DUG Technology Ltd (ASX:DUG)
Australia flag Australia · Delayed Price · Currency is AUD
2.160
+0.020 (0.93%)
Apr 29, 2026, 10:29 AM AEST
← View all transcripts

Earnings Call: H2 2024

Aug 22, 2024

Steve Loxton
Head of Investor Relations, DUG Technology

He will take us through the presentation, which was lodged with ASX earlier this morning. We expect this to run for about thirty minutes, after which we'll have Q&A. If you would like to ask questions, research analysts, please raise your hand in Zoom, and we will then give you speaking rights, and you can ask your question. Handing over to you, Matt, to take us through the presentation.

Matthew Lamont
CEO, DUG Technology

Thanks, Steve. It's great to be with everybody again at the end of another financial year. I suspect everybody's getting used to who we are, so we are, you know, we're the data people. We're the numerical analysts. We do big algorithms, and we have big, high-performance computers. We're about twenty-one years old now, and our offices are in Perth, London, Houston, KL, and Abu Dhabi. We are growing employees, but slowly, as we're doing it very carefully and looking at what's going on. We have more than forty-five petaflops of compute, and you'll see in my note, I talked about we've quadrupled our compute, and we've done that via adding new compute that everyone's aware of.

But we've also taken the RAM in over 9,000 machines we have from 128 GB RAM to three eighty-four, and that's given them a lot greater throughput. When you're comparing us with our competitors, you'll see our competitors often quote single precision petaflops, so you can double our number to compare with their number. Thanks, Steve. So, this is our journey, and everyone's probably seen it before. The nice bit is on the end there, where we now have an Abu Dhabi office, which is where the fit out is about to kick off. And, I think we've got 16 employees over there now, who are about to get training and learn our best practice and so forth. Thanks, Steve. So services is where we make most of our money.

That is, services are in oil and gas. They're in offshore wind farms and a few other bits and bobs where people do seismic processing, acquire seismic data, and we process it for them. That's where the multiparameter FWI imaging is. Yep, so that's where we make most of our money. Software is a great business. It's our favorite business. It's 11 million in revenue this year, and that's the software that we use, but it's also looks after the interpretation piece, so it's the piece that is done in the chain after we process the data. It's interpreted generally by oil companies themselves, and they use our software to do that, and then high-performance computing is that we just let people come on and use our computing.

They can come on, and they can use our computers using their own software. They can come on, use our computers using our software. They can come on and do it in whichever way they like. And we can support them and help them with their codes there as well. Thanks, Steve. Oil and gas, I've mentioned, is where we make most of our revenue. I think it's probably well over 90% of our revenue comes from oil and gas. Enterprise, we have a lot of clients. At the moment, they just don't spend that much money with us. But all the bioinformatics institutes from CSIRO to you know climate modeling to lots of stuff is going on in that space.

National security and space, we don't have any revenue yet, but we're still chasing that down. We're actually in a big conference in Adelaide this week. Thanks, Steve. This is the world according to DUG. The orange-colored countries are where we've worked. We've done projects before. You can see we've worked most places in the world. There's a dotted line running across the world there. That's our fiber network. We don't own it. We just lease it. Yeah, we've got our machines around the world. There are three big data centers now around the world. Yeah, it's great to see Abu Dhabi on the map there now. Thanks, Steve. Look, we wanna be the biggest and best seismic processing and imaging company on Earth, and we're working towards that goal.

There's a lot of market for us to gain to get there. We've got our sustainable supercomputing, and we grow that, but we grow it judiciously as we go along. And we wanna really make a mark in high-performance computing as a service as well, so. And continue to do our R&D. The BAC announcement showed you what value can come from our R&D efforts. Thanks, Steve. So, getting on to the business of the day. So service wins for the year of AUD 67.4 million, which is a really, really big step up from what we had in the year previous. Revenue of AUD 65.5 million, so up 29%. Underlying EBITDA of AUD 23.2 million, which is terrific.

And of course, the difference between our actual EBITDA and underlying EBITDA is that third-party compute, which because of circumstances of how we won work and when in a really big focused time last year, we got caught with not enough compute, and that meant we had to use third-party compute, and that's the difference between the EBITDA and the underlying EBITDA. The services order book at the moment is 36.5, and look, that's a really strong order book for us. What we have is a really large pipeline at the moment, so we're waiting to see what happens to that pipeline. And people are just taking a little longer this year compared with last year to award work. But the pipeline looks terrific, you know.

The pipeline, just to remind everybody, is where we put a proposal. Well, there's two parts to the pipeline. This work is where we've actually signed contracts, so this work will be done. It's underway now. The pipeline is then proposals that we've written and delivered, and we risk those as to the BD guys will risk them as to whether they think we'll win or lose those particular jobs, and we keep that in the first part of the pipeline, and then the early part of the pipeline is just where we get leads, and we, you know, where we do market surveys, and we put them into the early part, and they're risked very heavily. That pipeline looks... We've never had a bigger pipeline. It looks quite amazing. Thanks, Steve.

So over to Ajith.

Thanks. Thanks, Matt. So the key takeaway on this, on this slide is that the strong growth in underlying earnings, EBITDA, excluding $6.5 million cost of third-party compute costs, is up 54% on prior year. Total revenue growth was underpinned by services revenue growth of $14.4 million or 36% to a record high of $54.7 million. DUG won more service contracts than anticipated, which increased our compute requirements, and we chose to meet this extra demand by using third-party compute while our compute was delivered and commissioned. The cost of this was incurred from November 2023 to June 2024 of $6.6 million, and it doesn't continue into July 2024.

Excluding the third-party compute costs, other operating costs grew by AUD 4.2 million or circa 40%, driven by IT and data center facility costs, up AUD 1.6 million, and growth in sales and marketing up AUD 500,000 or 42%. Thanks, Steve. Three points on this. The PPE, property, plant, and equipment, has increased by AUD 26 million or so, reflecting the new computer and ancillary hardware, less depreciation. DUG has a net debt of AUD 14.5 million, being the asset finance liabilities of AUD 23.9 million, less AUD 9.4 million in cash. Our strong cash generation will enable us to prioritize repayment of the debt facilities in the following financial year. Thanks, Steve. We generated strong operating cash flow of AUD 12.1 million.

This would have been AUD 16.5 million without the third-party compute costs paid for in the year. About AUD 7 million of PP&E, property, plant, and equipment, was funded from our own cash flows that are not financed. Just a reminder that the capital grant that was received has been recorded under contract liabilities on the balance sheet and has not been taken to the P&L. Thanks, Matt.

So looking at our, breaking our business down into the three areas. Services. So look, services is really strong. You can read the numbers there. Record high. We expect it to grow with the new office in the UAE. We've got new technology out, which is the Elastic MPFWI, and the first results of that look very encouraging. We'll be showing them at the big, excuse me, at the big conference in Houston. I'm over in Houston, everybody, for our biggest conference of the year is next week here in Houston. And so we'll be showing our first results from that, MPFWI, Elastic FWI, and it's very exciting. They look terrific.

So we expect to be able to to drive growth in services through the new technology as well as the new office in the Middle East. Thanks, Steve. Software, we ended up growing by 11%. And look, this is the business that we really love. Everyone loves a software business, and we will. We've got a new global BD manager for this, who's actually rejoined us. She worked for us a few years ago before she went and worked for Santos, for the intervening years. She come back. Fantastic, fantastic person, and we're really looking to grow this business in the coming year. Thanks, Steve.

HPC as a service is a bit disappointing, but the highlight here is not in the last financial year; it's in the winning of a $500,000 deal for this year for this financial year. So that's. That's a really great news for a business line that we weren't particularly pleased with. We have reshaped it a little bit and yeah, we're still confident that we're gonna grow. It's just about timing on this business. Thanks, Steve. Look, we've got. Sorry about the lights. We've got really strong relationships with our clients, and the relationships grow over time.

They get more confident in us as we do projects, and as they get more confident in us, we get larger projects, and we get more complex projects. So we're growing our revenue from each client. We virtually work for every oil company on Earth, so it's now about doing more work for them, doing better work, because we're still, you know, 6% or 7% of the market is all we have. So there's an awful lot of work we're not seeing just yet, but we're seeing more and more of it as we go along, and we build our relationships. Client A there, we had a meeting with just last week, and they're just extremely happy with us.

That's a client from the Middle East, but that was one of our existing clients from the Middle East, where the work's done in Houston. Thanks, Steve. So again, I think everybody realizes that, Middle East is, you know, is the player in the oil and gas space. They are ramping up big time, big time. Massive surveys, bigger than I could have ever dreamed of. Lots of activity. Very exciting. We're sort of, just there, just in time, if you like. Probably a bit late, but really great, and we did win a project with Saudi Aramco, which we're really pleased about. And, the pipeline in the Middle East is really large. Jay Van Bulow is there for us, and he's just doing a terrific job.

We're really excited by that office, and the caliber of people we've got there is really, really great. We've managed to cherry-pick from other offices in the Middle East, and it looks really good. Thanks, Steve. Yeah, so this, we're really excited by this deal. We've been working on this deal for a long, long time and seriously working on it for eighteen months, but it goes back another six, eight months before that again. And basically, BAC. Well, first of all, BAC sell the majority of cooling towers for whatever purpose the cooling towers are used in the world. So whether it's a building will have cooling towers, or whether it's a data center or whatever the purpose is, BAC sell more than 50% of them. They have 500 channel partners globally.

They have, I think, eight manufacturing plants. It probably says it there somewhere. I mean, these, this is a huge private company, and so we... This is not just another small company selling immersion cooling. This is a really big, established company. They have a very large data center segment in their business. They already have deep relationships with all the hyperscalers. So these were the guys we wanted to do the deal with, and they're the guys we went after. So they have an exclusive deal. We get a 5% revenue of net sales. We can still use the IP ourselves.

They're gonna take over doing all the R&D on the tanks, because the newer computers are using more power, and therefore they produce more heat, and so the tank capacity in terms of kilowatts needs to go up. They're gonna do all the R&D. They've already started. They started some time ago. They're gonna do all the defense and pay for all the defense, if there's any patent defense required. So they're taking over this completely, and we just sit back and get our 5%. What we need to do is just to show people through our data center, especially the one down here in Houston, to show them what immersion cooling looks like at the scale, talk about our experience with it, and share numbers that we already have.

It's very not onerous on us at all, this deal. It's a beautiful deal. Thanks, Steve. DUG Nomad is a business unit that we've just started up. We've actually got one of these Nomads in Adelaide this week at the defense show. We've got another Nomad that's on its way to America, to a big client here. And so we're just looking at now commercializing this. It's a really, really cool, really cool piece of kit. Whereas with DUG Cool... Excuse me for a minute. With DUG Cool, we chose to. We just needed to be much bigger than what we were to do justice to DUG Cool. Nomad, I think, is a really good fit for us, and so we've started a business unit. We brought in a new guy.

He was a CEO of another company, and we brought him in to run that new business unit, and yeah, we're really excited. We're excited with where Nomad can go. Thanks, Steve. So look, we've got really outstanding organic growth. We believe we can continue our momentum. You know, if you look at what's gonna drive our growth, we've got the new office in the Middle East. I think that office will be our biggest office from what we're seeing in the pipeline. We've got a strong order book, but we've got a very, very strong pipeline. And we've got really exciting new technology in the Elastic FWI and the Elastic MPFWI, and the first results look really exciting.

You know, and on top of the Middle East, we're also receiving lots of tender opportunities out of India now. We've done a lot of work in India. We're about the same stage in Brazil. So we're not just expanding into the Middle East, we're also expanding into India and into Brazil. And our offices have had just terrific years, like the Malaysia office. Guna, who runs the Malaysian office, has done a great job, and that office has grown at over 100% this last year and is continuing to grow. And now the Malaysian office is the office reaching out into India. So we're excited by where we're going in this financial year. Thanks, Steve. I think that's it for our presentation today.

Steve Loxton
Head of Investor Relations, DUG Technology

It is. What we might now do is move to Q&A. A number of people have put up their hands. But what I propose we do is run through, and if we're gonna ask you to keep your questions to perhaps one or two, and by all means, please rejoin the end of the queue again, just to give everybody a turn. We have a little bit of time 'cause Matt has kept things nice and tight. Thank you, Matt and Ajith. Perhaps we can start, Julian, if you could go ahead, please, and ask your question.

Thanks, guys. Firstly, just on the order book, Matt, it kind of dipped down a little bit in that sort of fourth quarter, and then, you know, the win rate was a bit lower. So you said that, you know, people are taking a bit longer to award contracts. When do you think you'll start to see this step up? Would it be kind of this half or, you know, towards the back end of the financial year?

Matthew Lamont
CEO, DUG Technology

We expect. Well, everyone's got to come back from holidays. August is a big holiday month in the northern hemisphere. And so we need everyone to come back from holidays, and then we expect to see action start, so we expect to see work to be coming in pretty promptly.

Oh, cool. And then on the third party-

This is not an unusual thing, Julian. Sorry, Julian.

That's all right.

This is not unusual. It's sort of like odds wax and wane, so this is not unusual. We did lose more than we would normally lose over the last six months, but that's 'cause we put our price up, 'cause we had more work than we could handle, so it's all very predictable at the moment.

Right. And the margin on the MPFWI is that kind of sort of landing where you thought, higher than the traditional sort of form?

It's mixed. It depends on the marketplace where we're selling it into. We get more money for it in America at the moment than we do out of the London office, for example, but we're working on getting that price up everywhere. And we're also, that code is under a heck of a lot of work. We've got a big team working on that code, so it's getting more efficient as well. We're about to roll out a 10% efficiency gain, and there's more coming. We'll be working. I think that margin will increase.

Okay, and just finally, so with the third-party compute, you know, the cost of six point six, what, what's revenue would be attributed to that six point six, that you had to sort of outsource?

Yeah, I can't answer that question, Julian. I don't know. It's not how we sort of think of it, I'm afraid, and I don't know the answer to the projects that were run on it. We did just run MPFWI on the third-party compute, so, I don't know the answer, Julian.

Okay. Thanks, Matt.

Steve Loxton
Head of Investor Relations, DUG Technology

Thanks, Julian. Lindsay, from Woods, if you could go ahead and ask your question, please.

Yeah. Thanks, Steve. Hopefully, you can hear me.

Yes.

Brilliant. Yeah, Matt, a couple of questions from me, just on MPFWI again. I think in the past you've called out that MPFWI was something like a third of the new wins in certain periods. Just wondering kind of where that is today and maybe how we should be thinking about MPFWI as a percentage of your wins, say, over the next twelve months.

Matthew Lamont
CEO, DUG Technology

It's been a third of our revenue over the last twelve months, which was really good to see. I would expect it to grow up from there, to be honest, and I think we'll see more wins coming. The Elastic is more expensive again, and so that's another reason why I think you'll see it dominating wins and revenue, as we go forward.

Okay, and just timing, maybe on when we start to see commercialization on the elastic front?

Oh, I... Next week at the big conference, we'll be showing these results that look terrific, and we've got a lot of clients lining up to look at the elastic. So, I think that'll. That shouldn't take too long.

Brilliant.

Remember, it does take. When I say it won't take long, it's just from the, you know, start talking about a project, to write a proposal for a project, to get the project awarded, you know, in general, it varies a lot, but, you know, you're talking three or four months, so we're talking pretty promptly. But, it, when I say promptly, we're talking three or four months, probably.

Okay, that's helpful. And then just a final question, maybe more structural. I mean, I think you've always kind of talked to the business delivering something like 30% EBITDA margins longer term. The second half, you've delivered something closer to 40%, and that includes, you know, scale up in the Middle East and these sorts of things. If I look at Viridien, you know, their, their geo business does north of 50% margins. Just trying to understand, is 30% still the right margin to work with longer term, or is there, is there something that's fundamentally changed where maybe you can start to deliver, better profitability in the business?

Viridien is a business that charges a lot more for their services. So they're like, if you think of you don't get in trouble for buying IBM, at the moment, they're the IBM in the industry, if you like, but that's being broken down. Every day I talk to a client, and they're getting disappointed results, and so they're-- but that's where they've been sitting, although it is breaking down now. So their margins will be higher, but they are coming down. They certainly will be coming down, in my belief. So do I think we can increase our EBITDA margin? Yeah, I do, but I would be, I'd be a little cautious to say what it could go to, but, I do think we can increase that, yes.

Brilliant. All right, thank you. That's it for me. Thanks, guys.

Steve Loxton
Head of Investor Relations, DUG Technology

Thanks, Julian. Ross Barrows from Wilsons, if you would go ahead with your question, please.

Great, thanks. Can you hear me, Steve?

We can hear you.

Great. Yeah, a couple from me. Matt, you mentioned that you're attending a bigger conference of the year or the biggest of the year next week in Houston, and you and maybe some of your colleagues have attended others over the past few months. I'm just wondering if you could share any color from those events so far, and maybe making any observations, I guess, around your product versus the competitive landscape.

Matthew Lamont
CEO, DUG Technology

The Elastic has caught people's attention, as well as our MPFWI, but they're very, very different, very different offerings. And people are excited. The whole industry is up and about, and people are very excited by where FWI is going. They're very excited by the Elastic. They're very excited by MPFWI, and they're very excited by the two coming together, which is what we've got now. Of course, we're the only people with that. And as a guy from Shell said at the big European conference, maybe two months ago now, he said, "You've got the Holy Grail." You know, and you know where you feed in the field data, and you get out everything you need all the way through to the end of inversion, which we would typically do as a separate step, traditionally. So everyone's really excited.

It's a really fun time to be in... As a technology person, it's a really fun time to be in the oil and gas industry. It's up and about, lots happening and lots of excitement.

Great, thanks. And just a follow-up. You mentioned the word pipeline, and you haven't quantified that and probably not expecting you to now, but just in terms of order of magnitude of how that looks today versus, I guess, how it's looked in the past, can you give us any kind of guideline around that? Even not saying what the number is, but just the size of it relative to how it's been in the past.

Yeah. It's really big. It's way bigger than what we've had in the past. Way, way bigger. But it's also based on a lot of Middle East work. A lot of the pipeline is Middle East. The pipeline out of the Middle East is very, looks normal, looks like what it has been. And it's good, it's very solid, but it looks like what it is. The Middle East part of it is huge, and the issue we have with the Middle East part, of course, is that we've won one job. We've got some traditional clients in the Middle East, but not a lot, but we've got... You know, our biggest client is a traditional client in the Middle East. But they're sort of like a company which has a Western way to get into it.

You know, there, there's Westerners in key positions in our clients there that we know. Whereas the big ADNOCs and the Aramcos, they're like more seriously Middle Eastern companies, and we don't understand how and when they award jobs. We have no great feeling for, you know, how our pricing sits in the market yet. Although we won one job, we haven't—we need to win, and we need to lose, and we need to start to understand what we're gonna get out of that. We haven't lost any projects in the Middle East. We've won one since we've been putting out tenders. Oh, yes, we lost one. Actually, we did lose one. So we won one, lost one so far, and we just need to keep doing that to start to understand what it—how it's all gonna fall out.

Just super quick, just to characterize the Middle East clients, you know, they're kind of orders of magnitude bigger than, I guess, the existing clients that you've been working with. Is that a fair, you know, summary?

Oh, I can't actually... I don't know that. I mean, they're the biggest companies on Earth, I think. In Aramco and ADNOC, they're huge. How much bigger than an Exxon or a Shell or a BP they are, I don't actually know.

Okay, that's great. Thank you.

Thanks, Ross.

What I do know, Ross. Sorry, Steve. What I do know, Ross, is that their seismic surveys are an order of magnitude more expensive than the other surveys we're seeing shot elsewhere in the world, which is the most important thing for us.

Great. Thanks.

Steve Loxton
Head of Investor Relations, DUG Technology

... Excellent. Jack Daley, from Shaw and Partners, if you would go ahead with your question.

Jack Daley
Analyst, Shaw and Partners

Thanks, Steve, and yeah. Thanks, mate. You can hear me all right?

Matthew Lamont
CEO, DUG Technology

Can hear you, yes.

Jack Daley
Analyst, Shaw and Partners

Perfect, and yeah, congrats again on a great result. Maybe I noticed a slide in the deck just around the top ten customers and the contribution there. Seems like it's stepping up there in terms of the revenue that you're taking from your top customers. Could you maybe just talk about that a little bit in terms of, I guess, getting your foot in the door and then winning more work and bringing out the tech there? And, like, how do you see that trending over time?

Matthew Lamont
CEO, DUG Technology

Yeah, so this is Steve's favorite story, actually. So there you go, Steve, you've got the question you would like. Yeah, so, you know, when you start working... As I said, we sort of work for every client on Earth. We don't necessarily do much work for every client on Earth, and when you start working for a client, you will do a simple, small project in a non-core area, is typically how it would work, and that's after doing a whole bunch of tests and trials to prove your technology's okay.

And then, as you prove yourself and you do more projects and they get more confidence in you, then you'll do, you know, a bigger project from a non-core area, and then you'll do a small project from a core area, and you'll do more sophisticated work, and you'll do more production work, and you work your way up the chain as you go along. And we are working our way up the chain, and you're at different positions in that chain with different clients. You know, for small companies, you can go to the top pretty quickly. It doesn't take long. For the large guys, it takes years and years, and they just put you through the wringer, and...

But we're well on the way up now, and, yeah, but that's how the relationships works between us and clients.

Jack Daley
Analyst, Shaw and Partners

Right. And maybe just on, I guess you mentioned the other contract in the Middle East you didn't win. Can you give us just a sense of, do you know who they went with it and why, and anything you need to do different there?

Matthew Lamont
CEO, DUG Technology

So we always follow up a loss and understand why we lost and who it went to, and usually, they don't tell you who it went to, but you hear it on the street. But we haven't had feedback yet on that one. That's a fairly recent loss, and we haven't had feedback of why we lost or where it went to.

Jack Daley
Analyst, Shaw and Partners

Okay, maybe just... Sorry.

Matthew Lamont
CEO, DUG Technology

But yeah. Sorry, Jack. Next question.

Jack Daley
Analyst, Shaw and Partners

And just last one from me. Just you mentioned Elastic is a fair bit more than MPFWI. Is that when you go to market, how does your offering stack up versus the other guys in the market? 'Cause obviously, MPFWI, no one else really has it, but when you go live with Elastic, how is it gonna kind of compare to the other guys that are already in market with that solution?

Matthew Lamont
CEO, DUG Technology

So, the first thing, Jack, is that Elastic can be single-parameter elastic or multi-parameter elastic. We brought out single-parameter elastic maybe six, seven weeks, eight weeks ago, and we've brought out multi-parameter elastic maybe two weeks ago. So, that's the first thing. It's, they're quite separate things. And how... It's gonna be really interesting to see how we stack up. Because we haven't had it for very long, we don't know quite how it stacks up against our competitors, but what we're hearing, I think it'll stack up really well.

But what we're seeing in our test results is that you get a step up in the quality of the result going from the multi-parameter acoustic to the single parameter elastic, and then you get another step up of about the same amount going from the single parameter elastic to the multi-parameter elastic. So if that holds true, then we're in really good shape with the multi-parameter elastic. In other words, if, say, Viridien's single parameter elastic sits at about the same quality as our single parameter elastic, then our multi-parameter is gonna be the best one in the market. But this is all to be tested and it'll fall out, and we'll learn where we're at.

Jack Daley
Analyst, Shaw and Partners

Awesome. Great. I really appreciate that.

Steve Loxton
Head of Investor Relations, DUG Technology

Thanks, Jack. Alan, if you could, go ahead with your question, please.

Yeah. Hi, Matt, have you got me?

Matthew Lamont
CEO, DUG Technology

Got you, Alan.

Yeah, perfect. Good morning. Thank you for your time, and I guess late night where you are over in Houston, but just a couple of ones just to step out a couple of the earlier questions, please, or and maybe for Ajith, but just to understand the OpEx piece. I know it's around about the first half, you had sort of 250 employees, you now have sort of 270. Just trying to understand whether that is in any of the numbers in FY 2024, or does that more build into the first half?

Thanks, Alan. Yeah, so look, that step up in employee costs would be the second half, and there's been incremental costs on the back of the 600 computers coming on board at the start of the half, with regards to electricity and other data center costs.

Yeah, and then just a quick follow on: with the Middle East office and the team there, to what extent have they hit the ground already, or is that cost not in the numbers as yet?

No, there's no cost for people as yet in the FY 2024 numbers. We've just got Ajay Rendalo on the ground, who's been there for this half.

Perfect, thank you, and then-

Those guys only joined in August, Alan.

... helpful. Thank you. And perhaps just a query or just a follow-up on in terms of the work in hand and or how to think about sort of timeliness of execution for clients. Have you seen, maybe if you can just talk to the delivery timelines, if that has come in materially and or in this current world, do you need to be delivering throughput to clients in a lot quicker manner, hence that sort of order book and the work in hand sort of turns a lot quicker than perhaps it may would have a period ago?

The MPFWI work turns over quicker. The traditional projects take the same amount of time, really, as we're all trying to do them quicker, and they, probably they've sped up in the years gone by, but at the moment, to be honest, I don't. I think they're all, they're all taking about the same as what they always have. So it depends on what sort of work it is.

Perfect. And just one last quick one, just in terms of the extent to which FWI is sort of cannibalizing some of the core work. I mean, if you sort of strip it halfway back, there has been, you know, a little bit of a decline in the core work, but it doesn't look like it's gone materially back. A lot of the FWI seems to be incremental service growth coming through. Is that a fair observation?

Yeah, I don't think that we are cannibalizing our traditional business just yet. I mean, that's what we want to do, of course. You know, then with our employee base, we can produce a heck of a lot more revenue than what we are now. But yeah, I don't look at it that way just yet. And of course, the Middle East work is all land, which is a lot more difficult in the FWI front. So yeah, I'm not getting the feeling that we're cannibalizing stuff just yet. Yeah.

Helpful. Thanks.

Steve Loxton
Head of Investor Relations, DUG Technology

Thanks, Alan. Caleb Wang, if you can go ahead with your question, please.

Yep. Thanks, Steve. Congrats, Matt and Josh, on a good financial year. So I think Viridien commented last week or last month, basically saying that the Middle East companies, they've kind of spent the past few years gathering seismic data, and now they're kind of gonna start processing and imaging that data. And you also mentioned earlier in the call that you feel like you kind of timed your entry into the Middle East perfectly. So I guess, can we interpret that as sort of a lot of these Middle East oil companies, they kind of, the focus for the exploration budget a few years ago was more towards data acquisition, and now for the next few years, it's gonna be more processing and imaging, or?

Matthew Lamont
CEO, DUG Technology

I think that they've been doing a lot of processing and imaging over the last few years. I think that they are going into a new phase of processing and imaging, but they're also still acquiring massive surveys, the biggest surveys that have ever been acquired on Earth, so they're very, the things are going on in parallel, but it is really exciting what's going on over there. I think what's happened a little bit in the Middle East over the last few years is that there's been a lot of cheaper processing done, and I think now they're looking at really doing their processing really well, and so we're into that, that's probably more the way I would look at it. It's a new era of processing.

Yeah.

And just while we're on Viridien, they're the guys that say that 'cause I often get asked, you know, they've got 500 petaflops, you've got 45 or 50 petaflops. Well, Viridien use single precision, so if you want to compare our numbers to theirs, they've got 250 versus our 50 is the comparison to make computer wise.

Yep, for sure. And you guys are probably a lot more competitive in the other higher end processing stuff. So,

Yes, we are.

I think you mentioned earlier in the call that you're kind of cautious about adding headcount. Is that because, I guess, you see kind of MPFWI freeing resources as that get utilized more? Or are you just being cautious and not trying to, I guess, add headcount before you win some more contracts?

No, we are actively hiring. We're cautious that we're getting the right quality of people and that we're really being careful and judicious with who we're hiring. And we certainly don't want to balloon the company out, people-wise. But Houston, for example, we're hiring, and we need more people in Houston. And yes, we do see FWI taking over, and we do see it, you know, meaning we don't need as many people as we would to grow the revenue through traditional means.

Yep. All right. Thank you, guys.

Steve Loxton
Head of Investor Relations, DUG Technology

Okay. Thanks, Caleb. We have a question that's come in via the Q&A chat channel. It's one in relation to the new compute that's recently been installed, Matt, and the question was: how much additional work or how much additional revenue, however you measure it, does the additional compute enable you to handle? Or asked another way: how long before you think you might need to add more compute?

Matthew Lamont
CEO, DUG Technology

Currently, we have a bit of spare headroom on the compute. It looks like, which is really good. We've got to where we want to be, which is a bit of spare headroom. We have enough compute for what we're foreseeing at the moment. If we win a bunch of this work in the Middle East or we win a whole bunch of Elastic MPFWI work, then we'll need to add more compute. But that's a good scenario, right? If we don't get the workload that we're looking at at the moment, and we keep growing that workload steadily, and it looks like what it is, then we'll be fine for compute this financial year.

So it just depends on how that order book goes, and what the order book is comprised of as well. And in terms of revenue from the compute, again, it depends on what sort of what we're running on the compute, whether we're running, you know, and the balance between, you know, the cost of a project for us generally, the main cost is people and compute. And if it's traditional processing, it's very people hungry and more lighter on compute, and if it's MPFWI, it's very people light and very compute heavy. So it depends on. And the revenue is not that difference between the two. So it depends on what the makeup of the work is on the machines.

Steve Loxton
Head of Investor Relations, DUG Technology

Okay, thank you. One more question that's come in, and it might be worth just touching base on this. Revenue expectations around DUG Cool and DUG Nomad. They're still relatively early stage, but any commentary you can add to that would be helpful.

Matthew Lamont
CEO, DUG Technology

Yeah, look, I think I gave an answer the other day. Just to give you some sort of feel, I think the question was, you know, compared with services today... I'm not sure they meant to ask the question this way, but this is the way it came out. They said, "Compared with the services profit today, will DUG Cool make more money in five years time?" And the answer I gave was, "I believe in five years' time, yes, DUG Cool will make more money than our profit today, easily. But, will it make more money than services in five years' time?

I certainly don't think so, no." So, you know, I believe that both are gonna grow, but services has a really large upside, we believe, and for a long time to come. But the thing about DUG Cool, of course, is it's just revenue goes straight to the bottom line. It has no cost associated with it. It's a beautiful thing.

Steve Loxton
Head of Investor Relations, DUG Technology

Any comments on DUG Nomad?

Matthew Lamont
CEO, DUG Technology

DUG Nomad, again, very early days. We've got some great leads. It could be significant, but again, it's very early. We haven't sold any yet, so we have to wait and see.

Steve Loxton
Head of Investor Relations, DUG Technology

Okay, we might return to analysts on the panel. Jack Daley, if you would go ahead and ask your question, please.

Thanks, Steve. Yeah, just a quick one. Just on the cash conversion, just looked a little bit lower than what it's been traditionally. Are there any comments there, Ajith?

Matthew Lamont
CEO, DUG Technology

Yes, and that's particularly evident in the last quarter. The data book has grown. But we've had, you know, billings, and the cash doesn't come in yet at the reporting date. And yeah, just other working capital, growth requirements.

Okay, noted. And is that not really gonna be an issue moving forward, or?

We still expect to generate strong cash flow and cash conversion the next year.

Perfect. Thank you.

Steve Loxton
Head of Investor Relations, DUG Technology

Okay, Lindsay, if you could go ahead and ask your question, please.

Yeah, thanks, Steve. Matt, just another question on the Middle East. I suppose my question is, you sound very confident on the Middle East opportunity, but you've always sounded very confident on the Middle East opportunity. What feels like it's changed is that as at June thirty, you had one employee in the region, and now you have many multiples of that, I'm led to believe. Just trying to understand kind of what's changed. It feels like you've gone from, you know, confident and not allocating resources to confident and allocating resources. So that feels like a bit of a step change. Yeah, just trying to understand what has changed or to make you more confident on the Middle East opportunity in, let's say, the last three months or so.

Matthew Lamont
CEO, DUG Technology

So we put Jay into the Middle East as the BD guy in January, and our intention was to have a BD team and add a second person in there to work for Jay, and to win work, and to put that work out into our London and Houston offices, and Malaysian offices as well. That was the initial plan. But as soon as Jay hit the ground in January, you know, within a month, two months, what we were looking at was significant, like, extremely significant amounts of work. And the way we were welcomed into the Middle East was wonderful, right? And so I sat back and thought: "Well, we're underdoing this, we're undercapitalizing this. This opportunity I've never seen before. I've never seen a welcome like this.

I've never seen anything like the amount of work they have and the amount of work they're going to have here. We need to change our plan, and we need to invest money on this opportunity to really capitalize on it." So that plan was fairly early in the year. We just changed our mind and decided to put in an office and geophysicists. Then, of course, you start with well, where will we put the office? And how many geophysicists to give you a, you know, you've got to have bench strength. You know, you can't go in with five geos and think that people are gonna take you seriously. So what is the number of geos that you need, and where are you gonna find these geos?

Then you start sending in teams of, you know, we sent a team of three HR guys and Jay into Egypt. Crikey, that would be four or five months ago now, and they went and interviewed, like, 85 geophysicists in Egypt, and then we went around the place, and it just all takes time. So it might look like, you know, a couple of months ago, we started doing an office in Abu Dhabi, but no, it's a long time in the making. And then you've got to get job offers to those guys, and then you've got to get work visas, and then you've got to, you know, it's an enormous amount of work has gone into getting that office to where it's at.

And then, of course, we have to go there, and we stomp around Abu Dhabi and look at all the different tax regimes and where are we gonna put the office. So we're in a zero tax regime region in Abu Dhabi, and that comes with a whole bunch of overheads, so you've got to deal with those overheads and so forth. So there's a lot of work gone into that new Abu Dhabi office, and it's taken four or five months of a solid team working on that to bring it to where it is today. In terms of numbers, we're sitting, I believe, at 16 geos now in that office.

Okay, brilliant. No, that's really helpful color. And then just on Nomad, maybe feels a little bit preemptive, but some of the conversations you're having, I mean, how... Are they like single unit type conversations or when and if you actually do sign a DUG Nomad deal, should we be expecting tens of units, hundreds of units to be sold? Just how do we think about the quantum there? That'd be helpful. Thanks.

Yeah, it would be really helpful. Look, these are just rough leads. Until we start selling things and we start understanding the market better, a bit like the Middle East, then we'll know a lot more. We've got a lot of leads that are one to two to three Nomads, and we have one lead in the Middle East, in the States here, which is about sixty, sixty-one Nomads. And then there's a lot of crypto miners want them and, you know. So, it can be really big, but, you know, we need to see that what we're offering, the market wants, and they want to buy it. We think it's really cool, and it is unique. So, but do people want it? Will they pay for it?

That's where we're at the moment. The people that we're sending, it's a, it's a big company we're sending the Nomad into the States is, are like a, it's like a channel partner, if you like, and, they're really excited by it. So I think the feedback's really positive, but I'm not gonna get too carried away until we start to sell them.

Okay, brilliant. Understood. Thanks again.

Steve Loxton
Head of Investor Relations, DUG Technology

Thank you. A question that's come in, online, an update on Geraldton. Matt, if you-

Matthew Lamont
CEO, DUG Technology

Yeah, so Geraldton, look, you can think of Geraldton in that you've seen how we're disappointed with our HPC as a service result in Australia. And clearly, we're disappointed by that. Everybody would be disappointed by that, except for the new job we've just won with the astrophysicists. And so that goes hand in hand with if you're not building that business the way we expected it to build, we still believe it will go up. Do you need a really big data campus like we were planning in Geraldton, unless you're building a really big HPC as a service business? So those two go hand in hand.

And so because the momentum wasn't in that business unit, we said, "Well, it doesn't make sense to go ahead with Geraldton unless we have an anchor tenant." And so we went back to the state government and said, "We really need an anchor tenant." And that's what we're doing now. So we've paused it all, if you like. We've still got the option to lease on the land there, and we've paused it while we're looking for an anchor tenant. And the state government is extremely keen for that project to go ahead, so they're working with us, giving us time on that grant. No problem at all. And they're actually looking within themselves for whether they can provide an anchor tenant. So I can't tell you any more than that.

Whether it's gonna get up or not, I'm not sure, but there's a number of things happening that give it pause for thought that it may well get up.

Steve Loxton
Head of Investor Relations, DUG Technology

Okay, thank you. We might go to our final question. Ross Barrows from Wilsons, if you could go ahead with your question.

Ross Barrows
Analyst, Wilsons

Yeah, thanks, Dave. Just a clarification or maybe an extension of a comment you made earlier. Matt, in terms of DUG winning more work, and you've got some headroom to execute on that as it stands. But just in terms of adding more compute, could you answer the question in two ways: one, in terms of physical space, and then one, in terms of compute capacity. So you might have, you know, 50% or 100% more space, but given the density that you might be able to put in there, it might be, you know, 200% more compute. So could you maybe just give us some flavor around that? Thanks.

Matthew Lamont
CEO, DUG Technology

That's a great question, Ross, and one that I'm delighted to answer because we've been doing a great deal of work on this. So although we are not buying compute and have no plans to buy compute until we win a lot more work, we don't want to get caught with our pants down again, and so we've been doing an awful lot of work. So the data center in Houston here, called Skybox, is almost 50% full. So we've got 50% more space to grow into.

But of course, new compute is a lot more dense than old compute, and so although we have about fifty petaflops at the moment, or forty-five, between forty-five and fifty petaflops at the moment, depending on what we buy, we can put up to five hundred petaflops in that space, believe it or not. It's a power restriction problem, and so if you go to particular GPUs that produce a lot of power. You know, we always talk about bang for buck. Well, we got another one now. We, we also got to talk about, you know, bang per watt, and that's gonna determine how much we can put in that second half of that data center.

But on the best bang for watt machines, which are a GPU machine, we can put up to about 500 petaflops into that, and that's proper petaflops, not cheating petaflops like reading. That's proper petaflops. We can put about 500 petaflops into that, into that machine room. What was the other part of the question, Ross?

Ross Barrows
Analyst, Wilsons

It was both. One was on space, one was on density. That's great.

Matthew Lamont
CEO, DUG Technology

Yep. Thank you.

Steve Loxton
Head of Investor Relations, DUG Technology

Okay. Thank you, everybody. I think we've run out of questions. Matt, thank you. It's very late in Houston at the moment for dialing in and Jess from Perth. This session will be recorded and posted on the website. Thank you very much, everybody, for your attendance.

Matthew Lamont
CEO, DUG Technology

See you later, everybody. Bye.

Steve Loxton
Head of Investor Relations, DUG Technology

Thank you.

Powered by