Corporate update

Nov 17, 2026

Summary

New Beisa’s gold-first plan estimates first production at two years after Section 11 approval, with transfer and regulatory timing key to the schedule. Funding is planned through a mix of equity, debt, offtake prepayments and streaming; Henkries permitting and resource work are further catalysts.

Operator

Good morning, and welcome to the Neo Energy PLC investor presentation. Throughout this recorded presentation, investors will be in listen-only mode. Questions are encouraged and can be submitted at any time via the Q&A tab situated on the right-hand corner of your screen. Simply type in your questions and press send. The company may not be in a position to answer every question it receives during the meeting itself. However, the company can review your questions submitted today and publish responses where it is appropriate to do so. Before we begin, I would like to submit the following poll. Now I would like to hand you over to the management team. Theo, good morning, sir.

Theo Botoulas
CEO, Neo Energy Metals

Good morning, and thank you. My name is Theo Botoulas. I am the CEO and the acting CEO of Neo Energy Metals, and I would like to welcome you all to our corporate update webinar. Together with me on the webinar are our Chairman, Mr. Neal Froneman, our Chief Financial Officer, Elmarié Maritz, and our Head of Governance and Legal, Frederik Brand. Later in the presentation, when we are taking questions, I will ask them to answer some of them. Before we begin, I would like to hand over to our Chairman for his opening statement and anything he would like to say. Thank you.

Neal Froneman
Chairman, Neo Energy Metals

Thanks, Theo, and good morning, everybody. I think it is obviously quite clear that Neo Energy has a completely new Board of Directors. Some of us have really only been in place a few months. I think it is also clear that we have a new management team, relatively new in most cases. Our focus in the last few months has really been to ensure that we can deliver very significant value in a sustainable way to our shareholders. The way we will do that is through significantly improving corporate governance, which I mentioned at the AGM, and obviously ensuring a sustainable and a very structured funding pathway for the business. You might say, "Well, what does all that mean?" Give us some practical examples of what you have done as a team.

First of all, you would have seen we have established appropriate board structures to ensure that this company is properly managed. That includes the very necessary Audit and Risk Committees, Remuneration, and in my mind, probably one of the most important committees for where we are in our journey is a Safety and Technical Committee. These board committees have been applying their minds to board charters, to committee charters, and I am sure Frederik Brand will talk more about that under some of the very specific questions that we have received. We as a board and a management team have reviewed intensely our asset base, our operational plans. We have reviewed cost structures and profitability, timeframes, and I am very pleased to say that we have confirmed that there is very, very significant value to be released if we tackle this project and bring our assets to account in the right way.

We've developed a funding structure and pathway, and that is obviously done in consideration of minimizing dilutions, but we have a well-set-out pathway that we believe is implementable and financeable. I think what will be presented today by the management team is an outline of some of this work, and certainly this is the work that we are willing to commit to as a board and a management team. Of course, the board will hold the management team to account for delivery. With that, Theo, if I could hand back to you.

Theo Botoulas
CEO, Neo Energy Metals

Thank you very much, Neal. Just following on what Neal has just said, I'd like to open by just saying that these are possibly two of the most magnificent assets I've ever encountered. New Beisa, our internal modeling shows margins in excess of 50%, a very doable project, a lot of sunk capital, and a relatively short timeline compared to other major capital projects. The Henkries Mine down in the Northern Cape has been described as a little gem. There we have 37 km of palaeo channel, of which we've only drilled out 10%. However, in the past, I've on several occasions reiterated that there are matters within the direct influence and management over which management have direct control, and matters which are not. We have done things like undertaking to publish a quarterly update. We have done so, and we will continue to do so.

I would appeal to shareholders to read them. There's a lot of information in them on what we have done and what we are planning to do. Just covering timelines, the Section 11 and the Section 102. A Section 11 ministerial consent is required, is to acquire or sell South African mineral assets. This process is not discretionary. In other words, nobody has any discretion over it, including the DMPR. The law quite clearly states that once the relevant documents are filed and approved, the Section 11 must be granted. We are well on the way to doing that. As management, we accept full responsibility for all timelines, milestones, and deliverables that fall under our direct control. This includes internal planning, resourcing, procurement, execution, and quality control, and reporting.

If a delay arises from factors within management control, management will own it, explain it, and set out the corrective action taken. We work very closely with Sibanye-Stillwater. We have their full cooperation, and they have ours. However, we'd like to point out that in the case of Neo, a material portion of the overall project timeline is dependent on third parties outside our management control, specifically regulators and government departments, permit approvals. To date, the Sibanye Section 11 was granted well before the published date of 6th December, and Sibanye are currently completing the Section 102 together with the DMPR. The two parties involved in that process are Sibanye-Stillwater and the DMPR. Only once the Section 102 is granted will Neo management, that's our team, engage and file our Section 11 application, which we have prepared.

I must thank our team, our staff, and our consultants for the exceptionally high standard of work which has been prepared. Once submitted, Neo consultants and management will engage with the DMPR to ensure a successful outcome for our application. Timeline estimates as opposed to definitive project timelines. I'd like to also reiterate that all work that's been reported has been done from first principles. We have taken datasets, and we have reworked them to come out to our own conclusion. It is very difficult to provide accurate timelines and deliverables when a material portion of the overall process is dependent on third parties outside our control, specifically regulators and government departments. External processes are characterized by external timelines, which are not fixed or guaranteed by third parties, sequential dependencies, where one approval cannot commence until another is granted, decision-making processes outside the control of management.

What do we do? We prepare and submit compliant applications. That has been done. We engage with the authorities. That has been done. We mitigate where we can the impact of delays. What is a straight rule of thumb on when gold production will commence? The rule of thumb is the time the Section 11 is granted plus 24 months. It has always been that timeline. Sibanye currently own the asset. Legally, they are responsible for it until the Section 11 passes. In order to gain time and bring the two-year estimate forward, Neo management did negotiate and in place a contracting agreement with Sibanye to take control of the New Beisa site in order to initiate some work on site in parallel with the Section 11 to expedite the above timeline. The work streams are well defined in the presentation describing the Section 11 gateway.

I'll get to it now, the scope. After consulting with stakeholders, market players, and others, and at their request, Neo management did not initiate any on-site work until the Section 11 was complete and Neo had ownership of the mine. That was a request made to us, which we respected and which we abided by. The reserves and the assets remain intact. The shafts are still there, the ore reserves are still there, the infrastructure is still there, everything is still there, the value is still intact. Nothing material has changed. On the Sunshine Metals and Pamish transactions, shareholders will note that no reference has been made to either Beisa North or Beisa South transactions or to the Henkries South extension in the corporate update.

A review of these projects has been undertaken, has been completed as to the commercial terms and viability, technical merits, status of tenure as presented to us by the vendors of these projects. an RNS will be released in the coming days detailing the results of this review. Reserves and resources. The work on upgrading the reserves and resources at New Beisa continues. In time, management will work to include surface resources in the tailings as well as the Kalkoenkrans reef in the sub-vertical. But right now, we focus on what is really important, and that is the resource in the main shaft Beisa section. At Henkries, further resource drilling will be done. To date, 10% of the palaeo channel has been drilled, with a total of 37 km available.

There are 62 tons of sample, 2,500 samples, which need to be sent to the laboratory, and which we will process. What is abundantly clear to us is the massive disconnect between our modeled underlying value and the share price. Queries from shareholders we get often. We are not ignoring you. However, we believe that everybody must have access to the same answers and to hear the same questions. Hence, this webinar was initiated. If I can now go to the presentation and work through that. If you just give me a second to find the page down button. Just our disclaimer. As the screen is rather small, I like to go through the key corporate highlights. Just basically, our strategy is capital efficient by design. We are re-establishing a brownfields asset, recommissioning existing infrastructure.

On our gold and uranium resource in our company, which we have, just alone in the ground at just a few days ago value, we have $ 7.9 billion in in-situ resource. Gold at New Beisa, 1.2 million ounces, which is worth $ 5.2 billion in the ground. Uranium at New Beisa, 26.8 million pounds, which is worth $ 2.3 billion in the ground. And uranium at Henkries, which is worth $400 million, $ 0.4 billion in the ground, giving us a total of $ 7.9 billion. We've modeled these, and they show a very robust project, stable, and with a good margin. On the Sibanye-Stillwater partnership, if anybody would like to go, and I'm often asked, "What is the Sibanye-Stillwater intention?" There is, on the Sibanye-Stillwater press release section, dated 9th of December 2024, a very comprehensive statement made by Sibanye-Stillwater as to their intention with this particular project.

I will not repeat it here for them. Shareholders can go onto the internet, Google 9th of December 2024, Sibanye-Stillwater release, and you will find it. On the commodity price backdrop, structurally, we believe that both gold and uranium are in a bull phase, particularly the uranium requirements, as published by the World Nuclear Association, show a demand far, far outstripping supply up to 2040. The other interesting and factual statement we can make about the New Beisa mine, I was there last Thursday, is just simply the amount of equipment, material, and assets that have been invested into that site. Yes, it has been dormant for three years, unlike perhaps the local supermarket, which can stay closed for a few weeks and which you can open again and start operating.

A mine where we have to take men and material down 1,000 m, get them there safely, get them to the working places safely, this needs to be properly evaluated, properly considered, and reconstructed properly. Just as an aside, we will be employing ultimately 3,200 people at the New Beisa site. The brokers' price ranges are incomplete and agree that the share price is completely undervalued and that there is a massive disconnect. Another advantage we have in this country is our jurisdiction. South Africa has got a long record, decades, of mining uranium. We've got a host of regulations and laws which you must abide by, and which, in a commodity like uranium, we are very fortunate to have. It sets guardrails, benchmarks, and laws and regulations by which we must abide. We've got a very experienced team. We've done this before.

We understand South African mining, we understand the Wits mining, we understand open-cast mining in the Springbok area. We have very strong country relationships all over. We have a wide network in South Africa. We have a direct operating knowledge of the Neo assets. I was fortunate enough to work on that mine between 1990 and 1992. We have regional expertise and established global networks. It is myself. I am a mining engineer. I worked on this particular mine for Gencor. We have Fred Brand, our Head of Governance and Legal. He has worked in the industry before with some major companies. We have Elmarié Maritz, who is our Chief Financial Officer, who worked for more than a decade in the platinum sector in mines much like New Beisa, and understands the processes of controlling the financials and also financing these mines.

On our executive team, we are pretty strong, and we have a whole lot of consultants that support us. As the company grows, we will grow the team further. On our board of directors, we have Neal Froneman, probably, in my view, one of South Africa's most successful mining entrepreneurs. He put up Sibanye-Stillwater from four old goldfield shafts into a multinational company in a host of sectors. We have his guidance, and he gives us a lot of input and a lot of support, especially when it comes to difficult decisions. We have Sajjad Sabur, who is an ex-HSBC banker in London, also gives us a lot of positive inputs and a lot of advice on how to proceed forward.

Got John Wallington, also a mining engineer, who is also a director of a major mining company, and he heads our technical committee and checks that our technical work is being done properly, and that we are covering all the bases, crossing the Ts and dotting the Is. Johan Reeder, also the head of the Audit and Risk, and he has brought a new level of governance to our accounting and to how we operate the business. Just like to say that our board has, in the last couple of months that they have been here with us, they have made a huge impact beyond the straight and narrow. There are checks and balances. As Neal said, what is our principal focus? Corporate governance, number one, financial controls, and third, operational excellence. Now, we get to the project scope, which is the slide I mentioned a bit earlier.

You will see in the section in the middle, there is a Section 11 gate. What we previously tried to do was, while we were waiting for the Section 11, to try and get onto site and start some of the work. We then engaged with persons in the market, stakeholders, shareholders, and others, who said to us that they would prefer that we rather get the asset completely under our control before we initiate any work on the site. We respect that opinion and that request to us. In our current phase, we have set up our work streams, our cost and schedule controls. We have been reviewing historical data sets. We have been validating data. We have upgraded our geological models. We have assessed some of the infrastructure. More needs to be done. We have signed the contracting agreement.

We can go onto site tomorrow if the shareholders want us to, and if we have the money to do so. We can go onto site tomorrow. We were allowed to do limited administration facility refurbishment on site, so that our staff could have some place to sit and to work from. On the Section 11 gate, we have got execution limitation. A certain underground verification and full infrastructure activities remain gated. We are not allowed to go underground until such time the asset passes into our hands, and we can go underground and take a look. We need to restart winders, we need to re-examine shafts, and we need to get underground. That has an impact on our timelines, because we can see what is on surface, but we have yet to establish the condition of the underground workings.

We have done planning on computer and using mining software, but we still have to go underground and verify that the tunnels are still open and that the infrastructure exists and is in good shape. Given the questions we have asked some of the Sibanye staff, it appears that the infrastructure will be in good shape and will be usable. Past the transfer phase, that is when the action will really begin. That is where we will get underground access. We will start up main fans, winders, ventilation shafts. We will get the full surface infrastructure refurbished. We will get the gold plant refurbished. We will get the uranium process started and going. We will start the tailings recommissioning and full regulatory implementation of our tailings deposition facilities. The major work streams are right at the bottom of this slide.

Project controls, the resource and the mine plan, access and infrastructure, process plants, regulatory and tailings, and our investment basis. We will, when we do so, take our capital estimate up to a category four capital estimate, which is within 10% accuracy of what it will ultimately be. On the New Beisa asset, I think people may have seen this one before. It is situated in Welkom, in the Free State Goldfield. We would say, and it is pretty conservative estimate, there is about $500 million in infrastructure capital investment already placed there. The frames of the shaft are there. All the important infrastructure is there. The shaft is there. Everything is there. To start a mine from scratch of this nature would take you probably $1.5 billion and six to eight years to get up and going.

In this one, we can get going in a very short space of time by comparison, in two years. Our resources are stated. As I said before, they have got 26.8 million pounds of uranium and 1.2 million ounces of gold. The strategy is we have a shaft and we have a plant frame. We have leach tanks. We have mills in place. We have a lot of the key components and equipment that is required for a mine of this sort. Our strategy will be to bring the gold into production first, to create cash flow for the company, and to assist with the financing of the uranium plant, which will be done as a parallel process. There is no uranium plant at New Beisa, and there has not been one there for the last 25 years. We will be constructing a brand new uranium plant from scratch.

The great thing about that is that we can use the latest technology. We can do it in a place and in an area where we can get an optimal result. That is where we are at New Beisa. The mine is there, the asset is secure, the principal infrastructure is in place, nothing has changed. There is a bit of an explanation beneath that of the Section 11 process again. In the end, Neo Energy Metals will take control of the site, and we will bring it to account. That you can write down. The timelines are unclear at the moment, but we do everything within our capability to get this over the line. This is the New Beisa infrastructure and previous mining. As you can see, there is a series of shafts. There is a main shaft, and there is a sub-vertical, and there is associated ventilation shaft.

This is an enclosed system where you need to get sufficient air underground to mine and to ventilate the workings. There is a top shaft and six levels. Our initial calculations tell us that we need two raise lines, that is two working stopes per level to get to our planned production profile of 82,000 tons a month. It is very possible, it is very doable, and we have the shaft capacity to do it. Again, I will state that ultimately, at full complement, this mine will employ around 3,200 people. If you are reading the diagram, the blue mass is the previously mined-out stopes that was mined out by Gencor. Further in the appendices, you will see the complete strike length of this entire ore body. It dips at 48 degrees, and it dips from north to south.

The colored lines, the existing development tunnels, drives, cross-cuts, and raise lines, and the orange and yellow verticals are the main shaft running through the center of the ore body. That southern mine is there. However, the nice thing about this particular mine is the main shaft isn't in the ore body, it is to the north of it, which stops us having a shaft pillar. This is the work we have done on setting out the stopes and the stope shapes. We commenced with 3D reconstruction of the underground mine layout, replacing the outdated two-dimensional model that we received from Sibanye-Stillwater. We updated the geological model and converted legacy 2D interpretations into a full 3D interpretation. We initiated Stope Optimizer shape creation to define mineable blocks and early production geometry. In other words, it is okay to have a plant that can do 80,000 tons on surface.

The question is, consistently, can you feed that plant at that production rate from underground for the planned life of mine? What we have established is, yes, you can. It is doable, and we will do it. Henkries, that is a completely different ore body. Also like to mention, with our management team down in the Springbok area, we have a prospecting right over Henkries. We also made application for a mining right. Our management team, being rather industrious, they think on their feet. We are focused completely on the uranium here. However, if you have been to the Henkries site, you will note that there are what they call pegmatites to the northern part of it. In addition to the uranium, we have pegged other metals, tin, molybdenum, and a whole history or a whole suite of rare earth metals that exists on this particular project.

The team has brought some optionality into the project for shareholders. The reason we did that is we will send a geologist out to site, and he will work there, or she will work there. Once they are out there, they might find something outside of the uranium space that might be valuable and of interest to shareholders. We have upgraded the optionality of the Henkries site by making application for other metals, which we did announce in an RNS several months ago. It is a palaeo channel. What is a palaeo channel? It is an old river channel adjacent to the Orange River. It is a free dig operation with beach sand in it. The average grade there is 400 parts per million, 399, and there are zones in this palaeo channel that go in excess of 2,000 parts per million.

We have got 37 km of palaeo channel defined, and we have drilled out less than 10% of it. Both at New Beisa and at Henkries, the only way for our resource to improve is up. There is potential to grow it significantly. The processing will be conventional acid leach, we will produce direct yellowcake, and the process was proven by Anglo American with a pilot plant, and $ 30 million in historical expenditure and 211 test pits. Mineral Resource and Ore Reserve statement shows 5.34 million tons of uranium ore at 399 parts per million, giving us 4.7 million pounds of uranium. On Henkries, you have got the topography, pit shapes, and block model. This is what we have done to initiate the mining. Just hang on. If you look at that black block, to the top of it, you will see a whole lot of red holes.

Those are the 64 tons of sample that we have, 2,500 samples that we need to send to the lab, and we might twin a few of those holes to check, but that, in a reasonably small space of time, can upgrade our resource at Henkries. We have a 743 km squared prospecting right boundary. We have applied for a mining right. We have created a best estimate of what a mining pit will look like. We have got an initial block model with uranium distribution in 3D. Basically, what a block model does, it divides the deposit into thousands of equal-sized blocks, each assigned a grade estimated from nearby drill holes using geostatistical methods. It is the foundation of all resource estimates and mine planning. That is what we have done at Henkries. On the technical progress, we have reworked the open pit designs using the current block model.

We are incorporating historical unassayed drill hole data to expand the mineralized footprint. We are sending ore-bearing material to Mintek, which is a South African laboratory, for test work to generate data for our processing flow sheet design, and we have launched our environmental impact assessment studies. What are we going to still do? We are going to update the pit shells as the new datasets come in. We are going to use the Mintek results to define the processing routes. We are going to combine the hydrology outputs with pit design. There is a lot of water in the palaeo channel, and that influences the pit shapes and how we are going to mine it, and we are going to update the project economics. Now we come to the slide which generated most of the questions. You will see, right at the top of the slide, corporate and regulatory, Sibanye Section 11 carve-out, complete.

They did it well before. They achieved that well before the revised date of December 6. They are now currently, Sibanye and the DMPR, are currently busy doing the Section 102. In that process, Neo Energy Metals management are not involved. We are waiting for the outcome of that process. On the Section 11 consent now, once that process closes, then this team will file our documents, and then we will proceed to the DMPR and engage them to get our Section 11 documentation through. What have we got on the rest of it? New Beisa, gold first. It's a Free State brownfield project. That is completely dependent on when the Section 11 lands, when we can take control of the site, and when we can actually physically start working on the site.

That's the only time that we can start implementing a definitive approved timeline to production. Until the Section 11 lands, the initiating date for that process is uncertain. However, we have made the estimates, and we're again going back into what I said previously. The estimate was, if we done nothing at all, the timeline is Section 11 lands plus two years, and we have reflected that here. Just to clear up any misunderstandings, we are not in charge of the regulatory processes. We have to abide by them. On Henkries, we are going to push as hard as we can to get our mining license through, to confirm our resource, and to create our pre-feasibility study. Those are our timelines, very broadly. Again, we will address, and we will take ownership, and we will take responsibility of anything under our direct control. That we will do.

These projects are well worth waiting for and working hard at. They are probably some of the best uranium projects in South Africa at this point. We get all kinds of queries from all other nationalities who want to participate. However, this is an LSE-listed company, and that is our focus at this point. With that, I'd like to close off and open the floor to questions.

Operator

That's great. Thank you very much for your presentation this afternoon. Ladies and gentlemen, please do continue to submit your questions just by using the Q&A tab situated on the right-hand corner of your screen. Just while the company take a few moments to review those questions submitted today, I'd like to remind you that a recording of this presentation, along with a copy of the slides and the published Q&A, can be accessed via our investor dashboard. As you can see, we have received a number of questions throughout today's presentation. Gareth, if I could just hand back to you to read out the questions, chair with the team, and I'll pick up from you at the end.

Theo Botoulas
CEO, Neo Energy Metals

Okay.

Operator

Thank you. Theo, can I ask the first question?

Theo Botoulas
CEO, Neo Energy Metals

Yeah.

Operator

Sure. The first question is, what has Neo done to strengthen its corporate governance framework over the past year?

Theo Botoulas
CEO, Neo Energy Metals

I would just like to hand that question over to Fred. We have done quite substantial work in that regard. Fred, if you can expand and give the shareholders a background on what we have been doing.

Frederik Brand
Head of Governance and Legal, Neo Energy Metals

Yeah, sure. Thanks, Theo. I think over the past year, we have made significant progress in strengthening the governance across Neo, especially if you look at where they were and all the improvements that we made up till now. We have managed to improve our board and our committee structures. We introduced a number of key policies, not only from a regulatory aspect, but also from an operational perspective. We also established clear levels of authority and accountability. As Theo mentioned earlier, we do make use of various amount of contractors, and so we ensured that our delegation of authority incorporate so any executive have oversight of whatever any contractor do, and that they comply with Neo's regulatory requirements as well as policies. On top of that, we have strengthening our risk management environment, our internal controls, and then also any reporting that needs to be done to the board.

I think what is important to Neo is that governance is not just about having policies in place. It is about making sure that these policies are actually applied, and that we can measure our performance and our requirements according to that. So, the key focus has been to giving the board better oversight, improving the accountability, and then I think ultimately protecting shareholders' interest. Because in the end of the day, we are all there to basically assist the shareholder in addressing and ensuring that we operate within the lines of law and also in the best interest of the company. Thank you, Theo.

Theo Botoulas
CEO, Neo Energy Metals

Thank you. I would also like to just add to that is in the past year, while I have been here, and ever since, I think it was May 18, 2026, the executive and the staff, the team here, has presented on several occasions to our board of directors. I presented to the technical committee. We have had all the boards meet. They ask the right questions, and they ask us difficult questions in looking at improving our performance and that of the company. I can actually say with great respect, I thank all the directors for the inputs they have given us. They add a lot of value, give us advice. Yes, maybe Fred, you can just expand a little bit on how many board meetings have happened and committee meetings of the board and what we have done.

Frederik Brand
Head of Governance and Legal, Neo Energy Metals

Yeah, sure. Theo, I think what we did, first of all, after the board came in, we had a two or three-day board induction session where we took the board through, first of all, the company itself, also the past history of the company and potential issues that was in place. From there on, we moved forward to breaking it up into various sections, from operational, compliance, governance, legal, so that each member of the board clearly understand where Neo is at this stage and how Neo is going to move forward and the value contribution each of our board members can play. Soon after that, we initiated our first official board meeting as well as our subcommittee meetings. That means we had our first Audit and Risk Committee meeting that is led by Johan Reeder.

Then we had our Technical and Health and Safety Committee meeting that is led by John Wallington, and then Remuneration Committee that is Saj. Also, we have a Governance and Nomination Committee that is led by Neal. Soon after that, we had the sitting of the first board meeting, and I think that was a very tremendous moment because in that board meeting, it allowed not only us as management, but also the board to basically synchronize and see how best to move this organization forward. With all the hurdles and all the struggles that comes across our path, we managed to build a very well strategic plan to mitigate the organization going through these different cycles. Thanks, Theo.

Theo Botoulas
CEO, Neo Energy Metals

Okay, thank you. Gareth?

Operator

Thank you. I think that answers question two regarding how the board holds management accountable for delivery of the strategy, unless there's anything more you wanted to add beyond that.

Theo Botoulas
CEO, Neo Energy Metals

No.

Operator

How is Neo protected if Sibanye does not perform its obligations?

Theo Botoulas
CEO, Neo Energy Metals

Fred, if you'd like to.

Frederik Brand
Head of Governance and Legal, Neo Energy Metals

Sure. I think what firstly, obviously we have a contractual agreement in place that clearly set out the obligations of both parties and also provide a clear detailed framework for protecting Neo's interest. But I think it's equally important to look at Sibanye's actions. Sibanye has already obtained its Section 11 approval, like Theo early mentioned. We agreed on all extensions. They provided us access to site to allow preparatory work to progress. They're also very supportive whenever we require historical data, historical information that we can use in our planning phases as well. And I overall think there's a positive indication of its commitment to the transaction. Also from our side, we continue to engage closely with Sibanye, monitor progress, and manage our contractual and financial exposure. So I do believe it's a very good working relationship between Neo and Sibanye, and it's a very supportive relationship.

Both organizations see the value of this asset and see the potential future growth that can come out of this. Thank you, Theo.

Theo Botoulas
CEO, Neo Energy Metals

I would just like to reiterate what Fred just said. In my experience with Sibanye over the last one and a half years, they have been nothing but cooperative. They are just cooperative. They cooperate with us. They support us. When we ask for information, they give it to us. We have got a very good relationship with them. We meet once every couple of weeks to upgrade our status and to upgrade reports from their sides, particularly in work they are doing. So we have got a very open, transparent, and friendly relationship with Sibanye and their staff. They have only been as cooperative as they could be. So on that relationship, that relationship is in very, very good shape. So I have got no complaints, and I can say nothing. Like I said, Sibanye have only supported us, and they are just as keen for this transaction to close as we are.

Operator

Thank you. Question four: Is it likely that permission will be granted by the S.A. authorities by the 6th of December 2026 deadline?

Theo Botoulas
CEO, Neo Energy Metals

That decision is with the department, as I previously stated. That decision is a negotiation or an interaction between Sibanye-Stillwater and the DMPR. Neo Energy Metals management are not involved in that, so I would not like to venture an opinion. Once the Section 102 will land, our date that we have published for the Section 11 is June 6th, 2027. That is our date. That is the date in mind and the team that you see is I , okay? That is what we are contemplating. That is our date. Is our documentation prepared? Yes, it is. It has been prepared to an extremely high level, and again, I thank the people that have worked on that documentation to get it through first time. They have done an exceptionally good job. But answer to your question is, the December 6th date is between Sibanye-Stillwater and the DMPR.

Neo are not involved directly in that negotiation.

Operator

Thank you. Next question: Why has the first production of gold been extended again, and now by over a year when it was only extended a couple of months previously?

Theo Botoulas
CEO, Neo Energy Metals

For the same reason that I explained in my opening statement. The first production of gold will occur in a very base timeline. Section 11 lands plus two years, okay? What we tried to do was we tried to bring part of that to the left of the Section 11 gateway, where we would start work on site. I was prepared to take legal responsibility for the site using what they call my mine manager's tickets, so we could start the work. In other words, hit the ground running. Stakeholders, shareholders, and several parties came back to us and said they didn't want us to be spending money while the asset was not ours, so we then put that on hold. That is why that was moved. Again, the date of first gold production, to calculate it very easily, rule of thumb, the date the Section 11 lands plus two years.

We tried to adjust that, and the shareholders and stakeholders did not want us to do that. Simple as that. We will wait for the Section 11 to land, and then we can start. That is reflected in this project trajectory.

Operator

Thank you. Next question: Where is the funding going to come from to take the company to production?

Theo Botoulas
CEO, Neo Energy Metals

Elmarié?

Elmarié Maritz
CFO, Neo Energy Metals

Thank you, Theo. We understand and share shareholders' concern about dilution, and the company does not intend to fund the full development of New Beisa through equity alone. Our strategy is to match each phase of the development with the most appropriate and cost-effective source of capital, drawing on a combination of equity, debt, offtake prepayments, and streaming arrangements. Once the Section 11 consent has been granted, ownership of New Beisa has transferred to the company, and the pre-implementation studies have been concluded, the company will hold a substantive de-risked asset. We expect this to support project finance for the construction phase and to open access to structured, less dilutive funding, such as offtake prepayments and streaming.

Theo Botoulas
CEO, Neo Energy Metals

Thank you, Elmarié.

Operator

Thank you. A question around the recent placement. If you can just talk to the discount to market value that the shares were placed at.

Elmarié Maritz
CFO, Neo Energy Metals

The placing price of GBP 0.65 was set with reference to the level of investor demand and prevailing market conditions at the time. Pricing at a discount to the market price is customary for placings of this nature, particularly for development stage companies. The board concluded at the time that it was in the best interest of shareholders to secure the funding at that price, to strengthen the company's working capital position at the time and maintain momentum on the New Beisa transaction, rather than risk more delay.

Theo Botoulas
CEO, Neo Energy Metals

Thank you, Elmarié.

Operator

Thank you. Next question. When will the updated New Beisa economic assessment and independently verified capital expenditure estimates become available?

Theo Botoulas
CEO, Neo Energy Metals

As stated, everything is work in progress. We need to get down onto the site. We need to reevaluate the plant. We need to go through that entire infrastructure and check for the competence of the steel, of the structures. Everything has to be rechecked. Again, we are sending people down 1,100 m into a South African underground gold mine. The shaft is 1.1 km deep, 7.2 km wide, and there will be 3,200 people working on that site. Before we do that, we will ensure systematically, incrementally, and in a staged approach, we will ensure that all our equipment, all our infrastructure is safe and can be used for production purposes. The question is, when will we be ready to do that? Once we are on site, and it is in the timeline there, it should take us to check all the infrastructure on site, get our capital estimates done.

It should take us six to nine months. After that, we can then start refurbishing and fixing and repairing and operationalizing the mine site. That is where we are right at this point in time. Like I said, we are not dealing with the local shopping mall that has been closed for three months. This is a very high-risk environment that we work in, which is mining. Do we fear the risk? No, we are trained to deal with it. Part of our training is to ensure that all the equipment we use is safe and fit for purpose, and we will do exactly that on the New Beisa site.

Operator

Thank you. The next question comes from an investor that has been with the company since the RTO stage and invested since. They would just like to know, given the share price at the moment and the delays, how will you attract new investors?

Theo Botoulas
CEO, Neo Energy Metals

Okay, well, most institutions will not commit significant capital to an asset a company does not yet own. That has been made clear to us. Until our Section 11 consent is granted, New Beisa is not ours. It will be granted, and it will become ours. That is the main reason. It is also why the larger funding conversation changes once the transfer completes. Then we have more to offer because we actually own the site. The project itself has not been the obstacle. That is not an obstacle. An existing shaft with infrastructure in place, gold first, and a combined resource across our two projects of 31.5 million pounds of uranium and 1.2 million ounces of gold. The asset is the reason to own the shares. The asset will become owned. So, it is there. What is the actual asset that the company owns now?

We own a contract, which is an asset, and it has massive value. That contract will close, and we will own the New Beisa site. That is our current asset, is our contract, which both sides are honoring and both sides are implementing. So on that basis alone, that is the asset. Same as for Henkries. The other thing I would like to say is, what is the reason for investing in this company? Just our board of directors, the men that are on our board of directors, shows the intent of where we intend taking this company. We have intent. We will grow the company. We will bring the projects to fruition. We will bring them to account. We will get this job done, and we are well on our way to getting it done. So that is the reason. You ask, what is the major asset?

The contract is the asset. Contracts are also assets, and that is what we own right now, is a contract, which gives us the right to acquire the New Beisa site for an essential $30 million, half in shares, half in cash. I would challenge anybody on this call to find an asset elsewhere in the world of this nature, of this size and scope and scale, that you can acquire for $30 million. You would have to walk a far way to find that, especially in the uranium space.

Operator

Thank you. The next question asks, is the previously proposed secondary listing on the JSE in Johannesburg still being pursued? If so, what remains outstanding, and what are the likely costs, and what is the timetable? Would the JSE realistically improve liquidity, access to South Africa's institutional investors, and the company's ability to raise project finance?

Theo Botoulas
CEO, Neo Energy Metals

Would you like to take that, Elmarié, or you want me to take it?

Frederik Brand
Head of Governance and Legal, Neo Energy Metals

I can also take it too.

Elmarié Maritz
CFO, Neo Energy Metals

Fred wants to take this one.

Theo Botoulas
CEO, Neo Energy Metals

Okay, Fred, go for it.

Frederik Brand
Head of Governance and Legal, Neo Energy Metals

Yes, JSE listing remains definitely part of our long-term strategy. However, the reason why we postponed it was to allow the company to focus on immediate focusing on, first of all, the progression of our projects, to secure the necessary regulatory approvals, and then also addressing our funding requirements. We also needed to do a lot of work from a governance perspective to ensure that we meet the requirements of the JSE and that we are 100% compliant. We wanted to make sure that we are 100% aligned with what our duties and responsibilities is before we take on a new listing. However, we certainly see the benefit in a JSE listing, particularly in attracting South African institutions, investors, and potential improving liquidity at the same time.

Not only from a board, but also from a management perspective, it was all about getting the timing right, making sure the listing adds real value for shareholders. I believe the moment all of those lines, the moment all of those boxes can be ticked, the board will reassess this process, and we will move forward. Thank you.

Operator

Thank you.

Theo Botoulas
CEO, Neo Energy Metals

Thank you, Fred.

Operator

As we are almost at the hour mark, I think this will be the last live question. What positive catalysts does the board anticipate over the next 12 months that might have a positive effect on the share price?

Theo Botoulas
CEO, Neo Energy Metals

Well, judging from the questions, most definitely the granting of the Section 11, the issuance of a mining right at Henkries, and the results of the additional work that we're doing at Henkries to upgrade the resource, and also at New Beisa. I think those are the main catalysts that we can look forward to now, which are well within our control, and which we can deliver on. Elmarié, anything from your side?

Elmarié Maritz
CFO, Neo Energy Metals

I would add the closing of some funding with possibly a strategic anchor shareholder to unlock the value of these assets.

Theo Botoulas
CEO, Neo Energy Metals

Yeah.

Operator

Thank you. I'll now pass it back to the organizers.

Theo Botoulas
CEO, Neo Energy Metals

With that, Gareth, if I can just ask our chairman to close off, if you'd like to.

Neal Froneman
Chairman, Neo Energy Metals

Yeah. Thanks, Theo. Can I just confirm you can hear me?

Theo Botoulas
CEO, Neo Energy Metals

Yes, we can hear you, Neal.

Neal Froneman
Chairman, Neo Energy Metals

Good. Thank you. As I concluded my opening statement, I said that what would be presented today is an outline of the work that is currently underway and what we as a new board, a new management team, are prepared to commit to. I think you should have a good understanding of the work that's taking place. It's good quality work, it's fundamental work, it's work that requires expertise in many areas of finance, governance, and of course, mining. You should have received a good amount of information and confidence from what you've heard today. We will bring this asset, being New Beisa, to account. We'll work our way through the Section 11s. We will work with Sibanye-Stillwater, and of course, we mustn't forget about Henkries. The one point I would make to the question that was asked, what happens if the New Beisa transaction is not completed?

The company would still have a wonderful asset in terms of Henkries. Let's not forget that value underpin to the company while we only really have a contract in place. Thank you for your time, and we look forward to presenting future progress and being able to demonstrate real value accretion for our shareholders. Thank you.

Theo Botoulas
CEO, Neo Energy Metals

Thank you very much, everybody.

Operator

That's great. Thank you for updating investors today. Could I please ask investors not to close the session, as you'll now be automatically redirected to provide your feedback in order that the management team can better understand your views and expectations. This will only take a few moments to complete, and I'm sure will be greatly valued by the company. On behalf of the management team, we'd like to thank you for attending today's presentation, and good morning to you all.