Operator

Good morning, and welcome to Eos Energy's first quarter 2022 earnings call. All participants will be in a listen-only mode. Should you need assistance, please signal a conference specialist by pressing the star key followed by zero. After today's presentation, there will be an opportunity to ask questions. To ask a question, you may press star, then one on your telephone keypad. To withdraw your question, please Press Star, then two. Please note this event is being recorded. I would now like to turn the conference over to Joe Crinkley, Eos's Communications Manager. Please go ahead.

Joe Crinkley
Communications Manager, Eos Energy Enterprises

Thank you. Good morning, everyone, and thank you for joining us for Eos Financial Results conference call for the first quarter of 2022. On the call today, we have Eos CEO, Joe Mastrangelo, and CFO, Randy Gonzales. Before we begin, allow me to provide a disclaimer regarding forward-looking statements. This call, including the Q&A portion of the call, may include forward-looking statements related to the expected future results for our company, which are subject to certain risks, uncertainties and assumptions. Should any of these risks materialize or should our assumptions prove to be incorrect, our actual results may differ materially from our projections or those implied by these forward-looking statements. The risks and uncertainties that forward-looking statements are subject to are described in our earnings release and other SEC filings. Our remarks during today's discussion should be considered to incorporate this information by reference.

Forward-looking statements represent our beliefs and assumptions only as of the date such statements are made. We undertake no obligation to update any forward-looking statements made during this call to reflect events or circumstances after today or to reflect new information or the occurrence of unanticipated events, except as required by law. Today's remarks will also include references to non-GAAP financial measures. Additional information, including reconciliation between non-GAAP financial information, the U.S. GAAP financial information, is provided in the press release. Non-GAAP information should be considered as supplemental in nature and is not meant to be considered in isolation or as a substitute for the related financial information prepared in accordance with GAAP. In addition, our non-GAAP financial measures may not be the same as or comparable to similar non-GAAP measures presented by other companies.

This conference call will be available for replay via webcast through Eos investor relations website at investors.eose.com. Joe and Randy will now walk you through the company highlights, financial results and business priorities before we proceed to Q&A. With that, I'll turn the call over to Joe.

Joe Mastrangelo
CEO, Eos Energy Enterprises

Thanks, Joe. Welcome everybody to the 1Q earnings call for Eos Energy Enterprises. Proud to be here with everyone, and just wanna start off on page 3, walking through some recent milestones that have occurred since the end of quarter close. You know, first, you know, we recently signed a large letter of intent with a Northeast solar developer for 300 megawatt-hours of future business to be delivered over the course of 2023. We're gonna be working with that customer, as we've always talked about with our commercial model, get the LOI signed, get on the same side of the table, close out the overall deal. We'll be working here over the next 30, 60 days to bring that one to a bookable order.

At the same time, we talked about, in the last call, expanding capacity in a new addition to our facility in Turtle Creek. We've added 65 MWh of that capacity in the first two months that we've been in the facility and are producing product out of that facility in just over 60 days. Really proud of what the operating team has been able to do. On the picture to the right, you see we shipped our 100th energy block about a week ago. You know, this is a tremendous milestone by the team, really, great accomplishment. That energy block there, number 100, is gonna be headed to Blue Ridge and Pine Gate Renewables for the Eastover project that we've been executing on here over the past 30-60 days.

the same time, we also announced a financing commitment for up to $200 million with Yorkville Advisors. We're proud to be partnering with Yorkville. Randy will walk through a little bit more of the details around this agreement that we've come to. But we talked about finding you know the most effective means to raise additional capital to achieve our growth plans. I think this is one of the first moves that we'll be making here to shore up and be able to deliver on the plan that we laid out in our last call. If we go to page four, you see on the operating highlights, you know, really wanna focus in here on the growth side of the business. You know, we booked $67 million of orders, you know, 241 MWh.

Our total order backlog now stands above $200 million and is rapidly approaching a gigawatt-hour. I'll walk through the opportunity pipeline, which now stands at $6.2 billion and is up over a gigawatt-hour of opportunities since the last time we were together. Randy will give you the bridge and the walkthrough on the revenue that we delivered in the first quarter. Cash on hand right now stands at $55 million, exclusive of the financing arrangement that I previously talked about from Yorkville. You know, we're proud of where the company is heading and how the team is executing. You can see quarter-over-quarter sequentially, you continue to see progress across these core metrics as the team continues to get out in the market.

You know, we're seeing an uptick in demand for energy storage, and we're also seeing a shortage of available product, and that gives us an opportunity as we bring our capacity expansion online to continue to grow the company. I'll walk through a little bit more of the details on that in the next section. Okay. Let's focus now on our commercial pipeline orders backlogs. If we go to page six, this is our traditional, commercial activity or pipeline page. Always wanna start off on the left-hand side of this page and talk about lead generation. Lead generation are projects where customers are asking us for feasibility studies. They're coming with ideas. They wanna develop a project plan. They're looking at different regulations and revenue stacks to come up with ideas.

You know, when we look at this now, that stands at $5.4 billion or 28 GWh, up $1.3 billion versus the last time we spoke. We're starting to see more and more activity and more and more customers approach us to see how our technology can fit their use cases. You know, when you think about this. This has, you know, about a 30% hit rate where you go from a lead generation that becomes current pipeline. When you look at the current pipeline today, which is active proposals and LOI firm commitment, stands at $6.2 billion. Now, that's up almost 50% from the last time that we were together. You know, you're seeing a couple of things happening in there.

There's normal churn in and out of projects, but overall, the core projects are up around $700 million. At the same time, as we've been looking and analyzing our cost position and also looking at the demand in the marketplace, there's been an increase in the price that we're bringing to the market, which is also driving up the dollar value of the current pipeline. You know, we now stand about $100 a kilowatt-hour higher on price versus where we were at the end of last year. We continue to see that momentum carry forward, and you see the booked orders, which we talked about on the earlier page, you know, the $67 million that we closed.

I feel really good about that center part of the page and us being able to continue to convert and drive towards our $400 million order target for 2022. The uptick in lead generation is also important because we have more and more people calling us earlier in the deal cycle, which allows us to tailor their project specs and help them deliver more value to their end user by using Eos technology. Overall, we see the commercial pipeline strengthening, and that's growing the current orders backlog. If you go to page seven and you look at the breakout that we always give you know, we booked $62 million, almost $63 million of booked orders. Inside our order increase, we also had change orders.

You know, when you start looking at what's happening on the execution of projects, cost inflation that we see principally around transportation and change in scope to be able to deliver on our projects. Our project team is accreting value as they go through and execute on the projects. You've got customer shipments coming out of that number, where we stand now at $212 million in backlog. Really proud of that 827 MWh of backlog. It's 28 projects with 15 different customers. You know, we are seeing customers purchase more than one project from us, and we're seeing that pipeline of projects for individual customers increase.

You know, backlog deliveries, when you look at where we are in backlog, $177 million of that is for new equipment deliveries, and $35 million of that is for long-term service revenue. Now, when you think about what we've always wanted to target as a company is a 20% ratio, and right now we stand around 17% of long-term service revenue of our total backlog. That's a number that we're gonna keep driving as we move forward. You know, what we're trying to do is get customers to commit on the long-term service agreement at the time of the new equipment order. But in some instances, they wanna wait until they go through just in a normal cycle. It's something that I've always seen as I've been in this industry for 30 years, that that's how the market will behave.

We're really seeing great activity here on the commercial side. As it relates to asset leasing and things we talked about in the past, there's been no change in the portfolio here as we go more and more with just straight product sales out into the market with a follow-on service agreement. We're looking to continue to drive this number up. We're proud to have a number above $200 million here when you think about where we started when we went public being around $5 million. Just great progress by the commercial team in getting the product out into the marketplace. Shifting gears now to talk about operational excellence. We've really seen a lot of progress in the business here, and the team that is running the facility in Turtle Creek has really done a fantastic job at improving our performance.

If you go to page 9 and we talk about building operational excellence, you can see the factory for the people who have come and visited us, you know, every time you come, if you wait about two weeks, you come back in and it looks like a totally different facility than the last time you were there. You know, we're increasing our operational scale. You know, we had 69% increase in the number of energy blocks that we got out of the factory in the first quarter. We took a 50% increase in test fill line output. The picture on the upper right-hand side of the page shows our new fill line layout. What the team has done has really been taking both Lean and Six Sigma and improving performance and output. They've taken.

You know, when we were filling batteries before, we were touching the battery 27x to go from a welded battery to a filled battery. We're now down to four, with a target to get that down to three, which allows us to drive tremendous productivity over the existing asset base. At the same time, the picture on the upper left shows our current battery welding room in the existing facility, and the picture on the right is a new machine that we brought into our new facility. As we expand that facility, this machine gives us the ability to use artificial learning to be able to improve the performance of our welders and the throughput of the machines.

Now, the key thing on that picture on the upper left-hand side, and the big change that was made by the team, is that we now have one operator running two welders, which is a tremendous amount of productivity for us across the existing asset base and also reduces the need for labor input on the product that we put out of the factory. Taking that all into account, at the same time, we're also reducing the test cycle time. You know, as we've improved and dialed in our manufacturing processes, we're getting more and more consistent batteries off the line, which is taking us less time to form those batteries and prove that they work and get them out to our customers in the field. What you've seen is a lot of work being done by the team in taking product cost out.

The work that we've been doing here over the last 20 weeks has now translated into a 14% cost out on an input basis. This you'll see as we go through and we talk about the financial performance in the quarter. You're not gonna see that 14% on a quarter-by-quarter output basis, but we are starting to see core product cost out as we scale up manufacturing. You can see the battery volume in what we shipped in the first quarter is up 56%, and at the same time, we increased our battery yield to 4%. If you remember, our target is to get to 90%, and at the end of the quarter, we ran on a weighted average of 88%, which has again, been great performance by the overall team.

What I wanna do now is shift to the next page and really talk about the operating environment that we're running the business in today. You know, this is in one of the most challenging supply chain environments that I've seen in my 30 year career. We start off on the left-hand side of the page. You know, we see, like everyone else, tremendous inflationary pressure on our overall product. When you look at the battery, our core materials, there's been a 10%-20% inflationary pressure on those materials, but what we've been able to do is go out and get multiple suppliers, sign long-term agreements, and look for lower spec and alternate materials to take down cost.

On the energy block or the containerization and Battery Management System, we've been able to increase our U.S. supply chain content, and we've gone for a non-ISO container design, which will take cost out of the overall landed product in the second half of this year. Finally, one of the biggest cost drivers, I think, across the globe right now is just freight costs. What we've done to be able to start managing that is that our product now has a non-hazardous rating, which gets us into a lower cost shipping when we're shipping final product. We've increased the U.S. content, which reduces the shipping cost that we have.

On the customer side, we're working with customers on the transportation where we're holding the costs on battery material and the energy block as we bid out into the market, but then telling the customer that as we bid freight, we're gonna have to do that on a cost-plus basis just because of the uncertainty around that design. Now, while that's happening out in the marketplace, we are taking cost out with the production scale, design, and sourcing activities. If you look at these two lines, the line that starts off at 100% is the index bill of material cost on an input basis for our energy block.

You know, if you think about this, we took 14% cost out, and you can see the cost curve coming down to where we are targeting taking nearly 50% of cost out of our product by the end of the year, while at the same time, we ramp up production in the new facility from up to adding the 550MWh to get to 800MWh of total cost. Below that graph, when you look at that, you see the timing of the interaction of taking cost out while ramping production. There'll be a lag where we'll start to see savings on an output basis in the second half of the year as we ramp up production.

We're going through this process of driving down costs while ramping up capacity, and as you get into the second half of the year, we're gonna start to see costs come down on an output basis. We feel good about that because if you look at the right-hand side of this page, we're locking in our material pricing and capacity with suppliers. You know, 76% of our 2022 material requirements are under PO. 7% have already been delivered to us and are either have been shipped to customers or in inventory. We've got 17% still to go, which ties to some of the actions that I talked about on the left-hand side of the page. You know, we're getting good tiered pricing and volume discounts from our suppliers. We're signing up long-term agreements.

You saw that with the Tetra agreement that we announced at the beginning of this year. You know, at the same time, this comes with a cost on cash. You know, we've put out $11 million in advanced payments to suppliers to lock in capacity, and now it's up to us as a supply chain and operations team to manage the delivery risk of that material coming into the factory, converting that into finished product, and getting that out into the market. Feel really good about the team that we have in place, how they're managing and mitigating the risks, and this is something that we work on a daily basis to really keep in front of this.

New things pop up every day, but the team has shown tremendous grit and flexibility in being able to manage through these and continue quarter-over-quarter to deliver more output with a higher yield at a lower cost. Really proud of the work that's being done there. With that, let me turn it over to Randy, who will walk through the financial results and then wrap up and get us into Q&A. Thanks.

Randy Gonzales
CFO, Eos Energy Enterprises

Thanks, Joe, and good morning, everyone. We appreciate you joining us this morning. First of all, I wanted to say that what this Eos team has accomplished and it continues to accomplish on a daily basis is nothing short of inspirational. This collective team is working cross-functionally to navigate the inevitable daily challenges and to overcome hurdles, including those presented by supply chain disruptions, the best that I've seen in my career. We still have a lot of work to do, but we have a plan, and this is the right team to execute that plan. This team just gets it done. Before we jump into the financial results, I wanted to mention that as many of you know, we encourage in-person visits to our facilities.

Because of what we do as a domestic supplier of energy storage systems and the role we play in the world's energy transition, especially in a world where energy security is top of mind, we naturally get a lot of attention and visits from local, state, and federal officials. We've also seen an acceleration of visits to Turtle Creek by customers and potential customers, and the reaction has been overwhelmingly positive when they see batteries coming off the line, energy blocks being assembled, and our capacity expansion in flight, especially in a time when energy storage is severely supply constrained. Turning to slide 12, I'll walk through the first quarter performance. Compared to last quarter, revenue increased from $3.1 million- $3.3 million.

First quarter revenue includes energy block deliveries to four customers, and included some of the first for the 80 MWh Pine Gate Renewables Eastover project. We saw a sequential increase in energy block volume of 69% on a revenue recognition basis from fourth quarter 2021, which was largely on plan. There are several reasons why revenue didn't increase at the same rate as volume. Customer mix is one of the drivers. The revenue per DC energy block is lower in the first quarter than the fourth quarter of 2021 as we deliver against different orders. Please keep in mind that we are currently fulfilling orders against the backlog that had lower pricing dynamics when they were booked last year and prior.

Since then, we've seen a rapid and dramatic increase in the pricing landscape due to a variety of factors, including scarcity of supply of energy storage, particularly for the stationary storage market. This increase in pricing is reflected in current quotes, and we anticipate this price realization to take hold starting in the second half of next year as we start delivering on new orders. Next, there is DC versus AC scope mix, which is unfavorable quarter-over-quarter. In the fourth quarter, we had more projects where we recognized AC scope revenue. We are just starting to ship on the Pine Gate Eastover project, and so AC scope is not required on that until later in the year. In a projects-based business like ours, revenue can be volatile on a quarter-to-quarter basis as there are multiple performance obligations embedded in our customer agreements.

We only recognize revenue as contractual performance obligations are met consistent with the revenue recognition standard of ASC 606. Various performance obligations in our agreements can include, among other items, delivery of the standalone DC energy block, installation, commissioning, and/or training, and there can and will be incremental revenue recognized for energy blocks that have already been shipped and delivered, where a portion of the revenue has been recognized in a previous quarter. Cost of goods sold in the first quarter was $35.6 million, which includes a $1.7 million lower of cost or market incremental adjustment versus the fourth quarter. This adjustment is attributable to the increase in work in process inventory from last quarter with the associated increase in overall production of batteries and energy blocks.

Quarter-over-quarter, cost of goods sold, excluding the lower of cost or market adjustment, increased 60% compared to the 69% sequential increase in energy block volume. In short, cost of goods sold is increasing at a decreasing rate, and we expect that trend to continue as we execute on the strategic priority of taking costs out of the entire energy storage system. As Joe discussed on slide 10, we reduced the overall energy block bill of material cost by approximately 14% in the quarter. This is calculated by comparing the bill of material base cost at the beginning of the first quarter to the bill of material cost at the end of the first quarter.

There is temporary lag to this cost reduction benefit since the reductions happen over the course of a period, and the on-hand inventory, which has a higher cost basis, has to work its way through the system. As a result, we saw the average energy block cost, net of the lower of cost or market adjustment, decrease 7.4% in the quarter. These cost reductions are a result of a multitude of factors, including manufacturing scale and higher efficiency, continuous improvement initiatives on the factory floor, improved product and system design, and various strategic sourcing initiatives. We invested $5 million in research and development in the quarter to improve battery performance, to reduce both the cost of the product and lifetime operating cost of our battery system, and to develop future generation technologies. SG&A for the quarter was $14.3 million.

$5 million of this total is structural. $3 million is non-cash related to stock comp expense. There is another approximately $3 million of one-time items, and the remainder is discretionary spend associated with scaling the business. Overall, our first quarter operating loss was $51.7 million. Going forward, sales volume is expected to substantially increase as capacity expands and product cost is projected to decrease by almost 50% by year-end. At the same time, we see positive pricing on 2023 shipments, and we will continue to manage our SG&A spend. Turning now to slide 13. We had $55 million of cash on hand at 31st March 2021. As we've discussed before, we have been actively working to lock in raw material delivery to match our sales plan.

As a result, first quarter cash outflows include about $11 million of advanced payments to suppliers to secure volume commitments. This was an increase of approximately $6 million from last quarter due to our rapid scale, and we expect the level of advanced payments to decrease going forward. In addition, there is another $2 million of advanced payments to capital equipment OEMs for CapEx in conjunction with the Turtle Creek capacity expansion, which is consistent with last quarter. As we discussed last quarter, the plan we are executing requires the company to raise additional capital. On 28th April , we announced that we secured a financing commitment of up to $200 million through a standby equity purchase agreement, or SEPA.

Since the facility give Eos the right, but not the obligation, to sell up to $200 million of equity to the investor, we believe this gives Eos the greatest flexibility to access capital as required while continuing to pursue additional funding options. For example, as previously announced, we continue to actively pursue a loan from the U.S. Department of Energy and currently anticipate submitting an application under part two of the loan program this quarter. Now turning to slide 14, we wanted to give an update on our progress against the 2022 full year company commitments. The facility expansion is currently underway and on track to increase our capacity to a total of 800 MWh. In the quarter, we achieved 65 MWh of a 550MWh annualized battery manufacturing capacity expansion plan in two months.

We are managing capital equipment deliveries and phasing commissioning of assets. We're on plan to the full year CapEx investment of $25-$30 million and see a path to even further expansion to support the accelerated commercial pipeline if additional capital is available. The backlog is secure to achieve $50 million of revenue in 2022, and our production volume is expected to significantly ramp in the second half of the year as the facility expansion continues to come online. Although the team has successfully managed through supply chain issues to date, the current supply chain environment is volatile for everyone and has the potential to disrupt production going forward. We continue to make progress on our 90%+ first pass manufacturing yields. In the first quarter, we achieved 88%, an improvement of 4 percentage points from the fourth quarter.

Regarding our backlog growth, we booked $67 million of orders in the first quarter, which is already about half of the total amount we booked in the entire year of 2021. Our strategy is to have 20% of our orders backlog in long-term service commitments. Currently, we're tracking at 17%, which is mainly driven by timing of new order booking of battery energy storage systems and signing of service contracts. With that, I wanna thank everybody for their time and listening in today. I would now like to turn it over to the operator for questions. Operator, will you please open up the line for Q&A?

Operator

We will now begin the question and answer session. To ask a question, you may press star, then one on your telephone keypad. If you are using a speakerphone, please pick up your handset before pressing the keys. To withdraw your question, please press star then two. At this time, we will pause momentarily to assemble our roster. Our first question comes from Subash Chandra with The Benchmark Company. Please go ahead.

Subash Chandra
Energy Analyst, The Benchmark Company

Hi, Joe. Hi, guys.

Randy Gonzales
CFO, Eos Energy Enterprises

Hey, Subash.

Subash Chandra
Energy Analyst, The Benchmark Company

I guess on the, you know, the $55 million revenue target and, if this was in the preamble, I missed it. I think it was a lot of numbers there, so apologize. With I guess a good chunk of that in the back half, the run rate would have to be a lot, you know, higher than it is. Do you have any color on the second quarter with, you know, second quarter kinda halfway done at this point?

Joe Mastrangelo
CEO, Eos Energy Enterprises

Subash, like if you look at page 10, you know, we'll have increased capacity coming online here as we go through the quarter. I think you'll see the second quarter come in from a revenue standpoint, north of where we are in the first quarter with the majority of the revenue coming in in the second half because that's when the capacity will come online. I don't know, Randy, if you wanna add anything. No, I think that's exactly right. Yeah.

Subash Chandra
Energy Analyst, The Benchmark Company

Okay. On you know cost of goods sold, I guess with what's the direction there with some of that being sort of you know pre-funding of raw materials and pre-funding of the capacity expansion?

Randy Gonzales
CFO, Eos Energy Enterprises

Yeah. Subash referenced back to slide 10. You know, the trajectory is, it's that line that starts with an index of 100, which represents the bill of materials cost at the beginning of the year. The 86 represents the 14% of cost reduction on a bill of materials basis at the end of Q1. You know, you can see we've given what our estimates are, as we continue through the year on a quarter-by-quarter basis, getting the cost down to, you know, what we believe to be the cost entitlement by the end of the year.

Operator

Our next question comes from Chris Souther with B. Riley. Please go ahead.

Chris Souther
Senior Equity Analyst, Clean Technology, B. Riley Securities

Hey, guys. Thanks for taking my questions here. So would you be able to frame the price increases for the pipeline versus the uptick we've seen in lithium-ion competition? Is there kind of a target benchmark to that competition you're going out with on a nameplate capacity price per kilowatt-hour? Or just, you know, how are we thinking about kind of pricing strategy matching, you know, your costs versus your cost increases versus, you know, kind of the market overall.

Joe Mastrangelo
CEO, Eos Energy Enterprises

Yeah. Hey, Chris. There's a couple things in there I'd like to talk through, if you don't mind. First thing, you know, when you look at the market right now, there's a shortage of lithium-ion availability for shipment over the next 12-18 months. You know, when you look at where the pricing of that lithium-ion is when there's availability, it's higher than where we were a year ago. In fact, like what we said is on our pipeline for us, we're seeing, you know, increases in pricing of $100 a kilowatt-hour, which are kind of in line with the inflationary pressure that we've seen on our raw materials as we've gone through the last, you know, 8-12 months.

Going back then on page ten, you know, we, you know, being an early cycle technology versus lithium being a mature technology, there's a lot of work that we can do on ramping up volume tiers with our suppliers, on finding alternate materials and driving cost out of the product to make the cost more competitive in the marketplace. From where we were a year ago to where we are today, you know, I think we're in a range on bid price, you know, in the high 200s, low 300s kilowatt-hour.

Chris Souther
Senior Equity Analyst, Clean Technology, B. Riley Securities

Okay, got it. You know, just on the cost visibility, can you walk through what the 17% that still is remaining here? You know, and if you could provide any update on where we see, you know, gross margin inflection points, you know, from either a timeline or volume revenue run rate, you know, given kind of the costs, inflations, the cost down efforts and, you know, the price changes and, you know, where do we think costs are gonna shake out from, you know, $ per kilowatt-hour basis versus, you know, when we're running at that, you know, 800 MWh target at the end of the year?

Joe Mastrangelo
CEO, Eos Energy Enterprises

Yeah. You had a couple things in the question, Chris. You know, the 800 MWh, that'll be capacity in the factory, the annualized capacity in the factory. You know, we're on track to be able to deliver that right now. I think the team has done a great job, you know, producing out of the building in two months. You know, we are producing batteries out of the building. We'll start filling batteries in the new building here in the next 4-6 weeks, and then ramping up production over the second half of the year to get to the 800 MWh.

You know, when you think about what the team has been able to do on driving cost down, you know, from an index starting point of product cost, you know, we've already taken cost out here in the first quarter, and we see line of sight to taking almost 50% cost out of the existing product as we get into the back half of this year. We feel good about that cost curve because, you know, that pie chart on the far left of page 10, a lot of the volume agreements have been locked in on tiered pricing with suppliers.

You know, when we look at where the $50 million revenue target is for the year, we feel comfortable shipping out of the backlog and then having the tiered pricing with suppliers, and then continuing to do material substitution and value engineering to drive the cost down to position the company. You know, as we talked about last time, we said, you know, at the end of last quarter, be an 18-month journey to get to gross margin positive, and I think we're still on that trajectory where we stand today. I don't know, Randy, if you wanna add anything to that.

Randy Gonzales
CFO, Eos Energy Enterprises

Yeah, no, totally agree. Chris, I mean, the representation again to reference on slide 10 in the middle, there has been a lot of work done here at EOS over the last 6 months with regards to the plan on cost reduction and specific actions thereof. So, you know, that's why we have so much confidence around it. That's why we laid it out this way, is because, as I mentioned in the prepared remarks, it is a strategic priority item for the company.

Chris Souther
Senior Equity Analyst, Clean Technology, B. Riley Securities

Okay. The 17% to go, is there any specific components in there?

Joe Mastrangelo
CEO, Eos Energy Enterprises

On the still to be purchased?

Chris Souther
Senior Equity Analyst, Clean Technology, B. Riley Securities

Yeah.

Joe Mastrangelo
CEO, Eos Energy Enterprises

I got it now. On that 17%, there are some things that we're working on. On the container side is really one of the biggest items where we haven't locked in the volume for the year because we're designing a made in America product, and we're waiting to place orders to see how the prototypes come from the local suppliers versus buying internationally. That's probably the biggest item that we still have to go. There are some other volume pieces that we'll look at as we get closer into the third quarter, just on our ordering points that we haven't placed the orders yet because it's a little bit early as far as pulling the volume trigger on that until we get further into the year.

Chris Souther
Senior Equity Analyst, Clean Technology, B. Riley Securities

Okay. Maybe just last one from me. Do you have a target for kind of the cash burn rates for second quarter, third quarter, given, you know, kind of the high needs in the near term? Are there any other advanced payments we should bake into the next quarter or two, or is, you know, the $40 million-ish

You know, that we would see this past quarter ex kind of prepayment type stuff, kind of more comparable to what we should expect in the near term.

Randy Gonzales
CFO, Eos Energy Enterprises

I mean, a lot of work, as you can imagine, Chris, in terms of cash forecasting and funding requirements. What I will tell you is, you know, the one thing that you do have to remember is that on these bigger LOIs and bigger projects, LOIs, MSAs, et cetera, part of the agreements on the MSAs are down payments required from customers when it gets to, especially the purchase order point. Customers really understand that, you know, we have the requirement when we get a purchase order and we start ordering material that, you know, we need the cash in order to do that. Just wanted to make sure that you understood the fact that, you know, we do get customer down payments.

Those will grow as we get these bigger orders, which we're seeing. But you know, specifically, you know, a number, you know, I don't think we're prepared to give kind of a target count.

Joe Mastrangelo
CEO, Eos Energy Enterprises

The only thing I would say, Chris, like as we go through second quarter into third and fourth quarter, right? Second quarter, we'll continue to see a mix between the PP&E coming into the company to be able to scale manufacturing and then the ramp on the raw materials. I think, you know, advances to suppliers, given the environment that we're in and wanting to lock in volume, we're gonna continue to do that to secure the relationship with the supplier and get the raw materials where we get, you know, surety of supply.

I think you'll see a little bit of shift from a PP&E and a material, you know, raw material split on cash to much more on a raw material basis as we ramp up production in the second half of the year. Then that'll be muted a little bit by the cost out that we're gonna deliver here as we go through the year. It's a mixed equation that we have to continue to manage through. I think from a outflow perspective, we'll continue to manage that tightly, and you see that in, you know, in our SG&A.

you know, we'll be consistent with where we are, but as Randy said, as customer projects start to close into firm orders, we'll see deposits come in to offset the outflows that we're doing to lock in the volume and be able to deliver.

Chris Souther
Senior Equity Analyst, Clean Technology, B. Riley Securities

Okay, thanks. I'll open the queue.

Joe Mastrangelo
CEO, Eos Energy Enterprises

Yep. Thanks. Thanks, Chris.

Operator

Our next question comes from Joseph Osha with Guggenheim Securities. Please go ahead.

Joseph Osha
Managing Director and Senior Research Analyst, Guggenheim Securities

Good morning, folks. Thanks, and my congratulations on the progress. I'm wondering if you can talk us through a little bit what the prospective timing and process looks like on this DOE, LPO loan?

Joe Mastrangelo
CEO, Eos Energy Enterprises

Yeah. Hey, Joe. So we're in the process of finalizing the Part Two application, and then we'll go into full due diligence with the DOE here as we go through the summer. You know, we've been working through with them on our Part Two application. You know, we feel like we wanna get the application right as it goes in because that'll help us as we go through the due diligence process here, which will probably, I think, realistically last through the summer into the early fall.

Joseph Osha
Managing Director and Senior Research Analyst, Guggenheim Securities

Okay. What would happen then at that point? Is that a go, no-go? What happens next? Just trying to

Joe Mastrangelo
CEO, Eos Energy Enterprises

Yeah.

Joseph Osha
Managing Director and Senior Research Analyst, Guggenheim Securities

-understand what-

Joe Mastrangelo
CEO, Eos Energy Enterprises

Yeah. The next phase in this, Joe, is conditional funding on the loan, and then from there, you'd get into executing on the investment program to then draw down on the loan as we move forward.

Joseph Osha
Managing Director and Senior Research Analyst, Guggenheim Securities

Okay. Wrapping that all up then, if this works, which I'm sure it will, when might we possibly see funding, you know, hit Eos from that LPO?

Joe Mastrangelo
CEO, Eos Energy Enterprises

Yeah. Look, I think realistically, we're looking at, you know, end of third quarter into and beginning of the fourth quarter, depending on how the due diligence goes here, as we move forward through part two.

Joseph Osha
Managing Director and Senior Research Analyst, Guggenheim Securities

Okay. Thank you. Just to shift gears, I'm wondering, and I've got Ameresco in mind. I'm wondering if you're seeing anyone out there actually decommit at this point from lithium-ion and toggle over to your technology. Is that something that you have seen happen?

Joe Mastrangelo
CEO, Eos Energy Enterprises

What we've seen happen, Joe, is many people come back with tight delivery timelines and saying, "Look, where we thought we were gonna get delivery is now being challenged. Would you guys be able to deliver in late 2023 or early 2024?" We're working on a lot of projects now where people are coming and saying, "Let's sit down and go through the project specifications, work through on your technology." That's why you see the big uptick in the pipeline this quarter. As far as

Randy Gonzales
CFO, Eos Energy Enterprises

Them having firm commitments and saying, you know, we've walked away from lithium-ion, I haven't heard them come and tell us that, but I can say that there have been projects where we were told previously that customers are going in a different direction, who are now coming back and saying, "We'd like to come and visit Turtle Creek and walk through where you are on your manufacturing scale-up, and then see if you can deliver the project in our project timeline." There's a lot of those discussions going on right now.

Joe Mastrangelo
CEO, Eos Energy Enterprises

It's really more kind of people hearing that, you know, they're gonna get cells at, you know, and at the end of 2023 at the best, and saying, "Hey, I wanna come back and perhaps bring EOS into that conversation.

Randy Gonzales
CFO, Eos Energy Enterprises

Right. Right.

Joe Mastrangelo
CEO, Eos Energy Enterprises

All right.

Randy Gonzales
CFO, Eos Energy Enterprises

Exactly.

Joe Mastrangelo
CEO, Eos Energy Enterprises

Okay. Thanks very much.

Randy Gonzales
CFO, Eos Energy Enterprises

Thanks, Joe.

Operator

Our next question comes from Tom Curran with Seaport. Please go ahead.

Tom Curran
Senior Equity Analyst, Seaport Research Partners

Good morning.

Randy Gonzales
CFO, Eos Energy Enterprises

Hey, Tom.

Joe Mastrangelo
CEO, Eos Energy Enterprises

Hey, Tom.

Tom Curran
Senior Equity Analyst, Seaport Research Partners

Randy, in your model that projects Eos can achieve its first positive gross margin by the second half of next year, what annualized sales or shipments run rate do you assume at that crossover point into positive territory? You know, what annualized revenue level does it require?

Randy Gonzales
CFO, Eos Energy Enterprises

I mean, let me answer it at a different way, 'cause I'm not gonna give you a direct answer to the question. We're in the current generation product. We know what our cost entitlement is with regards to the current generation product. We're on path to getting to that cost entitlement. The gross margin positive is getting to our next generation product, which is currently under development and design. The design approach is all around design to cost, design to manufacturability. Yes, as part of that, there is volume assumptions, but I wouldn't really be so worried about those volume assumptions since we have the backlog.

It's all about, you know, particularly designing the product to begin with to be, you know, a lot less than the current generation product, but also designing for, you know, the process manufacturing in general, so we can output more product in less time.

Tom Curran
Senior Equity Analyst, Seaport Research Partners

Got it. Let me maybe ask from a different angle, just directionally, at the point you do break through to positive gross margin territory, would you expect the average revenue per Znyth system to be higher or lower? Because we kind of have these two conflicting trends, right? On one hand, you've increased pricing recently, but on the other hand, you're pursuing this longer term secular objective of bringing, you know, the price you need down to be as competitive as possible with the cost curve for lithium-ion batteries. So I'm just wondering how we should expect those crosscurrents to shake out for, you know, where pricing will be at that point.

Randy Gonzales
CFO, Eos Energy Enterprises

Yeah. I mean, good question. I mean, the pricing dynamics that we talked about and, you know, what we're quoting and the expectation of those current quotes to convert to orders, and that'll be largely in line with the same timing as the new generation product comes online. You know, I mean, every day that passes, given the pricing dynamic, I mean, we're more and more confident that we're going to have a, you know, a solid gross margin on the product, you know, not only because of the design work that we're doing, but because of the pricing dynamics that we expect to, you know, last well into the future here.

Joe Mastrangelo
CEO, Eos Energy Enterprises

Tom, the one thing I would add on the cost side of the equation, you know, even in this high inflationary environment where depending on how you look at where lithium pricing is from a raw material standpoint and the inflation they're experiencing, when you look at our page ten, the inflationary pressures that we see are much lower than I think other technologies are seeing in the space, and we need to manage that number down and continue to take cost out of the product. That's part of what we're doing in the next generation product. Yes, pricing is a tailwind for us here in the short term, and I think that will carry through.

I don't think this is a month phenomenon. This is probably a reset of a baseline that will carry forward. From there, we've just got to continue to drive our cost curve down in the environment that we operate in. I think we've got a core bill of materials with earth-abundant raw materials that don't see the same inflationary pressures that you see with other technologies.

Tom Curran
Senior Equity Analyst, Seaport Research Partners

Joe, then you've given me, you know, the perfect segue to my final question on this crossover timeframe into positive gross margin territory. At that point, what should your operating cost structure look like? Randy, how should COGS break down by major component? Just looking for an idea of what the rough percentages should look like.

Randy Gonzales
CFO, Eos Energy Enterprises

I mean, the basics of the product itself are not gonna change in terms of, you know, there’s gonna be the electrolyte component, right? I mean, we’re taking a lot of cost out of the product in terms of the way it’s assembled. It’s really, you know, it’s really simplified. You’ll see a dramatic reduction in the material - battery material component, you know, with the way it’s actually manufactured. You know, there’s a lot of work being done in terms of alternative material from some of the material that we’re using in the current battery generation.

Joe Mastrangelo
CEO, Eos Energy Enterprises

Tom, what I would say is here's how I think about it if you take those three buckets to the left-hand side of page 10. The battery component of the system that you're selling is always gonna be 60-something percent of the total, right? Then you've got another 20-25%, you know, that's kind of the raw materials that go into the system. You've got conversion cost, which as Randy is pointing out, as we move to the next generation technology, the throughput goes up, the ease of manufacturing goes up, that will come down.

Then there's a big bucket, which is just the freight and transport of getting things where you need to be, which the approach we've taken, which is a little bit different than what everyone else is doing in the market, is we've said, "Look, we've got to manage those first two buckets of how we handle the raw material and the processing cost of getting that out in the field." Then on the freight side, what we're telling everybody is, like, "Let's get on the same side of the table, and we will bid that out and put a handling charge on top of that, but not, you know, make a forward commitment on that because that's one thing that we really don't control, and there's very little that we can do about that." As you look at this bridge, the battery in and of itself, you know, is always gonna be the higher component.

We're using lower cost raw materials into that battery now as we move forward. On the system side, we're moving and making two moves to take cost out as we move forward. One is going away from an imported ISO shipping container to a locally manufactured containerized product that takes cost out and takes out the freight that you have to deal with and the uncertainty of getting deliveries of those units, and then moving to standardized, readily available electronics to be able to take the cost down and expand your supply chain on the Battery Management System.

Tom Curran
Senior Equity Analyst, Seaport Research Partners

Great. That was helpful and helps us better understand the evolution of the economics you're expecting as, you know, you scale up, ascend the manufacturing efficiency curve and optimize your cost components. So that's

Joe Mastrangelo
CEO, Eos Energy Enterprises

Right.

Tom Curran
Senior Equity Analyst, Seaport Research Partners

That's what I was looking for. Thanks.

Joe Mastrangelo
CEO, Eos Energy Enterprises

Yeah. Right. Tom, the way that I always think about this, and I think this is important, if you don't mind just adding one other thing in on clarification, is like the technology that we bring to market has not fundamentally changed. The battery in and of itself, of how it operates chemically has remained the same for more than a decade. What we've been working on as a company, and I think what every battery company goes through as they try to scale is we went from mechanically bolting together cells in the battery, cycle time's too long, cost too high, quality issues. Gluing the battery together, high variation in manufacturing throughput, was extremely hard to center and get a Six Sigma process around that manufacturing.

Went to infrared welding, which gets us a perfect battery that we're now approaching yields that are in the Six Sigma range, but cycle time's long and add complexity to the next generation of the product being assembling the product, which allows a higher throughput at a lower cost point for your processing cost. That's really what we've been focused on here to drive down cost and improve the performance of the product.

Tom Curran
Senior Equity Analyst, Seaport Research Partners

Got it. Very clear. Thank you.

Joe Mastrangelo
CEO, Eos Energy Enterprises

Thanks. Thanks, Tom.

Operator

Our next question will come from Martin Malloy with Johnson Rice & Company. Please go ahead.

Martin Malloy
Director of Equity Research, Johnson Rice & Company

Good morning. I wanted to ask about this cash burn again. You know, at the current cash burn rate, $40-$50 million, depending on the advanced payments that you're making, you know, it looks like, you know, maybe you've got enough cash for another 3-5 months. Can you give us any help in terms of the capital that would be required to reach free cash flow positive? I'm just trying to get an idea of the potential dilution here, with this SEPA arrangement and where your stock price is.

Randy Gonzales
CFO, Eos Energy Enterprises

Well, yeah, Martin Malloy. Good morning. Good question. I mean, we're not gonna be free cash flow positive this year. You know, in terms of the cash burn rate, and the requirement for additional funding, we have the SEPA facility. You know, we mentioned the DOE loan and kinda expected potential timing for that. You know, we are, you know, the SEPA gives us flexibility. Think of it as an elegant, you know, at the money transaction, but, you know, with a

Joe Mastrangelo
CEO, Eos Energy Enterprises

With a partner on the same side of the table as us that we can, you know, draw down as necessary to bridge that gap. Other options that we're pursuing, you know, not just potential equity options. I wouldn't assume that whatever you're modeling in terms of requirement for additional funding is gonna be all equity.

Martin Malloy
Director of Equity Research, Johnson Rice & Company

Okay. Thank you. That's helpful. That was my only question. The rest have been asked.

Joe Mastrangelo
CEO, Eos Energy Enterprises

Sure. Thanks, Martin.

Operator

This will conclude our question and answer session. I would now like to turn the conference back over to Joe Mastrangelo for any closing remarks.

Joe Mastrangelo
CEO, Eos Energy Enterprises

Thanks. Again, thanks everybody for the Q&A this morning and for listening in on the call. Again, you know, we continue to progress in the journey of becoming a profitable operating company. I feel really good about where the market is, and you heard some of the dialogue that we had here this morning around lithium availability versus us expanding capacity and having readily available, cost-effective raw materials that we'll continue to navigate as we've always navigated my four years here.

With the company focused on conserving cash, finding the right formula for growing the company, which will be a mix of the SEPA, which allows us to feather in versus make big chunks of equity to manage through to when we bridge to the DOE loan, which will help us expand the capacity to truly grow the company as we move forward. We'll continue to look at other opportunities here to be able to fund the company in the most cost-effective way for our shareholders and to achieve the growth that's out there for the company. You know, as we know, we're experiencing a tough moment in the capital markets, but at the same time, I would say in our operating market, every day becomes stronger and stronger.

The tailwinds blow harder and harder, pushing us forward here as you look at the world needing cost-effective, more than four-hour energy storage, and us being able to deliver that, and having a factory out in Turtle Creek that continues to set production and yield output milestones as we continue to operate and bring volume into the factory. From an operating standpoint, it's an exciting time to be inside of EOS and watch the company grow. We'll continue to do that in the most effective means possible, from a capital allocation standpoint. We're very excited about how the market is progressing and how the company's positioned to grow and look forward to sharing that progress with you here in the future. Thanks for listening this morning. Talk to everyone soon.

Operator

The conference has now concluded. Thank you for attending today's presentation. You may now disconnect.