Summary

Jan-Sep revenue rose 42% to €47m and EBITDA increased 45% to €18.5m. 2026 production growth guidance remains 10%-20%; exploration and Southern Gold Line development underpin long-term expansion.

Anni Turpeinen
Chief Communications Officer, Endomines

Hello, everyone, and welcome to Endomines' Third Quarter Results Webcast. Thanks for joining us today. My name is Anni Turpeinen. I am the Chief Communications Officer here at Endomines, and with me in the studio, we have our CEO, Kari Vyhtinen, and our CFO, Minna Karttunen.

Minna Karttunen
CFO, Endomines

Good afternoon.

Anni Turpeinen
Chief Communications Officer, Endomines

Our agenda today is that, first, Kari will share the main points from the third quarter and the first nine months of the year. He will also give you an exploration update. After that, Minna will go through the financials in more detail. Kari will come back to the stage with the strategy and our plans for the future, for the rest of the year, and for the upcoming years. As always, at the end of the event, we will have questions- and- answer session where we will be answering to your questions. You can send your questions via chat during the presentations, and please remember to type your questions in English. As a reminder, this webcast is recorded, and the recording will be available on our website later on today. Now we are ready to start, so let us go. Go ahead, Kari.

Kari Vyhtinen
CEO, Endomines

Thank you, Anni. Good afternoon, everybody. Extremely pleased to be here today and go through the financial and operational highlights of January- September 2026. This was a record-breaking time for Endomines. If you look at the financials, we had very strong financial figures. Our revenue has grown by 42% to EUR 47 million. The EBITDA has grown by over 45% to EUR 18.5 million, and it is approximately 40% of the revenue. The net result has increased to EUR 13.8 million, and it is close to 30% of the revenue. So very, very strong financial results, which have really turned the company around and allowed us to invest a lot for the future growth. Our operational cash flow was EUR 17.1 million during January, September, so also very strong operational cash flow that we used for investing activities.

There were other items, key developments during the nine months and third quarter. If we look at the third quarter, the UKKO, so our main exploration target, it just keeps delivering. We are getting excellent results every time we publish. Last time, we identified two new gold zones in the north, and that expands the potential area around UKKO by 1.7 km. We also extended our Boliden partnership agreement, so we sell our concentrate to Boliden, and that was now extended until end of 2032. The new agreement is better tailored for our needs, and we estimate that this will also have a positive effect on our net result in 2027, and the effect will be approximately EUR 1.7 million-EUR 2.3 million.

This comes from the fact that with the new agreement, we can optimize the grade and the recovery better, and this allows us to optimize the process in a way that we make more money. Then the sustainability. We started a pilot project to test new, more sustainable mine waste deposition method. This is the dry-stacking. It hasn't been used in Finland before, but it's used in other countries, and we see that one as a very important item in the future plans, that we start to use this item and get rid of these flotation sand areas that are very common in the mining industry. Then the Southern Gold Line, it's advancing as planned. Our plan is to increase the gold production to 70,000 to 100,000 ounces around 2030, and this work has continued as we have planned before, and everything is moving ahead nicely.

At the same time, we plan to start producing also tungsten and molybdenum, and during the third quarter, we published tungsten and molybdenum results, which confirm the potential, and we have also been very active going forward in the development plans that we currently have ongoing. We are building the foundations for future growth and really want to thank everybody, the whole Endomines team, for the great work done. If we go back to the basics, Endomines is a gold mining and exploration company. Our operations, they are located in Eastern Finland. The production is in a place called Pampalo, near Ilomantsi, and there we have an underground mine, open-pit mine, and a mill where we produce the flotation concentrate. Then 15 km north from Pampalo, we also have a Hosko underground mine, and this ore is treated at the Pampalo mill.

We perform exploration in two locations, Northern Gold Line. There we have a deposit called Kartitsa, and then Southern Gold Line. The Southern Gold Line, we are permitting to be in production around 2030, and there we also have tungsten and molybdenum. So, when we increase our production to 70,000 to 100,000 ounces level, we will also start tungsten and molybdenum production at the same time. This Karelian Gold Line is Archean greenstone belt, so very prospective for gold mining and exploration, and we have the rights for the key areas of the belt. Basically, the whole greenstone belt is controlled by Endomines. Our strong financial figures, they come from two factors. The production has been increasing, and then the gold market has been strong.

If we look at our gold annual production on the right side, then from 2022 to 2025, we have almost doubled our production. Our aim is always each year that we grow the production. This year, after nine months, the production has grown by 5.5%. We are expecting a strong fourth quarter. We have done a lot of actions to ensure that the fourth quarter will be strong. Our guidance is that the production will grow by 10%-20% during 2026, and we expect that the Q4 will ensure that this will happen. What we did in Q3, we improved mine planning a lot. We increased equipment availability. We implemented also a five-shift system for the mill, so now we are operating 24/7. We prepared a lot of new production areas and accessways for the mine, which we need during Q4, but also 2027.

We expect this to have a positive effect on the Q4 production, so that we have a higher volume during the Q4, and this will ensure the growth for 2026. The gold market is very interesting at the moment. There has been a lot of volatility. Now, after midterm elections, it's only second day, but there has been strong movements in the gold market, and that is mainly caused by the expectations of lower yields in the U.S. on a longer term. How do we see it? We see that there has been a lot of volatility, but however, the basic fundamentals, they support the gold price in the future. There is geopolitical, economical uncertainty. The central banks, they are buying a lot of gold, especially China.

Countries are decreasing the dependency on the U.S. dollar, and the money that used to go to the U.S. dollar is now moving to gold. Then there is very high amounts of debt and concerns how this debt can be financed in the future, and printing of money and so on. So, the market is strong for gold, and the forecast for next year, if you look at the forecast from different banks and financial institutes, our estimation has been that the consensus is somewhere between $4,600-$4,700, approximately $4,650 per ounce. So we expect the gold market to stay strong. Sustainability, we report the KPIs every six months. So in this slide, we have the KPI situation after end of June. But our targets, they are fossil-free gold production by 2035 in the water. The water is the most important.

We really want to take care of the water and the lakes. Finland is a beautiful country, and the lakes are absolutely precious, so we don't want to do any harm on the lakes. Our target always is that the waters, discharge waters are so clean that they do not weaken the surrounding waterways or ecosystems. Biodiversity, there the main thing is that we consider nature values throughout the mine life cycle. N ot just what happens today, but what happens during the whole life cycle of the mine. Personnel, that's the key to success in every company, and we want to take care of the people, that people are safe, no accidents, and then that they enjoy working for the company. Our lost time incident rate was 9.7 end of June.

This year, we got also this Finland's Most Inspiring Workplaces recognition, as the employee satisfaction was high, which I am very happy about. The local community, we spend a lot of time explaining what we do and getting feedback from local people. Just last week, we had two information sessions near Ilomantsi, and we had a good discussion with the local people. The governance ensure responsible and transparent operations. That is always key to ethical operations. Exploration highlights. When the strategy was changed in 2022, we started the exploration activities in 2023, and it has been very successful. The resources have more than tripled, so less than 200,000. Now we are at 620,000. We update the resources once a year, so the next update will be in March 2027.

If you look at the history, we drilled in the past three years, we drilled 52,500 meters in total. From the drilling, you get the resource growth. This year, we are drilling a record campaign of 50,000 meters in one year, so almost the same as in the previous three years combined. At end of September, the progress was in a way that we had drilled already 42,000 meters. There are a lot of results still at the laboratories, so we have not published so much, probably closer to 30,000. There is a lot more results to come in the near future. The exploration is focused on two locations, Northern Gold Line and Southern Gold Line.

The Southern Gold Line we are permitting to be in production around 2030, so a lot of the activities now, they focus on the Southern Gold Line and especially this UKKO deposit that we discovered last year. If we go to this UKKO, it is a world-class gold discovery. It is a BIF-hosted gold deposit, so banded iron formation type of deposit. It means that the gold is associated with iron. When you look at the maps, in this slide, there is a picture of electromagnetic map in this area, and you can see in these drone measurements that this iron formation is absolutely huge, approximately 10 km potential area. This is where our drilling activities are focusing on. As mentioned, this was only discovered in April 2025, so it is only 1.5 years.

It is unbelievable that we have achieved so much in 1.5 years. We will publish the first results in March 2027. March 2027 will be the time when we publish the first gold resource for UKKO. We tried to put in one slide, it is a little bit difficult, the whole UKKO, because it is a very wide area, 10 km, and just to describe a little bit what has happened and what are the plans for the future. If we start from the north, this is the area that we published now in October, a release that our first drill hole in this area returned over 30 m of over 3 g per ton of gold. V ery significant high-grade intersection, world-class intersection in this area, and completely new, 1.7 km from the main deposit.

If we go towards south, there is the main deposit. It is approximately 650 meters long. Here, we have done most of the drilling, and there are a lot of good drilling results, wide intersections with 2g to 6 g per ton of gold. V ery high grade. What is typical here, there has been intersections like 50 m, 2 g, 20 m, 4 g, and so on. So they are wide intersections and very potential area, and it is still open to north and towards depth. A little bit south from there, we have a gold zone which is approximately 200 m long, and this we published also this year earlier. It is a little bit lower grade, but anyway, important, 200 m is a reasonable distance. In the south, we have done only few drill holes.

There are areas that we have done two drill holes, for example, and we have discovered gold in three different locations, and these are the locations that we are now drilling during the late autumn and early winter. Also Q1 2027, we will drill in those areas just to have a look what is there. T hat is interesting. The main message here is just that the area is absolutely huge, and in most of the times when we have gone somewhere and tested the area, there has been gold. The areas we have defined in a way that we have done the electromagnetic measurements and then had a look that this looks like an area that there is gold. Then we have drilled, and usually there has been gold. So it is very potential.

On the eastern side, there is also similar formation where there has been gold in the outcrop. However, this we will drill in 2030, 2032, so not in the next two, three years, as we have so much work to be done on the western side. W e will leave this east a little bit later. In the east, we did some drill holes, and we actually did not hit gold. So, it requires a lot more work before we know where to target the drilling. W e will give it few years, maybe do some just EM measurements or something like that. Next year in this area, we plan to drill 30,000 to 40,000 meters, so significant amount, and it will be exploration, so looking for new areas. Then also the main deposit we will drill from this inferred category to indicated category.

That is the goal, so that we can go ahead with the pre-feasibility study later. So first gold resource in March 2027. Tungsten and molybdenum in the Southern Gold Line, very important. Tungsten used in the defense industry, one of the critical minerals in the European Union. There are significant amounts in the Southern Gold Line, tungsten and also molybdenum. The latest results, drilling results we published, they confirm the potential. We also did some sorting tests, and we achieved a grade increase of 3.1x . So the idea is that we mine low grade or send it to sorting, increase the grade, then it goes to processing, and that is the idea. We received this year also funding EUR 1.5 million to advance this project.

This year, we have also signed a letter of intent with Wolfram Bergbau und Hütten AG, which is an Austrian company, part of Sandvik Group, and that's to have a technical cooperation. The tungsten prices has really been strong. It has come down a little bit, but it's still on a very, very strong level. When we drilled these in Kuittila, which is in the Southern Gold Line, they are just next to the gold deposit, so outside the area where there is gold. So they are sort of the side rock of the gold deposit. We have drilled approximately 14,000 m. We published some of the results. Rest will be published in December this year or January next year, so there are more results to come. Those results will focus on tungsten and molybdenum.

Our goal is to now increase the resource and increase the knowledge as we are permitting this area to be in production, so we sort of need to know which areas, where can we have actually the production facilities and where there is the ore that we will be mining. So, a lot of activities during Q3 and 2026. Now I pass on to Minna.

Minna Karttunen
CFO, Endomines

All right. Thank you, Kari, and good afternoon, everybody, on my behalf. Here we have the revenue graph. I'd like to mention first before I start that even though the Q3 numbers look slightly weaker, I think we have to focus on the big picture and look at the, I think, quite impressive numbers we have achieved during the January-September period. So year-to-date revenue is EUR 47 million, which is a growth of 42% year on year, and gold production increase is 5.5% year on year. Quarterly numbers, so revenue in Q3 was EUR 12.3 million. That's 7% up compared to the Q3 a year earlier, and that's comprised of gold price increase, average gold price increase of 23.4%, and a slight decline in production volume of 3.9%.

Revenue compared to previous quarter, it declined 24%, and that was a combination of both decline in the gold price as well as in production. But overall, impressive growth numbers for the January-September timeframe. I would like to mention the other operating income we had in Q3. That was around EUR 300,000, and that consists of change in the fair value of a contingent sales price receivable. W e sold the Friday gold deposit earlier this year in the U.S., and for the second payment in milestone, we had the option to receive the payment either in cash or in shares, and this time we opted for the share payment. W e did receive shares in a company called Elk Range Mining, which is now listed on ASX in Australia, and the IPO took place on 10 of August. That's where the other operating income comes from.

Year-to-date EBITDA, EUR 18.5 million, 45% growth year-on-year in euro terms, and it represents a 39.3% margin, so there is a slight increase in the margin as well. Q3 EBITDA, EUR 4.2 million, margin of 34, and the Pampalo production segment EBITDA was EUR 5.3 million with a margin of 43.3. Other operating expenses here, I do not have the number, but total operating expenses amounted to EUR 8.5 million in Q3, and of that, EUR 5.1 million was paid for materials, goods, and services. A largest increase in that area was the maintenance and operating expenses of mining machines, and that includes rental costs of new machinery. We have invested somewhat in new machinery, and that is on its part also increasing the cost base. There was more maintenance work done during the summer holiday period, more than normally.

Employee expenses were increased because we have more people working for us now, so September end numbers, it is 24 people more than we had last year at the same time. The other operating expenses were EUR 1.7 million, most of which comes, or the biggest change of which comes from the mining mineral tax, which in Q3 was EUR 400,000. We had royalties starting to run, actually in Q2. The Q2 and Q3 royalties were both booked now in Q3, so EUR 0.2 million, EUR 200,000 altogether, and approximately half of that actually pertains to Q2. So it is kind of a one-off for Q3. What I wanted to mention here is that I do not have a slide on EBIT, but a depreciation.

If some of you have looked more in detail of the numbers already, our depreciation amount was actually quite a bit smaller in Q3 than in earlier, and that is because in August, there was change in the estimated life of the mines, and that cumulative difference in the amount of depreciation for the entire January-September period was recorded for the third quarter, which was EUR 0.8 million altogether. Pampalo and Hosko mines, estimated life of the mines now reaches until 2035. Cash cost. Year- to- date, EUR 1,657, 24% up year-on-year, and in Q3, EUR 1,839 per ounce, which is an increase of 26% year-on-year. It is a big increase, and it is particularly affected by the use of a lower-grade ore in production.

I know we do not publish these numbers in our reporting, but I wanted to open up this a little bit to kind of accentuate the magnitude of this lower-grade ore effect, because if we have a lower-grade ore, we need to increase the tonnage, and then, of course, the processing costs will increase. So to give you an idea of this, both the year-to-date and quarterly, the tonnage of mill feed has increased by about 1/3. So it is about 30% up year-on-year. If we look at the unit cost per ton, the increase is about 4%. So that kind of put this increase into perspective, in my opinion. We have also prepared for the next year, so there are additional costs there, like Kari mentioned.

We have opened new production areas and built the necessary accessways, and the maintenance and operating costs of the mining machinery, as already mentioned, has had an effect on this cash cost in Q3. Net result, year to date, EUR 13.8 million, nearly 30% margin. Just to put this number in perspective, in comparison, our full year 2025 net result was EUR 7.3 million for the full year. Q3 net result, EUR 3.4 million, margin 27.5%. We had net financial expenses of EUR 0.7 million. Interest expense on interest-bearing loans, EUR 0.3 million. That has halved from the previous year, so our financing cost has really gone down. There is this new item, this valuation loss of EUR 300,000, and this is what I just mentioned, is that we opted for a payment in shares in Elk Range Mining, and we are a significant shareholder there.

We now hold over 12 million shares, and at the time of the IPO, we were the largest shareholder with 9.95% shareholding. Going forward, changes in the share price will be recorded through our financial expenses or gains, as it may be. The IPO price in August was AUD 0.20, and at the end of September, it was AUD 0.16. The minimum holding period for these shares is one year, so at least for the next 12 months, we will have this item in our financial expenses. The group EPS basic for the Q3 was EUR 0.10, and for the year-to-date , it is EUR 0.40. Balance sheet, strong cash flow on a good level. Our total balance sheet nearly reached EUR 110 million at the end of September. Cash is still on a similar level than at the year- end, EUR 3.8 million.

Interest-bearing debt steadily going down, EUR 11.8 million, and interest-bearing net debt, EUR 8 million. Net gearing has been now around 10%, and equity ratio was nearly 68%, so really, really strong. When it comes to cash estimate, on the right-hand side, where you can see the division between long-term and short-term debt, short-term debt was EUR 6.3 million. Of that, EUR 5.8 million is actually the remaining convertibles we have. So they are very much in the money, so to say. Paying back that short-term debt will not have a cash effect on the company. Cash flow EUR 5.8 million, year-to-date EUR 17.1 million, net operating cash flow that is. Investing cash flow EUR 6.7 million, EUR 16.7 million year-to-date. Investments have been done both to Pampalo mine and exploration in the Southern Gold Line, both gold and tungsten now, especially in the third quarter. Thank you.

Kari Vyhtinen
CEO, Endomines

Thank you, Minna. Strategy. We have five points in our strategy. The production, that we grow the production each year. That is the engine of the growth. We invest the money to exploration. That is the biggest item, so that we can grow the gold resource, which enables us to grow the production to completely new levels, a lot higher levels. The critical minerals, they are part of our strategy, so we focus on tungsten, but we also focus on molybdenum. Financial stability, so we want to have a stable situation on the financial side. We do not want to continuously raise money. Sustainability, that is the backbone of the business. We want to do things in a right way. Our long-term targets, 1.5 million to 2 million ounces of gold resource by end of 2030. Currently 620,000, so approximately 3x higher.

Annual gold production to 70,000-100,000 ounces of gold around 2030, and take the tungsten and molybdenum into production at the same time. This is 4x-5x higher gold production, and then the fossil-free gold production by 2035. How do we get there is that we grow the resource, like we have done now last three years successfully, and now we have been speeding up in 2026. We have really upgraded the drilling volume. From the past three years, we have estimated that when we do 10,000 meters of drilling, we get approximately 100,000 ounces of resource growth. To get from 620,000 to 1.5-2 million ounces, we have estimated that we need to drill 120,000 meters of exploration drilling. This year, like mentioned, it is the record volume. We are the biggest in Finland.

We are drilling 50,000 meters exploration drilling. We expect next year to be also high volume year. That resource growth enables us to grow the production. Currently, we have a capacity at the Pampalo mill, approximately 25,000 ounces, and the idea is grow it steadily. The bottleneck has been the mine, so increasing the volume in an underground mine takes time. We grow it steadily until we get to the 25,000, and then the big jump will come when the Southern Gold Line will come to production, and that we estimate to be around 2030. After that, there is the Southern Gold Line phase II, there is the Northern Gold Line, there are other deposits. The goal is not to stay in this 70,000-100,000 level. We aim a lot higher levels on the long term.

The Southern Gold Line development plan, we started the permitting in January 2024. We have now done already close to three years. We have permitted four mines in this Karelian Gold Line, so this is now the fifth. We have a good idea how it needs to be done. We have lodged the environmental impact assessment program. Next year, we will lodge the report and apply for the permit. We estimate now the PFS will be completed Q3 2028. Little bit later than what we have estimated previously, and this is due to the fact that because we need to drill the resource to indicated category, and that we will do next year and early 2028. Then after that, financing negotiations completed, investment decision, and then go to production as quickly as we can. Outlook for 2026.

We expect strong finish for the year. The guidance for the production is 10%-20% growth. There is no change on that. The Q4 is supported by the actions that we took during July, September period. Resources, we are continuing and now finishing this largest drilling campaign, and we will be publishing results still later this year and also early next year. Then we continue the development of the Southern Gold Line expansion, and also the tungsten project and the design, how is the factory going to be done in the Southern Gold Line. The next growth phase is in a lot stronger position today than where it was one year ago. If you look a little bit about our priorities for 2027, we want to deliver production growth. That is the key, that we grow the production as our other activities are growing.

This cash flow that we get from production is the engine how we grow the business in other sectors. Then we want to expand the resource base. The resource update will be done in Q1 2027. The first UKKO resource will be published in March 2027. Then we will do this infill drilling to transfer the resources from inferred category to indicated category, which is needed for the pre-feasibility study. We will continue also the exploration activities at UKKO, especially. Also some other areas. Then the Southern Gold Line project, we will launch the environmental impact assessment report. We will apply for the permit, and the scoping study will be completed, and the pre-feasibility study will be ongoing. It will be a busy year ahead, exciting times ahead. Our strategy remains unchanged, and execution is progressing according to the plan.

Really happy to report the progress after nine months. Thank you. Now we are ready for questions and answers.

Anni Turpeinen
Chief Communications Officer, Endomines

Yes, thank you, Kari and Minna. This is Anni Turpeinen again. Yes, it's time to move on to the questions and answer session. We have had quite many questions again, so let's get started. The first question is about Boliden partnership. Can you elaborate on how the Boliden partnership affects the net profit? What is the Boliden agreement effect on cash cost?

Kari Vyhtinen
CEO, Endomines

This is actually how it works is that the details are confidential, so we can't share the exact details. What has happened before is that because we are producing a flotation concentrate, and in the gold production, there are two big things. There is the gold recovery, so how much you recover from the ore, and then the grade of the concentrate. The previous agreement, it was not so suitable for the Pampalo process, so we needed to sort of optimize our product to match with the Boliden requirements, and we experienced some losses in the production process. Now it's better tailored for the production, and we can really optimize the grade and recovery, and we expect that to have a significant effect on the profitability. Yes, very pleased about that.

Anni Turpeinen
Chief Communications Officer, Endomines

Okay, let's stay with the cash cost. Cash cost increased in this quarter. How should we think about cash cost in next quarter and going forward? Increasing or decreasing?

Kari Vyhtinen
CEO, Endomines

Is it me or you?

Minna Karttunen
CFO, Endomines

Well, I think last time I said something

Kari Vyhtinen
CEO, Endomines

Okay.

Minna Karttunen
CFO, Endomines

Well, you can continue then. I think last time I said something, it was a similar question, and I said that it still might go a little bit up, and then it should go to kind of more sustainable levels. Now we saw the going up part, and it should go down in Q4, and then also going forward to 2027. I would think the year-to-date level where we are at the moment is kind of a level to be expected, at least for the next six to nine months, or-

Kari Vyhtinen
CEO, Endomines

Yes.

Minna Karttunen
CFO, Endomines

Did you have something to add?

Kari Vyhtinen
CEO, Endomines

No, no, I think that you are absolutely That has been the view, so yes, exactly.

Anni Turpeinen
Chief Communications Officer, Endomines

Next question is about investment cash flow. Investment cash flow was -EUR 6.7 million. What was the split between Pampalo mine and the exploration drilling in the Southern Gold Line?

Minna Karttunen
CFO, Endomines

It was slightly more on Pampalo, and this was especially because of the investment in the equipment, so

Anni Turpeinen
Chief Communications Officer, Endomines

Okay. Let's move on to tungsten. You said that you will continue to develop the tungsten and molybdenum project without the status of strategic project in the European Union, at least for time being. What do you mean by the time being?

Kari Vyhtinen
CEO, Endomines

Yeah, that's a good question. It is possible that we apply again, because we got the negative decision, and that was mainly due to the fact that some of our plans are They were quite early-stage plans. We launched the application in January 2026, and since then, we have done a lot of drilling and a lot of update on the plans. It's possible that we apply again, but we will go forward anyway. We go forward anyway, and the status is not critical for us. But we see that it would be important to lift the knowledge that this is important for Finland, this is important for European Union. We would like the product to stay in the European Union. That has been our goal, and therefore, we might apply again.

Anni Turpeinen
Chief Communications Officer, Endomines

Let's stay with this topic. Can you give an update on Endomines' cooperation with Wolfram Bergbau und Hütten, and are you looking for other partners for future investments and production?

Kari Vyhtinen
CEO, Endomines

The partnership is The main goal has been to get help with the product so that we produce a sellable product. There are certain quality specifications that need to be met, and there we have received help. Also, like, what kind of process equipment we should use and things like that. It's a non-binding letter of intent, so we can look for other partners. I think when the time goes a little bit further, when we are in late 2027, 2028, I think it's realistic to estimate that we will discuss with a wider group of partners, as there is a lot of interest on the tungsten. There are a lot of opportunities what we could do with the tungsten. We also see it as a potential financing element.

It's a side product that is not sort of our core business, so it could be used for financing, but time will tell. Now the focus is just to increase the resource and do the plans that we know exactly how much it will cost, how much money it will make, and then we can go further into the partnerships.

Anni Turpeinen
Chief Communications Officer, Endomines

Are you planning to release tungsten and/or molybdenum resource estimate in 2027?

Kari Vyhtinen
CEO, Endomines

We could. Most likely, yes. Most likely, yes. Yes.

Anni Turpeinen
Chief Communications Officer, Endomines

Next question is about Pampalo production. Are you happy with the Pampalo underground mine production at the moment?

Kari Vyhtinen
CEO, Endomines

Well, we always would like to produce more. Of course, that's the key. We want to grow the business. We want to grow the business as quickly as we can, and most of our production comes from the underground mine. But there we are, of course, underground mine, it's something that to produce more, you need to make the development work. You need to have the tunnels to access the areas with gold and so on. It's not so fast to do. We look at this as an annual basis. For us, one quarter doesn't matter because we have an annual target, and that's what we aim to achieve. Some quarters will be higher, some quarters will be lower. Everything has gone according to the plan. That's the main thing. We have ambitious plans. They are not easy to achieve. I'm pleased.

Anni Turpeinen
Chief Communications Officer, Endomines

Then we have a question about recovery rate. Can you comment on your current recovery rate? What kind of levels you have?

Kari Vyhtinen
CEO, Endomines

We don't usually comment the recoveries in the production. That has been a known choice in a way, because otherwise it would become a regular part of the regular reporting package, and I think it would get quite complicated with different ore types and different grades and recoveries. We haven't published that.

Anni Turpeinen
Chief Communications Officer, Endomines

Then we have actually the last one, and it's about dividends. Is it possible that Endomines could start paying dividends based on this year results?

Kari Vyhtinen
CEO, Endomines

Well, we are a growth company, and our focus is to grow the company as quickly as we can. What it means is that the money that we make, we invest into the growth. Invest in exploration, invest in production growth. We see that it is very, very, very unlikely that we would pay dividend this year, from this year's result. Of course, in the future, everything is possible, and especially after the big jump in the size of the company when the Southern Gold Line comes to production. After that, we see the company as a company that pays regular dividend. That is the today's vision. Everything can change, but that is the vision we have today.

Anni Turpeinen
Chief Communications Officer, Endomines

Thanks for the excellent questions, and thanks again for joining us. A recording of this webcast and the presentation material will be available on our website later today. Thank you.

Kari Vyhtinen
CEO, Endomines

Thank you very much.

Anni Turpeinen
Chief Communications Officer, Endomines

We wish you a great day.