Andean Silver Limited (ASX:ASL)
Australia flag Australia · Delayed Price · Currency is AUD
1.455
-0.015 (-1.02%)
Nov 16, 2026, 4:10 PM AEDT
← View all transcripts

Deutsche Bank Virtual Investor Conference

Nov 12, 2026

Summary

The July 2026 resource totals 136 Moz AgEq, with six rigs focused on infill drilling and resource conversion. Scoping work is targeted for early 2027, a feasibility study and maiden reserve by year-end 2027, and mill restart in 2028.

Zafar Aziz
Head of DR Investor Relations Advisory, Deutsche Bank

Hello, and welcome to the 31st Deutsche Bank Depositary Receipts Virtual Investor Conference, dbVIC. My name is Zafar Aziz from the DR Investor Relations Advisory Team at Deutsche Bank. I am pleased to announce our next presentation will be from Andean Silver. Please note, all of today's presentations were recorded and can be accessed via the Deutsche Bank website, adr.db.com. At this point, I am very pleased to welcome our speaker from Andean Silver.

Matthew Allen
Managing Director, Andean Silver

Good evening. This is Matthew Allen, Managing Director here for Andean Silver. Great to be here to present the Andean Silver story to you, our flagship Cerro Bayo silver-gold project in southern Chile, and the advancement that we have been making on this project in the recent 12 months activity set. Looking forward to taking you through. Happy to take questions on notice, and we will respond post-presentation and follow up. Let us dive in to the presentation, and let us just start with some of the key investment highlights. Cerro Bayo, it is an historic producing mine. There is over 20 years of production history. The mine is currently on care and maintenance. We picked the project up just over three years ago now for AUD 5 million. We spent the last two years now drilling up the resource.

We reported in July this year our updated mineral resource estimate, around 20 million tons at around 211 g silver equivalent for 136 million ounces silver equivalent. This is a mine with scale already, and we have only spent, well, in the last two years, we have only been drilling within a little bit over a kilometer radius from the process plant. The project is 55 million ounces pure silver and 1 million ounces pure gold in the resource mix. There are no base metals. The project delivers a silver-gold concentrate that goes into markets around the world. Very high-grade con, gets around 98% payables of the metal in concentrate, excellent product and excellent material. Six drilling rigs currently on site, all diamond. We have been drilling now for a little bit over two years. We have got some drilling updates to come in the next few weeks.

A lot of the drilling is currently focused on the infill drill-out of the resource. We are looking over the next six months or so to convert the resource from its current status of a mix between inferred and indicated, up to around 70% of the resource being in the indicated category. That is going to support us being able to start to publish scoping studies, PEAs in the new year, and by the end of calendar year 2027, our feasibility study and maiden ore reserve. So, big year coming. It has already been a busy two years since we have taken this project over, but a lot of work for the team to do in the next year. Infrastructure. Let us talk about infrastructure briefly. There is a whole suite of mining infrastructure here already in place, built in the mid-1990s. It is currently on warm idle.

It is 500,000 tons per annum crushing plant, produces that concentrate. We have on-site diesel power. More importantly, we have associated infrastructure, including assay laboratories, workshops, and a fully permitted tailings facility. Social licence is very important. The first voluntary EIA done in Chile was done on this mine back in 1994. We have approved environmental permits and extraction permits, and more importantly, a lot of the local workforce are employed in this mine. High-grade discovery momentum. We continue to make new discoveries within a little bit over 1 km of this mill. Recent drill reports there include the Trinidad discovery, the highest-grade drill hole on the property to date. We announced that back in July, 2.4 m at over 15,500 g silver equivalent, which is an outstanding result. We also continue to make great infill results.

Delia Southeast there, another 3.1 m recently reported over 3,300 g silver equivalent per ton. We continue to make excellent drill hits. This is a project, a very high-grade, silver-gold dominant system, and we continue to grow and upgrade that resource. The real value for us in Cerro Bayo, the reason we acquired this project a little over two years ago, was the exploration upside. There is significant upside here. There is over 15 km of strike length that we have mapped up in the last couple of years, along with a major geophysical survey we did a bit over 18 months ago. It shows that there is still significant undiscovered exploration potential on this project. We are permitting that up now for drilling. We expect to start drilling that next year. That is, for us, the real exciting upside to this project beyond the current resource and infrastructure.

We are backed by a number of key institutions in North America, including the Sprott Group, the Equinox Partners Group, Scotia 1832. We were included in the GDXJ index back in March of this year, and we have sell-side research coverage from a number of different groups there. Capital structure, you can see summarized on the page here. A clean balance sheet. We have just reported our quarterly results for September. We are reporting around AUD 70.5 million cash in bank. Market capitalization is strong. Again, we have delivered constant share price accretion in the two and a bit years since we picked up the Cerro Bayo project. Board management hold around 9% of the register, and over 55% now institutionally held between both global and Australian institutions. So, very strongly supported register, and we keep close contact with our key shareholders. Board management team.

We have an excellent board management team, including alongside of myself, Tim Laneyrie, who is our GM Strategy and Growth. Tim was the gentleman who found the project and brought it into the vehicle. Tim and I work closely together. Damien Koerber, our Executive Advisor on projects, has worked in Latin America for the better part of his career with groups including Newcrest, Mirasol, and so forth. A great exploration geologist. Alvaro Fuentes is our General Manager for the Cerro Bayo asset. Alvaro comes to us from KGHM, and also previously Commercial Director at Ausenco, so has lots of experience working in Latin America. Behind that, Alex, Sofía, and the rest of our team, eminently experienced in these types of epithermal deposits and Latin America experienced more broadly. We will continue to grow the management team.

We've got some announcements coming in terms of key management appointments as we expand into the development and restart phases, so watch this space. Let's just put the project in a bit of regional context for you here. You can see in the bottom left of the screen here, this is the location of our Cerro Bayo project. It's on the Chilean side of the border. It's in a belt of rocks known as the Deseado Massif. It's a very large-scale district. It hosts very large silver, gold-dominant projects all the way through to the Atlantic coast. Projects over the border on the Argentinian side include San José, operated by the Hochschild Group, Cerro Negro, which is operated by Newmont, Cerro Moro, which is Pan American, and Cerro Vanguardia with AngloGold. There's a number of operating mines in this district.

We are on the Chilean side of the border and take the advantage of the Chilean jurisdictional advantages here. Very strong support from the regional and national level administration to support this project. Let's just dive in a little more closely here. You can see we're around 1,500 km south of Santiago. We access the site through the Balmaceda Airport just out from Coyhaique. We have ample infrastructure here all the way from the mine through Puerto Ibáñez to all the way through to the Puerto Chacabuco area, where there's a deep-water port access all the way out to the Pacific. As you can see, our tenure map here, we're going to focus in on the Laguna Verde mines and dive in on that area in a bit more detail. Here you can now start to see the infrastructure around our project. This is our tenure map.

100% held tenement package, 17 km by main road from the local town of Chile Chico, where the majority of our workforce are based. We're going to focus on two key mining districts. Firstly, the Laguna Verde district, where the process plant is located. Secondly, the historic Cerro Bayo mining district, where some of the largest and highest-grade mines in the project history have been operated from. I mentioned infrastructure previously. Here's our infrastructure hub. We have 500,000 tons flotation plant housed in the green building in the foreground. We have 2 million tons per annum crushing circuit there. Associated with it, we have around 14 MW of installed diesel power, on-site assay laboratory. We can turn around our assays from site in around five to seven days.

That's an advantage that is very key for us, but we also have all the offices, lunchrooms, workshops, and a permitted tailings facility at site. I mentioned that there's over 20 years of production history on this mine. Nearly 100 million ounces of silver equivalent materials all been already been produced from this project, and it's operated in three key phases. The first phase was operated here by Coeur d'Alene. The mine was developed back in 1994. It was produced for around that 20-year period by Coeur d'Alene before being sold to Mandalay Resources, who operated the mine up until 2017. With fairly low silver prices, the mines operated historically at generally below $10 silver prices, and it's never been fully explored out. It was tried to be restarted here in the COVID period unsuccessfully.

We picked the project up in late 2023, and you can see the silver price since that point in time has been moving significantly north. What that means is we have all the advantages of that 20 years of production history, 20+ years of production history. We have significant underexplored opportunities on this acreage in addition to our known resource volumes close to the process plant infrastructure. The mine, in terms of pure silver mines around the world, you can see here under the two previous owners, has produced up to around 3.7 million ounces of pure silver. That is ignoring the gold credit on top of the numbers we talked about a minute ago. Around 2.5 million ounces of pure silver per annum produced from this mine over that production history.

When you start to look at that in context of pure silver production around the world, this puts this project in a pretty healthy peer group of projects that you start to compare against. When you do the analysis against some of those key projects, you can start to see how highly leveraged Cerro Bayo is to future silver price movements. We see that as a key advantage of this project, is that direct exposure to pure silver production. We are going to dive in now to start looking at the first of the two mining districts. I mentioned firstly Laguna Verde. The process plant and tailings infrastructure is located just behind the Temer label here. But you can see there is a series of mines already in place, lots of drilling, around 800,000 m of historic drilling in this project previously.

If we start to just look through here and start looking on a northwest-southwest orientation, you can start to see a series of underground mines that were developed historically, and you can see all of that infrastructure is in place. Around 30 km of underground infrastructure already in place around this area, and that is in addition to the large Taitao open pit operation to the north of the mine. That open pit is right at the entrance to the process plant, and that will form a key part of our restart planning. We plan for an integrated open pit and underground operation once we reopen this mine, and you can now start to see, if I just dive in a little bit here, some of those infrastructures.

You can see mapped the resource envelopes that we have drilled here, and these mines are very high-grade mines historically, north of 450 g silver equivalent material, and all of that infrastructure, as I mentioned, historically is already in place. If we dive in and look at the main Coyita mine, you can see already five levels deep in the development, and you can start to see some of the high-grade drill hits that we have seen in this mine. The blue envelope represents the current inferred resource envelope, and we report our resource within the mineable shapes in yellow that you see here that represent, at $ 24 per ton, the NSR, our resource cutoffs. We report down to this level here currently in the Coyita North lode, and in the Coyita South lode, you can see we go about 100 m deeper.

Historically, around 150 m development only, drilling was done to about 250 m. We have now drilled to 450 m in this Coyita lode. You can see that we are continuing to drill this out and extend it on. We expect to fill in, once we can re-access the underground, this section underneath the lake here, connecting the northern and southern lodes for Coyita up. The infrastructure has already been developed, and the drive has been put into about here, and we expect to, when we re-access and reopen, continue to develop that towards the southern lode in Coyita as part of our mine plan. Delia Southeast is another one of our key mines in this area. Again, you can see the infrastructure and some of our more recent results here. Recent results at depth there include 3.1 m over 3,300 g per ton in the Delia Southeast lode.

Again, we are continuing to make very high-grade hits in these high-grade underground mines, and these will be mines of the future as part of our restart plans. We just come back out again and look again at Laguna Verde. What you see here is our current resource universe reported within those open pit Whittle shells marked in the orangey color, and in yellow, the underground resources constrained by those MSO shapes. You can see what the resource lode looks like that will feature as part of our mine restart plan. There are around five, six underground resources under the lake, the large Taitao open pit that we are currently drilling up to indicated category, then the Temer, Cristal, and Pegaso surface developed lodes that we will bring on in the future.

Let us now go about 7 km to the east and go to the second major district here. This is the historic Cerro Bayo district, again, significant amounts of infrastructure and drilling already done here. The main Cerro Bayo mine underneath the Cerro Bayo dome, which gives this area both the feature and its name. This material was delivering around 680 g per ton silver equivalent from that mine. Again, a very high-grade mine. When this district was operating, the project was delivering over 10 million ounces silver equivalent per annum. No drilling in this area in over 20 years now. We are going to be putting the first drill holes in here very shortly. We have permitted around 19 drill pads already, and we expect to bring the drill rigs in here and start drilling early in the new year.

The historic Raúl open pit will form part of our drilling. We are going to look to deepen this Marcela lode and then extend drilling out over here to the Guanaco area. If you look here at this Marcela infrastructure, this was put in place in 2007 by Coeur d'Alene, only about 100 and so meters depth, with intercepts continuing at depth there. We are going to be looking to drill that again further at depth, and we expect to continue to extend these lodes because we are drilling constrained in these resources currently. We see them as both extendable and open at depth. Zooming back out, just to cap off the Cerro Bayo district here, you can see the current mine infrastructure, current resource shapes that we are reporting against, and this is the next key district we are going to start drilling in very shortly.

Let us just come out another level here. You can see the tenure map in the bottom right corner. You can see the Laguna Verde district. In the center, you can see the Cerro Bayo districts. We have spent the last two years and a bit since acquiring this tenement package, we have been mapping up a very large district, nearly 10 km in strike length of exploration targets. These are a combination of both surface mapping, geophysical work, and continued exploratory work that we have been building up. We are permitting over 200 drill pads currently to be drilled across this nearly 10 km of strike length. You can see in the higher elevations the historic Cascada mine. This was operated by Coeur d'Alene in the early 2000s. A very, very high-grade underground mine there.

There is a number of veins you can see mapping off that Sinter Hill feature that have a response on the geophysical dataset that we have recently acquired that tell us there is a lot of interesting things going on in that area. There is potentially an intact sinter cap feature that has been feeding this entire district all the way through. Super exciting area. We have mapped up this area ready for drilling, and if we look at some of the targets, firstly, this Juanita prospect area. We announced these results in July. No work done in over 20 years on this prospect. It was previously drilled by Coeur, and some of these drill hits here that were put in and not followed up on are pretty astounding. What was being looked for was near-surface, open-pittable material that had to work in a sub $10 silver price world.

But we have recently announced results as high as over 60,000 g per ton at surface and continuous along a 2 km strike length. Interestingly, this is a very high-grade breccia-style target. Most of the mineralization is vein-style mineralization across this package. This is a structure we have seen at the Appaloosa underneath the Taitao structure, and what that gives us is both the high grade and the width that we see as being a future potential open-pit resource. You can see the discovery rock there in the image on the bottom right. That is the rock that was grading over 6% silver at surface. Super exciting district being mapped up for drilling currently. The second major area that we are going to follow up on is this Guanaco area.

You can see in the pink there, the vein intercepts that form part of our current mineral resource and the recent surface mapping that we have done that we can now see extensions to these veins cross-fault going out for hundreds meters further than the existing mines, as well as mapping out parallel lodes within these structures. We see numerous follow-up structures in this Guanaco area in addition to drilling below the historic mining areas and looking to extend these both along strike and at depth. Drilling here planned in next year. But you see some of those significant sawn channel intercepts, 2.7 m at over 1,000 g silver equivalent. These are very, very high-grade lodes that we have mapped across this entire area, and we are going to be following up during the coming year. This is the Droughtmaster Corridor.

It extends south of that district we have just been looking at, an area around 8 km in strike length with multiple targets, including exciting targets like the Claudia vein that we can see extending through this area. Again, around 3% at surface in some of the surface samples we have taken across this area. Super exciting corridor. What is unique about this area is very limited exploration, some shallow gravel cover over surface, which has historically been something that has not been followed up on. But you can see in that bottom left image targets like the Veta Madre outcrop here, these big dinosaur back structures that extend over multiple hundreds of meters. These are very, very prolific structures up at around 900 m elevation.

The mine is at 400 m elevation, so there is about 500 m vertical relief here and structure length to follow up and test here. A large greenfield district here that we are going to be drilling in the coming year, and something that for us is the real exciting upside potential on this prospect area. We have talked about social license. I am just going to recap here because we do take it very seriously. We have a deep-seated involvement with the community. We have a drive-in, drive-out workforce historically, and a lot of the workforce is employed in the region. We do spend a lot of time in the community supporting the town and building support for the restart of mining in this area. You will see us continue to engage as we go forward.

Let us just bring all of this together and cap off. An aggressive drill program. We have got six drill rigs already working on our tenement package out here. Currently, the focus is on infill drilling to convert the resource from inferred up to measured and indicated, and that is going to support us publishing firstly a scoping study early in calendar year 2027, and by the back end of the year, a feasibility study, maiden ore reserve, and flesh out our restart planning. We move early in the new year into our regional drilling at Cerro Bayo. That is a super exciting area. No drilling there in over 20 years, and some prolific targets to follow up on given those historic mines. Then we get into the regional greenfield exploration. I am super pumped about that. That is some really exciting targets.

This is in-your-face geology that we have been working, and we expect that we are going to yield material new greenfield discoveries once we get into that area to support the extension of the mine life. The early works are on the go at the moment. We are already looking to recondition the mill. We are starting some of those works now, and that will position us for the ability to get the mill going in calendar year 2028 and bring new mining into this operation. A true brownfield operation here with significant greenfield upside potential. Thank you for listening to the Andean Silver story. Great that you have taken the time to follow us and listen. Love to follow up.

If you have any questions, happy to take them, and we will respond to those outside this call. But look forward to staying in touch going forward. You can access our updates through our website. We are ASX listed. We also have an OTCQX ADR program that you can participate in through our register. Look forward to seeing people involved in following our story through calendar year 2027 and bringing you updates as we continue to deliver success at Cerro Bayo.