GE Aerospace (GE)
NYSE: GE ยท Real-Time Price ยท USD
309.62
-9.26 (-2.90%)
At close: Nov 20, 2026, 4:00 PM
310.30
+0.68 (0.22%)
After-hours: Nov 20, 2026, 5:02 PM EST
โ View all transcripts
Baird 2026 Global Industrial Conference 2026
Nov 10, 2026
Summary
Strong 2026 momentum lifted full-year profit and cash outlook, while 2027 services growth and >100% cash conversion are expected to continue. LEAP, wide-body aftermarket and CPP investment underpin longer-term growth.
Good afternoon, everyone. My name is Peter Arment. I am the Senior Aerospace Defense Analyst here at Baird. We are delighted to have GE Aerospace with us here today. From GE, we have Rahul Ghai, who is Senior Vice President and Chief Financial Officer. Rahul, thank you again for your continued support for the conference. Really appreciate it. Welcome. Rahul is going to make a couple opening comments, and then we will get into a little Q&A. Rahul, welcome.
Thank you, Peter. Thanks for having us. Much appreciated. It is a big conference, so thank you for allowing us to meet some investors. It has been a busy fall. Just maybe taking from the top, really good momentum in the business. We have the largest installed base between commercial and defense in the industry with 18,000 engines, and continued commercial success building on that installed base. Just since we released earnings, and in the third quarter here, we got the LEAP-1B order of about 300 engines from Turkish Airlines. On the defense side, our engine for the NGAP program got down selected for the next phase. Just continued commercial momentum. Operationally, very strong. We have had 26% services growth year-to-date, and 21% engine deliveries increase on a year-over-year basis. Good operational momentum as well.
As most of the people in the room probably know, we also announced the CPP transaction just after Labor Day. The thinking behind that was, on the strategic side, we wanted to do two things. One, the castings is one of the most mission-critical components in our industry, and we wanted to build capacity on that or for that commodity, not just for ourselves, but for the industry in general. That goes for defense, that goes for commercial, because that is a critical component that is needed for continued growth of output across our product lines. The second thing was we have been testing this new airfoil that runs much cooler, and we have about 3,000 test cycles on that new airfoil. It is more durable, and it will increase the time on wing for both the current generation and our next-gen products.
As we think about bringing that technology to market, this acquisition definitely accelerates the time to market for that new technology. That was the second strategic reason for doing that. Operationally, as we think about the transaction, clearly there is value that FLIGHT DECK can bring to how CPP is run today. We have demonstrated that with our own results over the last couple of years, but now even more so with, and we can take that to CPP, reduce the scrap, reduce the rework that happens as they produce their both structural and airfoil castings. You put all that together between the strategic and the operational benefits that we drive, that leads to a year one accretion on EPS and free cash flow for the GE share owners, and a double-digit ROIC as we get into early 2030. It should be a good financial transaction.
On our financial performance since we started the year and in the third quarter, our orders were up 50% year-over-year. So really strong momentum on orders, including commercial services that was up 23%. Commercial services is up about 30% on a year-to-date basis. So strong orders momentum across all our product lines. That translated into really strong revenue growth. Our revenue was up high teens, profit of $3 billion, margin expansion of 220 basis points in the quarter. So really strong third quarter results. That is largely on the back of our strong commercial services performance. That is our commercial services performance. Our revenue is up like 26% on a year-to-date basis. That allowed us to raise the full year guidance.
Our full year for the year, we can now grow our profit about $2 billion, grow cash flow $1.5 billion for the year. That gets us very, very close to our 2028 targets on profit and exceeds the target for 2028 that we had provided just last summer. So much stronger growth rates than we expected in the business when we gave our 2028 guidance in July of 2025. So great operational momentum, great commercial momentum, financial results are strong. We expect that to continue as we get into 2027, and we're expecting commercial services to be up low double digits next year, which is higher than our double-digit kind of run rate that we had expected. That low double-digit growth is mostly going to be driven by the engines that will be off wing as we exit this year.
That'll be more or less in our backlog, and the removals that we are expecting in the first half based on the number of cycles that the engines have already flown. So they need to come off because it's time for an overhaul. That should drive continued profit growth as we get into 2027 as well. So that's where we are. With that, I'll let you
Terrific
proceed us with
Great overview, strong momentum in 2026. You talked a little bit about 2027. You also mentioned, I think, high single digit, expecting high single-digit growth in defense and propulsion technology as well, in addition to the low double digit. I guess beyond those comments, what assumptions are most important to you as you kind of build the plan for January? What is the best, like where is the visibility the strongest? Maybe thinking into airline conditions as well, production rates, execution, kind of all those things wrapped up in it.
Absolutely. Again, just like thinking about 2026 on defense, maybe we start there. We're expecting high single-digit revenue growth for defense. The defense backlog is up 20% this year, 33% orders growth on defense. Defense book to bill is like 1.5. We expect high single-digit growth next year with continued margin expansion on the defense side. As we think about the commercial business, we're expecting on the services- $3.5 billion-$4 billion of revenue growth, which is the low double digit that I mentioned. That $3.5 billion-$4 billion is higher than what we started our expectation in 2026. Because we started the year, we were expecting $3.5 billion of services growth. The ending is like $5.5 billion. So, better momentum during the year than what we expected in the beginning. Next year, our initial part is $3.5 billion-$4 billion.
That, as I said a minute ago, is mostly driven by the backlog that we'll have at the end of this year, and the engines that will come off wing in the first half of next year. You combine that with improvement in work scopes that we're expecting, and I'm sure we'll get into that here, Peter, so I won't spend too much time on that, and the improved pricing. You put all that together, that gets us to the low double-digit growth rate, which is better than what we are, what we kind of normal run rate is.
The good news there is, and that why we feel confident about that growth is because if you look at, even with a strong 26% year-to-date services growth that we've had, our spare parts backlog and the backlog that is delinquent is actually up sequentially, and up since the last couple of quarters. So the backlog continues to grow, which speaks to the strong demand environment that we are in. So that's on services. On the engine side, we expect engines to grow higher than our services on a percentage basis, but obviously engines or the OE side is a smaller business. So the dollar growth will be lower than services, but the percentage growth will be higher.
We will continue to build on our GE9X shipments to Boeing as well, and that has an incremental financial impact of about $300 million as we think about 2027 versus 2026. You put all that together, commercial engines and services should be, the margin should be consistent with 2020, given the services growth offset by the GE9X impact. Total company, we haven't really commented on profit, but we did speak on our earnings call that our margins should be consistent with 2026 at the total company level. But if you take our revenue growth, you take consistent margins, that just means strong continued momentum on profit growth with continued 100% plus conversion for 2027.
Yeah. So I was going to ask right about cash conversion.
Yeah
You led me right there.
Yeah.
Just, how durable is cash conversion as shop visits and investments kind of continue to grow? How do we think about that?
Yeah. This year, Peter, just to kind of anchor everyone, this year's our latest cash guidance is $9.1 billion-$9.4 billion. Last summer, we said $8.5 billion by 2028. So we're exceeding the 2028 target by, call it, $600 million-$1 billion in 2026. So a couple of years earlier. That's at 110% conversion. So the conversion has been very strong. A big driver of that has been the continued billing increase and the favorability on contract assets and liabilities. As we think about 2027, we expect greater than 100% conversion even for 2027. The favorability on contract assets and liabilities will come down, won't be as strong, just given the increase in shop visit output. So that'll continue to grow, so that favorability won't be as strong.
But our inventory has been building up because just given the material availability, we don't get all the material that we want from all our suppliers. So we've got a lot of trapped inventory right now because we've got nine out of 10 parts for an engine, we don't have the 10th part, right, to complete a shop visit or an engine. So, as material availability gets better, our inventory growth should moderate substantially as we get into 2027. So that kind of offsets that. Therefore, we expect greater than 100% conversion for 2027 as well. As we look beyond that, if you get into the medium term, we still should be in that 100% range, even over the next few years.
Perfect. Let's talk a little bit about services and orders. What determines how quickly some of the kind of strong commercial service orders become revenue? What's the driver there?
Yeah. The typical cycle, Peter, is six to nine months. On average, if things are flowing seamlessly across our value chain, you would think six to nine months, because this is a shorter cycle business. But given where the material availability has been, and even though material availability is getting a lot better, we've had probably 10 consecutive quarters of material increase, and last quarter they were up 10% both sequentially on a year-over-year basis. So material availability is getting better, but even with that, as I said a minute ago, both our backlog and our delinquent backlog, both have increased on spare parts. So the cycle is more closer to 12 months, if not maybe even slightly longer than that. So it is lagging behind, but it is converging.
I spoke to some of these numbers earlier, but our orders growth this year has been 30% year-to-date, revenue growth of 26% year-to-date. Those numbers are converging, but still not exactly there.
Yeah.
Keep getting better, but that is what makes us feel better, that the orders that we've received this year, they should convert into revenue in 2027. Thus, the confidence in this continued strong services growth for next year.
Got it. Perfect. Let's stick with kind of an aftermarket theme around kind of your worldwide shop visits, maintaining around the 2,400, I think was the number next year that was out there. That, I guess, is in your opening comments, we talked, you'd mentioned the work scope, you said we'd probably talk about it. Is that kind of the flat work scope that you were kind of referring to? Maybe just flush that out a little bit regarding when you think about retirements and supporting also the airframes.
Absolutely. Peter, you're talking about CFM56 shop visit 2,400. I think that's what you're referencing. Overall, listen, if you look at the CFM56, it's a relatively young fleet. Two-thirds of the engines have not yet gone through a second shop visit. If you look at the work that we do, more than 80% of the work that we do is on the first or second shop visit, engines that are less than 20 years old. Most of the retirements that are happening are happening in the 20-year-plus range. The retirements does not really reduce and impact the shop visits directly. But even if you touch on retirements a little bit, when we started the year, we were expecting the retirements on CFM56 to be between 2%-3% for the year.
Based on now, with 10 months kind of behind us, we think the number is going to land somewhere below 2%. The retirements continue to kind of lag behind our initial expectations. As we think about next year, we expect 3%-4% retirements for next year. But given the rate pushout of rate 52 at Boeing into now second half of next year,
Yeah
that probably takes the retirements closer to 3% than 3%-4%, right? Just given that there won't be as much OE output as there was previously expected. So that pushes CFM56 retirements closer to the 3% range. We had taken up the number of shop visits for CFM56, as you mentioned, to 2,400 back in the summer. That was obviously built on that 3%-4% retirement rate. Now, as we think about a 3% retirement rate, that probably gives us a little bit of contingency in that number.
Okay. Yeah.
Even if other things happen, we should be able to get to 2,400. I think that's kind of our overall expectation now. As we think about the work scopes on CFM56, the work scopes are driven by the amount of cycles the engines have already flown, and most of the work with the engines that we are seeing right now need a replacement for the life-limited parts. There's not a lot of variability in the work scopes that the airlines can manage because those life-limited parts do need to change, and they need a new stack of life-limited parts. So that is driving the work scopes. The work scopes are largely consistent.
There's not been a huge change here in the last few quarters, and that's what we expect for 2027 as well, that the CFM56 work scopes should be consistent with this year, very similar, and the growth will just come from incremental price and slightly higher shop visits next year.
How sensitive is the CFM56 aftermarket to kind of the fuel prices or things of that nature? We're obviously planning for a lot more deliveries and used material availability.
Yeah.
That's out there as well.
Absolutely. I think in the longer term, of course, there is a linkage between the two. But in the near term, as the work for 2027 is more contingent on the cycles that already have been flown, and if you look at the number of parked aircraft, the parked aircraft is still below where it was before the start of the conflict. As I said a minute ago, the retirement rates have not increased. So we've really not seen any change in fleet plans based on what is happening in the air traffic.
So if you look at the work being contingent on the number of cycles being flown, the fleet plans of various airlines just learning from their COVID experience, not changing a ton, a lower OE growth rate, especially at Boeing for next year, I think that just gives us confidence the CFM56 is going to be here strongly in 2027 and beyond. That does not factor in any of the power demand that is emerging.
Right.
Right? Because I am sure a lot of people in the room are aware of a lot of need for our engines to power the new data centers, and that has largely been a wide-body play. Now with the tightness in the number of engines that are available for data centers and the power needs that the data centers have, there is a lot of push to convert CFM56 engines for the data centers as well. So that gives us another leg of growth and absorbs a lot of retirement that may have otherwise created some used material in the market. So it reduces the cannibalization of OE sales. I think given everything that I have just said, I think we expect that shop visits for CFM56 should stay in the 2,400 range for 2027 and 2028, then gradually starting to come down.
But the revenue growth should continue right into 2030, given price increases.
Very clear. Thank you. Let us talk a little bit about LEAP service margins. How should we think about what must happen for LEAP service margins to kind of reach the broader service margin level as kind of the target in 2028?
Yeah. So listen, overall, really pleased with how LEAP is doing. Our backlog for LEAP is now more than 17,000 engines. If you look at Boeing, of course, that's 100% because we have the sole supplier. At Airbus now, our backlog for the undelivered aircraft at Airbus is now at close to 70%. So 70% share on the backlog at Airbus, 100% share at Boeing. So really strong commercial success that I spoke to earlier. That's on one side. If you look on the services profitability that you just asked about, Peter, our services business broke even in 2024. What we're expecting is by 2028, the LEAP services margins get to the overall commercial services margin. So within a four-year time span, there's going to be a huge ramp-up in margins, and we are tracking really well to that. It's not back-end loaded.
We are on a steady state up curve on our LEAP services margins. It's coming, I would say, largely from three things. One, the cost.
Yeah.
The cost of the shop visit is coming down. It's coming down for two reasons. One, we are expecting about 25% growth in number of shop visits every year on a CAGR between 2024 and 2030. If you look at that, we have a fixed install base. We are pumping more volume through it. So basically, it helps us with fixed cost absorption. The second thing that we're working on is we're developing a lot more repairs for the LEAP parts, and the number of repairs growing is like 20% every year. Anytime we don't need a new part and we use a repaired part, the cost is like a fraction.
Yeah.
That brings down the cost of the shop visit. The second thing that is happening is that the third-party channel is growing. Maybe if you go back a couple of years, about 10% of the shop visits were performed by a third-party channel partner. This year, the number is 15%. If you look at our services backlog of number of shop visits globally, that number is closer to 25%. That number will continue to climb up, and as the external channel grows, that comes with higher margins. The third part of that, the LEAP margin expansion is going to be on price.
Yeah.
If you look at the pricing of shop visits, the pricing of shop visits is up 50% from 2019 to 2021 timeframe, so kind of the COVID and the launch period, to between 2022 to 2026. What we are selling the shop visits is like 50% higher. That begins to show up in 2028 in a very, very small way, but maybe a small contribution, but a lot more beyond that. If you look at 2030 LEAP margins, that incremental pricing should contribute almost two points of margin expansion for LEAP. LEAP will get to overall services margins level by 2028, with additional margin expansion beyond that. Then if you look at the profits on a dollar basis, LEAP and CFM56 should contribute kind of similar levels of profit by the time we are in 2030.
Wow.
Really, really strong. Again, going from break-even in 2024 to CFM56 type of profit by 2030. It has been a really good story for us.
Yeah, it is terrific. Maybe staying within services, just talk a little bit of how much runway remains within the wide-body services cycle with thinking about GE90 and GEnx, as those kind of fleets mature. How much will work scope continue to contribute to growth? How are you thinking about that?
Yeah. No, listen, overall, wide-body franchise is something that is really strong for us. We power maybe about 55%-60% of the wide-body cycles in the world between GE90, GEnx, and CF6, right? Those are three kind of key franchises. What we are seeing for wide-body is our overall services growth for this year is very similar between wide-body and narrow-body. Wide-body is growing really nicely, and it is coming from, I would say, kind of three main things again. One, on GEnx, we expect the install base of GEnx to double between 2024 and 2030. A lot more growth on GEnx just because that new engine, it continues to grow. On GEnx, 50% of the engines have not seen their first shop visit, 90% have not seen their second shop visit.
As they go from like a quick turn to the first shop visit, second shop visit, we are seeing a work scope increase, right? Very similar to LEAP, the pricing for GEnx shop visits has also been increasing. I quoted a number of 50% growth in a LEAP shop visit price. Equal number for GEnx is that GEnx shop visits are now 30% higher. The price of a GEnx shop visit is 30% higher over the last few years than if you go back to before 2020. That drives kind of the GEnx growth.
Yeah
Then on GE90, a lot of demand, just both for passenger and now increasingly for freight. We miss the kind of the freight story, but if you look at the departures for freight, they are up call it mid-single digits this year, just given the disruption in shipping lanes, a lot more air freight, which was similar to where we were last year. A lot of GE90, we have seen almost no retirements on GE90, just given the increased need for freighters and the push out on the 777X from Boeing.
If you put all that together, GE90 install base is very steady, and the growth is largely coming from increase in work scope, because we are seeing a lot more second shop visits for GE90, and that is like a 50, 60% higher work scope on GE90 in a second shop visit versus the first shop visit. CF6 is steady as it goes, right? Between GEnx install base growth, work scope increase, pricing, all that is working in our favor. GE90 work scope expansion is working in our favor, and CF6 is steady. You put all that together, it is a great franchise, and we think that is a high single-digit growth services business with above overall CS service margins. Margins on wide-bodies are very strong.
Yeah, good tailwinds there. Let us maybe switch a little bit to GE9X.
Yeah.
Maybe how should investors separate the GE9X timing effect from the underlying equipment economics?
Okay. Yeah. I think what you are trying to get at, Peter Arment, is, okay, on the financial impact that we are seeing, how much is from engine shipments and how much is the rest?
Yeah, that is right.
Yeah. If you look at, again, proud to be in the wing on 777X, the backlog currently sits at more than 1,300 engines. We have been shipping engines to Boeing starting last year. We shipped more in the first half of this year. The shipments continue. If you look at the total financial impact to us, it is about a losses of $250 million or so in the first half, expecting similar amount in the second half.
Yeah.
About $100 million of that 250 in the second half is going to be like R&D, somewhere in that range, and the remainder is going to come from engine shipments. Where we're spending the R&D is obviously dust, durability testing, making sure that that engine is as durable as it can be. The engine's been certified since 2020, so all we're spending money is just making sure that the durability is strong coming out of the gate, and that is where the R&D money is going. That's kind of where we are. As I said earlier on your 2027 question, overall, we think the financial impact is go from like $500 million or so this year to with an incremental $300 million of losses for next year.
Got it. All right, let's quickly touch upon CPP. I think that's
Yeah
hard to ignore and not ask you. So, how are you thinking about that? How's that change capacity, technology, some of the returns you're thinking about there?
Yeah. I said a couple of things in my opening comments, but again, the strategic rationale here, Peter, is around building incremental capacity for the industry. Our defense customers need it. CPP has some of the key components on a lot of the missile programs. The technology at CPP is very, very strong. So CPP provides airfoils for us for our most advanced engines. They provide airfoils for LEAP, they provide airfoils for GE9X, which is our highest technology airfoil. So they have the technological capability. We need to build some capacity. I think our ownership of that business will drive that build-out of capacity, because we'll take a longer-term view of that business. So that's one. Then secondly, as I said earlier, that we've been testing this new airfoil that runs much cooler. So it's been under development.
We have 3,000 cycles of testing on that new airfoil, and owning that asset in-house will accelerate the time to market. That was kind of the second strategic reason. Then you've seen the value that FLIGHT DECK has added to our business with-
Right
kind of, if you look at a two-year stack of services and engine growth, two-year stack is close to 50% growth on services and on engine deliveries, and that's all FLIGHT DECK. I think we can bring the same mindset to CPP and reduce their scrap, reduce their rework, drive higher output. That's kind of the thinking behind-
Yeah
doing that. As I said earlier, for our share owners, that should be an accretive transaction both on an EPS and free cash flow basis in 2028.
Terrific. Let's wrap up with kind of capital deployment.
Yeah.
Maybe how does CPP change the balance between organic investment, innovation, anything else that is on shareholder returns, how you are thinking about that?
Yeah, it does not really change anything, Peter.
Yeah.
Luckily, given the strong cash flows we have had, we are an A- company right now, so a lot of cash on the balance sheet. So we have deployed some of the cash towards CPP acquisition, but our dividend is still up 30% this year. We expect dividend to continue to grow because we are still below kind of what we are targeting as percentage of net income. So we expect dividend to continue to grow. And then we are buying about $7 billion of our own shares this year, and we continue, as we think about 2027 and beyond, we still feel that our goalpost, that greater than 70% of our free cash flow goes back to share owners. That does not change with this transaction. So I think we are going to maintain our buyback posture. We are going to maintain our dividend posture.
Yeah, and still be able to invest in things like RISE and things.
Absolutely. That organic investment comes first. We are investing $3 billion in R&D between our own funds and customer-funded funds, and then about $1 billion in CapEx. R&D is going towards LEAP, just improving the durability. R&D is going towards GE9X, as I said earlier. For future of flight, between our commercial RISE, we are working on the Open Fan, we are working on a compact core, we are working on hybrid electric, and then obviously for 6th Gen defense, our R&D is going towards that, and then on the Collaborative Combat Aircraft, the CCAs. That has been our investment for defense.
Terrific.
That does not change either.
Terrific. Well, we are out of time, but thank you so much for everyone joining us. Rahul, thank you again for-
Thank you.
joining the conference.
Yeah.
Thank you again.