be available in the company site. I ask you to send the questions through the Q&A and with the name of who is going to ask the questions, and I am going to read them after. No mics, please. I would like to say that all the statements made in this video conference about the business, PetroReconcavo issues, the information is based on what the board thinks as well as information that is available in the company site. This does not involve the risks. I am going to give the floor to Firmo to start.
Thank you, Marília. Good morning, and thank you for attending our third quarter 2026 earnings presentation. This quarter, we reinforced PetroReconcavo's ability to advance simultaneously on different value generation fronts. We delivered solid results, increased commercial predictability, made relevant capital allocation decisions, and continued to evolve in the strategy of sustaining production, always with capital discipline and focus on maximizing the value of our assets.
We ended this period with net revenue of BRL 786 million, a reduction of 3% compared to the previous quarter, and mainly impacted by the drop in the average Brent price from $103.85 per barrel to $96.87 per barrel, representing a reduction of 7% in the quarter-on-quarter comparison. The adjusted EBITDA was BRL 379 million, a reduction of 4% compared to the previous quarter. The adjustment excludes BRL 19 million, mostly referring to the non-recurring effect of the write-off in the investment made in the UPGN Miranga project in the amount of BRL 15 million.
In the annual comparison, despite the revenue being the same, the adjusted EBITDA grew 8%, mainly reflecting efficiency gains and the reduction in our cost base over the last 12 months, following our strategic pillar of excellence in execution. The net income was BRL 236 million, 60% higher in the quarter-on-quarter and 94% higher than the same period last year, influenced by the effects related to mark-to-market of financial protection, instruments, and swaps associated with our debt. Finally, free cash generation for the period, equivalent to cash generated by operating activities, was BRL 134 million, 81% higher than in the second quarter of 2026. On an operational level, average production was 23.7 thousand BOE /d , a reduction of 2% compared to the second quarter. We made progress in structuring initiatives.
The new long-term contract with Brava came into force in October, bringing better pricing conditions for the oil from the Potiguar asset. In Bahia, we secured gas processing capacity at UTG Catu between 2028 and 2037, which allowed us to suspend the planning investment in UPGN Miranga and preserve approximately $60 million in capital. Finally, we acquired two exploratory blocks in the sixth cycle of the ANP permanent offer adjacent to our operations in Potiguar and Recôncavo basins. These blocks expand our portfolio and create opportunities to expand reserves and capture synergies in regions where we already have geological knowledge, operational experience, and infrastructure. The company's average production was 23.7 thousand BOE /d , 2% below the second quarter. However, it is worth mentioning the change in the composition of this production. Oil grew 4%, while gas retreated 9%.
In the Bahia asset, total production increased 1%, with oil production advancing 9%. In the Potiguar asset, the reduction was also marked by the decline in gas production. It is important to note that this behavior of oil production occurs in a context of lower capital intensity, with a CapEx of reserve development 14% lower in the quarter. This behavior represents the reflection of the initial effects of the water injection projects started as a priority after our strategic review in 2025, which, despite being in different stages of maturation, are already beginning to show positive indications of value creation. Our strategic objective remains firm in the direction of increasing the return on capital employed through management focused on the repressurization of our reservoirs, which means less CapEx, more production, and less short-term decline. This strategy is fundamental for the return of production growth in the coming years.
This slide presents one of the main signs of operational evolution in this quarter. In the four priority fields highlighted, Sabiá da Mata, Sabiá Bico de Osso, Brejinho, and Tiê, the increase in water injection is already beginning to translate into a reversal of the trend of decline in oil production. Between May and September of this year, consolidated injection in these four fields grew 44%. As we increased the volumes injected, we promoted the repressurization of the reservoirs, improved drainage efficiency, and created conditions to reduce the natural decline of the fields. The results are still at different stages of maturation and should not be interpreted as a linear or an immediate response in all reservoirs. Even so, the behavior observed in these priority fields can be considered as a good proxy for the technical and economic effects of the injection strategy.
It is worth noting that it continues to be developed for other fields of the company. In addition to the direct effect on production, secondary recovery increases the potential return of future workover and drilling campaigns, contributes to the incorporation of new reserves, and extends the productive life of our assets. Therefore, we will continue to expand these initiatives selectively, prioritizing the fields with the best technical response and the greatest potential for value generation. In this quarter, we have the new processing contract with UTG Catu, and this represents a structural advance in the strategy of monetizing the gas produced in Bahia. The new conditions ensure processing capacity between 2028 and 2037, increase the operational predictability, and reduce the expected cost of processing. For this long-term solution, we suspended UPGN Miranga's final investment decision, avoiding approximately $60 million in future CapEx. This decision demonstrates our capital discipline.
We preserve processing security and commercial competitiveness without the need to immobilize resources in a new plant of our own at this time. The move adds to the other fronts of the operational resilience plan. In Bahia, we have UTG São Francisco and now a long-term contractual solution at UTG Catu. In Rio Grande do Norte, the acquisition of 50% of UPGN Guamaré increased the integration predictability of the gas chain. For oil, the long-term contract with Brava has increased predictability and improved value capture, while the development of the route through the Port of Pecém seeks to add logistical flexibility, new domestic routes, and access to the international market.
In summary, our operational resilience plan launched in 2024 is implemented and has materially reduced the operational risk profile of delivery, in addition to creating tens of millions of dollars of value already starting to be captured in this quarter's financial results. The only thing missing is a more robust solution for the alternative oil flow in Bahia that we continue to pursue. I now turn the floor over to Rafael Procaci, our CFO.
Thank you, Firmo, and good morning, everyone. CapEx in the third quarter totaled BRL 147 million, a reduction of approximately 24% compared to the second quarter. This evolution reflects a more selective capital allocation aimed at maximizing returns and preserving financial flexibility. It is important to highlight that even with a lower intensity of investments, we have been able to maintain stability in the company's production.
In reserve development, we invested BRL 149 million, 14% less than in the previous quarter. Investments in drilling totaled BRL 15 million and were focused on remaining completion costs, in addition to preparations for the next campaign, including several seismic reprocessing studies. In workovers, we invested BRL 104 million, with fewer interventions and a focus on projects with better returns. In the quarter, we carried out 42 workovers, 24 in the Potiguar asset and 18 in the Bahia asset. Six interventions were directed to the expansion of water injection projects, including the conversion of another producing well into an injector in the Tiê field. In facilities, BRL 30 million were directed mainly to water treatment, transfer, in addition to some automation integrity and improvement projects and compression systems.
In the midstream assets, the negative amount of BRL 12 million reflects the write-off of BRL 15 million associated with expenses previously made in the UPGN Miranga project that was suspended with the signing of the long-term contract with Petrobras. On the other hand, investments of BRL 3 million in UPGN Guamaré. Remember that this write-off is a non-recurring accounting effect and does not represent cash disbursement in the quarter. The year-to-date CapEx totaled BRL 537 million, 55% below the same period in 2025, due to the decision to slow down drilling activities to allow the maturation of the water injection projects that have been implemented in recent months. In this quarter, the net revenue totaled BRL 786 million, a reduction of 3% compared to the second quarter.
This decrease is mainly a reflection of the reduction in oil revenue, partially offset by the growth in natural gas revenue. In oil revenue, the main effect was the 7% reduction in the average dated Brent to $96.87 per barrel. Besides this, there was a higher settlement of NDF contracts with hedge contracts with a negative impact of BRL 107 million on revenue, as I will explain later on. These effects were partially offset by the 4% growth in oil production and the 2% appreciation of the average dollar. The average oil trading discounts in the quarter were about $5 per barrel against the ICE Brent, against around $8 per barrel in 2025, thus consolidating this quarter a discount level much lower than that seen a year ago.
Gas revenue grew 4%, reaching BRL 291 million, mainly due to the normalization of the UPGN Guamaré after the scheduled shutdown in the second quarter and the consequent recovery of LPG and C5+ sales. Revenue from the provision of services to third parties was BRL 25 million. Although the total hedged volume remained stable in relation to the previous quarter, we had an important change in the composition, with a greater share of NDF contracts in relation to zero-cost collars. As NDFs are accounted for via hedge accounting, this change in mix meant that a larger portion of the hedging effect was recognized directly in the net revenue of this quarter. The NDF settlements had a negative impact of BRL 107 million on revenue, while the zero-cost collars generated a negative impact of BRL 20 million on the financial result.
In the previous quarter, there were BRL 89 million in the NDF modality and BRL 50 million in the zero-cost collar. It is also worth emphasizing that mark-to-market fluctuations in futures contracts can generate relevant accounting effects without immediate cash impact, which only materialize according to the settlement of each contract. Our hedging strategy remains focused on cash flow predictability and reducing exposure to oil volatility while preserving participation in more favorable price scenarios. Finally, there was no contracting of new hedge volumes throughout the third quarter of 2026. The company's total costs and expenses were BRL 427 million in the quarter.
Excluding non-recurring effects associated with the write-down of previously capitalized costs of the UPGN Miranga project in the amount of BRL 15 million and BRL 14 million of adjustment in accounts receivable, costs and expenses were BRL 408 million, with a slight reduction compared to BRL 412 million in the second quarter of 2026, and reinforcing the continuity of cost discipline. Operating and administrative costs and expenses, excluding royalties, gas purchases, and other effects, totaled BRL 283 million, 1% below the second quarter and 15% below the third quarter of 2025. Total lifting costs decreased 1% to BRL 185 million. And in unit terms, it fell 2% to $16.52 per BOE, favored by the appreciation of the average dollar and the reduction in total costs, which more than offset the lower production base.
The general and administrative expenses fell 4% to BRL 45 million, mainly due to lower personnel expenses. The midstream costs remained practically stable. Gas purchases decreased 20% to BRL 35 million, reflecting lower prices and volumes of gas purchased from third parties. The royalties increased slightly due to the greater weight of Chia in the production mix, since the field has a higher rate than the average of the others. The adjusted EBITDA for the period totaled BRL 379 million, down 4% from the second quarter and up 8% from the third quarter of 2025. The quarter-over-quarter reduction is mainly due to lower oil prices and the greater impact of NDF contract settlements. These effects were partially offset by oil production growth, gas revenue recovery, and cost discipline.
The EBITDA margin stood at 48.2%, close to 49% in the previous quarter, evidencing the resilience of profitability even with the Brent 7% decline. The netback, average net revenue was $66.33 per barrel of equivalent oil, considering product mix, trade discounts, gas pricing, and the effects of the NDFs. The break-even cash cost was $30.55 per barrel equivalent, slightly lower than the previous quarter, resulting in a margin of $35.78 per equivalent barrel of oil. We closed the quarter with a cash position of BRL 1.7 billion and net debt of BRL 1.2 billion. Leverage decreased to 0.9 x net debt to EBITDA from 1.01 in the previous quarter and 1.1 at the end of 2025. The cash position increased in the quarter, supported by operating generation, even after the payment of BRL 100 million in interest on equity in August. The debt profile remains comfortable.
The dollarized average cost remained at 6.12% per year, with a duration of 3.4 years and principal maturities concentrated in the long term. The combination of robust cash, low leverage, and elongated debt preserves our flexibility to execute the strategy, finance projects with good returns, and capture growth opportunities without compromising financial strength. Free cash generation reached BRL 134 million in the third quarter, an increase of 81% compared to the BRL 74 million recorded in the second quarter. When adjusting for the seasonality of interest and debenture swaps, free cash generation reached BRL 148 million, remaining stable compared to the previous quarter. In 2026, we have already paid BRL 200 million in JCP, equivalent to BRL 0.68 cents of a real per share, representing a dividend yield of approximately 7% in 2026.
In addition, the BRL 300 million dividend distribution schedule approved in December of 2025 remains in force with installments of BRL 100 million to be paid in December 2026, 2027, and 2028. These numbers reaffirm the company's ability to combine capital discipline, financial strength, and recurring return to shareholders. I now give the floor back to Firmo.
Thank you, Rafael. Taking advantage of this opportunity to announce the name of our new Vice President of Subsurface, who will continue the work started by Troy in the design and implementation of our management strategy for our reservoirs. I hereby acknowledge and thank our dear Troy Finney, that is at the end of his chapter, a 26-year chapter at PetroReconcavo at the end of December.
Although he was unable to participate in this last call, I cannot fail to praise the contribution of a PetroReconcavo native who recruited, trained, and developed our people as they are today, in addition to having helped build the PetroReconcavo way of managing mature fields in Brazil. Troy, we wish you all the success and happiness in your new adventures, and we will always be in contact with you, sharing our future successes. Troy and Peter will now make the transition process, and you will have the opportunity to get to know Peter better in our future meetings. In closing, I would like to reinforce our vision once again.
Achieve the state-of-the-art in the management of our reservoirs, maintain Brazil's benchmark status in the management of mature onshore fields, implement long-term value generation projects through secondary recovery initiatives to mitigate natural decline and increase the recovery factor of our reserves, continue to seek greater operational efficiency and execution capacity using the experience accumulated over the last few years in the operation of mature fields to increase the resilience of assets and extract more value from our current base. Allocate capital with robust discipline, directing resources to opportunities with higher returns, and preserving flexibility to adjust our decisions whenever we identify more efficient alternatives. All of this is supported by a solid financial structure with low leverage and high liquidity, which allows us to execute our strategy safely and at the same time maintain the capacity to capture new opportunities.
The combination of these pillars, subsurface management, operational execution, efficiency, capital discipline, and financial strength is what we believe will continue to sustain cash generation and value creation in the long term for PetroReconcavo. Thank you once again, everyone, for your presence, and I will return the floor to Marília to start the Q&A session.
Thank you, Firmo, Rafael. We have a question from Citibank. What is expected for the fourth quarter, and then after the maintenance of UTG Catu?
This year, thank you for the question. This year, we adjusted the strategy with the objective of finding the balance point in the workover activities, and especially in the workover activities, to balance CapEx and give time for the recovery project, secondary recovery projects to begin.
We're still starting, but in general, in the production of the company, especially in terms of oil, already respond to the strategy. The expectation is to have stable production. In the new plans, there is no radical change expected for the fourth quarter, considering the application of capital as well as in the return for production. Our expectations are to go back to the production levels that we had before the interruption that we announced in Catu, and also stabilize the production until the end of the year. This is our vision for the end of the year. I don't know if you want to add something.
I just wanted to add that. We talked about the interruption, and it's a little different from the interruption that we had in 2023 when it was not planned. Over here, it is an interruption according to the needs, of course, for maintenance of the plant, but also with the protocol for our associates. We have the expectation of concluding this interruption and going back to the levels of production that we had before, which is different from that period where we had to recover production when we had that unplanned interruption that happened in Tucano do Norte at the end of 2023.
Okay. Tasso from UBS asked, "With this, do you have any risk of not being able to go to 100% of the level impacted?"
Yeah, that was the answer. Yeah, it was exactly what I said. It's slow, but we have prepared for this. We prepared, we planned this interruption, and we took care so that the production could go back to the previous levels.
Okay, next question is from Rodrigo from BTG about the repressurization and water injection projects, Sabiá and Riacho da Forquilha. Is there a response, where you can measure the pressure or the production of the field? What is the realistic deadline for this effect on the curve?
In the discussions with all of the stakeholders, not only the investors, but also with the board, in 2025, when we directed our strategy to a much bigger focus in the secondary recovery, the question that always comes up is, how much time does it take to get a return? When we talk about the technical answer about the reservoir, it is not a satisfactory answer because it depends. It depends on the reservoir, the permeability. It depends on the injection project.
In several of these projects, there is an initial phase called fill-up, and that is the phase where injection is basically occupying the space before the pressuring starts again, repressuring starts again in the reservoir. We tried to wait to answer this question. We waited to have a more visible response, and then it comes in two different ways: pressure that we monitor, and the final answer, which is the most correct one, which is production. In this presentation, we try to provide a view that several of these reservoirs, and today we have a huge plurality of reservoirs. Some of them, we have been doing water injection for 20 years, and others we started injection in 2025, and others we started injection in 2026. Each of these have a different maturity.
But the answer, the way we try to present it, is that the strategy, not that there is any question about this, because it is a global strategy for management of mature fields, and just to provide these strategies and the reservoirs that we chose from 2025 until today, definitely they are already showing the first signs that the support to this depletion, this strategy that we are using, they are beginning to give us results. But the intention was to show, more than anything else, that we have discipline in our investment, and we are not really trying to just characterize the return in each one of these reservoirs, because definitely there is an approval plan for the project, but then there is an expected return, and it is better to wait to have more robust results so that we can calculate them properly.
Okay, the next question is from the Bank of America, and if we can actually update according to the new campaign and how this affects the CapEx in 2027.
In 2026, we established a reduction of more than BRL 1.1 billion to BRL 850 million, and we are going to deliver according to this expectation with the injection projects and also the injections and the workover projects. This year, because we have been saying this, and it is true, that PetroReconcavo, as from the efforts it made, there is a whole maturing process in its perforation and drilling campaign, and it is very relevant. We have the implementation of technology and new processes in PetroReconcavo, and there is the objective of diminishing the costs of new reserves. These drilling costs, they have a mechanic that has been reviewed, and in the future, they will come back.
My expectations are that we will have some projects in the last quarter, and then next year, we're going to have a drilling portfolio that will be more similar to the workover and injection. This year, we did a lot more workover and injection compared to drilling, and next year, this should go back. But the level of CapEx that we're projecting is always around BRL 800 million-BRL 850 million, total CapEx in terms of reserve and others. We believe that as a result of this, we can structure the company for a solid production basis with capital returns, and we also allow a perspective to increase production as these programs are implemented.
Still about CapEx, we have a question from BTG asking if there's any minimum CapEx for us to have stable production.
Well, that's a recurrent question. Thank you for the question, and the answer is a little more complex. It really depends on what phase you are in the project in terms of secondary operation. In the beginning here, for example, the options that we made this year, we have the option of not having production increase through drilling or a more aggressive workover, so heavy workover to get a bigger production, because we believe that repressurization of the reservoirs will bring a drilling campaign and a workover campaign that are much more advantageous later on. So it's a choice in our investment, and we want to get capital returns, and we saw that PetroReconcavo's capital returns needed to be focused on when we talked about secondary drilling. They needed to go back to having growth in terms of capital returns.
There's a number that says, "Okay, if I invest this amount of quantity, I can remain with the same production." It really depends on how many water injection projects you need to do to have that. But what is the vision of the future? What happens? It happened in Humaitá, during 25 years of production. It will happen in the projects at PetroReconcavo. When you do that, you have a project that will give you return after two or three years, which is different from the other workover and repressurization projects that give you a return the following year or the two months after.
This adjustment that we made this year, and this year we adjusted to be able to bring production to a level that is very similar to what we're talking about now, it was the adjustment that was necessary to set up this base and to start developing from then on. I would say that today, observing this year, if we reduced CapEx from BRL 1 billion to BRL 850 million, adjusting the investment balance between workover projects and secondary recovery projects and drilling projects, that we were able to be stable. This is a number that we have. Obviously, this is going to change next year in terms of how we're going to allocate the capital. The more emerging projects of secondary recovery were done this year.
There are new projects in the portfolio that we are going to implement, but I reserved some space in the portfolio next year to get the balance between workover and drilling to be a little more daring in terms of drilling, as long as the observations that we have today in each of these reservoirs allow us to accelerate drilling, because drilling definitely is one of the consequences of the secondary recovery project.
Now until the end of the year, a question from Gabriel. If the company can make a catch-up to get a CapEx of BRL 800 million this year, and if we should actually see a smaller number in terms of CapEx.
The projection of the CapEx at this level, I think there are allocations in the CapEx that can pull over to the next year, but the expectations are to maintain them at this level.
Next question is from Sakura, and in terms of the commercialization contract with Brava, what is the initial evaluation, really initially after the first month with the adjustments made?
This contract is already generating a lot of value. The negotiation, of course, tried to provide predictability in Brava and to increase our discount. The discount in this quarter was better compared to last year, and we continue to evolve. But the contract has already had effects on the results of this quarter, and they are very good. Now, what we need is I am still concerned about there being a condition of only providing oil at one point in [Rio Grande do Norte] . Now we are developing the option of doing it in two delivery points, which I consider to be the correct way of having production resilience in the future. Our contract has already given a lot of positive results.
Gabriel Francini asked about UTG Catu and Miranga, and if we could talk about the economy with the processing capacity in Catu compared to the other project, the Miranga project.
Oil from Bahia and Potiguar, there was a characteristic that the projects in Potiguar had greater urgency because the commercial inefficiency of these projects in Potiguar, it is huge. The discount in oil is very big. The oil processing or the cost of oil processing was very high. That is why we attacked it in a much more urgent manner. In those solutions, we were able to achieve the results that were expected in terms of our return. In Bahia, the oil discount as well as the gas treatment, they are in more reasonable levels.
That is why all the time that we developed our plant, we maintained discussions with Petrobras saying, "Look, it is not that difficult for us to find a commercial solution." It has to come from two assumptions, commercial improvement, of course, and that is not material or anything. It is not 40% or 50%. It is smaller, but it also gives me the ability to foresee and to invest in getting more gas without the risk of not having processing. This structure for commercialization here and this discussion here in Bahia was more in terms of resilience and harmonization of our future plans for gas development than the price, because the price was not that high compared to what we have in Rio Grande do Norte Definitely, it is better.
As a rule, I do not publish my private contracts with my customers or my partners, and I think that is the correct thing to do. Everybody will be able to observe. PetroReconcavo, we have had a drop over the last few years, and we are still generating, and we are still doing that, and this is going to be observed, a greater reduction now with these contracts that close next year.
Rodrigo from BTG asking if there is any update about the renegotiation with Bahiagás.
The process is a public process. It is well-known, and it is moving forward. Of course, we have to wait for Bahiagás to finish its governance to be able to announce it.
Conrado from Safra said, "We have a good performance in this quarter in terms of non-recurring debts. Do you think that this can be maintained in terms of the adjustments, and are there any specific cases that need to be reviewed?"
None of these things have to reduce. What about the promises we have? In 2026, we were able to maintain good stability in terms of cost, much smaller compared to the previous year. There is always a challenge, right, in terms of processes, and we are trying to continue this reduction progressively and item by item. I think it is still in the pipeline. With regard to that situation in Boqueirão, it was a unique case. We cannot really give you details about the case, but nothing really concerning.
The next question from Bank of America, "Do you expect a new reduction in the lifting cost in the barrel in the third quarter, even with Catu, and a higher cost of energy in Bahia? Looking forward, what is the lifting cost that is sustainable?"
Our perspective of the lifting cost, João is going to talk about the promises we have, right? But we wanted to place in the company a process, a transparency and visibility process of the management that would allow us to always looking at our performance, current performance, and our past performance, always trying to get better efficiency in a pragmatic way. This is what we implemented over the last two years to be able to get to most of what we considered to be easier.
Now, the lifting cost, it is being observed quite closely, and I would not say there are material opportunities of the possibility of reducing the lifting cost. There are many alternatives and many initiatives, technological efficiencies that we are going to try to use to reduce the lifting cost, but I do not really see any perspectives of a lifting cost or a rupture in the lifting cost that is really big from now on. The great difference per barrel in the lifting cost is our capacity to increase the number of barrels, and I think that is going to be the big topic. That is my perspective, of course, with a lot of pressure that we place on the system. Our mantra over here is we are only owners of these fields because we were able to operate them more efficiently than any other operator.
The reason why with [Himalos] we were able to extend its useful life for 25 years, and we brought 5x the reserve that was meant for it, that was expected for it, is because of our capacity, our capacity to do this efficiently. The assumption in terms of recovery at PetroReconcavo is the reduction of the lifting cost, yes. I think one year, the stability that Rafael mentioned, it's a reflex of this established process. We were able to reduce costs, operational costs, and the general expenses 15% this quarter compared to the same quarter in 2025, and we maintain a huge stability. This follow-up allows us to understand where the biggest transformations can be done from now on, and they need to be structural. It's a good example of what we were able to do throughout the year.
It was the reduction of the taxes with repairs and what was established in a specific project. We were able to address the repairs of the wells better. This reflected not only a smaller cost, but also greater availability of our equipment to do this kind of operation. That's the kind of thing we continue to do. We're not satisfied with the levels we've reached. This is much bigger, but the objective is to improve these cost levels from now on.
I would add, he asked per barrel. Of course, in our case, if it's in dollars per barrel, we are benefited by the recent depreciation in the exchange rate. There's going to be an interruption by PGN, but continuing at this level, this is positive when you think about the cost per barrel in dollars.
The next question is about capital allocation. It was done by Gabriel from Citi, and Tasso from UBS, and the people from Bank of America. I'm just going to put all three together, saying that there's a lot of cash and leverage is below one, and the company has. What are we telling the shareholders about how much they're going to get? Is that going to change in terms of capital allocation?
I think I'm going to provide the same response that I have discussed with everyone. Every quarter, we do our internal exercise religiously with the board about the allocation of capital. In this quarter, cash generation plus what was recovered, we considered that the payment to be made in December was the focus of the cash generated in this quarter.
This was the decision that the board had to ensure that what we developed in this quarter and with the commitment we already have in terms of payment for the year. The next quarter, we're going to do the same exercise. The strategy that we have is to maintain the company absolutely flexible for M&A opportunities, for investment opportunities, and for decisions for the allocation of capital in our reserves, and also making this decision every quarter together with the board.
To conclude, it's a question from Montanari. With the current position we have in Brazil today, do you still see opportunities for investment in the next few years?
My answer is definitely yes. Maybe with the same view that I had when I got here, that maturity of our ecosystem in Campos and Santos, in mature fields, it should lead us to what we see in the whole world. It is partnerships, joint ventures, and this will be more common than changing in the structure of the company or anything else. Onshore has moved towards what I believe in, which is systemic efficiency, but there is still a lot to be done.
There are still many fields, many wells, and a lot of structure that could operate much better and generate value to two or three companies if these partnerships are developed and there would be better outcomes. I see many opportunities, and we continue to interact with our partners about this. In some cases, we were able to structure them, as we saw in Amadeu. We will continue in terms of great M&As.
I agree with him, so the perspective is one of being calmer over the next few years, but I still feel that in terms of fields, in terms of structures, there is still a lot to be done to be able to gain general efficiency.
Okay, I think we can end here. Thank you very much.
Thank you.