Earnings Call: Q3 2026

Nov 24, 2026

Summary

Oil production rose >20% QoQ, adjusted EBITDA increased 50%, and full-year production guidance was affirmed. Bridle Bit came online early, setting up expected Q4 growth and broader 2027 activity.

Operator

Good day, and welcome to the Epsilon Energy Third Quarter 2026 Earnings Conference Call. All participants will be in listen-only mode. Should you need assistance, please signal a conference specialist by pressing the star key followed by zero. After today's presentation, there will be an opportunity to ask questions. To ask a question, you may press star then one on your telephone keypad. To withdraw your question, please press star then two. I would now like to turn the conference over to Andrew Williamson, Chief Financial Officer. Please go ahead.'

Andrew Williamson
CFO, Epsilon Energy

Thank you, operator. On behalf of the management team, I would like to welcome all of you to today's conference call to review Epsilon's third quarter 2026 financial and operational results. Before we begin, I would like to remind you that our comments may include forward-looking statements. It should be noted that a variety of factors could cause Epsilon's actual results to differ materially from the anticipated results or expectations expressed in these forward-looking statements. Today's call may also contain certain non-GAAP financial measures. Please refer to the earnings release that we issued yesterday for disclosures on forward-looking statements and reconciliations of non-GAAP measures. With that, I'd like to turn the call over to Jason Stabell, our Chief Executive Officer.

Jason Stabell
CEO, Epsilon Energy

Thank you, Andrew, and good morning, everyone. Joining me today are Andrew Williamson, our CFO, and Henry Clanton, our COO. We will be available for questions following our prepared remarks. On our August call, we indicated that the second quarter would be the low point for production this year, and that growth would be driven by our oil development in the Powder River Basin and the Permian. Our third quarter results reflect that trajectory. Oil production grew over 20% sequentially in the third quarter and nearly fourfold year-over-year, driven by a full quarter of contribution from our recent Permian well and the two Niobrara DUCs we completed in the Powder River Basin. Total third quarter production was marginally higher quarter-over-quarter and would have been even higher had it not been for temporary shut-ins.

In the Powder River Basin, we shut in our newest Niobrara wells for most of September during an offset operator's frack and took several wells offline for rod pump conversions. In the Marcellus, the operator took advantage of low natural gas prices to complete offset frack operations, compression upgrades, and workovers, which all required temporary shut-ins. The Niobrara wells returned to production in late September with no apparent impact from the offset frack. Our most consequential operational milestone of the quarter came in its final three days, when we turned to sales the three-well Bridle Bit pad, our first operated Parkman development in the Powder River Basin. The pad came online a month ahead of schedule and on budget, and at IP30 rates that were approximately 30% above our type curve.

Based on these results and the timely availability of the same drilling rig we contracted earlier in July, we accelerated our next three-well Parkman pad by two months. We began drilling the three wells in early November, and they are expected online in 2027, most likely early in the second quarter after the winter weather abates in Wyoming. During the third quarter, we also executed several land transactions with large-scale operators in the Powder River Basin. We traded acreage to join two EOG-operated units planned for four-mile Niobrara laterals beginning in late 2027. In a separate transaction with a large private operator, we contributed acreage to a joint venture covering multiple drilling units in exchange for a carried interest and the opportunity to participate alongside the operator. These transactions high-grade our investment program.

They pull forward activity at very attractive rates of return on acreage where we had no development planned over the next five years, and they let us develop the Niobrara and Mowry on that acreage with partners who have the scale to do it very cost-efficiently. In the Permian, Continental Resources closed its acquisition of our previous operator in the last week of September. Based on our initial discussions, we now expect two gross, 0.5 net Barnett completions in December, with first production in early 2027. Previously, this development was expected in Q1 of next year. In the Marcellus, we expect incremental production from ongoing development to come online by February. Turning to current production, with the Bridle Bit pad now online and our Niobrara wells back on production, fourth quarter net production through mid-November was approximately 7,900 BOE per day, including approximately 3,100 net barrels of oil per day.

That is up approximately 40% compared to the third quarter daily sales figures. That sets up the fourth quarter for material sequential growth in production, revenue, and cash flow. As a result, we are affirming our full-year production guidance. Overall, the story this quarter is execution. Our new wells are performing at or above expectations, at or below our capital estimates, and ahead of schedule. We have also set up to pull forward high-return unconventional development through partnerships with high-quality operators in the basin. With new wells coming online across the Powder River Basin, Permian, and Marcellus, we are positioned for an exciting period of growth in production cash flow and shareholder value in 2027 and beyond. Andrew and Henry will now provide additional detail on our results, outlook, and operations. Andrew, I'll turn it over to you.

Andrew Williamson
CFO, Epsilon Energy

Thanks, Jason. For the quarter, production was up slightly quarter-over-quarter, with declines in Marcellus gas production offset by oil-weighted growth in the PRB and the Permian. As Jason mentioned, third quarter production came in slightly below expectation due to temporary shut-ins in the PRB and the Marcellus. With the new high working interest Parkman wells online ahead of schedule, we're seeing a step change in volume growth in the fourth quarter. As a result, we are affirming our oil and total production guidance for the year. Also on the quarter-over-quarter, adjusted EBITDA was up 50% on higher revenue in the PRB and lower overhead costs after the transition-related expenses related to last year's acquisition rolled off in the second quarter.

On the capital side, third quarter capital expenditures were $18.3 million, with the biggest contributors being the Bridle Bit Parkman wells and water facilities work in the Powder River Basin. Drilling on the two Barnett wells in the Permian also started during the quarter and is now complete. We expect those completions to start next month. As Jason noted, the increase in our full-year capital guidance of approximately $8 million reflects activity pulled forward from 2027 into the fourth quarter in the PRB and the Permian. This is a timing change rather than a cost increase, and we expect a corresponding reduction in 2027 capital. Turning to the land transactions Jason described, neither transaction involved cash consideration. Through the acreage trade, we now hold an approximately 8% working interest in the EOG-operated unit, covering approximately 5,000 gross acres, with eight four-mile Niobrara wells planned for development starting in late 2027.

Under the joint venture with a large private operator, we contributed a majority of our interest in three units in Campbell County, Wyoming, in exchange for a carried interest in the gross costs of 24 wells. That is 15 Nios and nine Mowrys set for development starting in 2028. We retain the option to participate with an incremental 14% working interest in addition to the carry. Together, these transactions pull forward development of approximately six net locations, normalized to 10,000-foot laterals, at very attractive rates of return on acreage where we had no activity planned over the next five years. We have also been active in managing our commodity price risk. Over the course of this year, we have added to our oil hedge book at opportunistic times in a rising market, locking in attractive prices for 2027 and early 2028.

These hedges help protect the cash flow that funds our development program as we move into a period of higher activity. The 2026 trading activity has materially improved our hedge book, which had been weighed down by the legacy oil hedges we assumed in the Peak acquisition last year. That said, we retain significant oil price exposure with well less than half of our expected 2027 oil production currently hedged. Our balance sheet remains in great shape. We ended the quarter with $42.5 million drawn on our credit facility, with a leverage ratio of roughly one times, calculated on net debt to trailing 12-month adjusted EBITDA. We expect to end the year well below our stated leverage target of 1.5 times. Also, our fall borrowing base redetermination is underway, and we expect to announce the result this quarter.

Looking ahead to 2027, we expect higher activity across all three of our core areas, led by our operated Parkman development in Converse County in the Powder River Basin, continued Barnett development in the Permian, and new Marcellus development signaled by our operator partner. We feel comfortable that this growth program can be undertaken while preserving the balance sheet. We plan to provide a formal 2027 capital budget and guidance with our fourth quarter 2026 results in the first quarter of next year. Now to Henry.

Henry Clanton
COO, Epsilon Energy

Thank you, Andrew, and good morning to everyone. Today, I would like to begin with our operated assets in Wyoming. We executed two projects in the third quarter, and both came in under budget and ahead of plan. Our three-well Bridle Bit Parkman pad in Campbell County was our first operated drilling program with the post-acquisition integrated team, and it has gone very well. The wells were drilled and completed and were placed on production late September, about a month ahead of plan. The wells have been tracking above forecast, and on a combined net basis, IP30 rates averaged just under 1,600 barrels of oil per day. The wells were outfitted with production tubing prior to flowback, making them available for lift when needed. Currently, all three wells continue to flow under a managed choke protocol

As with our Niobrara wells, the production facilities were built out ahead of first production, which allowed the wells to be brought online without delay. Our two Niobrara wells, the Iberlin State pad, continue to perform above expectations, with combined net IP30 rates just under 450 barrels of oil per day. While the wells were shut in for an offset operator's frac, we used the downtime to run production tubing and gas lift valves, making the wells available for lift when needed. Both wells have returned to production at the same rates as before the shut-in, with no apparent frac interference. In our Converse County acreage in the Powder River Basin, we had the opportunity to pull forward the development of a three-well Parkman program in the Eynot Unit and have begun drilling two months ahead of plan.

Currently, drilling operations are progressing per plan, with drilling expected to be completed in December. These are two-mile laterals in which we hold approximately 75% working interest. Completions are planned for the spring, and first production is expected in the second quarter of 2027. Regarding frac water sourcing, our Eynot water impoundment facility is complete with approximately 1.15 million barrels of storage. We are currently drilling the water supply well, which is expected to provide approximately 10,000 barrels per day. The facility will supply all of the water required for these completions, and as I mentioned last quarter, it has been designed to handle produced water recycling in the future, which would lower our water sourcing and disposal costs. Regarding our operating cost, the compressor right-sizing program is essentially complete, with 22 units being replaced and one remaining this month. Gross savings now exceed $110,000 per month.

We have also downgraded electric service at 39 locations, with 27 more planned in January, and expect $18,000 gross monthly reduction in operating costs from this program. In the Permian, our first three-mile Barnett well, the Patricia Unit 1H, has now been on production since May, with normalized rates consistent with the Barnett peers. The Woodford appraisal well mentioned in prior calls was completed and placed on production in September. Early flowback data is being evaluated, and we will continue to monitor its performance as it relates to our future inventory on our acreage. During the quarter, operatorship of the project has transitioned to Continental Resources. Two additional Barnett wells have been drilled, with completions scheduled before year-end. Based upon initial discussions with the new operator, three to four additional Barnett wells are planned to spud before year-end, including the first four-mile lateral in the project.

We are encouraged by the operator's early engagement and the expected accelerated development cadence and scaled efficiencies, and we will provide more detail as the program is finalized. In the Marcellus, the three-well Chevreshevsky pad was placed on production in mid-September. The operator plans to complete the four-well Riley pad in December, with first production expected by February. A combined net production of 7 million cu f t a day is expected from these two pads. Now I'll turn it back to Jason.

Jason Stabell
CEO, Epsilon Energy

Thanks, guys. Operator, we can now open the lines for questions.

Operator

Thank you. We will now begin the question-and-answer session. To ask a question, you may press star then one on your telephone keypad. If you're using a speakerphone, please pick up your handset before pressing the keys. If at any time your question has been addressed and you would like to withdraw your question, please press star then two. At this time, we will pause momentarily to assemble our roster. The first question today comes from Anthony Perala with Punch & Associates. Please go ahead.

Anthony Perala
Analyst, Punch & Associates

Good morning, guys. Thanks for taking my questions here. First off, Henry touched on it a little bit at the end of his remarks, but just if you could give an overview of what you're hearing from the operator in the Marcellus, in what's been a weaker shoulder season here, and if there's any changes to planned 2027 activity that you've outlined this year so far as we look into next year.

Jason Stabell
CEO, Epsilon Energy

Hey, Anthony. This is Jason. Thanks for the question. No indications of change from the operator. As Henry mentioned, the Riley pad, which of the two that he mentioned, so the Chevreshevsky pad, which came online in September, we have a very small working interest in that. The Riley pad is much more meaningful to us, so it makes up the vast majority of that 7 million cu ft of incremental production net that we expect to see by February. That all seems to time out with our anticipation that they are going to bring those volumes into a stronger winter market. Obviously, there has been some concern about the weather. We just have to kind of wait and see. But right now, natural gas prices have firmed a little bit, and as we usually see in the Marcellus, we should see our basis differential come in quite a bit.

We historically go from a buck or more differential to Henry Hub to something approaching $0.30-$0.40. As far as next year's activity, we usually sit down with the operator in December to get a more firm view of their year-ahead plans. So, have no indications that they have any changes with what we have been looking for in 2027. But obviously, if we get updated information, we are going to communicate it in our next sit-down with investors and shareholders.

Anthony Perala
Analyst, Punch & Associates

That is great. Yeah, kind of as expected, bringing in the stronger winter season like you had highlighted. Switching over to the oil development, a lot of moving pieces, nice to see things moved forward rather than to the right. But it seems like more to come on the Barnett development as Continental kind of firms up their view. Could you just remind us, with some of that activity in the PRB being moved forward, what initial thoughts are for your operated activity in the PRB for 2027?

Jason Stabell
CEO, Epsilon Energy

Sure. This is Jason again. I can take that, and then if Andrew or Henry have any additions, they can add to it. But as we mentioned in the press release quote, our operated focus is going to be Parkman. We have two three-well Parkman pads in Converse County, what we call the Eynot Unit. The first three-well pad, we had an opportunity to get that same drilling rig that we were really happy with the performance on this summer, and we were able to slot that in before it got real cold up in Wyoming, and so we took advantage of that. So that pulled forward the drilling. On the completion side, we are right now talking to pressure pumpers and service providers, but our current thinking is that we are going to be fracking that first three-well Eynot pad in the early part of the third quarter.

Then we have a second three-well Parkman pad in that same Eynot Unit that right now we're kind of thinking a mid-next year spud on those three wells. So that would mean completion coming probably sometime in the third quarter on the operated side. Henry or Andrew, anything to add on that?

Henry Clanton
COO, Epsilon Energy

Yeah, this is Henry. Jason, I think you mentioned the completions were scheduled for the Eynot wells that we're drilling currently for Q3. We actually are going to be planning those Q1, sorry. So we're looking at pressure pumping services for the wells that we're drilling now. We've got two of the three drilled. On our third one as we speak, with pressure pumping, as I was mentioning, scheduled for late Q1, early Q2. We think that the plan looks achievable for us to get those online in Q2.

Jason Stabell
CEO, Epsilon Energy

Then, Anthony, you asked about the Permian. Yeah, we're real excited to have Continental as the partner. They obviously know the basin very well. They have, I think the last I checked, they had six rigs running in addition to the rigs that they picked up in the Firebird transaction, or including the Firebird rigs that they picked up. The early indications we have, we'll have some additional sit-down with them to really firm up their view of 2027 plans. But as Henry mentioned, they've indicated to us that there could be additional activity on top of the two wells that we're currently completing that could spud in mid to late December. So, excited about that, particularly that four-miler. That'll be the first four-miler in the project.

So, I think next year could be, just as we've been communicating to shareholders and investors, an uptick there, which we're real excited about because we love that asset. Henry, anything else on that?

Henry Clanton
COO, Epsilon Energy

Yeah, I'd just say we've got the 10 producing wells now. We've got the two western offsets to the Patricia Unit 1H well, the first three-milers Jason mentioned, that are drilled and uncompleted. Actual frac operations have begun this week. Those are ongoing with plans to drill two eastern offsets to the Patricia Unit 1H well, as well as the four-miler. Yes, exciting time.

Anthony Perala
Analyst, Punch & Associates

Is there going to be any more data or takeaway from the, I think it was the Woodford Bench test well that was drilled this summer that could expand the resource?

Jason Stabell
CEO, Epsilon Energy

Henry, why don't you take that one?

Henry Clanton
COO, Epsilon Energy

Sure. Yeah, the well was drilled and completed. A lot of moving parts on it, where the lateral was landed, the length it was, the type of completion that was applied, the flowback technique, the artificial lift that's on it. We're watching it with a lot of interest. It's too early yet to make any technical or economic conclusions, and what its potential impact for our development might be over the top of it. But as we firm up decisions and understand the data better, we'll be providing feedback on that. I can say that it did have similar pressures to its Barnett peers. It's productive. It's got hydrocarbon. We're just trying to see how it's plotting out against its Barnett peers and what it may look like on a standalone basis. But nothing further than that to report.

Anthony Perala
Analyst, Punch & Associates

Excellent. Thanks for the color. I will jump back in the queue.

Operator

The next question comes from Nicholas Pope with Roth Capital. Please go ahead.

Nicholas Pope
Analyst, Roth Capital

Morning, everyone.

Jason Stabell
CEO, Epsilon Energy

Good morning.

Anthony Perala
Analyst, Punch & Associates

Hey, Nick. Good morning.

Nicholas Pope
Analyst, Roth Capital

I was hoping to get a little more clarification on this new JDA in the Powder River. Curious, what's the retained interest in the wells that you're being carried on? I guess once drilling happens, what's Epsilon retaining here in those drilled wells?

Jason Stabell
CEO, Epsilon Energy

Andrew, why don't you take that one?

Andrew Williamson
CFO, Epsilon Energy

Yeah, Nick. All in, we've got a carried interest there in consideration for the acreage we contributed to that joint venture, and then we've got the opportunity to participate heads-up for an incremental interest. I think together, think about roughly 20%-21% working interest in those wells, in those 28 wells. They're going to be drilled starting in 2028 through 2031.

Nicholas Pope
Analyst, Roth Capital

Got it. This is just a carve-out, that 5,200 acres of the broader 30, I guess, you are at 38,000 something in the Powder River, is that right? 37?

Andrew Williamson
CFO, Epsilon Energy

Yeah, that is a gross acreage figure, the 5,200. Our net there is less than that. So that is a gross acre figure. Yeah, this is an area in Campbell County where we had some lower interest in some of these units. It was not in kind of the next five-year plan for us on the unconventional side, so this is a way to pull forward some inventory alongside a scaled operator that is super active in the basin at a better cost structure. All of that kind of making sense commercially from an implied per acre value on the carried interest and that better cost structure participation.

Nicholas Pope
Analyst, Roth Capital

Got it. Excellent. I appreciate that. Additionally, I was looking, there was another income line item that seems to have been fairly meaningful within the quarter. It looks like it is something related to water disposal in Wyoming. I was curious, is that something that is sustainable, potentially growing? Just trying to get some understanding of what that new line item was for other income. I think it was a little over $1 million

Andrew Williamson
CFO, Epsilon Energy

Yeah

Nicholas Pope
Analyst, Roth Capital

for the quarter.

Andrew Williamson
CFO, Epsilon Energy

Yeah, Nick, there's two things in there. Part of that is the water facility revenue that we generate selling water to third parties out of our water infrastructure in the Powder. The other part there is a spud fee. We sold down some interest, as we've messaged to the market previously, in that Bridle Bit Parkman pad. It just came online and got a spud fee or a promote there upfront from our partner. That's included there as well. I think that's a mechanism that we think about on the operated side in the Powder, as we think about right-sizing interests in some of these developments. That's a good lever that we can pull to sell down some interest and get a spud fee, and it proves our economics there with that spud fee.

We kind of do it on a case-by-case basis, but we'll use that lever if we need to to right-size the capital program.

Nicholas Pope
Analyst, Roth Capital

Yeah, that makes sense. Nothing related to this new, the water impoundment stuff. That's purely a cost-saving measure for you guys on the operating cost side?

Andrew Williamson
CFO, Epsilon Energy

Yeah, Henry can talk a little bit about that impoundment that we're building.

Henry Clanton
COO, Epsilon Energy

Yeah, there could be scenarios where we sell water to offset operators. It is a pretty common practice there. We do not have any forecasting of that, but we do already have interest from offset operators seeing our facility out there. Anticipate that. So long as we do not need the water, we are happy to share it and make it available to others.

Nicholas Pope
Analyst, Roth Capital

Got it. All right. I appreciate it. That is very helpful. Thank you, guys.

Andrew Williamson
CFO, Epsilon Energy

Thanks, Nick.

Nicholas Pope
Analyst, Roth Capital

Okay.

Operator

This concludes our question and answer session. I would like to turn the conference back over to Jason Stabell for any closing remarks.

Jason Stabell
CEO, Epsilon Energy

I just want to thank everyone again for their interest in Epsilon, and want to wish everyone a great Thanksgiving holiday. As always, please reach out to us in Houston if you have any questions or comments. With that, thank you.

Operator

The conference has now concluded. Thank you for attending today's presentation. You may now disconnect.