that will likely stay.

Somewhat associated with the Middle East conflict, we have been experiencing a slightly higher cost in terms of freight for parts as we kind of move parts around the rigs to service our rigs. Those components will stay. The Odin is one that should normalize as we go along. But as Magnus said, keep in mind that the U.S. is an operating region that has a generally higher operating cost.

I think that when you think across the fleet from these developments, but as well as from the way the rigs have been reshaping around the world, or reshifting around the world, we have a bit more exposure to higher-cost geographies, which will mean that our operating expenses will track a bit higher now for the foreseeable future.

Gregg Brody
Analyst, Bank of America

T hen just in terms of your stacked rig costs, your warm stacked rig costs, how should we think about that?

Magnus Vaaler
CFO, Borr Drilling

It is also in the different categories. So we have the ones that are stacked for longer terms, such as the two in Singapore, the Var and the Freyja. They are typically lower costs, so around $15,000 per day, give or take $10,000-$20,000 per day. Then you have these rigs which are between contracts that you keep relatively warm and active to keep it available for upcoming contracts.

That would be more in the region of $30,000, $25,000, $35,000. But very much dependent on the outlook for work and how warm you want to keep it. But on the flip side, then you do not need to pay a lot on reactivation costs. So for a shorter term stacking, I would say between $25,000 - $35,000 per day. Longer term stacking is more in the region of $15,000 per day.

Gregg Brody
Analyst, Bank of America

Got it. Now, this is my last question. I know estimating what total cost will take some time to figure out from the incident in Gabon. How should we think about the timing of the investigation? Do you have a sense of how long that is expected to take in terms of having a final conclusion?

Bruno Morand
CEO, Borr Drilling

Yeah. It is difficult to precise, Greg. What I can confirm is that the investigation is in its full course. So we think, as I mentioned earlier, DNV has been engaged. They are very experienced and specialized in that field. They are going through the material available. The fact that obviously the rig sunk and a lot of the evidence that has to be assessed to come to a conclusion sits at the seabed does not necessarily facilitate things for us.

So it is early for us to say. I think we are still waiting for DNV to run their initial assessment. I think in the next couple of weeks, we will likely start having some more firm hypothesis of what could have happened. The timeline of actually getting to conclusion remains a bit uncertain. I think at this stage, it is obviously very important that we have some visibility of that.

We want to make sure that whatever investigation is completed is not rushed, is thorough, and really gets us to the bottom of what happened. It is the sort of event that is extremely tragic, and we have a duty to make sure it does not happen to our company again. Hopefully, we can assist the industry to make sure that it does not happen across the global fleet.

Gregg Brody
Analyst, Bank of America

Thank you for the time, guys, and good luck with the investigation.

Magnus Vaaler
CFO, Borr Drilling

Thanks, Greg.

Operator

This concludes the question and answer session and today's conference call. Thank you all for participating. You may now disconnect your lines. Thank you.