Good morning, ladies and gentlemen. Welcome to the Anglo American corporate head office. My name is Captain Grohmann, and I form part of the Emergency Response Planning Team. It is my responsibility as the incident commander to see you safely out of the building in the event of an emergency. There are no planned evacuations. There are no planned emergencies for today. However, if you do hear the very loud PA system, which gives us an audible warning to evacuate the building, I'd like you please to make note of the evacuation points in the building. Incident commander to see you safely out of the building in the event of an emergency. There are no planned evacuations. There are no planned emergencies for today.
However, if you do hear the very loud PA system, which gives us an audible warning to evacuate the building, I'd like you please to make note of the evacuation points in the building, which are demarcated with a little green running man on the top there on the left-hand side. Anybody who's on this side of the auditorium, if you could make your way single file down and escape through that glass door. Those of you that are in the middle of the auditorium, you can use this evacuation point here, and you'll see that those wardens of mine with the orange jackets will be able to lead you safely out of the building. If anybody has any kind of disability, physical challenge, please let me know during the break so that we can actually get you out of the building safely.
I'd also like you just to leave your cell phones and your laptops for now. Do not use, do not hold them and do not take them out when you're going down the stairs. If you find yourselves in the rest of the building upstairs and you need to get out, please do not use the lifts 'cause the lifts actually home. You will not actually be able to use those lifts. Please make use of the fire escapes. Once you're in the stairwells, please make use of the handrails. Make sure that you have a free hand, use the handrails, and keep in a single file out of the building.
Once you're clear of the building, you will find assembly points at the rear and at the front on the Oxford side and on the rear side of the building, and the roll call will be done to establish your location. Once you're in the stairwells, please make use of the handrails. Make sure that you have a free hand, use the handrails, and keep in a single file out of the building. Once you're clear of the building, you will find assembly points at the rear and at the front on the Oxford side and on the rear side of the building, and the roll call will be done to establish your location. If you're physically challenged, remember, please let us know as soon as you possibly can, as soon as you have a break. Thank you. Can you switch that off as well, please? Thanks.
Thank you so much, Captain. Good morning and welcome to everybody in the room and online. I must say this is the fullest room that we've had since, certainly since my start here, and it's actually delightful to be able to talk to real people and not imaginary people online. Welcome, delighted to have you here as part of our presentation of Anglo American Platinum's 2022 interim results. Thank you again for taking the time to join us today. I'm Natascha Viljoen, the CEO, and I'm joined here today by Craig Miller, our finance director. At the end of the presentation, we will have time for questions and answers. I would like to draw your attention to the cautionary statement.
I'm Natascha Viljoen, the CEO, and I'm joined here today by Craig Miller, our finance director. At the end of the presentation, we will have time for questions and answers. I would like to draw your attention to the cautionary statement, which I will appreciate if you could read this in full in your own time. Before we start, on behalf of everyone at Anglo American Platinum, we would like to pay our respects to two of our colleagues who we've lost in this first half of the year. Julian Sesinyi sadly passed away following a slip and fall accident at the ACP processing facilities on the 23rd of November, 2021, when he sustained a serious spinal injury. He succumbed due to a complication while recovering at a rehabilitation facility. He showed tremendous courage and a fighting sp.
Fall accident at the ACP processing facilities on the 23rd of November, 2021, when he sustained a serious spinal injury. He succumbed due to a complication while recovering at a rehabilitation facility. He showed tremendous courage and a fighting spirit in his rehabilitation, and from this, we draw additional inspiration in our work towards achieving zero injuries. Rheina Malatji from the independently managed Modikwa operation tragically lost her life after being struck by a tire from an underground mining vehicle. We send our deepest condolences again to their families, friends, and colleagues. Now despite these two incidents, we have made progress on improving our total recordable injury frequency rate. With a relentless focus, we will further build on this improvement in the second half.
We've made a significant contribution of ZAR 71 billion to society, highlighting the work we are doing to distribute value to all of our stakeholders. We've concluded a groundbreaking five-year wage agreement, illustrating the constructive relationship with our unions and employees, and importantly, improving the stability of our business. It is two incidents we have made progress on improving our total recordable injury frequency rate. With a relentless focus, we will further build on this improvement in the second half. We launched our very popular hydrogen fuel cell haul truck that is a key part of our decarbonization program.
As a result of illustrating the constructive relationship with our unions and employees, and importantly, improving the stability of our business. We launched our very popular hydrogen fuel cell haul truck that is a key part of our decarbonization program. As a result of successful integration of the concentrate debottlenecking projects, we saw significant increase in production from our 2 operations at Mototolo and Unki. Our PGM basket prices were robust in the first half, with a realized average price of $2,671 per PGM ounce, the second highest on record. This illustrates the robust underlying fundamentals for our metals. Now, in line with our balanced capital allocation framework, we are pleased to again deliver industry-leading returns with the first half dividend of ZAR 21.5 billion, equating to 80% payout of our headline earnings.
In the fast-changing and an uncertain landscape we operate in, we continue our uncompromising focus on getting the building blocks for success in place to deliver on our strategic priorities in order to create value to all of our stakeholders. This is underpinned by ensuring safe, stable, and capable operations, and a workplace where every employee can come to work every day being physically and psychologically safe. Now, we continue to navigate the challenging operating context, and we have previously flagged the items mentioned on this slide. It is important to recognize that COVID-19 value to all of our stakeholders.
Now, we continue to navigate the challenging operating context, and we have previously flagged the items mentioned on this slide. It is important to recognize that COVID-19 did change our operating environment. It is further being impacted by disruptions on supply chains, the looming global recession, and closer to home, the socioeconomic and political impact on stability around our operations. It is also worth highlighting that our comparative period, the first half of 2021, had both record prices for the metals we produce, and we had record sales volumes due to being able to process almost all of our built-up work in progress inventory following the temporary closure of our ACP for a couple of months in 2020. In this context, we have returned now to a more normalized level of production, but within a more complex operating environment.
Despite these circumstances, we have navigated the headwinds and continued to produce a strong set of results. Our strategy is guided by our purpose to reimagine mining to improve people's lives, and it is underpinned by the delivery of the objectives set out in our four pillars to ensure shared value for all of our stakeholders. We are building on our performance with ESG measures and continue to be a leader in this area.
We are going beyond just being a resilient business with an aim to thrive through this ever-increasing rate of change. This specific strategic priority forms the basis of successful execution of our strategy despite the fast-changing environment. We have a world-class portfolio of assets in an integrated value chain, and we are maximizing value by pushing for benchmark performance and deploying technology and innovation to drive efficiencies and growth with targeted investments that will generate incremental value. This specific strategic priority forms the basis of successful execution of our strategy despite the fast-changing environment. We have a world-class portfolio of assets in an integrated value chain, and we are maximizing value by pushing for benchmark performance and deploying technology and innovation to drive efficiencies and growth with targeted investments that will generate incremental value.
Finally, our market development work is fundamental to ensure a sustainable market for all of our products. We are leveraging capabilities through our market development activities and capturing value from adjacent value chains. We will highlight the progress we are making in delivering against our strategy throughout the presentation. Now let's start with ESG. As I mentioned, tragically and unacceptably, we lost two of our colleagues in this period. A slip and fall incident resulted in a tragic fatality, and it is a stark reminder that we need to focus on the elimination of all harm from our workplaces. As Julian's accident occurred in November 2021, and aligned with our reporting standards, we will record this fatality in the year that the incident happened, being 2021. We are constantly working towards safe, stable, and capable operations.
During the first half, our total recordable injury frequency rate improved to 2.41 per 1 million hours worked. After COVID, our health approach strives for zero harm, promoting employee wellbeing and optimal levels of health. At our operations, we make sure that immunocompromised employees have their chronic disease under control, with viral load suppressed, and it has been ongoing, an ongoing focus for us through the period of COVID as well. You will see that our TB incident rate has remained the same, but we remain well below the South African average. There are indications though that the focus on COVID-19 management has negatively impacted on chronic disease management in the countries that we operate in. For all of these reasons, we are broadening our health focus to track our employee wellness, now also including long-term effects of COVID-19 and mental health.
In this period, we have commissioned our sulfur dioxide abatement plant at our Polokwane smelter, which has significantly improved the air quality around our operations and reduced emissions to below legislated limits. We continue to manage our environmental impact and have once again had no serious environmental incidents in this reporting period. Employee wellness now also including long-term effects of COVID-19 and mental health. We continue to contribute to building thriving communities where we operate. In the first half of 2022, we have made meaningful economic contributions and added value to broader society.
This totaled over ZAR 70 billion. We continue to contribute to building thriving communities where we operate. In the first half of 2022, we have made meaningful economic contributions and added value to broader society. This totaled over ZAR 70 billion and included our significant contribution to the fiscus, making us one of the largest taxpayers in the countries where we operate. As part of our efforts to stimulate off-mine job creation, we increased our local procurement spend to ZAR 15.3 billion, and of this, ZAR 1.1 billion are with suppliers from our doorstep communities. We invested ZAR 350 million in social investments, community development projects, and dividends to our community trust, as well as ongoing COVID-19 support. We paid nearly ZAR 7 billion in salaries.
We invested ZAR 350 million in social investments, community development projects, and dividends to our community trust, as well as ongoing COVID-19 support. We paid nearly ZAR 7 billion in salaries and wages to our employees. Importantly, we continue to invest in capital projects to ensure the long-term sustainability of all of our operations. Finally, we've paid ZAR 33 billion in dividends in respect of the second half of 2021, which included ZAR 213 million paid to our community share schemes. We balanced this contribution with strict capital allocation and ensuring meaningful returns to our shareholders. In May of this year, we signed a groundbreaking 5-year wage agreement, and I'm looking at Virginia here in front of me, premised on strong foundations of trust with our employees and ensuring meaningful returns to our shareholders.
In May of this year, we signed a groundbreaking 5-year wage agreement, and I'm looking at Virginia here in front of me, premised on strong foundations of trust with our employees and unions. This was signed with three of our four recognized unions, representing 90% of our unionized employees, and enabled the implementation across all of our affected employees. It increases salaries and related allowances, which will increase the total labor cost to company on average by 6.6% per annum over this period. It is an important factor in ensuring stability and is the reason why the negotiation process started earlier this year.
As part of our work with the Anglo American Group, we are collectively evaluating options for multiple forms of renewable energy across Southern Africa, and this includes solar, wind, hydro pump storage, and wheeling renewable energy into the grid. At Mogalakwena, we launched our hydrogen electrolyzer and 300-ton hydrogen fuel cell mine truck. The technology will be commercialized and scaled across the rest of the fleet once the pilot is completed. As part of the overall energy solution for the fuel truck, to fuel the truck from green hydrogen produced on-site, we expect to start the construction of our 100-MW solar plant at the mine at the end of this year. Now, the truck represents the first of its kind in the world and puts South Africa on the global stage for energy solution for the fuel truck.
To fuel the truck from green hydrogen produced on-site, we expect to start the construction of our 100-MW solar plant at the mine at the end of this year. Now, the truck represents the first of its kind in the world and puts South Africa on the global stage in terms of innovation and the decarbonization of heavy-duty transportation. It will also drive demand for PGMs and help create a new economic sector in Southern Africa. A powerful example of how we help address society's biggest challenges. Healthy community relations are vital to the success of ensuring thriving communities around our operations. We are aware of the socioeconomic challenges our host communities face, and we continue to work with our stakeholders to collectively address these. Our focus areas include local employment and skills development, host community supplier development, and procurement, as well as education and health initiatives.
We're working with Anglo American Zimele, where we have intentionally increased our spending with doorstep communities. Recently, we awarded a ZAR 2 billion load and haul contract at Mogalakwena to a consortium consisting of 51% doorstep ownership. Our focus areas include local employment and skills development, host community supplier development, and procurement, as well as education and health initiatives. We invest significantly in education and training with support to bursars and graduates, with ZAR 65 million invested in the first half of this year. We're very proud of our engineering students, who achieved an average of 77% in their exams.
Furthermore, in partnership with the Department of Basic Education in South Africa, Anglo-American launched the second phase of our education program, investing over ZAR 1 billion by 2027 and aims to achieve quality education and training for all children in Anglo-American 's host communities across South Africa. Importantly, we need to produce safe and stable, stably to ensure that we can continue to support returns to all of our shareholders. Let's, from that point of view, return to our production performance. Our total PGM production was down 4%, with the majority of our own mine assets performing better than in the first half of 2021.
Let's, from that point of view, return to our production performance. Our total PGM production was down 4%, with the majority of our own mine assets performing better than in the first half of 2021 and highlighting the benefit of our portfolio of diverse and world-class assets. Despite this slightly lower production, we have maintained strong mining EBITDA margins across all of our operations, as you can see in the blue bubbles on the slide. Operationally, Mogalakwena specifically experienced a number of headwinds, which led to a slow start of the year. We believe we will continue to see improvements into the second half. Amandelbult maintained production despite mined-out areas, which led to infrastructure closures at Tumela at the end of 2021.
Mototolo and Unki, as mentioned, both delivered 21% increases in production, as we successfully implemented the concentrator debottlenecking projects. Now, Mogalakwena, as I mentioned, experienced a number of headwinds in this half. Firstly, unprecedented rainfall, which diverted us to mine in lower grade areas. Delays in delivering of drilling equipment as a result of supply chain disruptions. And as part of our ongoing cultural heritage work, together with our local communities, we identified an area of significance for our communities, which caused us to divert our waste dumping zone, resulting in longer hauling distances.
As part of our ongoing cultural heritage work, together with our local communities, we identified an area of significance for our communities, which caused us to divert our waste dumping zone, resulting in longer hauling distances. We are confident, though, that we can improve performance in the second half. We have access to higher grade mining areas in line with our mine plan, moving from the central pit into the south pit. We've increased our truck fleet to mitigate longer haul distances, and we are seeing operational improvements.
We've increased our truck fleet to mitigate longer haul distances, and we are seeing operational improvements through the operating model, gaining maturity and implementing our operational excellence initiatives. We also will have greater runtime at our North concentrator as we've pulled forward our North concentrator major shut into the first half. Despite our South concentrator going into a plant maintenance shut in the second half, we should be able to process most of this material by year-end. Now let's look at refined metal, the refined production. Refined metal production and sales were lower year on year. As I mentioned, this is due to the refineries who benefited the runtime at our North concentrator as we've pulled forward our North concentrator major shut into the first half.
Despite our South concentrator going into a plant maintenance shutdown in the second half, we should be able to process most of this material by year-end. Now let's look at refined metal, the refined production. Refined metal production and sales were lower year-over-year. As I mentioned, this is due to the refineries who benefited from having significant stockpiles available for processing in 2021. Those stockpiles resulted from the unplanned temporary closure of ACP plant in 2020. The buildup in work in progress inventory was largely released and processed in 2021 due to significant improvement in the ACP performance. Subsequently, we have returned to more normalized levels of refined production and sales.
The buildup in work in progress inventory was largely released and processed in 2021 due to significant improvement in the ACP performance. Subsequently, we have returned to more normalized levels of refined production and sales volumes a year ahead of time. We had strong refined production performance in the first half, refining all of the metal in concentrate production and navigating the annual stock count and planned maintenance at both our Mortimer and Waterval S melters to ensure smelter reliability into the second half. As we have highlighted before, our Polokwane smelter will undergo a full rebuild in.
As we have highlighted before, our Polokwane smelter will undergo a full rebuild, and it's already started now in the third quarter of 2022, taking it offline and reducing overall smelting capacity into the second half. We are confident, though, that second half refined production will be above that of the first half, as we will prioritize high grade PGM in concentrates and process additional stockpile releases. I will now hand over to Craig to take us through the financials and a review of the market. Thanks, Craig.
Thank you, Natascha. Good morning, everybody. I'm pleased to be reporting.
Process additional stock releases. I will now hand over to Craig to take us through the financials and a review of the market. Thanks, Craig.
Thank you, Natascha. Good morning, everybody. I'm pleased to be reporting a strong set of financial results. The company generated revenue of ZAR 86 billion in the first half. We achieved robust first half EBITDA of ZAR 43 billion with a solid EBITDA mining margin of 59%. Our cash operating costs per PGM ounce was ZAR 14,600, 16% higher than the prior year, but firmly within our market guidance. Return on capital employed of 150% highlights the strong performance and the efficient use of our capital. The company's balance sheet remains in a net cash position of ZAR 43 billion, with a solid EBITDA mining margin of 59%. Our cash operating cost per PGM ounce was ZAR 14,600, 16% higher than the prior year, but firmly within our market guidance.
Return on capital employed of 150% highlights the strong performance and the efficient use of our capital. The company's balance sheet remains in a net cash position of ZAR 42 billion after paying the dividends in respect of the second half of 2021. On the back of these strong results and in line with our disciplined capital allocation framework. The board has declared an interim dividend of ZAR 21.5 billion, which equates to ZAR 81 per share, 80% of our headline earnings. We delivered a solid earnings performance in the first half of ZAR 43 billion on the back of a realized PGM basket price of 41,132 ZAR per PGM ounce due to the robust underlying fundamentals for our metals. This is a good earnings achievement relative to prior periods.
However, EBITDA was about ZAR 20 billion lower than the record we achieved. 3% of our headline earnings. We delivered a solid earnings performance in the first half of ZAR 43 billion on the back of a realized PGM basket price of ZAR 41,132 per PGM ounce due to the robust underlying fundamentals for our metals. This is a good earnings achievement relative to prior periods. However, EBITDA was about ZAR 20 billion lower than the record we achieved last year due to two things. First of all, the 3E dollar basket price declined 14% compared to the record PGM prices achieved in the first half of 2021, resulting in ZAR 14 billion lower earnings.
Earnings last year also benefited from the higher sales volumes of about half a million PGM ounces as a result of the release of the work in progress that we achieved in 2021, following the ACP shutdowns of 2020. Last year due to two things. First of all, the 3E dollar basket price declined 14% compared to the record PGM prices achieved in the first half of 2021, resulting in ZAR 14 billion lower earnings. Earnings last year also benefited from the higher sales volumes of about half a million PGM ounces as a result of the release of the work in progress that we achieved in 2021, following the ACP shutdowns of 2020. Sales for the half year were 2 million ounces in line with our refined production, and our mining margin remains strong at 59%.
Turning to costs. During the first half of the year, we experienced around a 10% year-on-year increase in mining inflation. Labor and contractor costs rose 5%, despite the salary increases of 7% for employees. Sales for the half year were 2 million ounces in line with our refined production, and our mining margin remains strong at 59%. Maintenance costs escalated by 11% and consumables were 18% up year-on-year. The sharp rise in consumables was mainly attributable to increases in commodity-linked inputs such as oil, which was up 61%, chemicals were up 71%, and explosives were up 55%.
Despite these significant increases, we managed to contain the cash operating cost escalation at 8% as we focused on driving efficiencies and savings in the business. If we rebase the 2020 oil, explosives, and chemical prices to rates achieved in 2019, i.e., before the COVID-19 pandemic and the global supply shocks we're experiencing, our consumables and maintenance costs would be about ZAR 700 million lower, and the total cost would have increased by about 4%.
Cash operating costs per PGM ounce was around 14,600, driven by those above-mentioned escalations that I've spoken about, as well as the impact of lower production. We remain agile in a global inflationary environment, and will continue to focus on containing our costs by driving, first of all, those P101 efficiencies, progressing the renewable energy projects to address escalating energy costs, and embedding the certainty that we've derived from the completion of the 5-year wage agreement. Our company is in a strong net cash position of ZAR 42 billion. During the period, we generated from our operations ZAR 39 billion. We paid taxes and royalties of ZAR 10 billion, and we invested capital into the business. Our cash position is after paying the final 2021 dividend of ZAR 33 billion.
Our company is in a strong net cash position of ZAR 42 billion. During the period, we generated from our operations ZAR 39 billion. We paid taxes and royalties of ZAR 10 billion, and we invested capital into the business. Our cash position is after paying the final 2021 dividend of ZAR 33 billion. We continue to invest capital in sustaining the business. As I said, we spent about ZAR 6 billion capital expenditure in the first half, ZAR 4.8 billion of that was in sustaining capital, while ZAR 1.3 billion was spent on progressing our growth studies and our breakthrough projects. In the second half of the year, we plan to invest between ZAR 10 billion and ZAR 11 billion, again, focused on maintaining asset integrity and reliability, such as completing the Polokwane smelter rebuild and the slag cleaning furnace rebuild at the Waterval complex.
We'll also take delivery of heavy mining equipment at Mogalakwena. In the second half of the year, we plan to invest between ZAR 10 billion and ZAR 11 billion, again, focused on maintaining asset integrity and reliability, such as completing the Polokwane smelter rebuild and the slag cleaning furnace rebuild at the Waterval complex. The Mototolo, the Der Brochen life-extension project, which was approved at the end of last year, we anticipate spending ZAR 1 billion of the ZAR 3.9 billion project CapEx this year. You will see that we've revised our total CapEx guidance down to between ZAR 16 billion and ZAR 17.5 billion.
The reduction has been necessitated by us having to re-orientate skills and expertise critical to projects such as the Polokwane smelter shut and the supply chain disruptions impacting equipment and material delivery. Consequently, we've had to reschedule some of the execution of our projects. In terms of share returns to shareholders, the board has approved an interim dividend of ZAR 21.5 billion or ZAR 81 a share. It comprises of a base dividend of 40% of headline earnings, equaling ZAR 10.9 billion or ZAR 41 a share, and a special dividend of ZAR 10.6 billion or ZAR 40 a share. Taking our total payout to 80% of headline earnings. This represents an annualized dividend yield of approximately 14%, highlighting our commitment to return value to shareholders.
We remain committed to our disciplined and value-focused earnings equaling ZAR 10.9 billion or ZAR 41 a share, and a special dividend of ZAR 10.6 billion or ZAR 40 a share, taking our total payout to 80% of headline earnings. This represents an annualized dividend yield of approximately 14%, highlighting our commitment to return value to shareholders. We remain committed to our disciplined and value-focused approach to capital allocation. The strong performance in the first half resulted in 23 and a half billion rand being generated from our operations after paying taxes and investing capital expenditure, supporting the 21 and a half billion rand dividend to be paid to shareholders in the middle of next month. As I mentioned, in the second half, we anticipate spending between ten.
Sorry, yeah, between ZAR 10 billion and ZAR 11 billion of CapEx to sustain the business into the future while maintaining a strong balance sheet. Finally, we've also retained our full year production and unit cost guidance, and as I just mentioned, we've updated our capital guidance for the year. Our guidance is clearly subject to the impact of any Eskom load shedding and other headwinds, which Natascha has mentioned. Excuse me. Turning now to a review of the PGM markets. The first half of 2022 was another strong period for average PGM prices, though with exceptional volatility. The basket price was higher than the second half of 2021, although it was lower than the record we achieved in the first half of 2021.
PGM prices surged in February and into March as the Russian invasion of Ukraine sparked supply concerns, seeing palladium of the PGM markets. The first half of 2022 was another strong period for average PGM prices, though, with exceptional volatility. The basket price was higher than the second half of 2021, although it was lower than the record we achieved in the first half of 2021. PGM prices surged in February and into March as the Russian invasion of Ukraine sparked supply concerns, seeing palladium hit an all-time high. When the supply impact was not as negative as anticipated, PGM prices fell back. A strong dollar was also another headwind. Minor PGMs, iridium and ruthenium, showed similar trends, remaining above long-term averages, hit an all-time high. When the supply impact was not as negative as anticipated, PGM prices fell back.
A strong dollar was also another headwind. Minor PGMs, iridium and ruthenium, showed similar trends, remaining above long-term averages and continuing to make sizable contributions to our basket price. As you know, the automotive sector is the largest contributor to PGM demand. Automotive sales have remained production constrained. The first half, once again, was disappointing for automotive production. China's COVID-related lockdowns hit domestic output and was exacerbated by supply chain issues. The second half is looking more positive. Easing lockdowns, Chinese purchase incentives, and improving chip supplies seem to be feeding through into higher auto production. May's output was higher year on year, and preliminary data suggests that June has accelerated further. Of course, there are still downside risks due to supply chain issues, especially in Europe, and we're closely monitoring consumer demand.
Though, at present, we think the demand remains above production levels. In contrast, platinum industrial demand was exceptionally strong. Last year, this was a nearly 3 million ounce sector, making it one of the largest of the four traditional categories, which as you know includes automotive, jewelry, and investment. Platinum plays a crucial role in a range of sectors. Last year, demand in the glass industry was nearly 1 million ounces on the back of an expansion of lightweight fiberglass manufacturing, which is crucial for new technologies such as wind turbines and vehicle lightweighting. 2022 might see some pullback in overall volumes, especially if the global economy continues to slow. Areas such as fiberglass, packaging, chemicals, and hydrogen all point to a strong future. When we look ahead, it's with an awareness that it is a particularly uncertain time.
The long shadow of COVID-19, Russia's invasion of Ukraine comes at a time when economies and societies are grappling with the huge effort needed to achieve net zero. For our metals, as in any period of great change, there are risks, many obvious and well-known. However, we must not lose sight of the many opportunities too, offering upside potential to both demand and price. As a result of our market development work in targeting the many future opportunities and turning risks into potential demand for our metals, such as progressing the iron-air batteries and leveraging the useful characteristics of PGMs in new applications. In the short term, all these factors have meant changes to our expectations for PGM balances. We see platinum and rhodium tightening in the next few years, though a return to deficit will possibly take a year longer than we had previously anticipated.
If correct, the recent downgrades to auto production forecasts are likely to mean palladium will move into a surplus, assuming all Russian metal flows continue. Thank you. I'll hand you back to Natascha.
Thank you so much, Craig. Now let's look at our portfolio of tier one assets. We do have the largest PGM resource globally with every asset having a different PGM mix, base metal content, and other co-products. This creates a diversified portfolio of commodities that we mine and allows us to take a portfolio view while considering our integrated end-to-end value chain to ensure that we optimize value. The quality of our ore body and assets enable us to ensure we have the lowest cost assets amongst our primary producing peers. Now, despite our capital reinvestment cycle into our assets, which is a really important cycle for us, to build asset reliability, we continue to have the lowest All-in Sustaining Cost in the industry. We have the most productive assets with optionality and growth projects in our portfolio, which will continue to drive competitive advantage in the industry.
For Mogalakwena, we have completed the resource development plan that takes a holistic long-term view on how to maximize the value of this ore body and optimize shared value across all of our stakeholders. In addition to optimizing the open pit, we are investing in the development of an underground operation, which will allow for more targeted mining of the reef, resulting in reduced cost and waste to access the ore body. Reduced surface mining, and therefore less of an impact on communities and environment, and new mining methods that should not be compared to traditional underground mining methods to enhance safety and efficiencies. Within these parameters, we saw how important underground mining will become to the future of this asset, and we have therefore committed capital of ZAR 2 billion for a twin exploration decline.
The declines are already at about 20% of the first stage of targeted development, and underground geological drilling from these declines will commence before the year end. We've increased our engagement with all of our communities to develop open and transparent relationships, and we are undergoing a process to address value protection and value creation for our communities. Our resource development plan further indicated the need for access to land, and we have commenced engagements with relevant communities for potential resettlements. To understand our ore body better, we are executing a fast-track plan to improve the rate of understanding, and we are doing this in two ways from surface. We are targeting 120 km of surface drilling this year. That will be double what we've done in 2021, and we're well on track to deliver that.
We are embedding innovation through technology used at this operation, and as an example, the bulk ore sorting is fully commissioned and the integration process is at an advanced stage. It is already demonstrating value with rejecting approximately 4% of low grade or waste material. Further work will continue to establish stability and increase this rejection rates. Our coarse particle recovery plant is under construction and will be commissioned in the fourth quarter of this year. Our resource development plan further indicated bottlenecks in our downstream processing, and these will be addressed through a combination of technical options and commercial solutions. The ACP debottlenecking project is already in execution and further facility optimization studies are underway. We're also evaluating commercial battery-grade nickel production opportunities.
The feasibility study for a third concentrator is now complete and progressing through the relevant review processes. Lastly, the future of this mine will be developed on the foundation of achieving P101 performance independent on whether it is an open pit or underground facility. We are committed to develop this world-class asset, and we will do so in a holistic and measured way. Our approach allows for value-based incremental capital steps to be taken, allowing for optionality to respond to market cycles. Now, we have more work to do, but more than just take a decision on the future of a concentrator. As I hope you can see here, that we have made significant progress in the last six months in each of the six work streams that we need to deliver on.
Now we've highlighted that we have a portfolio of tier one assets, and we have considerable growth optionality and margin expansion opportunities at every asset. We show on this graph that by 2030 we will have more than offset the end of life of our crude oil joint operation through operational efficiencies across our portfolio, such as the benefit of the concentrator debottlenecking projects that are already delivering value. In addition, as we progress the future of Mogalakwena, we should see growth from both a PGM and base metal point of view. Now, what we've done on this chart is we've converted our base metal tons into PGM equivalent ounces at 2030 consensus prices. We should see growth and greater diversification in our portfolio through this process.
Now, this does not include further optionality in our portfolio, which we will discuss on the following slide. I think it is important to note that the capital required to unlock these opportunities would at all times be assessed through our disciplined capital allocation process that include a continued evaluation of the development in the markets and are generally much more conservative than what we see in consensus pricing. As we've shown, we continue to focus on understanding how we generate the greatest value from each of our assets. We have a number of ongoing studies which assess growth and efficiency opportunities across the portfolio. None of these are embedded into any valuation or ounce profile into the future, but highlights that we have many organic opportunities in our business that can unlock significant value in the future.
Now let's stand still for a moment on the demand side that also closely link into our market development work. In the medium term, and certainly in the longer term, we believe that the foundation of the hydrogen economy and hydrogen pure-powered fuel cell mobility is critical to decarbonization and energy security. The positive news is that this is already gaining momentum. Firstly, we know there is a necessity for hydrogen as an alternative fuel source. The urgency of net zero has never been so apparent with global warming already impacting lives and businesses. Hydrogen and fuel cells not only help us to reach net zero, but also offer a pathway to greater energy independence.
We have long known that fuel cell electric vehicles are, as described by the International Council on Clean Transportation, as one of only two mobility solutions that would provide a pathway to a low carbon future. Increasingly, we have learned that for many other industries, hydrogen seems to be the only decarbonization solution. In its role as an energy carrier, it also helps to maximize potential of renewable energies. In decarbonized mobility, fuel cell electric vehicles and electrolyzers have very different resource requirements than battery electric vehicles. Both facts mean that they make the transition to zero carbon easier, cheaper, and given marginal mining, and energy impact also cleaner. This year's sharp price rises in battery electric vehicle materials and concerns about the future availability of sourcing of key metals have brought home that mobility transition will not be easy or achievable by only one technology.
For these reasons, governments are increasingly keen on hydrogen. 39 countries now have a hydrogen strategy at the core of their decarbonization journey, with China, the USA, and the EU all making big announcements this year. There've also been some useful commitments made to fuel cells in regions like China. As governments seem to be focused on battery electric vehicles, we need to continue our advocacy program through the Hydrogen Council and various other forums to remove restrictions and to create a level playing field that enable economies of scale. One of the main things holding fuel cell electric vehicles back is the lack of cheap and available hydrogen, but there is good news in this space as well. Recently, we have seen strong growth in green hydrogen production and a big expansion in capacity.
This will drive costs down, which ultimately will enable faster growth in fuel cells and further opening of new areas for hydrogen. Now, when we put all of these items together, and aided by our continuous advocacy and market development efforts, we see progress in the last block, commerciality. For hydrogen in hard-to-abate areas, such as steel making and certain transport applications, this is already happening. In others, such as light vehicles, it remains in its early stages. As a society, we are developing a better understanding of the interdependencies required to deliver a successful decarbonization agenda. Now, in closing, we continue to focus on delivering our strategy through our four strategic pillars to ensure we achieve our purpose of reimagining mining to improve people's lives. As illustrated with this set of results, we are already making good progress on our targets.
Having a better understanding of the interdependencies required to deliver a successful decarbonization agenda. Now, in closing, we continue to focus on delivering our strategy through our four strategic pillars to ensure we achieve our purpose of reimagining mining to improve people's lives. As illustrated with this set of results, we are already making good progress on our targets. Our ultimate outcome is to ensure a shared value benefit to shareholders and our broader stakeholders, and we continue to track our delivery against these value creation outcomes. That concludes our presentation, and thank you once again. I will now hand over to Emma Chapman, our Head of Investor Relations.
I will now hand over to Emma Chapman, our Head of Investor Relations, to facilitate a question and answer session for us. Thanks, Emma.
Sorry. Thanks. Thank you so much. I guess we can try and start and see if we have any questions in the room. Chris Nicholson, why don't we start with you?
Morning, Craig, Natascha, and Glencore team. Thanks very much. I'm interested just in a little bit talk, chatting about the volumes and the smelter rebuilds, et cetera. I'm interested, on page seventeen you talk to the fact that you think in the second half of this year you'll be able to get your refined production pretty much through despite the Polokwane smelter rebuild. Yet for next year, you still have that implied inventory.
Why don't we start with you?
Morning, Craig Miller, Natascha Viljoen, and Glencore team. Thanks very much. I'm interested just in a little bit talk, chatting about the volumes and the smelter rebuilds, et cetera. I'm interested, on page 17 you talk to the fact that you think in the second half of this year you'll be able to get your refined production pretty much through despite the Polokwane smelter rebuild. Yet for next year, you still have that implied inventory build. I think it may have to do with the base metal intensity of the Polokwane production. Could you confirm that? Then linked to it, you've had a very good quarter in terms of what you put through the base metal refinery.
Could you maybe just comment on that and whether there's any way you may be able to kind of tweak that up next year and you won't get that inventory build next year? Thanks.
Yeah. Thank you, Chris. I think it is firstly a combination of targeting the ounce throughput for H2. We will be targeting higher grade concentrates, which is generally from operations other than Mogalakwena. Now, Mogalakwena not generally having a higher base metal load, as you know. That we'll need to release into next year, and that is some of the lockup that you see that we will release into next year. From a base metal refinery point of view, there is significant amounts of work that's been happening from a renewal and an asset and higher grade concentrates, which is generally from operations other than Mogalakwena. Now, Mogalakwena not generally having a higher base metal load, as you know.
That we'll need to release into next year, and that is some of the lockup that you see that we will release into next year. From a base metal refinery point of view, there is significant amounts of work that's been happening from a renewal and an asset reliability point of view, and we start to see some of that coming through. There is still quite a bit of work left to be done there, but we believe that we start to see that that has come through. What we're doing in the second half, as part of our business planning process, is to look at how we now optimize that we need to deliver into next year.
There would be an opportunity for us on the back of proven performance this year to relook how we unlock that value into the next year.
Catherine. She's just behind you. Thanks.
Hi. Thank you for the presentation. Just two quick questions from me. The release mentions that there's been negligible impact from load shedding for the first six months of the year. How was that in July, and has there been any negative impact from reports around power rationing in Zim at the Zim assets?
Just in terms of the macro, how concerned are you guys in the near term around end user demand destruction for, like, vehicles, just given where consumer inflationary pressures are globally?
Okay. Thank you, Catherine. You comment correctly. Our first half impact from Eskom was very negligible, about 6,000 ounces. The second half would be a bigger risk for us, as Polokwane is down for the rebuild we've mentioned. Our agreement with Eskom is when we curtail, we curtail from the base load that we're on in that period of curtailment, which now takes our base load significantly lower. How we normally manage it is to protect areas like mining and concentrators correctly. Our first half impact from Eskom was very negligible, about 6,000 ounces. The second half would be a bigger risk for us, as Polokwane is down for the rebuild we've mentioned.
Our agreement with Eskom is when we curtail, we curtail from the base load that we're on in that period of curtailment, which now takes our base load significantly lower. How we normally manage it is to protect areas like mining and concentrators and take load where we have catch-up capacity. If it happens in the second half, we might have to push back into areas that we don't have catch-up capacity. There is a risk in that area. We've seen less of that in Zimbabwe. When we look at the demand for our metals from a car manufacturing point of view, there's quite a bit of pent-up demand at the moment.
We do see that production, due to all of the other realities that we've seen, hard lockdown in China, chip shortages, that the actual production of vehicles are quite low already and compares to previous periods of recession. When we look at the demand for our metals from a car manufacturing point of view, there's quite a bit of pent-up demand at the moment.
When we then consider ongoing recession threats, the uncertainty, the geopolitical uncertainty, energy into Europe, we believe that quite a bit of that already will be flowing through into similar kind of production levels. When we take all of this into consideration, we will see volatility. Craig has touched on some of the volatility. We think that the kind of range that we're in at the moment would be stable for a period of time.
Perfect. Arnold?
Yeah. Good.
When we take all of this into consideration, we will see volatility. Craig has touched on some of the volatility. We think that the kind of range that we're in at the moment would be stable for a period of time.
Perfect. Arnold?
Good morning, everyone. Arnold van Graan from Nedbank. Two questions, if I may. The first one is on Mogalakwena, with the areas of cultural significance. Is that something that you've known about for some time? Is it a new issue? The question that goes with that is, what impact does it have on your longer term plans for Mogalakwena? Does that push you closer or more towards going underground? Because then you've obviously bypassed a lot of these issues. My second question is on hydrogen. You've focused quite a lot on that, so my question specifically deals with your hydrogen truck project. How has that performed relative to plan? So obviously it is R&D and it is work in progress, so you would expect that, you know, the performance wouldn't be on par with what you have in your conventional vehicles.
Has it exceeded expectations or are you struggling? You know, what's sort of the longer term outlook in terms of when you bring on more of these vehicles and when they reach, let's say commercial state. Do you have a timeline for us or-
Mm-hmm.
Focus quite a lot on that. My question specifically deals with your hydrogen truck project. How has that performed relative to plan? Obviously it is R&D, and it is work in progress, so you would expect that, you know, the performance wouldn't be on par with what you have in your conventional vehicles. Has it exceeded expectations, or are you struggling? You know, what's sort of the longer-term outlook in terms of when you bring on more of these vehicles and when they reach, let's say, commercial state. Do you have a timeline for us, or it's still too early? Thank you.
Okay. Thank you. You need to start to ask questions that Craig Miller can answer here. Well, Craig Miller can answer this question as well. It feels like this is still my responsibility to answer this. Arnold van Graan, very valid question around Mogalakwena. You would remember in the last two and a half years, we have reshaped that project to include a very specific work stream on our relationship with our communities. As we mature our understanding and our realization on our responsibility around our communities, we've also matured the work that we are doing. We had to start by ensuring that we rebuilt trust with those communities, and we had to close out on commitments that we've made to those communities, which we have done.
Standing on our realization of our responsibility around our communities, we've also matured the work that we are doing. We had to start by ensuring that we rebuilt trust with those communities, and we had to close out on commitments that we've made to those communities, which we have done. We see that opening up more open and transparent conversations with our communities. It's also some of the local economic development work with Doorstep community spend is all helping us to build a more trusting and transparent relationship. In that process, one of the pieces of work that we have been doing in that pillar is understanding culture and heritage into the communities that we work. It's part of our Anglo Social Way.
Quite a bit of work done in understanding better, and in that process, we have identified additional areas to the ones that we were aware of. I think it all bodes to the relationships that we are building. We're not there yet, but it's definitely, I think, a sign of progress. Is this impacting the way that we're looking at the future of Mogalakwena? Yes, it does. I guess as we understand our ESG responsibilities, as we stand back and we look at the long-term sustainability, both social, environmental, energy, water, those all are factored in when I talk about a holistic plan around resource development.
I guess as we understand our ESG responsibilities, as we stand back and we look at the long-term sustainability, both social, environmental, energy, water, those all are factored in when I talk about a holistic plan around resource development. Then if we consider the significant surface impact that we will make on an open pit only, the underground options become a real opportunity because it will be less energy-intensive. We will deal with less waste. Your All-in Sustaining Cost will come out in the wash because you will have less surface waste that you need to remove in stripping versus targeted and more quality mining. All of this come together to say, well, probably optimizing what we have with the open pit and going underground is overall the best option for that asset.
Your last question on hydrogen. The truck is not in the pit yet. The truck will be in the pit in August. As we've done work with it, there was some finalization of small waste that you need to remove in stripping versus targeted and more quality mining. All of this come together to say, well, probably optimizing what we have with the open pit and going underground is overall the best option for that asset. Your last question on hydrogen. The truck is not in the pit yet. The truck will be in the pit in August. As we've done work with it, there was some finalization of small operational issues around the truck. It will go into the pit in August, and then we'll be able to tell you exactly how it's performing.
If we consider the performance just with the load that we've put on it before the launch, and we've driven it around quite a bit, there was no reason for us to believe operational issues around the truck. It will go into the pit in August, and then we'll be able to tell you exactly how it's performing. If we consider the performance just with the load that we've put on it before the launch, and we've driven it around quite a bit, there was no reason for us to believe that it would not be able to perform well in the pit.
I think the focus needs to be for us on how the prototyping and layout on the truck, how we optimize that into commercialization with big partners, OEMs for instance, and then how do we build it into the mining ecosystem, and looking at full lifecycle costing. That is the next piece of work underway. Our target is to have our 40 fleet, 40 trucks, converted by the end of the decade.
Steven?
Thank you. It's Steven Friedman from UBS. Maybe a question for Craig. Just on the third-party material. I mean, this has been what seems like an exceptionally good period or half for third-party from an EBITDA margin perspective. I think 36% looks like a record, at least over the last maybe 10, 15 years, and also contributed around a quarter of your group EBITDA. Maybe if you could just sort of unpack, you know, what were the key drivers for that sort of strong performance from the third-party material and what you expect in a more normalized environment. Obviously, there's lots of, you know, moving points at the moment, so maybe just so you can comment on that. Thanks.
Thanks, Steven. Yes. Certainly, the 36% EBITDA margin from the third-party materials, that's in line with what we actually had in the first half of last year. I think it's sort of broadly, you know, it's just reflecting, I think, the PGM prices, as we mentioned, sort of second highest level of PGM prices in the half. You know, if prices continue to trend downwards, what we've seen in the last month, you would obviously see that EBITDA margin coming down to more levels that we've experienced before. Roughly, you know, between 15%-20%.
We'll take a final question from the room. René .
While we make the
I think the PGM prices, as we mentioned, sort of second highest level of PGM prices in the half. You know, if prices continue to trend downwards, what we've seen in the last month, you would obviously see that EBITDA margin coming down to more levels that we've experienced before. Roughly, you know, between 15% and 20%.
We'll take a final question from the room. René .
To René , I think it's still important to note, Steven, that it's still lower than our own EBITDA margins, and our own product is still the best product through our value chain.
Hi. René Hochreiter from Noah. You mentioned a new mining method at the
Mm-hmm.
Twin decline that's 20% complete. What is that new mining method?
What we're currently doing, René, is we are exploring, we're putting down twin exploration declines. We're doing two of them, and that's not the mining method I referred to, but just for completeness sake. We're doing one decline with a tunnel borer and another decline with modern drill and blast methods. We are also using this opportunity to lift our knowledge and skill and efficiency in this underground mining method. The contractor that we have involved is setting world-class standards for us and achieving world-class performance. We already have a team from our local community. We've employed people from our local community who are learning to lift our knowledge and skill and efficiency in this underground mining method.
The contractor that we have involved is setting world-class standards for us and achieving world-class performance. We already have a team of our local community. We've employed from people from our local community who are learning, so that we can transfer that knowledge and skill in going forward. The mining method that we are targeting for underground is longhole open stoping. It is a well-utilized method, and it's bulk mining, totally mechanized mining. All indications, if we look at benchmarking across the world, assuming that we continue with the world-class mining standards that we are setting already in the decline development, is well in all from an all-in sustaining cost, would be very competitive to what we're doing with open pit mining.
Hopefully lower.
Yes.
Also CapEx guidance for 2023, 2024, I think.
Continue with the world-class mining standards that we are setting already in the decline development. From an All-in Sustaining Cost, would be very competitive to what we're doing with open pit mining.
Hopefully lower.
Yes.
Also CapEx guidance for 2023, 2024, I think you gave it in February, but you haven't given it now. Is that still the same?
We have given. Do you wanna take that, Craig?
Yes. We've maintained 2022, 2024. We're obviously, excuse me, in the middle of our planning process for the next five years. It's something clearly we'll need to take a review on based on sort of where we are, excuse me, on, you know, just execution of projects this year. I think, you know, at the moment assume that that's sort of the anticipated spend in the next two years.
Just a last question. You allocated quite a lot of CapEx to project breakthrough. Is that going to be ongoing or is that project coming to an end? Or could you remind us what that is, that project?
Yes. We've got a series of breakthrough projects, and some of those relate to the coarse particle recovery at Mogalakwena. You've got some of the bulk ore sorting. You've also got the copper debottlenecking project at the base metal refinery. Those are all projects that we have underway that either look to improve throughput or recovery or ultimately product.
Thanks very much.
We have a couple of questions coming through from the web, and then we'll come back to the room, shortly. I have a question here from Nkateko from Investec, who asks, "Can you please give us a bit of color on the Mogalakwena cost performance in the next two years, considering the substantial increase in the past year, as well as the impact of the bulk ore sorting plant coming online in the next year?
Okay. Will you cover the bulk ore sorting?
Yeah.
Okay, perfect. In terms of cost, we've certainly obviously seen the increase in unit costs at Mogalakwena, driven by some of those commodity-linked escalations that I've spoken about, particularly oil. Just by way of reference, every $10 increase in the barrel adds about ZAR 100 million worth of cost to the Mogalakwena base. That's been a key driver to the increase in costs. Clearly, obviously, the assumption around what happens in the next two years depends what happens to the price of oil, but if it stays at this level, that will obviously some of those commodity-linked escalations that I've spoken about, particularly oil.
Just by way of reference, every $10 increase in the barrel adds about ZAR 100 million worth of cost to the Mogalakwena base. That's been a key driver to the increase in costs. Clearly, obviously, the assumption around what happens in the next two years depends on what happens to the price of oil, but if it stays at this level, that will obviously give us some degree of certainty. You know, in terms of the next two years, from our perspective, we're in the middle of that budget process, and just looking at the mine plan, taking into account the disruptions that we've experienced in the first half, what does that do from a mining sequence?
We'll look to update you as soon as we've got a better view of that in the second half of the year.
The bulk ore sorter, as we've mentioned, we see approximately a 4% rejection rate, which effectively mean that for the same ounces, we have to treat 4% less material. As we develop that, it's a target of getting at least double that. We'll continue to help the efficiency and the related PGM unit cost and bring that down. That's certainly the target around the bulk ore sorter. I think the other aspect that's important for me around both rejection rate, which effectively mean that for the same ounces, we have to treat 4% less material. As we develop that, it's a target of getting at least double that. We'll continue to help the efficiency and the related PGM unit cost and bring that down.
That's certainly the target around the bulk ore sorting. I think the other aspect that's important for me around both this project and the coarse particle recovery is the fact that ultimately it reduce our overall energy consumption because we are spending less energy to recover the same amount of metal. Ultimately, with coarse particle flotation, as we targeting, a dry engineered stack instead of typical tailings facilities, the recovery of water would be way more efficient, which brings that total ESG cycle into it, cost, and then obviously the efficiency and ESG impact.
I have a question here from Wade, from Avior Capital Markets. He also asked about the benefits of higher rejection rates, so we've answered that. He also asks: How should we think about the quantum of Mogalakwena's grade improvement over the next 18 months as the mine moves to higher grade regions of the pit?
I think the first thing that's important around Mogalakwena, it's quite a variable ore body, where we've got the highest grade in the south and lower grade in the north. It compares, the kind of ranges we're talking about is about 2.8-3.2 in the north, and it goes higher as we go down to the south, more to the upper 3.5. That's the kind of variance that we need to consider. Our normal practice is to ensure that we spread the mining plan for the year across all of these areas to get more of an average. It's important that we also then build stocks to help us to manage the variance that we have in the pit.
I think, Wade, you can work across those kind of upper and lower limits in terms of grade, but the upper 3.5. That's the kind of variance that we need to consider. Our normal practice is to ensure that we spread the mining plan for the year across all of these areas to get more of an average. It's important that we also then build stocks to help us to manage the variance that we have in the pit. I think, Wade, you can work across those kind of upper and lower limits in terms of grade. We'll continue to see, if we look at full year results or longer term performance, that we should average it out.
It is also the reason why if we look at the underground exploration declines that we are doing, we started in the south because those are the areas where we will achieve the highest grade.
I have a question here from Thomas Streeter who asks: You mentioned that you have concluded wage agreements with 90% of unionized employees. Where are you at with the remaining 10% or the last union?
That conversation continues. It's important to note that it is a union that is.
Only at our Mototolo operation. We will continue those conversations and into its conclusion. In the meantime, we have been able, because it's the agreement was with 90% of our employees and our unions already, that we have implemented across the entire business.
A question for you, Craig. From Nina from Goldman Sachs, who asks, you typically spend around 40-45% of your full year CapEx in the first half. In 2022, the first half CapEx is around 30% of your full year guidance. Do you see risks to full year CapEx spend, and what has triggered lower spending in the first half?
Thanks very much for the question. I think it's just important to recognize that in the second half, we have a number of rebuild projects that you've spoken about. The Polokwane smelter rebuild being a very significant build. It's the first time that we've rebuilt kind of taken a full rebuild of that furnace in the last 12 years. That is planned for the second quarter. That's one of the drivers in terms of the increase versus what we've experienced.
Perfect.
Thanks very much for the question. I think it's just important to recognize that in the second half, we have a number of rebuild projects that you've spoken about. The Polokwane smelter rebuild being a very significant build. It's the first time that we've kind of taken a full rebuild of that furnace in the last 12 years. That is planned for the second quarter. That's one of the drivers in terms of the increase versus what we've experienced previously. We've also got continuation of delivery of heavy mining equipment at Mogalakwena. That's about another ZAR 1 billion of spend in the second half.
It's a lot of these planned activities that we had that we've now got into the second half of the year. In terms of the risk to the spend, as you note, we've sort of lowered our guidance, just given some of the disruptions that we have seen to supply chains in the first half of the year, and how they'll sort of factor into the previously. We've also got continuation of delivery of heavy mining equipment at Mogalakwena. That's about another ZAR 1 billion of spend in the second half. It's a lot of these planned activities that we had that we've now got into the second half of the year.
In terms of the risk to the spend, as you note, we've sort of lowered our guidance just given some of the disruptions that we have seen to supply chains in the first half of the year and how they'll sort of factor into the second half. That's really why we've taken the second half spend down between ZAR 1 billion and ZAR 2 billion.
Perfect. We've got a number of callers on the conference call. Can I please link over to the conference call and see the questions there?
Okay. Thank you, Emma. Ladies and gentlemen, just a reminder, if you'd like to ask a question, please press star then one. The first question comes from Patrick Mann from Bank of America. Please proceed, Patrick.
Good day, Natascha, Craig, and Emma. Thank you very much for the presentation. I wanted to ask you a little bit about platinum substitution. How much impact are you expecting from substitution of palladium or platinum in? How key is that to your forecast that platinum goes into deficit? You know, do you think that given Russia is the primary or the biggest supplier of palladium, have you seen any acceleration in efforts to substitute out palladium as a result of this year as a result of Russia, Ukraine? That's my first question, please. The second one is just you spoke a little bit about CapEx scheduling and pushing out a bit of CapEx. Has there been any operational impact?
Has it slowed down any projects at all? Thanks very much.
Okay. Patrick Mann, in terms of the substitution, yes, we have continued to see the substitution taking place. I think last year we estimated there was around about 75,000 ounces of substitution. We think that possibly will increase to about 200,000 ounces this year, and still up to potentially 1 million ounces. Those have been incorporated into our forecast. We haven't necessarily seen significant changes to the flows of metal from Russia at the moment. You know, I think a lot of what we do acknowledge takes place. I think last year we estimated there was around about 75,000 ounces of substitution. We think that possibly will increase to about 200,000 ounces this year, and still up to potentially 1 million ounces.
Those have been incorporated into our forecast. We haven't necessarily seen significant changes to the flows of metal from Russia at the moment. You know, I think a lot of the supply contracts sort of agreed at the beginning of the year. What we do acknowledge, a lot of that sort of understood. It's very clearly, obviously something we're just going to need to monitor in the fourth quarter and into 2023 in terms of whether customers still, you know, look to take Russian metals or whether they would look to sort of not take those metals and seek them from ourselves and other PGM producers in South Africa.
Do you want to do the second?
The Russian bit?
No, I think.
Oh, the capital scheduling. Sorry.
Yeah.
I think that's you.
The impact on the operations, yeah.
Yes, yes, I've got that.
A big portion of our capital spend is a part of our renewal program, and this is also the areas where we've seen slight delays to ensure that our capital efficiency and readiness to execute some of these larger projects are in line with our own expectations. The renewal projects would not have any impact on production. It will delay some of our renewal projects to get to full completion, but we're comfortable that it is the right thing to do. As you know that our capital profile has increased quite significantly, and Progression is taking a very deliberate approach to ensure that as we step into these projects, that the level of engineering and confidence that we have in execution is at the point that we need it to be before we trigger a project.
We will not see that flow through in any operational challenges.
Thank you, both.
Thank you. The next question comes from Dominic O'Kane from J.P. Morgan. Please proceed, Dominic.
Good morning, Craig Miller. Good morning, Natascha Viljoen. Two quick questions from me. First question is just relating to Amandelbult and specifically costs. The costs came in above ZAR 18,000 per ounce, and we've seen a trend-
Proceed, Dominic.
Good morning, Craig. Good morning, Natascha. Two quick questions from me. First question is just relating to Amandelbult and specifically costs. The costs came in above ZAR 18,000 per ounce, and we've seen a trend higher over recent years. Can you maybe just help us with how we should think about some of the medium-term cost movements and guidance for Amandelbult? Is it reasonable to assume that we can think costs can come down, or would you see current rates as being kind of a new normal for the mine? And then my second question is around the dividend. Obviously the policy is to pay out 40%, but this now represents the second year.
Is it reasonable to assume that we can think costs can come down, or would you see current rates as being kind of a new normal for the mine? My second question is around the dividend. Obviously the policy is to pay out 40%, but this now represents the second year of a very big payout at 80%. Can you maybe just help us with some of the goalposts about how we frame ordinary dividends versus excess capital returns going forward? Thank you.
Thank you, Dominic. I'm gonna ask, we'll do this question jointly. I'll ask, Craig to touch on the detailed breakdown of costs. I will go into some of the operational efficiencies, and then we'll go into the dividend question.
Dominic, you know, look, I mean, obviously the biggest component of Amandelbult's cost is labor, and that's sort of roughly 50% of its cost base. You've now got some degree of certainty as a result of the wage negotiations in terms of what the cost escalations will be. We've provided that to you around about 6.2% per annum, so you can sort of filter that in.
Actual efficiencies, and then we'll go into the dividend question.
Dominic, you know, look, I mean, obviously the biggest component of Amandelbult's cost is labor, and that's sort of roughly 50% of its cost base. You've now got some degree of certainty as a result of the wage negotiations in terms of what the cost escalations will be. We've provided that to you around about 6.2% per annum, so you can sort of filter that in. But I do think that there is opportunities for us to continue to drive efficiencies at Amandelbult, and that is linked to what I'm sure, and Natascha will touch on, but particularly around the benefits of mining cycle, and really sort of driving some of the improvements there in order to control and maintain costs.
Do you wanna do that, and I'll come back to dividend?
Yep. Okay. For starters, if we're talking about 50% of Amandelbult's cost is labor. We do have excess labor at the moment. We've been in a process of voluntary separation and looking at how we get that labor to within the required level in a way that is obviously considering the socioeconomic challenges that we have in the country. That process is underway. We are also addressing some of our operational discipline items on site that ensure that we have full capacity on the mine as we should on a daily basis.
That process is underway. We are also addressing some of our operational discipline items on site that ensure that we have full capacity on the mine as we should on a daily basis. We've been talking about the modernization of Amandelbult for quite some time. You should be, I think everybody's fairly familiar with it. One big portion of the modernization is our mining cycle. We are learning as we go with mining cycle. To Tumela specifically, 80% of our working areas at Tumela is now running on mining cycle, which does give us quite a bit of uplift in efficiency. I think our challenge there is to get consistency.
We've seen good runs for a number of months, and then we saw consistently and falling through, and then we see the lift, and we've seen this quarter three going into quarter four last year. We've seen a significant improvement, and we lost that stability over our Christmas period and restart period. We've rebuilt that now in Q1 going into Q2, and we've seen it higher than the levels in 2021. The work at hand is to ensure that we get stability in that process. It's very different way of thinking about conventional mining. We are definitely building, and we're seeing the benefit of that coming through. The Dishaba is still a little bit of a bigger challenge because of ground conditions. It will take us a little bit longer to get to full efficiency there.
If we combine the two areas, excluding the inflationary pressures that we do see, there is a real work that we do. Stability in that process. It's very different way of thinking about conventional mining. We are definitely building, and we're seeing the benefit of that coming through. The Dishaba is still a little bit of a bigger challenge because of ground conditions. And it will take us a little bit longer to get to full efficiency there. If we combine the two areas, excluding the inflationary pressures that we do see, there is a real work that we're doing in bringing the cost down on Amandelbult instead of seeing the continuous increase. That's outside inflation, of course.
I think the other area that's important is just to consider the work that we are doing in mechanization. 15 East drop-down mechanization is underway. The efficiencies, as we have expected and we've warned the risk around it, is lower than expected, but we have not stopped that work. The team has stepped back and reviewed the way that we are approaching mechanized mining. There will be a continuous push for us to bring this mine to a mechanized mine into the future. Dividends.
The team has stepped back and reviewed the way that we are approaching mechanized mining. There will be a continuous push for us to bring this mine to a mechanized mine into the future. Dividends.
In terms of dividends, absolutely, you know, very happy to have obtained the board support to pay a special dividend. If I can just remind you, Dominic, as you've pointed out, 40% is our base dividend. 40% of earnings is our base dividend. Clearly going through a disciplined capital allocation review.
Clearly going through a disciplined capital allocation review, at the half year, and at the full year, again, in terms of, what do we do with any excess cash, that we have available to deploy to shareholders. You know, at the first half of the year, we, you know, generated roughly net of taxes and CapEx about ZAR 23 billion, paying out ZAR 21.5 billion. I think just demonstrating that discipline will do, that we continue to have. Sort of going forward, you absolutely, you know, bank in the 40%, and then clearly obviously will progress. You know, at the first half of the year we, you know, generated roughly net of taxes and CapEx about ZAR 23 billion, paying out ZAR 21.5 billion.
I think just demonstrating that discipline will do that we continue to have. Sort of going forward, you absolutely, you know, bank on the 40%, and then clearly obviously will progress the various options that we have in terms of Mogalakwena, and, you know, progress those studies and make sure that they still meet our investment criteria. As they progress, we'll reevaluate what the dividend policy is. At the moment, with certainty around 40% of earnings.
Do we have any more questions on the line?
Yes, we do. The next question comes from Myles Allsop from UBS.
As they progress, we'll reevaluate what the dividend policy is. At the moment, with certainty around 40% of earnings.
Do we have any more questions on the line?
Yes, we do. The next question comes from Myles Allsop from UBS. Please proceed, Miles.
Great. Thanks, Sharon. Just a couple of follow-up questions. First of all, can you remind us with Mogalakwena when you were targeting kind of FID? Is it still end of this year, beginning of next year? And then on Dominic's question as well, do you have a net cash buffer that you see as a normalized level for the business? And then the last question very quickly, just on the market. If you're seeing palladium move back into surplus over the next couple of years, do you think we'll see prices of palladium and platinum converge more? And maybe on rhodium as well, you know, why price is so resilient? Thank you.
I missed the second question.
When we make an investment decision on Mogalakwena.
Yes. The second question was?
Net cash.
Net cash.
What do you think we'll see prices of palladium and platinum converge more? Maybe on rhodium as well, you know, why price is so resilient? Thank you.
Sorry, I missed the second question.
When we make an investment decision on Mogalakwena.
Yes. The second question was?
Net cash.
Net cash.
What's your net, target net cash?
Okay.
Sort of level is.
Okay.
Great then. Thank you.
All right. You'll take the second question, correct?
Yeah.
Myles, I think it's important to reiterate that we have been taking decisions around Mogalakwena. There is, for a period of time, we have created a perception that the decision on Mogalakwena is premised on taking a decision on the concentrator. We have reshaped this project now for the last 2.5 years to be clear on the 6 work streams that needs to happen for us to unlock the potential of this asset. If you were looking at a greenfield and we say we need to build all of these at once to get the operation going, it would have been a very specific financial decision to take the project forward. We have been taking decisions in the direction that we believe we will continue to build this. We have...
We've taken a decision on the exploration declines that will not only give us access to faster access to the knowledge of the ore body and developing the underground mine, but if that is the case, it gives us faster access into the underground mine. We will license this from it being an exploration decline to a mining decline, but it will give us early access into the ore body. We have taken decisions on downstream processing. We've kicked off the ACP debottlenecking, as an example. A portion of that project is already underway. The next portion of the project is in last stages of evaluation. The work that Yvonne and her team has been doing around the communities is fundamentally part of how we.
A decline to a mining decline, but it will give us early access into the ore body. We have taken decisions on downstream processing. We've kicked off the ACP debottlenecking, as an example. A portion of that project is already underway. The next portion of the project is in last stages of evaluation. The work that Yvonne and her team has been doing around the communities is fundamentally part of how we unlock this asset. That work has been going on and has been showing significant improvement and progress. We still have challenges around the community. It's not as similar to what we see due to socioeconomic and political challenges across our country. But I believe there's enough indication for us that we are making progress.
For that reason, we have opened up conversation with our communities on resettlements. There's a number of examples where I'm hoping you'll get the indication that we are taking decisions, and it will not be a single big decision, which I think is also beneficial to us. The community is not as similar to what we see due to socioeconomic and political challenges across our country. I believe there's enough indication for us that we are making progress, and for that reason, we have opened up conversation with our communities on resettlements. There's a number of examples where I'm hoping you'll get the indication that we are taking decisions, and it will not be a single big decision, which I think is also beneficial to us.
We do have the option to say, "Well, we've got confidence in the market," but if affordability plays a role and our disciplined capital allocation tells us that it's not the right time to make a next step of investment, we have the opportunity not to do so. I think this is the beauty of this project. It is long-term. It's got a number of different assets and aspects to the project, and we're unlocking it as we go with incremental decisions that from a risk. We do have the option to say, "Well, we've got confidence in the market," but if affordability plays a role and our disciplined capital allocation tells us that it's not the right time to make a next step of investment, we have the opportunity not to do so.
I think this is the beauty of this project. It is long-term. It's got a number of different assets and aspects to the project, and we're unlocking it as we go with incremental decisions that from a risk point of view, in an uncertain environment, I think gives us a really good opportunity to develop this asset and make sure that we continue to give the returns that we committed to. Net cash.
Yes, net cash. No, we don't have a prescribed net cash balance. Clearly, obviously, you know, as I've explained the capital allocation framework, it's, you know, we've obviously got a number of options that we have on the table that we're continuing to pursue. As part of that, we're also looking at how do we actually structure, how do we fund that and what does the structure look like. As we progress that, we will evolve that thinking.
Committed to net cash.
Yes, net cash. No, we don't have a prescribed net cash balance. Clearly, obviously, we, you know, as I've explained the capital allocation framework, but, you know, we've obviously got a number of options that we have on the table that we're continuing to pursue. As part of that, we're also looking at how do we actually structure, how do we fund that and what does the structure look like. As we progress that, we will evolve that thinking. Clearly one, you know, one of the tenets of that disciplined capital allocation is to maintain a strong balance sheet and the required liquidity to be able to support the business.
The last question on the palladium substitution.
Palladium substitution. Certainly, we are forecasting palladium being substituted and going into a surplus. When we look through what does that mean from an overall pricing perspective, we do take that into consideration, and clearly forms part of our price evaluation. Which then, you know, sort of steps back in terms of the requirement for the various projects that we have and looking to execute, that they meet the disciplined and the strict investment criteria. Financial criteria as well as the ESG criteria that we have in terms of them going forward. Clearly, obviously, we take when we do that assessment, we do an assessment of prices which are much lower than where spot is today.
I think taking on board the point that it could be in a bit of a surplus 5 years after.
Perfect. I think we'll go to the last question in the room. Leroy, do you have a question, sir? Great.
Hi. Good morning, thanks for the opportunity. I was wondering if you could share with us. I understand that some of your customers have contractual ranges on, you know, how much metal they take. If you could maybe share with us if that has changed the levels at which your customers are taking metal, and if you're seeing anything that maybe suggests that the market is tightening as we get into the second half of the year. Just the chrome volumes on Amandelbult, it seems to have declined a bit more than the rest of your sort of metal and concentrate production. If anything happened there, if there are any issues. Thanks.
Okay.
I'll take it and then you add.
Okay. Yeah.
From a range point of view, you are correct. We've seen that stabilize. We haven't seen, for a period of time during COVID, we've seen our customers taking on the lower end. We're back to normalized levels. What we've also seen, on the back of the geopolitical situation, is that we have more customers reaching out to us, in exploring availability of metal. Now, as we know that many of these contracts, not our contracts, other contracts, do tend to come to an end at this year end. We are assuming that that's also on the back of Russian palladium. Customers exploring that if they want to self-sanction, whether there's other metal available in the market. We have seen an increase.
Now, when you're talking about tightening in the market, apologies if I repeat myself in this audience. We currently see that production levels, car manufacturing, is at recessionary kind of production levels. Despite the fact that there's pent-up demand, the production is quite lower than what we expected. We thought we'll see at least a 10% increase this year. We've only seen about a 4% increase. If you look historically, it is at the lower end of vehicle manufacturing. I don't think we'll see further tightening.
I think it's already at fairly low levels, despite the fact that demand is there, and it's already been incorporated into the broader demand side, instead of seeing tightening of the market. Any comments?
Yes.
Anything you wanna add there?
Yeah, just to add. I mean, we are obviously seeing with some of the recent upgrades in car production coming through, that there is starting to more inquiries.
Mm-hmm.
Sort of, you know, stocking levels starting to take place.
Yeah. It's the opposite of tightening. I would argue. Okay. Chrome volumes is a factor of the amount of Merensky, open pit Merensky, that we've also treated at Amandelbult. We have seen challenges with operational stability through the concentrators. We've got three concentrators there, Merensky being an old, very old concentrator, not automated. When we see any disruption in that area, that then we do see that flow through into general operational stability across that asset. You will see some of that. We have seen quite a bit of stock build of chrome because of our inability to get it through the port.
The challenges with Durban, with the rain that we've had, disruptions there and disruptions through on Spoornet has all resulted in quite a bit of chrome stock built on site. Then sometimes we just start to run out of space.