Borosil Renewables Limited (BOM:502219)
India flag India · Delayed Price · Currency is INR
501.40
-4.20 (-0.83%)
At close: Apr 30, 2026
← View all transcripts

Q3 25/26

Jan 29, 2026

Operator

Ladies and gentlemen, good day and welcome to Borosil Renewables Limited Q3 FY 2026 earnings conference call hosted by Axis Capital Limited. As a reminder, all participant lines will be in the listen-only mode, and there will be an opportunity for you to ask questions after the presentation concludes. Should you need assistance during this conference call, please signal an operator by pressing star, then zero on your touch-tone phone. Please note that this conference is being recorded. I now hand the conference over to Mr. Rohan Gheewala from Axis Capita l. Thank you, and over to you, sir.

Rohan Gheewala
Senior Manager, Axis Capital Limited

Thank you, Shubham. Good evening. On behalf of Axis Capital, I'm pleased to welcome you all to the Q3 FY 2026 earnings conference call of Borosil Renewables Limited. We have with us the management represented by Mr. P. K. Kheruka, Executive Chairman, Mr. Ashok Jain, Non-Executive Director, Mr. Sunil Roongta, Whole Time Director and Chief Financial Officer, and Mr. Dhaval Patel, AVP, Investor Relations. We will begin with the opening remarks from the management, followed by an interactive Q&A session. Thank you, and over to you, sir.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

This is Pradeep Kheruka, Chairman. Good afternoon and welcome to the Borosil Renewables Q3 FY 2026 investor call. The standalone and consolidated financial results for the quarter ended 31st December 2025 were approved by the Board of Borosil Renewables on Wednesday, 28th January. Our results and an updated presentation have been sent to the stock exchanges and have also been uploaded on the company's website. We will now discuss the operations of the company on a standalone and consolidated basis. On a standalone basis, the company achieved an all-time high quarterly sales of INR 386.5 crores versus INR 275.28 crores in the same quarter last year and INR 378.44 crores in the preceding quarter. The company EBITDA at INR 129.04 crores, which is 33.4% of sales, shows a quantum jump of 518% from INR 20.89 crores, which is 7.6% of sales, in the corresponding quarter last year.

While it remains consistent with an EBITDA of INR 125.5 crores, which is 33.2% of sales in the preceding quarter, sales rose by 40% during this period compared to the corresponding quarter last year. Almost the entire increase in sales value for the quarter came from increased sales prices. Average ex-factory selling price during the quarter increased to INR 149.97 per mm as compared to INR 104.54 per mm in the corresponding quarter last year. This compares with INR 147.5 in the preceding quarter, leading to a significant rise in the margins. Exports amounted to INR 20.74 crores, accounting for 5.4% of the turnover, compared to INR 16 crores in the corresponding quarter, when exports made up 5.8% of the turnover. Company's major markets, that is EU, Turkey, and USA, continue to face challenges due to low demand.

The domestic demand continues to be steady, even though the anticipated changes in GST and prolonged monsoon challenged solar module manufacturers with postponed deliveries. This had led to cash flow blockages for the manufacturers and a decline in the selling prices of modules, affecting the margins. The delivery situation started to improve towards the middle of December and is now normalizing. With 145 GW of module manufacturing capacity, India is now an international manufacturing hub. This is expected to rise further to 200 GW by 2027. While conventional wisdom projects capacity utilization of module manufacturers to come down, my personal guess is the reverse. With the landmark India-European Union Free Trade Agreement now a reality, I foresee the European Union to start sourcing a portion of its solar modules from India.

If this is handled right within the agreement, the solar module manufacturing industry could become a significant beneficiary under this agreement. Coming to solar installations in India, in the first nine months, these have been around 30 GW, and another 10 GW can be expected to be added in the last quarter, making a total of 40 GW in 2025-2026, which would reflect modules' glass consumption of about 55 GW, as against 24 GW during the previous year. ALMM mechanism for modules implemented from April 2024 has led to a rush for capacity additions, which many feel could lead to overcapacity, which would have its own repercussions in the future. Considering challenges in grid stability and power evacuation, we see a trend of increasing adoption of battery energy storage systems.

The cost of fully dispatchable renewable power with battery storage is now reduced considerably with aggressive bidding and has come down to about INR 4.5 per watt-peak. Significant investments are seen in this space. The government has introduced ALMM II with effect from June 2026, mandating use of domestically produced solar cells. It is expected that the solar cell capacity, which is currently at 24 GW, will rise to 75 GW by 2027, looking to the momentum to add capacities. The next step will be to introduce ALMM II/III from June 2028, under which ingot and wafer will also be mandated to be locally produced. These measures will ensure the building up of a local supply chain and ecosystem.

While we expect the strong demand for glass to continue, we are in dialogue with the government to develop and introduce measures to ensure a continued robust demand for all domestic components, including solar glass. Present solar glass capacity in the country is 2,600 tons per day, which translates to about 18 GW. Considering the expected current demand of about 55 GW on a daily basis for domestic installations, imports occupy about 70% share of the consumption, leaving huge scope for capacity addition for import substitution. We understand that new capacity additions, majority being for captive consumption from the existing and new players, will take the total domestic capacity to about 51 GW by March 2027, which will still be short of the real demand. CVD on imports from Malaysia, set to expire on 8th March 2026, has now been extended by three months to 8th June 2026.

Since DGTR is considering the sunset review, we expect the authority to issue the final findings in the next couple of months. Now, I come to the consolidated results for the quarter, which include the operations of the subsidiaries. The overseas subsidiaries, including the step-down subsidiaries, have generated net revenue of INR 3.96 crores and EBITDA of INR 1.9 crores for Q3 FY 2026, net revenue of INR 0.43 crores and negative EBITDA of INR 5.08 crores. The consolidated net revenue for the quarter under review stands at INR 390.46 crores and an EBITDA of INR 130.94 crores, as compared to net revenue of INR 378.88 crores and EBITDA of INR 120.42 crores in the preceding quarter. The wholly-owned German subsidiary, GMB Glasmanufaktur Brandenburg GmbH filed for insolvency, after the German bank ILB demanded payment of capital subsidy of EUR 4.81 million given by them to GMB to support CapEx plans as GMB has undergone insolvency.

GMB has denied obligation to make such payment as the condition of operating GMB for five years could not be fulfilled due to a force majeure situation arising out of inaction by the EU and German government to support domestic solar glass manufacturing. I'm happy to report that the company has been able to achieve significantly better sales and EBITDA for the last few quarters on the back of improved domestic operations. Sales on a standalone basis for nine months in this financial year at INR 1,097 crores, showing an increase of 40% for the corresponding nine months in the last year, and an EBITDA of [inaudible] .

With that, shows a jump of 235% over the corresponding nine months. With that, I would now like to open the floor to questions that you may have. Thank you.

Operator

Thank you very much. We will now begin with the question -and- answer session. Anyone who wishes to ask a question may press star and one on the touch-tone telephone. If you wish to remove yourself from the question queue, you may press star and two. Participants are requested to use handsets while asking a question. Ladies and gentlemen, we will wait for a moment while the question queue assembles. The first question comes from the line of Vikram Sharma from Niveshaay. Please go ahead.

Vikram Sharma
Analyst, Niveshaay

Hello. Hi, sir. Congratulations on good result numbers.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

Thank you.

Vikram Sharma
Analyst, Niveshaay

Sir, my first question is regarding what would be a trigger for announcing further capacity expansion? Like, if demand remains very strong and if we see other players announcing aggressive expansion plans. And we also have feedback from the market, that Borosil offers the best quality among Indian players. So if we are unable to supply, then definitely our demand may shift to other manufacturers. So how, what is management's view on this and how are we thinking?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

It's like this. There has been a very significant increase in the number of new participants. Can you mute your microphone because there's a lot of background noise coming from your phone? So with the increase in the number of new entrants, there has been a lot of poaching of expert people. And when we are now currently in the process of taking up production by 60%, which is quite a lot actually and requires a lot of people. So we are cautious. We don't want to move in a hurry and not be able to manage the situation. So I guess that should answer your question. But we are very conscious. We are acutely conscious of the increased demand, and we are acutely conscious of the fact that we may have to do something about it. Thank you.

Vikram Sharma
Analyst, Niveshaay

The second, what will be the impact of INR depreciation? What has our selling price improved in this quarter, or are we expecting it will improve further?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

So you can see in the last quarter, our average realization was INR 147.50, and this quarter, it is nearly INR 150. So some advantage we are gaining out of this depreciation. But it's only a marginal increase and not a significant one.

Vikram Sharma
Analyst, Niveshaay

Okay, sir. Okay, sir. Thank you.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

Thank you.

Operator

Thank you. The next question comes from the line of Nidhi Shah from ICICI Securities. Please go ahead.

Nidhi Shah
Analyst, ICICI Securities

Thank you so much for taking my question. I want to know firstly on the divestment from the German subsidiary. What are our timelines on that? When can we expect the loss to sort of go away from our controlled P&L? That's the first one.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

So the answer to that is that you see the company has filed for insolvency. A gentleman has been appointed by the court to look into the affairs of the company and see whether liquidation is required or some new buyer can be found, etc. And until that entire process is complete and a final recommendation is placed before the court, the next action cannot be foreseen by us. Now, from our point of view, what we had done was that we had provisioned the entire amount of money which we had invested and which had remained outstanding from that company. So there is nothing more that we could do. And I mean, that would really be the limit of our involvement in the matter by our understanding. So they will take what time they will.

So one thing, from the perspective of accounting and losses, we already deconsolidated the balance sheet by deconsolidating GMB, which is the operating step-down subsidiary. And now we also deconsolidated Geosphere, which was the holding company of GMB. So the deconsolidation is already done in the balance sheet. So assets have been removed. The investment has been removed. And even the losses, which were in the form of other equity earlier, have been adjusted back. So all that has been done, and there are no more losses. As you can see, the consolidated and standalone results, there are hardly any differences. So it is more or less a standalone, which is being shown as consolidated now.

Nidhi Shah
Analyst, ICICI Securities

All right. Thank you. My second question would be on the expansion. I can see that we are on track to complete by December 2026. Is this the entire capacity then, or will we be phasing it out? And when can we expect, say, utilization upwards to 85% on the expansion?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

We expect that you see the date announced last had been March 27, and we are discussing December 26 based on indications which we can see today. As you know, setting up a project entails a lot of different agencies, a lot of supplies coming together. It's very difficult to accurately predict when all of these will actually come together and then the people required to set it up. We are also going to be looking at a monsoon this year, and that also has a tendency to delay matters. We expect to always start one furnace first, stabilize it, and then start the second one. As matters stand, we are building both the furnaces side by side. They should be getting complete within just a couple of weeks of each other, in my opinion.

Nidhi Shah
Analyst, ICICI Securities

Thank you. My last question would be on the macro. Is that where do you think the prices for solar glass specifically are headed, given that there are a lot of other macroeconomic factors that are affecting these prices? Where do we see in the next year probably solar glass prices will go, given that it's a steady state of tariffs and duties?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

You see, because there is a minimum import price set by the government, the prices which are coming in from China are fixed to that. We are looking at what the government might do with glass coming from Malaysia because we cannot hazard a guess. We did have a 9.71% CVD on that. So there are only three possibilities. It might go down. It might stay the same. It might go up. Whatever that is, the module manufacturers generally, they set their purchase for the longer term rather than the shorter term. So wherever we have business, which is ours, which is ours, which people to whom we are supplying, we do not expect there to be interruptions in that. Small changes in prices are always possible. So when that happens, that will happen. And to that extent, it's impossible to predict anything with certainty.

Nidhi Shah
Analyst, ICICI Securities

All right. Thank you so much.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

Pleasure. Thank you.

Operator

Thank you. The next question comes from the line of Deepak Purswani from Svan Capital. Please go ahead.

Deepak Purswani
Analyst, Svan Capital

Yeah. Hi. Congratulations for a good set of numbers, and thank you for the opportunity. So firstly, I wanted to check it out. Like we mentioned, 70% of the import, I mean, 70% of the consumption is catered through the import. If you can also give a broader sense in terms of the ADD on Malaysia is getting extended. What is the ADD on Malaysia? Sorry.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

You see, I have to be accurate in the terms that I use. So there is an ADD on imports from China. There is a CVD on imports from Malaysia. As it stands, now once the government comes out with its findings, whatever those might be, that we will be able to know once the government has said so, which might take a couple of months. Yeah.

Deepak Purswani
Analyst, Svan Capital

Sir, just wanted to check it out. What is the pricing difference between Malaysia and India route? Indian manufacturer and Malaysian route?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

See, we are pricing from Indian domestic industries, pricing the products based on the Chinese landed cost. The Vietnam cost and Malaysian cost is slightly below the Chinese cost. We always try to position ourselves as an import substitute for Chinese prices and try to get that much price. The difference between Chinese and Malaysian and Vietnam pricing is of the order of 3%-4%, in my view.

Deepak Purswani
Analyst, Svan Capital

Okay. Just wanted to check it out. Is there any further scope for the price at the current level, given the further depreciation of the Indian rupee? Or how has been your dialogues with the clients at this point of time?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

We don't foresee a significant change going forward. The prices are quite stable at these prices, at these levels. They are fairly competitive in that sense. We are comfortable at these prices.

Deepak Purswani
Analyst, Svan Capital

Okay. Secondly, sir, if you can also give a broader sense in terms of any raw material or fuel cost inflation, which I mean, are we facing any?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

Hello?

Operator

Hello?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

We are not able to hear you completely. We lost the end of your question.

Deepak Purswani
Analyst, Svan Capital

Just wanted to check it out, sir. If you can give a broader sense in terms of are we facing any raw material or fuel cost inflation at the current juncture, or how we are placed at the current juncture?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

At the moment, we do not see any inflationary tendencies in the cost of inputs, whether raw materials or fuel. You see, we are living in a very volatile environment, as we all know. And there is no doubt about it that the Indo-European Union deal has brought a sense of stability generally, not just to India, but to other markets which are not related to us as well. So I don't know that there might be any volatility. At the moment, nothing is foreseen. So things look like they should be stable. So there have been some increase in prices of one or two key inputs, but the plant operations have worked very diligently in order to remove the, or say, do away with the impact of this price increase of that particular input b y increasing their efficiency.

They have increased the efficiency. They have changed the batch mix and done many other operational adjustments, due to which the impact is not felt in the final results. Of course, there have been some changes at the price levels, but the team has been able to control the impact.

Deepak Purswani
Analyst, Svan Capital

Okay. And finally, sir, if you can give the data related to the volume growth in the nine months, and we were also talking some efficiency gains, which we would look out in the existing capacity. So if you can just update on that part, that would be really helpful.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

The operational gains in the form of volume is about 6% up from compared to last year's nine months. We expect this to continue in the current quarter as well. On the whole, compared to last year, we will have at least 6% volume growth.

Deepak Purswani
Analyst, Svan Capital

Okay. Is there any further possibility to optimize or get some more efficiency gain till the time new capacity get operationalized?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

We keep trying every day, and we are not stopping here at 6%. So obviously, the team is there to try for increasing the output further. It would be marginal in my view because at least 2%-3% is what we can expect.

Deepak Purswani
Analyst, Svan Capital

Okay. Thank you. Thank you and wish you all the best, sir.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

Thank you so much.

Operator

Thank you. The next question comes from the line of Rikin Shah from The Boring A MC. Please go ahead.

Rikin Shah
Analyst, The Boring AMC

[Foreign language]

[Foreign language] sir, congratulations on a steady set of results. My question is a little on the policy end. On the module manufacturing end, the ALMM policy for cells is going to be implemented in June 2026, which is going to mandate a large part of cells in the projects to have a good DCR content, I think complete DCR content. With that logic, on the ground, I don't find enough cell capacity in India at the moment. It is being put up. Do you think a temporary demand issue could come up because the module manufacturers may not be able to sell if they don't have their own cell capacity?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

There is no bar on the import of cells. So I do not see anybody who has orders for modules not being able to manufacture and supply that because the cells can be very easily sourced from China. So there's a certain price attached to it. That's all. So from your perspective, your question is regarding what happens after June 26. You know the government and the industry are working together. And in case the situation comes in where the cell capacity cannot ramp up to the current level of module manufacturing and demand, the government and industry together would be able to find some solution, I suppose.

The government may come up with some deferment or some leeway for certain projects, certain type of projects, whereby the manufacturing can continue using the imported cell till the time the domestic production of solar cell increases to the level of consumption. So we have to leave it to the government, I think. But I do not think government will take a stand that the module production has to stop if the solar cells are not available locally.

I can add one thing about the government that I'm seeing a level of interaction with industry and with customers by the government, which I have not seen before. They are very fluid in. They know exactly what they are doing. In industry and in consumers, I think we are very satisfied and comfortable that the government is doing every single thing possible to increase solarization and deployment of solar energy in the country.

Rikin Shah
Analyst, The Boring AMC

Thanks, sir. That helps a lot. The reason I asked is because your commentary is a little conflicting from module manufacturers who already have their cells in place. But obviously, that's to each their own. So my next question is along the lines of Bharuch. So we have obviously been very cautious about expansions. But do we have any room for further expansions after the 600 TPD is in place? I mean the land space and the utilities, right?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

We can easily go for another furnace.

Rikin Shah
Analyst, The Boring AMC

Okay, sir. Got it. That's all.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

The land is all there. We have to decide to do it, and it can get done.

Rikin Shah
Analyst, The Boring AMC

Sure, sure, sir. Thanks, sir. That helps.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

In fact, we have all the utilities, batch house, everything is ready in case we want to go ahead. There's nothing stopping us other than caution.

Rikin Shah
Analyst, The Boring AMC

Sure, sir. That helps. Thanks, sir.

Operator

Thank you. The next question comes from the line of Vanshita Amlani, an individual investor. Please go ahead.

Sorry to interrupt, ma'am. You are not audible.

Vanshita Amlani
Analyst, TatvaSoft

Yes.

My first question is related to the revenue. What will be the revenue visibility for next four quarters?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

We do not expect any major changes in revenue. The reason for that is that we are manufacturing full production and selling everything that we make. I don't think there'll be much change in revenue. There can be a few percentage points plus or minus. I don't see any major change.

Vanshita Amlani
Analyst, TatvaSoft

Okay. So we can say that till the end of FY 2027, it will be of like quarter and quarter basis.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

Generally, up to December, it will be similar kind of revenue. Once we start the production from the new furnace, which are under construction right now, in the Q4 FY 2027, we might see some revenue coming from them. Then thereafter, the revenue will increase by 60% as the capacity is going up by 60%.

Vanshita Amlani
Analyst, TatvaSoft

Okay. So my second question is related to the equity. Will there be any further equity dilution?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

No, there will be no further equity dilution. We are completely funded from the perspective of these expansions. In case we need to expand further, the cash flows will support us. As of now, there is no plan to raise further equity.

Vanshita Amlani
Analyst, TatvaSoft

Okay. What is your targeted ROC after 600 expansion is in place?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

ROC will be upwards of 25%.

Vanshita Amlani
Analyst, TatvaSoft

Okay. Thank you.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

Yeah. Thank you.

Operator

Thank you. The next question comes from the line of Mehul Panjwani from 40 Cents. Please go ahead.

Mehul Panjwani
Analyst, 40 Cents

Hello, sir. Thank you so much for the opportunity. Sir, as you mentioned that the government is doing a lot for the solar sector. What can be some of the positive developments from the budget for our company?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

That's a million-dollar question.

Mehul Panjwani
Analyst, 40 Cents

I mean, what are some of the possibilities? I know that we don't have any preliminary information, but what can we expect in terms of what developments we have seen so far in the last one year?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

See, according to me, as far as the solar glass production is concerned, our big ask was for anti-dumping duty, which the government was able to grant us last year. So that part has been done. For the rest of it, there are no hiccups in our quest for implementation of our new project. Other glass manufacturers also who are trying to implement new glass projects also are coming up, coming online. I don't see that there's any hiccup from the side of the government. So far as what they can do, it's impossible for me to think. Though I can say one thing, recently we saw in GST, in many items, they reduced the GST from 18% to 5%. That made a very big impact on the sales of those products like automobiles and other things.

So in that sense, I don't know what the government might do for rooftop solar for right now. There's a certain limitation on companies being able to set up renewable energy projects. So normally, it's limited to 100% of their contract demand. Now, when you set up a project for 100% of contract demand, you'll only get about 20% of that. So you're still buying 80% from the grid. Now, if the government goes up and says, "We can make it double, triple, quadruple," I don't know. That would really set the market on fire. So I don't know what the government can come up with in their effort to increase this. One thing now is that from a module manufacturing capacity of 10 GW about three, four years ago, we are at 120 GW. So we have the muscle power now in terms of manufacturing.

I've also mentioned about the European trade deal. If something works out over there, Europe has installed about 70 GW of modules in the year 2024. The 2025 figures are not yet out. If they take, say, even half of that, there'll be 35 GW they can buy from India. I mean, everything is open-ended. This trade deal is a big deal, in my opinion. Let us see in what way this plays out.

Mehul Panjwani
Analyst, 40 Cents

Sir, my second question is regarding our German subsidiary. Can we say that all the negative developments are out of the way now?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

We have been advised by lawyers. According to the advice given by our lawyers, there's nothing more that we can be stuck with.

Mehul Panjwani
Analyst, 40 Cents

Is there any possibility of any positive thing happening? I mean, like the German, like we are able to sell the subsidiary to another company and recover some of the losses?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

Frankly, I think that is unlikely. The German subsidiary, the manufacturing company, is under the control of court now and court-appointed administrator. So we have lost the control already. We have deconsolidated the balance sheet. It's not in our control now, though we have shares. So the court and the administrator will take a decision whether to sell the company, whether they can find any buyer, or they have to sell the assets of the company. It will be decided by the court and the administrator.

Mehul Panjwani
Analyst, 40 Cents

Okay, sir. Thank you so much for all the answers. Thank you. All the best.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

Thank you.

Mehul Panjwani
Analyst, 40 Cents

Thank you.

Operator

Thank you. The next question comes from the line of Karan Sanwal from Niveshaay. Please go ahead.

Karan Sanwal
Analyst, Niveshaay

Thank you for the opportunity. Sir, I wanted to ask what would be the proportion of electricity and natural gas in our power cost, and how much savings can be made from additional renewable energy that the plant that we have set up? How does the recent increase in natural gas pricing affect our power and fuel cost?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

So power and fuel is close to 32% of the cost of production, both put together. And in terms of the saving on the power cost, we can save almost 1.5 basis points in terms of the incremental margin on the company sales. So it's a quite substantial saving which we can achieve through the renewable energy deployment, which we are, I mean, this is slightly delayed from the developer side. So this was to be commissioned in September, but we expect it to be commissioned by end of February now. So this will save about INR 1.25 crore per month or something like that. And yeah, so these are the things which we can see in the coming quarters. Natural gas price recently has gone up to some extent because of the increase in the prices of the USA gas, the Henry Hub gas.

We have certain benchmark contracts which are linked to those benchmarks, and we have to pay as per those movement in those benchmarks. So the cost has slightly gone up in the last quarters.

Karan Sanwal
Analyst, Niveshaay

Do we anticipate any impact on our margins due to this increase in natural gas prices?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

It will not be significant because we are doing our bit to save on the consumptions in terms of both power and fuel and try to optimize our production, which can offset these cost increases. So there will not be any significant change in the margins.

Karan Sanwal
Analyst, Niveshaay

Understood. And sir, what would be the proportion of import from Malaysia currently versus during the time the ADD was implemented?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

In, say, 2024, before the ADD was levied on China and Vietnam, the imports of Malaysia were almost nil. As soon as the ADD started in December 2024, the imports started in a big way. Currently, Malaysian imports are to the tune of about 25% of the total imports. Vietnam is about 10%. 65% is basically from China. So this is a broad composition of the imports as of now. Malaysia has become significant only after the anti-dumping duty has been levied on China and Vietnam. So it is important for us to get the CVD continued so that it does not increase further from here.

Karan Sanwal
Analyst, Niveshaay

Do they have the capacity to increase imports from here as well, the Malaysian domestic sales?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

Yes. They have commissioned more capacity in Malaysia. So the capacity is available for export to India or to any other part of the world. So that will not be a constant. So we have to take concrete steps in terms of the government to continue levying the CVD and control the imports from Malaysia.

Karan Sanwal
Analyst, Niveshaay

Understood. And one last question. How much time would we take to stabilize our line and scale the utilization once the lines are commissioned, the new lines?

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

We expect to fire the furnace in December 2026, and thereafter, we generally plan for 3 months' trial periods to stabilize the production. Now, it all depends on the process adjustments and behavior of the synchronization of all the equipment and furnace. It might be done in 1 month. It might take 3 months. We have to see. But 3 months is something what we have budgeted.

Karan Sanwal
Analyst, Niveshaay

Understood. Thank you so much and all the very best.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

Thank you.

Operator

Thank you. As there are no further questions from the participants, I now hand the conference over to the management for closing comments. Thank you. And over to you, sir.

Pradeep Kheruka
Executive Chairman, Borosil Renewables Limited

Thank you very much. It was nice to have the questions from participants. It's very interesting to see the amount of interest which investors take in the company and this process. We assure that from our side, we will do our very best to continue to run the company professionally and efficiently. Thank you very much. Bye-bye.

Operator

Thank you. On behalf of Axis Capital Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your line. Thank you.

Powered by