Earnings Call: Q3 2026

Nov 20, 2026

Summary

9M revenue reached €1.8bn and operational profitability €316m, while backlog set a record at €5.2bn. FY operational profitability guidance rose to €415m–€430m; execution and steel-market volatility remain key risks.

Operator

Good day, ladies and gentlemen, and welcome to today's analyst briefing of Cenergy Holdings Trading Update for Q3 2026. Before we begin, please note that this event is being recorded. All participants are currently in listen-only mode. The Q&A session will follow after the presentation. If you would like to ask a question verbally, please use the raise your hand feature, which you can find in the bottom right corner of the video player. Then you will have the opportunity to speak and ask your question. If you prefer to submit your question in writing, please use the chat box at the bottom of your screen. I will now hand over to today's host. Please go ahead.

Alexandros Benos
CFO, Cenergy

Thank you so much. Good evening, ladies and gentlemen, and welcome to our company's 2026 Q3 trading update. I am Alexandros Benos, the CFO of Cenergy Holdings, and without further ado, let me list the four important highlights of the third quarter of the year and of the first nine months of 2026. The performance for nine months was really strong, and that guided us into upgrading our full-year estimate of operational profitability. I will come back to that in more detail in a while. Secondly, we have recorded a EUR 5.2 billion order backlog, which is an all-time high for the backlog of both segments, with awards both in cables and steel pipes. In Q3, we received our first HVDC project, as also the cable segment was qualified for the 525 kV projects.

Finally, we keep on investing ahead of demand, as is clear from the doubling of capacity for the Thiva plant producing land cables and for the Baltimore plant in the U.S. I will come back to those in a minute. So, our revenue reached EUR 1.8 billion, 15% higher than the corresponding period last year, with operational profitability following at EUR 316 million, 21% higher than nine months of 2025, with an adjusted EBITDA margin of 17.7%, almost 90 basis points higher than the corresponding period last year. The operational profitability translated into EUR 186 million of profit after tax, 26% higher year -on -year, and this, of course, led us to upgrade, to increase our guidance for the year-end operational profitability , from EUR 415 million to EUR 430 million of profitability. The bar charts show clearly this strong growth in the last two years.

We are comparing here nine months of 2024, of 2025, and 2026. Without going into the numbers one by one, I would like to actually draw your attention to two things. First of all, that the turnover increase in these last two years was really strong, with an average of 20% per annum, and that increase in the turnover translated into operational profitability adjusted for one-offs, EBITDA, then profits before tax, and profits after tax, all of them showing an increase of more than 20% year- on -year. It is also clear from this slide that Cenergy Holdings puts value before volume, as it is shown by the profitability rising at a higher pace than the turnover. The quarterly performance is also quite solid.

Since Q2 of 2026, the revenue increased more than EUR 600 million after the full inclusion of Thiva's expanded capacity in land cables, and the operational profitability for all quarters of 2026 stayed above EUR 100 million per quarter, which is 10% over the corresponding Q3 of last year. This is clear from the new land cables capacity of Thiva that started ramping up at the beginning of 2026. Q4 is also expected to finish strongly, both in PBT and profit after tax. The performance also allows us to deliver on our promises, both in earnings per share, which are close to EUR 0.90, an increase of 26%, with a very strong return on capital employed above 26% for the nine months of 2026.

Turning now to our major piece of news, I would say, for Q3 of 2026, which is our entry into the HVDC market, first with the 525 kV qualification of Hellenic Cables, followed by the EUR 1.5 billion Corinth–Kos award, which really marks a new page on our segment's performance. The first thing here is that the 525 kV certification, qualification in a sense, is important because the Hellenic Cables segment was qualified both for submarine and underground applications. The cable passed all tests for continuous operations at 80 degrees Celsius, and it clearly positioned Hellenic Cables for large offshore grid programs in Europe, where HVDC is really becoming the dominant technology. The underlying reason for that was also briefly noted in one of our previous meetings.

It is the fact that the distances over which electric power has to be transported increase, and as distances increase, we have to use DC technology, and being present in such a market is an absolutely necessary condition for growth of our cable segment. The Corinth–Kos project is the first that was awarded to us. It's a 320 kV project of transmission of 1 GW. It is of total 1,290 km of cable, most of them, the great majority being submarine, only 30 km underground, relaying the mainland grid from the city of Corinth, where the first converter station is, to the Dodecanese Islands, the island of Kos, where the other converter station is found.

That project was actually done as a cooperation, I would say, as a project managed by Hellenic Cables, but it includes, of course, installation of cables by Asso.subsea and the production of the so-called insurance cable, or NDR cable, by Nexans. The project is expected to complete in 2030, but already in this Q4, this quarter, works have started, especially by Nexans, in studying actually the sea depths to find out how the cable will be laid two and a half years from now. So, it's an important step forward for the company, and we're expecting some more HVDC projects to come towards our company in the short future. The backlog, of course, once we have added EUR 2.7 billion of awards by the Greek IPTO, has increased considerably to EUR 5.2 billion from EUR 3.4 billion in December 2025.

For Hellenic Cables, that has jumped, as expected, of course, from EUR 2.9 billion to EUR 4.8 billion. This includes actually the two projects I have talked about, which are valued at EUR 1.5 billion and EUR 1.2 billion respectively. In that nine-month period, there is almost EUR 1 billion project which have been executed. Whereas for Corinth Pipeworks, the jump has been smaller, but it is still impressive, from almost EUR 500 million to more than EUR 650 million in the first nine months, with a corresponding EUR 400 million of projects executed in the first nine months of 2026. Geographically, the backlog is actually a little bit different between the two segments. What I mean from that is that if you look at the backlog of cables, it is clear that almost everything is found in Europe, 61% in Greece, the IPTO projects, and 37% in Europe.

For CPW, it is a little bit more, I would say quite more diversified geographically, covering the Americas, Europe, and Africa. The African project, the main African project being the Rovuma LNG pipeline, which we have disclosed in September, and it is valued at around $250 million. It is a 250 km pipeline produced in the LSAW technology. In what concerns the applications of our products, the sectors in which our products are used, Hellenic Cables is heavily axed towards interconnections with 76%. Wind offshore is now a much smaller percentage of the total backlog, while CPW is a little bit more balanced, with again, gas, fuel, and oil taking an important part, hydrogen and CCS around 25% of the backlog. Let us talk a little bit now, because these are actually numbers that have already happened.

Let us talk a little bit about the outlook, not only for the three months, actually the one and a half month which is left of 2026, but also of 2027. What is clear, I will start with cables, what is clear from cables is that the demand is a structural demand for cables. We do have demand for grid replacement, for grid expansions, for cross-border interconnections, demand for cables in offshore links, in data centers, HVDC demand. It is a very strong structural growth profile, and it is also actually reinforced by the quantified European transmission requirements, which you have seen maybe with the numbers published by the ENTSO-E, the European Organization of TSOs, which indicate a very large number, 34,000 km of DC cable demand in the next 10 years. For cables, what do we have in front of us? We do have a structural and diversified demand.

We have visibility for the next five to 10 years with large multi-year backlogs. Ours covers at least four to four and a half years in the future, so it actually touches 2031, with the competitor capacity additions coming up as well. The market, I would not say is waking up, but is clearly reacting to such strong demand. Finally, of course, the returns depending on a lot of parameters, the utilization of our plants, the project mix, and the execution quality. That is why we have been saying for the last one year and a half that the most important risk we are facing right now is execution risk. If execution is perfect and flawless, as we have achieved until now, the returns will come. They will maybe slightly different from quarter to quarter, depending on the project mix, but the returns will come.

When you look at the steel pipes, the story is a little bit different, and it is a little bit different because the steel pipes do not really enjoy this structural demand. It is more of a market led by specific projects. The activity is substantial for gas, for LNG, the offshore activity, a little bit less the onshore activity, all around the different geographies, the Eastern Mediterranean, North America, and the Middle East. But it is dependent on the FIDs, the final investment decisions, the awards, when those projects will be finally released. The problem, the issue right now in the steel pipe market, actually the welded pipes market on which we are focusing, is not the actual existence of projects. It is when these projects will find the right financing, when these projects will come to a final investment decision, and what will be the distinct timing.

To give you a little bit more detail on that, we try to differentiate. Of course, we do have natural gas and oil as our first priority, as our largest part of our backlog, but we try to differentiate between those fossil fuels and hydrogen and CCS. On top of that, the companies, our clients, also differentiate in terms of approach specification, steel quality, welding quality, testing, lifecycle reliability. All of these are important because the players are very big, we are talking about the oil majors, and the suppliers are quite limited. There are three, I would say, maybe four global suppliers of welded, large-diameter welded pipes in the world, Corinth Pipeworks being one of the top tier ones. It is also a question of regional infrastructure.

We see that the war in the Middle East and in the Straits of Hormuz and all of that geopolitical uncertainty has created the need for geographic diversity in order to reduce dependence on a single supplier. What does that mean? It means that we can look at the Middle East, the Eastern Mediterranean, Europe, or North America as project pools, areas where each of these has projects of different nature, of different specs, of different requirements in order to build up the infrastructure needed in the specific geographical area. In that market, there is a lot of input volatility, input cost volatility, I would say. Steel markets are, I would say, quite tight. There are quite big changes in price from week to week. Freight tariffs are moving up and down.

Energy is also moving up and down, although in the case of Corinth Pipeworks, this is not a major cost input. You have local content requirements that can change how one supplier can react or can respond to a demand, and that can materially change the economics of the bid. What does that mean for us? It means that, A, our new plant in the U.K. is an important step because it actually bypasses local content requirements for the U.K. It is positioned strategically for the North America projects because of shorter transportation routes, and it focuses on high-spec applications since this is a plant that has a large LSAW capacity. I remind you, the LSAW pipelines are the ones that are suited for the most difficult projects, I would say, the most sophisticated ones.

It is also important to, in such a market, to use a disciplined approach to bidding. We are not really bid for any project that will come up, because we have to manage steel, freight, and tariff volatility. Our priority is really to turn this backlog, which is really strong, into cash, to convert it into cash, and try to pass through the raw material price volatility to the final customer. In a nutshell, I would say that the implications for Cenergy are as follows. First of all, selectivity. We cannot really go for projects as we find them in front of us. The strong demand should not dilute contract discipline. Second implication is that we have to convert this backlog into cash.

The finance lens through which we are looking at projects is quality of milestone payments, working capital absorption, change of order governance, because not usually, but there are cases where the orders change during the execution of the contract, especially in steel pipes. Finally, to protect the planning and production schedule, because a change in the production schedule might be very costly. The third point is that we try, and I think up to now we are achieving that, we are investing behind positions which are defensible. Defensible means that we are investing in HVDC, we are investing in North America, where the structure of the market cables is extremely strong.

We are putting a lot of efforts on subsea execution, on high-spec pipe capabilities, and all of that, in a sense, create intrinsic barriers to entry for our, I would say, protected for our niche segments, both in cables and in pipes. Finally, we have to monitor very closely any divergence from this cycle. Cables, I would say, benefit from a larger, a broader infrastructure cycle. Steel pipes, however, require very close tracking of project sanctioning, of geographic concentration. There are right now investments by Indian pipe suppliers around the world. The reaction by U.S. pipe mills is important, although they cannot produce the projects which are awarded to players, to producers like us. There is a lot of movement, I would say, in the steel pipe market. That is why a close monitoring is important.

As a bottom line, I would definitely say that these market developments reinforce our portfolio logic. What is this portfolio logic? This portfolio logic is that cables offer structural demand, high voltage DC capabilities, whereas pipes will offer the selective upside from a broad infrastructure fund. My personal priorities as the Finance Director of Cenergy is to protect the capacity which is becoming scarcer, to manage risks that come from raw material volatility and policy issues, tariffs, et c, to secure the milestone payments so that the backlog is smoothly converted into cash, and to distinguish really the financed projects from entry-level marketing announcements, I would say them, with a lot of being written about great cable connections across Europe or pipelines that will run from the Himalayas to Turkey.

All of these announcements might seem very promising, but our job is to go for projects which are realizable, which are doable, and which have strong financing behind. Closing up the discussion this afternoon, all the above, all of the previous, allowed us to estimate our year-end profitability on the upper end of the previous range. That is why we increased our guidance to an interval of EUR 415 million -EUR 430 million, 20% and more higher than last year. The usual caveat, of course, applies. Assumptions necessary for that are smooth delivery in both segments, no extreme disruptions, no significant changes in geopolitics, and so on.

But these are standard assumptions that are used for the year-end guidance, given that we are now one and a half months before the end of the year, we are very confident that we will be inside that interval. Closing up, our next appointment will come in March 2027 for the full year 2026 results. The first years of March, we will have the press release and the conference call, and by the end of March, the publication of the annual report. Then in May, we have the Q1 2027 trading update, then the OGM, and so on for the rest of the year. I would like to thank you very much for your attention until now, and I give the floor back to the operator to guide you through the Q&A session.

Operator

Thank you. Ladies and gentlemen, we will now move on to the Q&A session. If you would like to ask a question verbally, please use the raise your hand feature on the bottom right corner of your screen. You will then have the opportunity to speak and ask your question. You may also submit your question using the chat box. Our first question comes from Bakar Bowen. Please go ahead. Make sure you unmute your microphone.

Speaker 3

Sorry, am I now?

Operator

Yes, we can hear you.

Alexandros Benos
CFO, Cenergy

Yes, we can hear you.

Speaker 3

Thank you so much for taking my question. I have one on the submarine cables business. How should we think about the sales growth for this business going forward into 2027? My understanding is that we are already perhaps running at full capacity utilization in 2026. So, how do you think about 2027? Is it going to be mostly driven by the project mix that you execute on going forward, or are you also planning any capacity expansions there?

Alexandros Benos
CFO, Cenergy

No, we will just run on the backlog that we have right now on submarine cables. There is no capacity expansion planned in the short term for the submarine cables plants.

Speaker 3

Thank you. The second question is on your adjusted EBITDA margin for 3Q. It dropping to 16%, and this is the lowest we have seen for a 3Q in the last three years. Is this like a function of a high metal price on the project mix that you have mentioned in the release?

Alexandros Benos
CFO, Cenergy

No, it's not a question of metal prices. It is a question of product mix, as mentioned in the press release. It's the fact that since the beginning of the year, I don't know if you followed my Q1 trading update call, but where we had this great 19% margin in Q1 of 2026 for cables, I had mentioned at that time that that was expected to fall because in Q1, we did not yet have the extra capacity, therefore the extra production of land cables. It was, in a sense, the revenues of Q1 were imbalanced in favor of the submarine projects, and the submarine projects have a much higher EBITDA margin of 23%, 25%, 27% sometimes. As the new land cable capacity came in, we have executed more land cable projects in the last four to five months, gradually bringing down the EBITDA margins.

It's really a question of product mix. You should be looking at margins for cables over the year, which are at the level of 25% and even higher, slightly higher. As I said in previous calls as well, the cables EBITDA margin is a weighted average of projects and products. As these weights change throughout the year, quarters might show some increased volatility. But overall, the shift, slow as it may be, the shift is towards the projects business, meaning that we go slowly to higher margins towards the 20% level. But that will take years because you don't have weights changing from 30/70 one year to 70/30 the next in order to have a big change. The cables margin is something that is moving slowly upwards, and it is a chosen decision, a decision from us to boost projects and boost high-margin business units, in a sense.

Speaker 3

Thank you so much.

Operator

Our next question is from Thijs Berkelder. Please go ahead, and please don't forget to unmute your microphone.

Thijs Berkelder
Analyst, ODDO BHF

Hi. It's Thijs Berkelder, ODDO BHF. I have a question on your backlog and relate to that to your margin guidance. Can you confirm that your reported backlog includes the Nexans part of the IPTO project or not? Does also Q3 revenues and probably also Q4 revenues then include, let's say, that low margin part for you of revenues? My second question is more on steel pipes. You're saying the U.K. plant will go into production in Q4. What kind of factory utilization should we roughly assume in 2027?

Alexandros Benos
CFO, Cenergy

Okay. Thank you, Thijs. Yes, the backlog includes the part of Nexans, but let me, because there has been a lot of discussion on that. Nexans is a subcontractor of us, okay? They will, in a sense, produce the cable for us. It's Hellenic Cables which will invoice the full EUR 1.5 billion to IPTO. So it's like having a subcontractor for nuts and bolts, for cables, for other services. Nexans is not issuing any invoice for the Kos–Corinth project directly to IPTO. So they are just working for us. Of course, the revenue of EUR 1.5 billion, which is included in the backlog, includes not only Nexans cable, but also the price paid for the cable laying vessels and so on.

As in any project, and let me be very clear, any project that we have as the main contractor, as the project manager, includes payments to other companies, whether they are Nexans or anyone else involved in the production and laying of the cables. Now, the question about the steel pipes plant. The U.K. plant was acquired in March. It was a plant that offers a lot of advantages. I think I've mentioned them quite often. The high technology, the mentality of the working staff there, the location, the large land plot, and so on.

But let's not forget that it was a plant closed for six months. So, that plant had to be cleaned, recommissioned, the equipment had to be recommissioned, raw materials sent over there, some sample production made. The actual production will start in Q4. For 2027, there will be a ramp-up as well, and we believe that by the end of 2027, we will have the full capacity of around 100,000 tons of LSAW produced in the U.K. But it is a ramp-up period. It will take some time, and it starts with projects that we have already won. Projects that we have already won, some of them will be produced in the U.K. plant.

Thijs Berkelder
Analyst, ODDO BHF

That's clear. Thank you.

Operator

Those are all raise-your-hand questions. We can now move on to the written questions.

Alexandros Benos
CFO, Cenergy

Sure. First I have a couple of points made by Mr. Sajek on the publication of the earnings slide before the earnings call. This is not possible. What we are doing is publish a press release, and then during the analyst call, we are just presenting the numbers that we present also in the press release. Believe me, there is nothing in the earnings call that is new information or whatever. It is just a more detailed information. Going to the heart of your point, the information about the announced production capacity increase in Baltimore. The Baltimore factory was decided, we decided to build such a factory four years ago. In these four years, lots of things have happened. Our initial decision was a cautious one, was a decision to build a factory focused on land cables, on medium voltage land cables.

We started building a plant which would also produce high voltage land cables, because we could see that such a demand was present in the U.S. The decision to increase capacity in Baltimore, taken by our board of directors a couple of months ago, is just a decision, is simply a decision to add some insulation machines in buildings which already will or will already be existing by the time we start our investment. The point which is of importance here is that the original CapEx of the U.S. plant, which, and I repeat the numbers, which can be broken down as follows: $30 million was the land plot, another $200 million is the construction, then you have another $60 million-$70 million for equipment. So we are talking about a total of $300 million.

That is not when you want to increase your capacity by adding two insulation lines, you do not spend another $300 million. You spend an amount which is much, much smaller, maybe 20%, 25% of that amount in order to buy and install the two extra CCVs or three extra, whatever, how many we will need in the U.S. The timing of the decision was two months ago, but the actual investment, the arrival of the equipment will not happen until the beginning of 2028. So once the machines arrive in 2028, these will be operational and adding to the capacity, to the production capacity of the factory in, I would say, by the end of 2029. As far as orders are concerned, I have also said in previous calls that the interest from the American utilities is very strong.

We are talking about a market which waits almost a year before they get their cables delivered. Therefore, it is not a question of price competition, it is not a question of us being cheaper, it is just a question of us being there and producing cables. When? Nine months from now, in September 2027. Therefore, there are utilities that come over and start First of all, they are all discussing with us some agreements, but even some of them start placing orders 11 months before the factory is operational. This is just a very strong point from us. I would not say that right now I have half of the capacity of the factory filled up. It is almost dreamlike to believe or to expect something like that.

But already to have a new producer, a greenfield producer in the U.S., a non-U.S. original and originally non-U.S. company, building a factory in Baltimore and already having very advanced discussions with utilities of the East Coast for agreements that span the next three to seven years is an extremely optimistic point. Okay? And that's what I would like really to stress in this call. There is a question from Mr. Vassilis Karnapatis of NBG. How do we expect CapEx to evolve going forward? CapEx, as I said, is a point that was really strong these last three years, I would say, from end of 2023, 2024, 2025, 2026. As I said in the beginning of this presentation, we really invest in a very structured way ahead of demand. Now that demand is arriving, we are already invested.

We expect CapEx to decrease starting from 2028, not in 2027, slightly lower in 2027 because we still have the last part of the U.S. investment. So it will not be definitely at the levels of 2026. It will gradually be a little bit lower in 2027, and then from 2028 onwards, the CapEx will be much lower going towards the maintenance level that I have mentioned before. There are questions from Mr. Katsios. I think I've answered the first one about the Halkida plant. The second one on, he says, "Can you give us some color on the inventory loss this quarter?"

Well, it's not, I wouldn't call it inventory loss. It's just a metal lag accounting difference, which is, if I have the correct number, it is something like, let me check out, a small amount of, I think it is, where is it? Find it. It is EUR 4 million accounting loss in, yeah, EUR 3 million-EUR 4 million in cables. So it's just a change, as I've explained in the past, it's just the difference, the price change of raw material that we have in our warehouses, the price change between the time we have bought and actually recorded the value, and the requirement to price them at market at the end of the quarter.

That's it. It's not a financial impact. It doesn't have any financial impact. It's an accounting loss. Mr. Bourazanis is asking a question. Mr. Bourazanis from Eurobank. He's asking a question about the competitive landscape. I mentioned that the competitive landscape is becoming a bit more tight in Europe, with many peers investing in new capacity. So, he asks me to give a little bit more color on the margin trajectory that we expect European cables market to follow in 2027.

Look, Marios, it is true that all, not all, but a large number of our competitors are investing, and it's absolutely expected, and it's absolutely natural. NKT, Nexans, Sumitomo, you can read that they are investing in Europe, also some in the U.S. There are investments in the U.S. from the U.S. suppliers as well. They're investing in plant, they're investing in towers, in production capacity in general. Now, this is something expected. This is something that we expected to happen. It didn't catch us off guard, okay? Will it change the margin trajectory? I don't think so. It will not change the margin trajectory because the investments that were disclosed do not fundamentally produce such an increase in capacity that can change the balance between the current imbalance, I would say, between supply and demand.

So, all of the investments we have read about are investments that increase partially the capacity of, let's say, Nexans or Sumitomo or Southwire, but they are not fundamentally changing the imbalance. This happens because everyone is cautious about creating an overcapacity shock. Therefore, we could see, in theory, some pressure in the future on medium voltage or low voltage, or voltage is already a commodity, so I don't think that many competitors are investing right now in the commodity part of the market. But we could see theoretically some pressure there. But the demand is so strong that that pressure will not materialize as an important change in margins. Our change in margin, again, and I stress that, is due to a different product mix. It's not due that in a project or something else, we had to decrease our margin in order to gain the project.

This has not happened, and first of all, even if it happened right now, the impact of such a new award will be seen in 2028 or 2029 or 2030, because the new awards will be executed at that time and not immediately. Secondly, we have not seen price pressure on the large infrastructure projects, which are important for everyone. So, there is an expected, a natural, I would say, investment by our competitors in new production capacity, but nothing that is too strong to change that imbalance. There are then a couple of questions by Mr. Morfidis. He asks, "With the Baltimore plant expected to start operations in 2027 and plans already underway to double its capacity, have you secured any long-term supply agreements with U.S. customers?

When do we expect the plant to start making a meaningful contribution to the group's profitability?" Mr. Morfidis, I think I answered that above a little while ago. We have some long-term supply agreements. I wouldn't like to disclose right now the signing of a long-term frame agreement. We are very close to doing so. In all terms, the Baltimore plant will start making a meaningful contribution in 2028 and will only start being completely included in its full ramp-up possibilities, in a sense, in its full ramp-up state by 2029.

You then continue to ask, "Do you expect adjusted EBITDA to continue growing in 2027?" Of course, we do, because the backlog that we have in front of us includes projects that were secured a year or two years ago with the margins as they are today, and we expect, of course, adjusted EBITDA to continue growing, not only in 2027, but also in 2028 and 2029. Definitely, we don't expect margins to remain close to current levels. We know that margins will remain close to current levels since, for cables, the 2027 and even 2028 are two years that are completely predefined in terms of revenue by the current backlog. Now, the only risk there is, God forbid, one of these projects going wrong, you know, with us doing something wrong and, you know, I don't know, doing something wrong in execution.

But apart from that, we have the contract signed. We know exactly what the milestone payments are. We know exactly how the copper and the aluminum price will be included in the final all-in price to the customer. We are receiving, or we have received, advance payments from a number of these projects. We know how things will evolve. That same approach is also taken by steel pipes , because steel pipes have increased with the Rovuma project, their backlog to over EUR 600 million, which means that 2027 is also pre-defined in a sense for them as well. What they are now going after is the utilization of their capacity, both in Greece and the U.K., for 2028. Yes, that's what I mean by saying strong visibility. For cables, it's 2031. For steel pipes , it would be 2028.

Then there are a couple of points by Mr. Verbeek. I hope I pronounce your name correctly. "Has Hellenic Cables any capacity left to accept new orders to be manufactured in the next two years? And in case it still has capacity available, is this solely in wind offshore or in interconnections?" Look, Hellenic Cables is, as you know, not a fully project-led company. It has four production sites in Greece, the fifth one being built in the U.S. Well, three in Greece and one in Romania, sorry, in Southern Europe. Out of these, two production facilities are focusing on projects, submarine and land cables, and the other two facilities are producing more commodity products. Is there capacity left for an exceptional order that will come in 2027 for a project, therefore for a high voltage or extreme high voltage, that could be manufacturing starting immediately?

In principle, yes, but that's not our objective. A production plan cannot leave capacity unutilized for the extra order that may arrive in March, in June, or in September. The production planning is done based on the backlog that we have. Right now, the utilization of the submarine factory is almost 100%, three shifts, seven days a week, and it's almost fully utilized as well in Thiva. It's not three shifts, seven days a week, but a little bit less, and with the sixth insulation machine coming in, but we are close to full capacity. So, if something extraordinary comes in and we decide to actually honor it and service it, yes, we will have the possibility of doing it.

But it's all a question of choosing, as I said, selecting what will be produced without, of course, leaving behind projects that were awarded and we need to deliver that are also important, we need to deliver in time. Then there is a question by Stefan Ferencz. "Why did we outsource a part of the Corinth–Kos project to Nexans?" Well, it's not that we outsourced a part of the Corinth–Kos project to Nexans. First of all, it's not a question of being able or not being able to do it. It's not a question of ability. It is a question of a lot of other factors. The most important one being the obvious that the Corinth–Kos project, as I told you, is 1,300 km of cables.

In case we had to do all of that by ourselves, it meant that one of our plants would be totally and uniquely producing for more than a year only for the Corinth–Kos project. I would like to believe that this is not a very prudent risk management approach to production. You do not want your factory to be uniquely axed towards one single project. Therefore, we worked with Nexans. We actually offered them to take the lower voltage, I wouldn't say lower importance, but a lower voltage insurance cable. The Nexans cable is not the connection cable between Kos–Corinth . It is for insurance reasons. It's a third cable that will run in parallel between the two poles, and will be used if and only if one of the two poles falls down, defaults, in order to keep power being transported between the mainland and the Dodecanese.

It is a safety cable in a sense. We decided to outsource that part to keep our factory from being completely devoted to one project, which in risk management terms is a very bad decision in a sense. Then I have to actually pick a final question. By Mr. Verbeek again, he asks about, "With a strong increase in net finance cost in Q3 2026, is it fair to conclude that working capital significantly increased?" Yes, it is. It is absolutely true. Working capital has significantly increased in Q3. Working capital is very closely linked to the needs of production. It's a seasonal or circular thing that will go up and down throughout the year.

Our objective is always to finish the year at much lower levels than the intermittent point in time, and with it, actually, with that lower working capital having also lower net debt, because as you know, working capital is a part of net debt. As for discussing or disclosing these financial, the leverage numbers in between quarters, we have until now followed the path of being quite frugal in information about leverage, especially because we don't want to introduce noise to the market, and we prefer to give numbers about debt and working capital every six months in order to smooth out any seasonal changes between quarters. I believe, I don't know if the operator is online, but I believe that we are very quickly closing up the time slot. I will just choose one final question. There is Mr. Tavlaridis from Fathom Wealth Management Advisors.

He's asking, "How do lower commodity prices impact your top line and margins if they do in the medium term?" Look, I would only say something about steel, because copper and aluminum in the large cable projects are raw material inputs which are totally adjusted in the contracted prices. So whether they are lower or higher, they affect the final price paid by the client and not our profit margin, because our profit margin comes from the processing of these raw materials, turning them into cables. They are not linked in any way to the prices of copper, aluminum. For steel, it might be a little bit different, but as I said, the steel market is very itchy right now. I use maybe the word itchy because it's not something easy to follow. You have steel makers quite tight in giving long-term quotes for the steel we are using.

I remind you, we are using API steel plates, and steel coil. We are not talking about the general steel that you may see prices going up and down, and that is one of our major issues right now, not right now, but issues in general in Corinth Pipeworks, because the fundamental raw material is not a financially traded asset. That is why we are feeling that the fact that we have long-term standing relationships with our suppliers is what makes us better suited or better positioned to withstand these price pressures one way or another.

The steel market is a little bit difficult right now. Fortunately, we do have a strong demand in front of us for steel pipes. We do have very good terms with steel plate producers, voestalpine, Dillinger, POSCO, JFE, Nippon Steel, and so on, as well as coil producers in Europe and elsewhere. We are trying to diversify our supply chain in order to get the better terms without sacrificing margins. I think we are over our time, so I give it back to— I thank you very much for your presence and for your attention, and I give it back to our operator to close down the call.

Operator

Ladies and gentlemen, this concludes today's presentation. Thank you for joining us. You may now disconnect. Have a great day.