Operator

Good morning. My name is Vincent, and I'll be your conference operator today. At this time, I would like to welcome everyone to the Agnico Eagle Mines Limited Q1 2026 conference call. All lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be question and answer session. If you would like to ask a question during this time, simply press star then the number one on your telephone keypad. If you would like to withdraw your question, please press the number two. Thank you. Mr. Ammar Al-Joundi, you may begin your conference.

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Thank you, Vincent. Good morning, and thank you for joining our Agnico Eagle first quarter 2026 conference call. I'd like to remind everyone that we'll be making a number of forward-looking statements, so please keep that in mind and refer to the disclaimers at the beginning of this presentation. Next slide, please. We're pleased to announce a solid start to the year, with production slightly above budget and with costs in line with our guidance. This solid operating performance, coupled with exceptional gold prices, has allowed Agnico Eagle to announce yet another quarter of record net income driven by record operating margins. We are reiterating 2026 production guidance, with production expected to be weighted approximately 48%, 52% between the first and second halves of the year. We're also pleased to re-reiterate our cost guidance for 2026.

This is no small task given the uncertainties and pressures in the market over the past several weeks. As you'll hear on this call, this has been a strong quarter across all of our businesses. Solid operations, strong progress on moving our growth pipeline forward, continued exceptional exploration results, as mentioned, another quarter of record financial results. My team will go through all of this in more detail in a moment, let me outline and summarize what I believe are the three key messages that are important to take away from this call. one, as mentioned, we're off to a good start to the year with solid operating performance, delivering record operational and financial results. Record mill throughput at Macassa, record development rates at Meliadine, record pit tonnage at Detour.

We're delivering these solid operating results while doing an excellent job controlling costs, leveraging off our relentless focus on cost control while benefiting from certain structural cost advantages that derive from our business model, including, for example, in both Ontario and Quebec, where we produce the majority of our gold, all of our electricity is either hydro or nuclear and really not exposed to changes in fuel and diesel prices. With regards to Nunavut, where we do generate our own power through diesel, we've got a lot of that diesel hedged both by necessity because we have to bring the diesel up in advance through a short barge season, and we have it stored up there, but also by some very smart and proactive hedging by our treasury department with regards to diesel exposure.

We've also got the benefit of lower employee turnover and the reliable supply chain that comes from being the best customer for decades in the safe regions in which we operate. Two, we continue to strengthen our financial position and to increase returns to shareholders. This quarter, we paid a $1.3 billion 2025 tax catch-up. We distributed $375 million to shareholders. We invested almost $400 million into our high-quality growth projects, all while increasing our cash position by almost $250 million. At these gold prices, we will increase our share repurchases, and we are increasing our normal course issuer bid to $2 billion.

Three, and perhaps the most important takeaway, we continue to aggressively reinvest in our business, into the best pipeline in the industry, into projects that deliver exceptional returns at relatively lower risk, and we are making steady progress, in many cases, ahead of schedule. Dom and Natasha will spend some time talking about the projects they're moving forward to increase production at Agnico Eagle by up to 20%-30% over the next decade, including Detour to 1 million ounces, Malartic to 1 million ounces, Hope Bay, Upper Beaver, and San Nicolas. In addition, with the expected consolidation of our Finnish platform, we now see a path to further growth that comes from building a 500,000 ounce a year multi-decade platform in what we believe to be the most prospective land package in Northern Europe.

He will spend some time going over the some of the continued great exploration results he and his team have generated, focusing on Detour and Malartic, but he'll also spend a bit more time talking about this Finnish land consolidation and what he and his team see as a long-term potential well beyond the Ikkari project. Our strategy remains focused on safe, responsible mining, focused on operational excellence, delivering reliable, low-cost production. We have the best land packages in the most prospective and safest gold jurisdictions in the world. We have a path to industry-leading production growth over the next decade. Our execution of delivering this growth remains on track, and at these gold prices, we think we can deliver this growth and reduce share count at the same time.

Before I turn the call over to Jamie, I need to spend a moment on safety. Tragically, we've had two fatalities over the past five months. This is not acceptable. I recognize and I accept that the responsibility for the safety of our people rests ultimately with myself and with my team. We've mobilized our teams to reinforce across our company and at all levels and to all employees our commitment to not only deliver on our guidance, but to do so safely and responsibly. There is nothing more important than the safety of our people and our communities, and we commit to do better. With that, I'll turn the call over to our CFO, Jamie Porter, to review our 1st quarter operating and financial results.

Jamie Porter
EVP, Finance and CFO, Agnico Eagle Mines

Thank you, Ammar Al-Joundi. As highlighted earlier, we delivered another strong financial quarter, driven by solid operational performance and continued leverage to higher gold prices. We had several record financial results during the quarter, including adjusted net income of approximately $1.7 billion or $3.41 per share, and adjusted EBITDA of just over $3 billion. We generated about $730 million of free cash flow in the first quarter. This is particularly impressive given that we paid roughly 50% of our expected 2026 cash taxes totaling $1.8 billion in the quarter, of which $1.3 billion had been previously disclosed as related to our 2025 tax liability.

First quarter gold production of approximately 825,000 ounces was actually slightly better than planned, with the lower production year-over-year reflecting mine sequencing at LaRonde, Macassa and Fosterville. With the first quarter representing about 24% of the midpoint of our annual guidance in production weighted to the second half of the year, we're well-positioned to meet our full-year production targets. total cash costs were $1,093 per ounce, and all-in sustaining costs were $1,483 per ounce, reflecting higher royalty costs associated with a significantly higher realized gold price, lower production volumes as expected, and a stronger Canadian dollar compared to the first quarter of 2025.

Importantly, costs continue to trend within our full- year guidance ranges of $1,020- 1,120 per ounce for total cash costs and $1,400- 1,550 per ounce for all-in sustaining costs. While we continue to monitor cost volatility, including diesel prices and foreign exchange movements, we believe our regional operating model, local procurement strategies and disciplined hedging program provide meaningful mitigation against potential cost pressures. With respect to diesel prices, our 2026 cost guidance assumes an average diesel price of $0.78 per liter. Direct diesel consumption, covering mobile equipment and on-site power generation in Nunavut, is estimated at approximately 108 liters per ounce of gold produced, representing roughly 7% of our total operating cost base.

We believe that our exposure to diesel price volatility is below industry average, reflecting the fact that the majority of our gold production comes from underground mines, which are generally less diesel-intensive than open-pit mines. The majority of our gold production is from mines located in Ontario and Quebec, which benefit from access to non-oil-based grid power. Overall, our sensitivity to diesel prices is estimated such that a 10% change in diesel prices results in roughly a $6 per ounce impact on annual total cash costs after taking into account our hedge position. We do not currently anticipate any disruption to our procurement strategy for fuel or other key consumables, and we remain comfortable with our full- year cost guidance. If we turn to slide 5, we are in the strongest financial position in the company's history.

We continue to deliver meaningful returns to our shareholders alongside further balance sheet strengthening and disciplined reinvestment in the business. During the quarter, we returned approximately $375 million to shareholders through dividends and share repurchases, representing roughly half of free cash flow. As previously announced, we intend to renew the normal course issuer bid in May on substantially the same terms with an increased limit of up to $2 billion. At current gold prices, we are still targeting returning approximately 40% of annual free cash flow through dividends and buybacks. We will also look for opportunities to offset dilution from the proposed Rupert Resources acquisition, including potentially returning proceeds from portfolio investment sales through additional share repurchases. In parallel, the balance sheet keeps getting stronger.

At the end of the first quarter, our net cash position increased to approximately $2.9 billion, giving us one of the strongest balance sheets in the sector. This strength was recognized recently by Fitch, which upgraded Agnico Eagle's long-term issuer rating to A minus with a stable outlook. At the same time, we continue to reinvest in the business, advancing our five key pipeline projects that are expected to underpin long-term production growth of 20%-30% over the next decade. We are exceptionally well-positioned in the current gold price environment with a continued focus on disciplined capital allocation and long-term shareholder value creation. With that, I'll turn the call over to Dom.

Dominique Girard
Chief Operating Officer – Nunavut, Quebec and Europe, Agnico Eagle Mines

Thank you, Jamie. Good morning, everyone. In my section, I'm gonna talk ab-- the update on operation and project for Quebec, Nunavut, and Finland.

For the first quarter, a good start led by Malartic and Meadowbank on the production, we are in good position for the full- year cost and production. An important milestone in the first quarter at Malartic, where we took the first stop at East Gouldie via the ramp, approximately 1 kilometer underground. Why it's important, based on the 2023 study, we're gonna mine there up to 2042, based on what we know now, we're gonna be mining there up to 2060. Most probably, I will not be the COO at that time. We have good bench that's gonna take it from there. It's very positive. On the shaft sinking, I'm gonna talk a bit about that next slide, shaft sinking and also production ore, it's also going well.

The plan is to bring that ore to the surfaces via the shaft mid-2027. Everything is aligned. On the continuous improvement, an important milestone achieved at LaRonde. They were working on that since a couple of years to do autonomous hauling. It's a good example of leveraging the synergy into the region, using the LZ5 expertise. What is that autonomous hauling? We are taking the ore from the 3.2 kilometers underground up to 2.9 kilometers without drivers. This is a real example of a positive impact using technology. Instead of operating, let's say, or using four trucks and eight operators for day shift, for night shift, those guys in the current situation, they are able to operate effectively 10-12 hours per shift just by the time to go underground.

Using the technology, we're able to use two trucks operating by one person, one night shift, one day shift, so a total of one, and we're able to operate on a 20-hour basis. It's a clear example of using technology to improve productivity, and very good job done at LaRonde on that. Also in Finland, what we did, we took two and four people, key people from each site, from mainly Canadian operation. I mean, the GMs, the key guys in the continuous improvement, the VP. We bring them to Finland to see what they did there. It was the first time for most of the people, not just to see the reindeers, but also the Finland site.

It was about how they did it in Finland, the mindset on continuous improvement, the leadership and the tools they were using. It was also a very good opportunity to build relationship and sharing best practices through our key people into the company. Guy Gosselin's gonna talk about that, but very also happy about the Ikkari. What's going on is very positive for the Finland team. Next slide. On the growth project, at Malartic, the ramp and shaft, as mentioned, going well. The pilot hole for the 2nd shaft is done, down to 1.8 kilometer underground. No issue related to that. The study continue on the shaft two and Marban in the Wasamac study. It's progressing well, and we're looking to give you an update in September later this year.

At Hope Bay, look to the picture. We are in good position. That was our goal. We are in good position to potentially announce the construction in May with the board. The camp is ready. The fab shops are ready to welcome the construction team. The mill is empty, ready to go. We are in good position for the engineering. That was an important goal, so we're gonna be over 50%. That guarantee and give us confidence into the cost and into the schedule. We're gonna give you more detail at the visit at site for the lucky one that are coming because we're gonna have muskox on barbecue, charcoal barbecue. This is, the team is working on that. That's gonna be a good thing.

Before giving the mic to Natasha, the visit at Hope Bay, you're gonna see the picture over the first 10 years. We're gonna most probably there, be there for many 10 years. That's what Guy's gonna show you into the core shack, what is our vision onto the region. The last two- year, we focused on infilling the patch, the new deposit, and to be ready for that study. Guy is also gearing up to restart treasure hunting into the Hope Bay site eventually more next- year and the years after. On that, I will pass the mic to my great colleague, Natasha.

Natasha Vaz
EVP, Chief Operating Officer - Ontario, Australia and Mexico, Agnico Eagle Mines

Thanks, Dom, and good morning, everyone. I'll cover the operational highlights for Ontario, Australia and Mexico. The regions delivered good performance to start the year. At Detour, they hit a quarterly record in tons mined, but they also had a record mill throughput for a 1st quarter with the lowest turnover, quarterly turnover that we have seen since the mine began open pit operations. Over at Macassa, the mill here also delivered record quarterly throughput as a result of the ongoing optimization initiative as we ramp up that mill towards over 2,000 tons per day by the end of the year. Despite this progress, total mill tonnage was below plan this quarter, and this was mainly a function of challenges we faced with our old paste plant while commissioning the new one, which we expect to be fully operational in Q2.

At Fosterville, they also performed very well this quarter. There was a significant step change in productivity, and that's really due to ongoing mine optimization efforts. Improvements this quarter were seen in both development and stope cycling. It was the same with Pinos Altos. The team there continues to work very hard on initiatives to safely extract the most value from their assets. Now, in terms of initiatives this past quarter, Dom spoke about our knowledge-sharing trip to Finland to help other sites understand their continuous improvement journey and really inspire them to do the same. Of course, it was really great to network, to gain alignment, to collaborate with other sites.

Another good example of collaboration between sites and really maximizing the value of our assets and our infrastructure was between Macassa and LaRonde. I just wanna take a quick second to recognize both teams here. They worked very closely together over the last few months, and with a coordinated e-effort, they were successful in receiving the approval to allow ore from the AK deposit to be transported and processed at the LZ 5 facility. At Macassa, we also successfully completed the installation of the LTE network underground. The connectivity is expected to support a range of optimization initiatives, including the implementation of a dispatch system and enabling the site to obtain short interval control.

This can enable us to make decisions quicker, to become more agile, to become more productive, and as a result, further optimize our costs. These are just a few examples of our ongoing productivity focus and our operational improvement initiatives. Moving to the next slide, I'll give you an update on the projects in Ontario and Mexico. The Detour Underground project, that plays a very big role in the plan for the complex to be a 1 million ounce producer annually. We're still in the early days of this project, but we're making very good progress, and we're advancing on schedule. We continue to advance the exploration ramp and have achieved just over 820 meters of development, reaching a depth of about 140, 147 meters.

We also began excavating the overburden for the conveyor portal, which is near the mill, and progressed work on the camp extension. To complement the planned bulk sample, we initiated a high-intensity drill program in an area being considered for mining as early as 2028, and Guy will speak to this program shortly. Over at Upper Beaver, there have been a lot of progress made this quarter with both the ramp and the shaft advancing ahead of schedule. The ramp has advanced over 500 meters in the quarter and has reached a depth of 108 meters. The shaft sinking, which commenced in the 4th quarter of last year, has already reached a depth of 382 meters.

Similar to Detour, to complement the planned bulk sample at 760 level, the high-intensity drill program continued during the quarter. Now, with respect to San Nicolas, we're waiting on the regulatory decision for key permits. In the meantime, we're continuing to advance the engineering of the critical infrastructures, which will help further de-risk and build confidence in our execution strategy. We're also continuing to continue with the drilling activities focused in on condemnation drilling and geological evaluation near the planned mine area. Finally, I'd like to close by just recognizing the teams at our operations and our projects for their very disciplined execution in the 1st quarter and for their continued focus on advancing our optimization initiatives and our key projects as we move through the year. With that, I'll turn the call over to my friend, Guy.

Guy Gosselin
EVP, Exploration, Agnico Eagle Mines

Thank you, Natasha, Good morning, everyone. Pleasure again to be able to report on progress we're making in exploration, as obviously it is one of the key component to be able to deliver that 20%-30% growth that we are promoting. We had an excellent quarter in terms of diamond drilling, completing 25% or nearly 360 km of drilling of our overall budget of 1.4 million meter for the year, having 127 rig in operation on mine site and key value driver project. We continue to advance in our journey in exploration to make drilling safer and more productive while maintaining a unit cost in the same order than the last couple of year, aiming to offset inflation with gain in productivity. Going to specific project, on slide 10.

In Malartic, 35 drill rigs are in operation, completing 75,000 meter in Q1. 16 underground, 13 on surface in proximity to the Odyssey infrastructure, and 6 other on regional target, including Marban deposit across the street. At Odyssey, as mentioned by Dominic, the shaft and the ramp development are progressing ahead of schedule, and the first stope is currently being mined at East Gouldie, which is quite exciting considering the discovery hole in East Gouldie was made just a couple of years ago in 2018, and that we are already there with the ramp and the shaft because of the great collaboration between the various team to turn it from a discovery into a mine in such a short period of time. This is impressive.

We continue to get strong exploration result at East Gouldie, with 6.7 gram over 36 meter on level 105. In the center of the ore body and also in the internal zone between Odyssey North and Odyssey South with a new structure that returned 9 gram over 53 meter core length. While though we do not have a full understanding yet of the true thickness of that structure, it continue to shows, the additional upside we see, both in the internal zone in, at Odyssey North and South and in East Gouldie that keeps growing laterally. On the adjacent, Marban project, lateral exploration drilling continue to the west and to the north of the proposed open pit, while we are at the same time advancing with the combination drilling program to confirm the potential location of surface infrastructure.

Now on slide 11 at Detour Lake, nine rigs completed close to 40,000 meter of drilling in the first quarter in line with our budget. Drilling was continued to focus on the western extension of the ore body to the west of the open pit, where we are contemplating to initiate mining underground early on, utilizing the exploration ramp. Some strong results, such as 8.9 grams over 14 meter at 190 meter depth and 10.7 gram over 10 meter at 500 meter depth shows a strong potential for high grade underground mineralization over a large area that extend over more than a kilometer now adjacent into the west of the open pit, where the exploration ramp is currently being developed. Briefly, at Hope Bay, as mentioned by Dominique Girard, we've had a great quarter in terms of drilling on Ice.

Thanks to the team's great winter drilling program. We started early. We've completed north of 33,000 meters of drilling as of the end of March. A full update will be provided on the May 19th press release along with the project announcement we've been talking. Finally, on slide 13 in Finland, I would like to provide some color on the recent announcement we made with an offer to acquire all of the outstanding share of Rupert and Orion Resource Partners, along with the 70% interest of B2Gold and the FinGold JV. It was a great job by our corporate development team and legal team.

With these three combined transaction adding to our current landholding, we will be consolidating close to 2,500 sq km, consistent with our corporate strategy of focusing on regional, leveraging our 20 years of experience in exploration, permitting, mine construction, and operation with a strong social license to operate in the most fertile greenstone belt in Europe. By combining the Finnish workforce of Agnico along with the workforce of Rupert and Orion and removing property boundaries, we will aggressively explore in the near- term the immediate lateral extension of the Ikkari deposit, as well as the multiple occurrences that were identified on the Fingold JV and the large land position owned by Rupert and Orion. Personally, it reminds me a lot about Kittila mine acquisition in 2005.

At the time of the acquisition, there was approximately 2 million ounces down to less than a kilometer. 20 years later, at Kittila, it grows down to and still open at depth below 2 kilometer with a global endowment of 10 million ounces, considering past production reserves and resources known so far. I see a similar potential on the structure that hold the Ikkari deposit. As these mineral system are similar to our Canadian Greenstone Belt that have demonstrated extended vertical geological fertility. By this transaction, we are aiming to deliver in Finland a platform for multiple mine over multiple decade, similar to the 3 region in Canada that are Quebec, Ontario, and Nunavut, where we will be leveraging our regional expertise. On that, I will return the microphone to Ammar for some closing remarks.

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Thank you, Guy. Thank you, Jamie and Dominique and Natasha and everyone else on our team. Really exceptional work, really tremendous results. Well done. As you can see, we continue to work hard for all of our stakeholders, and we'll continue to build off the same foundational pillars that have defined our strategy and that have served us very well over the past almost 70 years. We will focus on the best mining jurisdictions based on geologic potential and political stability. We'll be disciplined with our owners' money, making investment decisions based on technical and regional knowledge, creating value through the drill bit and through smart acquisitions where and when it makes sense. We are uniquely well-positioned with a quality project pipeline, leveraging existing assets in the best regions in the world where we believe we have a competitive advantage.

We will continue to be focused on creating value on a per-share basis and on being leaders in our industry in returning capital to shareholders as evidenced by over 43 years of consecutive dividend payments and increased share buybacks. We have a clear and executable strategy to create tremendous additional value per share for our owners well into the foreseeable future with manageable risk, leveraging off existing infrastructure and regional competitive advantages. We have the assets, we have the projects, we have the resources, and we have the people. We are making it happen right now. We will stay focused, and we will not be distracted. Thank you again for joining us on this call, and for many of you, thank you for decades of trust and support. We will always work hard to maintain that trust, and we will never take it for granted.

Operator, may I ask that we now open up the call for questions?

Operator

Ladies and gentlemen, we will now begin the Q&A session. Again, if you'd like to ask a question, just press star 1 on your telephone keypad. First question comes from the line of Lawson Winder from Bank of America Securities. Please go ahead.

Lawson Winder
Analyst, Bank of America Securities

Thank you very much, operator. Good morning, Ammar team. Great to hear from you all, and thank you for the update. I would like to start off with the Finnish acquisition. We haven't had a chance to ask you guys about this in this type of forum since the announcement. Guy Gosselin, thank you very much for the picture you've painted and for the color on getting to 500,000 ounces. Can you help us understand what are the sort of value creation steps over the next 12 to 24 months to get to a better understanding of what that ultimately looks like? You know, resource update, study, when do you expect permitting to start? Just any other considerations along that sort of timeline thinking.

I appreciate it.

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

I can start, but maybe Dom and Guy can jump in on more details. The first thing, Lawson, and by the way, nice to hear your voice. The first thing, Lawson, really was to consolidate all of this property. There's a lot of potential. They're good properties, but they were individually constrained. That's why it was very important for us and as mentioned, our entire team, but in particular the corporate development team and the legal team did a really good job in allowing us to consolidate all of this at the same time. It's really first and foremost. I'll pass it over to my colleagues, about consolidating what we think is the best land position in Europe.

Dominique Girard
Chief Operating Officer – Nunavut, Quebec and Europe, Agnico Eagle Mines

Thanks, Ammar. Lawson, Dominic speaking. Maybe I think what on my side I need to do is to free the scope of that 1, let's say, without the boundaries, where we should put the mill, the tailing, and revamp the schedule, the study based on the new acquisition. It, the exploration guys are all excited to add, but we're gonna need to kind of try to kick that project for a first start and but also to get some flexibility, maybe, for example, at the mill. To make sure it's always a challenge to get enough detail into the study to push that into the permitting. That's what we're gonna focus by staffing the study team and eventually the construction team.

Guy Gosselin
EVP, Exploration, Agnico Eagle Mines

Maybe in complement, Lawson, Guy speaking now. As we discussed in the press release, our plan by removing the property boundaries to have sort of an updated view with the current information by the end of 2027, where we're gonna have sort of a better picture of what the optionality that removing the property boundary offer on both, you know, the optimum pit design and location of infrastructure. While we're gonna right away, as a matter of fact, start drilling once the acquisition is completed, because we know as well that property boundary was also constraining the drilling close to the property boundary. That's our intent.

By the end of 2027, we should have, you know, an idea of the kind of a revised concept based on the current information while we continue to drill and maybe look at other iterations. It'd be like you can refer to what we did in Malartic. You know, we're gonna be providing most likely, you know, a first version of what it could be and then keep drilling and adjust based on what we're gonna discover.

Lawson Winder
Analyst, Bank of America Securities

Okay. Thank you. That's helpful. A follow-up from me with respect to the Detour Lake underground drill results. There were some really substantial intercepts, of course. You know, with the drilling you've done to date, has your understanding of what the Detour Lake underground can be, has it evolved and changed in any way in the past, let's say, 12 months? I mean, is it starting to look like it could be a much bigger system? Are you possibly reconsidering what the ultimate development plan might look like for Detour underground?

Guy Gosselin
EVP, Exploration, Agnico Eagle Mines

To me, the area west of the pit is very similar to what was historically mined on the ground at Detour, you know, that we are now mining with the pit closer to surface. Obviously, we are showcasing a couple of great results. On average, we think that that area will be anywhere between maybe 2.5 and 3.5 gram, something like that. Obviously, when you put those, you know, some spectacular results along with some other that are in the 2, 3 gram over 20, 30 meter. It's in line with our expectation. It's in line with the, we're actually just firming up the model of that zone. As you know, we are mindful of the history at Detour.

You know, in order to selectively mine a high-grade core, you need a ton of drilling, you need the right drill spacing. When we are getting there with the ramp, we're gonna be soon being able to drill it more aggressively from underground as well from the exploration ramp. It is shaping up as we thought. It's always an area that I personally liked a lot with the pit.

Natasha Vaz
EVP, Chief Operating Officer - Ontario, Australia and Mexico, Agnico Eagle Mines

Hi, Lawson. Just to add to that, it's Natasha, by the way. Just because of the, we do have a study team looking at this and looking at different iterations, as we proceed with the exploration program. With the combination of the exploration success and the high gold price environment, there is definitely optionality here at Detour. It's fairly early stages, I would say. The team is looking at different trade-offs for potentially a higher milling capacity, a larger underground, potentially, another pushback at the pit. Again, very early days.

Lawson Winder
Analyst, Bank of America Securities

Good. Fantastic. Thank you all very much.

Operator

Your next question comes from the line of Fahad Tariq from Jefferies. Please go ahead.

Fahad Tariq
Analyst, Jefferies

Hi, thanks for taking my question. In the quarter, there was an announcement about a Nunavut collaboration agreement with B2Gold. Can you maybe just talk about the thinking behind that and what you, what you hope to learn from their operations at Goose? Thanks.

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Well, it's Amar here. I'll start, then maybe Dominic or Jean can comment. In general, we always like to try to work with our colleagues, our peers. You know, we have a lot of experience in the areas we operate. We think we have some competitive advantages, but we're not so naive to think that we know everything. Any time we get an opportunity to work with our peers to see what they're doing, we take advantage of that. You know, I think our owners would want us to do that.

Also from B2's perspective, you know, they're good people that we know them well, and they think that we do a good job where we operate, and they wanna see if they can learn a little from our operations as well. It's just the kind of stuff that we wanna do in the industry. I think that's probably the enough on that.

Fahad Tariq
Analyst, Jefferies

Okay. Maybe just one for Jamie. I noticed the buyback pace slowed down quarter-over-quarter in the first quarter. Is that just a function of the pretty significant cash tax payment? Can you just remind us of the minimum cash you'd like to keep on the balance sheet going forward? Thanks.

Jamie Porter
EVP, Finance and CFO, Agnico Eagle Mines

That's exactly right. I mean, we said we put out our guidance in February that we'd be targeting returning about 40% of our free cash flow through a combination of the dividend and the share buyback. Our free cash flow was lower in Q1 as a result of the cash tax payment. I think our the percentage worked out to closer to 50%. It was $150 million of shares repurchased in the quarter, which was half of what we did in Q4. That will ramp up certainly in Q2 and then and through the rest of the year as our free cash flow is expected to be higher.

In terms of minimum cash balance, I mean, I think we're comfortable where we're at now with, you know, $3.1 billion of cash, $2.9 billion of net cash, between, you know, $3 billion and $5 billion. I think that's a good position to be in in terms of just giving us financial flexibility to be able to execute on our strategy. Yeah, definitely higher share buyback activity expected through the remainder of the year.

Fahad Tariq
Analyst, Jefferies

Okay, great. Thank you very much.

Operator

Your next question comes from the line of Josh Wolfson from RBC Capital Markets. Please go ahead.

Josh Wolfson
Analyst, RBC Capital Markets

Yeah, thank you very much. appreciate the additional disclosure on the energy sensitivity side of things. I had a question in terms of the Hope Bay project update later this month. you know, when looking at the current market for prices, there's obviously been a high degree of inflation. you know, how are you thinking about incorporating some of those input prices for that project update and thinking about maybe the near- term impact versus what, you know, otherwise would a long-term, much more reasonable price be? Thank you.

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Hi, Josh. It's Ammar here. I'll start, and then Dominique will jump in. You know, in my, in my experience, the most important thing in building projects is to get the engineering done and to have the execution plan well laid out. You know, we have seen some inflationary pressure, but actually it hasn't been that bad. You know, and the team, as Dominique said, I mean, you know, you looked at the picture. You know, the camp is gonna be there. The backup power is there. The mill building, half the mill building is there. You know, water treatment is there. You know, we're coming to this with an advantage of infrastructure in place, which allows us to execute. I mean, it's all about execution.

Also, exceedingly important is the amount of engineering, the team has done, which allows them to get a much better, control overall on execution and therefore on cost. Dom.

Dominique Girard
Chief Operating Officer – Nunavut, Quebec and Europe, Agnico Eagle Mines

Yeah, Josh. We in May, we're gonna give more detail on the economic. That's gonna be obviously a positive economic. Our assumption are all based on the long-term view. We're gonna give you some sensitivity to understand how that could impact, and we don't, we don't know the future. As Amar mentioned, I'm very comfortable where we are right now. We've been mining in Nunavut over 17 years, and we've built already three project with Meliadine, Meadowbank and Amaruq. So that's it's a good time for Nunavut to add another-- It's gonna be over 400,000 ounces per year, and that's gonna bring us to potentially 1 million ounces per year into the Nunavut platform.

Josh Wolfson
Analyst, RBC Capital Markets

Great. Thank you. Then, another, I guess 2-part question from Malartic. I mean, first question there is, you know, what drove the great improvements this quarter? I guess we saw something similar last year. Should we expect to see it going forward? Then second part is just on this September update that you referenced. You know, given that we had expected, I guess, the shaft project completion not really until year-end and then a larger update the second half of next year, you know, how should we be thinking about what information is disclosed, you know, ahead of that completion in September? Thank you.

Dominique Girard
Chief Operating Officer – Nunavut, Quebec and Europe, Agnico Eagle Mines

Yeah, just for the grade, it's a question of sequencing, mainly into the Barnat pit. That's the only thing that changed that. I will let Jean- Marie answer on the second part.

Jean-Marie Clouet
VP, Investor Relations, Agnico Eagle Mines

Hi, Josh Wolfson. Yes, in September, the plan would be to provide an update. The last update we did for Canadian Malartic was in June 2023. What we want to reflect in September is the update in the reserves resources that we've seen over the last few years, and also start giving a better idea in terms of how the second shaft, Marban and Wasamac start to fit together, start giving ranges around what we think it will cost and operating. You're right, the studies will be later in the year, but we should be able to provide a very good picture of what Canadian Malartic will look like to get to the million oz per year.

Josh Wolfson
Analyst, RBC Capital Markets

Great. Thank you. Looking forward to that update.

Operator

Your next question comes from the line of Daniel Major from UBS. Please go ahead.

Daniel Major
Analyst, UBS

Hi, Ammar team, and thanks for the questions. First question on the Finland acquisition and then around the kind of balance sheet and capital returns. First question is, was there a reason for using Agnico shares rather than cash specifically? I guess the second part, you alluded to exceeding the 40% cash flow payout potentially in order to reduce the share count following the acquisition. Can you give us a sense of kind of quantum? You could be at $3 -5 billion of net cash quite quickly through the year. Should we expect that as a limit to the cash balance you'd wanna hold and how that would flow through to the buyback?

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Well, thank you for the question. Ammar here. I'll answer the first one, and maybe Jamie, you can answer the second question. It's a very good question on why we used shares instead of cash. The answer is, we wanted to use cash, and they wanted 100% shares. I think their view, and rightfully so, is, you know, Agnico shares are good shares to have, and they wanted 100% shares. We used full cash on the other deals, I think Jamie, as part of his answer to the second, can also incorporate how we hope to offset a little bit of the share issuance through the rest of the year.

Jamie Porter
EVP, Finance and CFO, Agnico Eagle Mines

Yeah, absolutely. I think in our disclosure, Daniel, we referred to, you know, potentially increasing repurchase activity based on the sale of some of our portfolio investments. If there's opportunities for us to do a little bit more, based on, you know, our views on valuation, we will do so. With respect to kind of minimum cash balance, like, you know, where we are now, I'd say is, we're very comfortable and, you know, as the cash balance increases, we'll look at even more activity under the share buyback. I'd say the minimum target's 40%.

We may be able to exceed that based on either our free cash flow performance or the, you know, proceeds of the sale of some of our investments.

Daniel Major
Analyst, UBS

Okay, thanks. My next question is on San Nicolas. Actually saw Teck and Anglo American yesterday and discussed the project a little bit. I mean, it feels like it's somewhat subscale at 50% for either yourselves or the other partner. Have you had any discussions around the ownership of the project? Would you be keen to consolidate if the opportunity arose?

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Yeah, I think we would look at it. We still think it's a good project. You know, I don't wanna forecast what our, what our colleagues and our partners are thinking. You know, obviously, if they said, "Hey, would you wanna look at it?" We'd look at it.

Daniel Major
Analyst, UBS

Okay, great. Then just one quick one if I could on Finland. I noticed Boliden deferred a pushback at Kevitsa because of the change in the taxation for the mining sector in Finland. Can you just give us any color about how you're seeing that landscape with respect to Kittila and the new acquisitions?

Jean-Marie Clouet
VP, Investor Relations, Agnico Eagle Mines

Yes, there's tax change in Finland, and this is included into our evaluations as well as our life of mine at Kittila.

Jamie Porter
EVP, Finance and CFO, Agnico Eagle Mines

Yeah. I was just gonna add, the industry is lobbying the government to look at potentially changing the structure of those taxes to make, you know, certain additional things deductible to offset the impact. All that was factored into our modeling.

Daniel Major
Analyst, UBS

Okay, great. Thanks a lot.

Operator

Your next question comes from the line of Bennett Moore from J.P. Morgan. Please go ahead.

Bennett Moore
Analyst, J.P. Morgan

Good morning, Ammar and team. Congrats on the record quarter. Thank you for taking my questions. I guess following the land consolidation in Finland, as you continue to think about the company's next leg of growth beyond the early 2030s, where does Australia fit in this picture? Do you see similar opportunities around Fosterville?

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Well, thank you for the question. Actually, you know, I was just out in Fosterville about a month ago, and, I mean, it's such fantastic people. We spent a lot of time on some recent, I would say, very good exploration results in and around Fosterville. I think as some of you know, we've consolidated some land. You know, that part of Australia was the original gold rush, nobody's really focused on it for decades. You know, it's still very early, but I was quite pleasantly surprised with some of the results they were getting and the enthusiasm they had. You know, we get questions all the time about, you know, the rest of Australia. We think Australia is a great place to mine, not just for gold.

I mean, you know us, we are very careful about what we do. We're very disciplined. Right now we are, you know, we continue to be focused in Australia at Fosterville and the team we have there and the opportunities around that.

Bennett Moore
Analyst, J.P. Morgan

Thanks for that. I think it's been about six months since you launched the Avenir business. Just wondering how this is progressing, what sort of new opportunities the team may be evaluating, and then maybe if you could also comment on what sort of critical mineral opportunities there may be around the Lapland Greenstone Belt as well.

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Well, I mean, I'll ask Guy to talk about sort of base metal and critical metals in the Lapland Belt because there are some. Just with regards to Avenir Minerals, you know, it's a really enthusiastic team. They are looking at a lot of things. What I would say is that they are naturally narrowing down what they're looking at and becoming more focused. You know, it's an exciting business to be in. It is a separate entity. We're supportive of it. Just to repeat, you know, we're not obliged to do anything, but it does give us an opportunity to see things that are well considered. Maybe, Guy, you can talk about non-precious opportunities in Finland.

Guy Gosselin
EVP, Exploration, Agnico Eagle Mines

In addition, obviously, of what triggers our primary interest, which is, you know, the structure around the Sirkka Line and the Main Break, we also know that, you know, it's the same to the north of that's the same rock package that hosts basically the Kevitsa and the Sakatti deposit that are nearby that are nickel, copper, PGE. Even at the for the old Pahtavaara Mine, there was some evidence of mass sulfide that are potentially kind of a sign. We have all of the ingredients, but for us, we see that potentially an add-on and our primary focus remains to fully explore for gold. If there's something else, because, you know, there's the fertility of the rock is there, we'll see.

Bennett Moore
Analyst, J.P. Morgan

Great. Thank you. Best of luck.

Guy Gosselin
EVP, Exploration, Agnico Eagle Mines

Thank you.

Operator

Your next question comes from the line of Anita Soni from CIBC Capital Markets. Go ahead.

Anita Soni
Analyst, CIBC Capital Markets

Hi. Good morning, everyone. Thanks for taking my question. I just wanted to ask a little bit about the cadence of the production ramp over the course of the year. I think you said that in Q2, it'll be similar to Q1 production. In Q1, there were, I guess, a couple of challenges with Kittila coming off of the shutdown and then the weather just impacting the restart there. What are the things that, you know, are kind of offsetting in Q2 if Kittila is gonna ramp back up? I would assume it's the caribou migration that I should be modeling. Going into the back half of the year, what are the things that are ramping up? It's the AK project, right? In at Macassa.

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Hi, Anita. It's Amar here. Honestly, it's more just mine sequencing and where we are on the plan. There's, you know, you've got a good point on specific items that were in the first quarter. You know, there are always, and we try to spread it out through the year, you know, when we have maintenance, when we have shutdowns. We try to, as you mentioned, exactly right, you know, there's always the uncertainty of the caribou season. I think our team is really quite exceptionally good at taking all of that into account and projecting through the year. We don't typically give, you know, 48%, 52%. We decided we wanted to do it because we just wanted people to know that actually everything's going quite well.

As mentioned, you know, the 1st quarter was actually a little bit above budget. There's nothing in particular. It's mostly just, you know, mine sequencing and various other elements that come into it.

Anita Soni
Analyst, CIBC Capital Markets

Just from a longer- term, capital allocation question, a lot of those questions have been asked and answered, but I just wanted to get an idea of, you know, as you think about the cash balance increasing, you know, where do your priorities lie in terms of capital? Just rank them again in terms of capital return to shareholders. I mean, the balance sheet's pretty strong at this point, and you're accumulating a lot of cash. You know, where does reinvestment into the business now fall into the? Has it moved up over the capital return to shareholders?

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Yeah. Thanks, Anita. I'd say, I mean, reinvestment in the business is always, you know, a very high priority, right? The five key value driver projects that we're advancing are, you know, 30%-60% IRR projects in the current gold price environment. We want to invest, you know, as much, as quickly as we can in those. We're doing that. I mean, our capital spending has increased from, you know, $2.3 billion last year to probably $3 billion this year, all in. We'll look to continue to find opportunities to accelerate that, to bring that production forward.

You know, beyond that, I'd say right now, in this gold price environment, we're fortunate in that we can do, we can do it all. We can afford to reinvest aggressively in the business. We can afford to deliver very strong returns to shareholders. I mean, 40% is kind of the floor for this year of our free cash flow being returned, I think is quite attractive, and we can continue to strengthen the balance sheet.

You know, having that $3 -5 billion net cash position just gives us the, again, the financial strength and flexibility to be able to execute on our business strategy, even in a much lower gold price environment. I don't think our priorities have really changed. We'll continue to look for opportunities to accelerate reinvestment in the business while strengthening our financial position and delivering strong returns to shareholders.

We understand the, you know, the questions. You know, the exact position of cash on the balance sheet is as much an art as it is a science. You know, it's a $100 billion company, you know, whether it's $3 billion or $4 billion or $2 billion, really that's up to the discretion, primarily of the CFO and treasury. You know, I just wanna make the point, having been a CFO myself, it's not like there is an exact perfect number. What you wanna do is look at all the circumstances at the time. You know, make sure you have. The most important thing a CFO has on his table is liquidity for the company.

I think Jamie and the team are doing a great job balancing everything.

Anita Soni
Analyst, CIBC Capital Markets

Yeah. Agreed. Thanks for answering the question.

Operator

Next question comes from the line of John Tumazos from John Tumazos Very Independent Research,. Please go ahead.

John Tumazos
Principal, John Tumazos Very Independent Research

Thank you very much for your service to the company. I'm trying to make a back of the envelope concept of the Ikkari mine or Central Lapland new mine coming in 2034. Is a fair guess 15,000 tons a day times two and a quarter grams times 95% recovery to get to the 500,000 ounces, and that that might cost $1.2 billion when we get to 2034, all those years out?

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Yeah. It's, John, first of all, I'd like to thank you for your service to the industry. That's a very nice introduction. We're still early in looking at that. It's, you know, maybe we can go through some of the details offline. I don't know, John, did you wanna. I mean, we gotta be careful 'cause these are very early and we're working on it, but, go ahead, John.

Guy Gosselin
EVP, Exploration, Agnico Eagle Mines

I can step in first. First of all, John, I'm very surprised with your question because I was expecting that you were asking how we're able to put all of this together at once. A bit disappointed with the question. On this lesson, 10,000, 15,000, we will have to define it, and a function of the throughput, we will arrive with the minimum of, let's say, 200,000 plus. We'll be careful before we'll provide any number. I'm more focused on looking what it will be one day. As he described, it's a high potential, and I think this is where I would like that we bring most of the attention, what it can be eventually.

We are excited with the consolidation, and stay tuned because I think moving forward toward the end of 2027, we'll have more to say.

Yeah. John, what we are referring to in our press release is a platform of 500,000 ounces when combining Kittila and Ikkari together. We need to work if we can make it bigger than that. Just to make it clear, the 500,000 is just solely for Ikkari. It's our vision of the platform for the time being.

John Tumazos
Principal, John Tumazos Very Independent Research

Let me ask another one, if I may. Thank you for the clarification. I was assuming we were only talking about the new property. I was guessing the CapEx and then the consideration for the three purchases. On the 4.22 million ounces of current resources, slightly larger than the three and a half million ounces of reserves, at $1.2 billion development capital, it works out to $1,268 an ounce acquisition and CapEx to develop. Should we be assuming that the resources are going to double or triple, and that that's not the new normal for how much we're gonna pay for developing mines?

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Yeah, John, it's Ammar here, and I think this is probably the way that we look at it. The acquisition cost worked out by our internal assessment, and remember, we know this project quite well. We've been there for, you know, six-plus years, looking at it. We acquired it effectively by our own internal models at a quite a good discount to NAV, just based on what we felt on our own, what we thought were fairly conservative. We've acquired an asset in a region we know well, that we have been looking at for six-plus years. At a considerable discount to NAV, and we got the rest of the land package for free. You know, we're excited about it.

We think it makes a lot of sense. I can't get into all of the numbers except to say, in our usual fashion, we did an awful lot of homework before we decided to proceed.

Operator

Thank you.

Your next question comes from the line of Tanya Jakusconek from Scotiabank. Please go ahead.

Tanya Jakusconek
Analyst, Scotiabank

Good day. Thank you very much for taking my questions. My first is for Dominique Girard. Dominique Girard, I hope that snow will be gone from Hope Bay when we're up there. That picture showed quite a lot of for barbecue. I just wanted to ask, because we've seen capital increases lately at some of the projects out there, should we still be thinking that $2 billion for Hope Bay would be a reasonable capital for, and your mine plan that you've been talking about?

Dominique Girard
Chief Operating Officer – Nunavut, Quebec and Europe, Agnico Eagle Mines

Hi, Tanya. Yeah, we see a bit of inflation, but it's gonna be below at 2.5 for sure. The thing we need to finalize, we have a very good now, let's say, level of engineering, but there's decision that we're taking, for example, to fast track Patch 7 and to do more ounces earlier, for example, to start the mill right up at 6,000 ton per day. Well, it's gonna be a ramp up, but the mill is gonna be designed right up front at 6,000 ton per day, compare what we did with Mill 18. Also, for example, we're looking to add one more wing to keep the drilling ongoing and to get to let Guy doing a treasure hunting on to the property.

There's decision that we're taking internally, that at the end of the day, affecting the initial CapEx, but it won't be a big surprise. It's gonna be slightly over $2 billion.

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

The changes are not so much, inflation. They're more.

Dominique Girard
Chief Operating Officer – Nunavut, Quebec and Europe, Agnico Eagle Mines

Yeah.

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

You know, instead of ramping up the mill in 2 stages just because of the economics, you just do it all at once. As Guy said, you know, do you invest in some peripheral infrastructures so that we can continue to accelerate exploration?

Tanya Jakusconek
Analyst, Scotiabank

Okay, that's all. It's, you know, over $2 billion slightly because of planned rather than inflation.

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Yeah.

Dominique Girard
Chief Operating Officer – Nunavut, Quebec and Europe, Agnico Eagle Mines

Yeah. Sure.

Tanya Jakusconek
Analyst, Scotiabank

Okay. Now that I have you, Ammar, just two quick questions for you. You mentioned the strategy in Australia, which was to focus around Fosterville and drilling that platform to see what you have there. In Mexico, besides San Nicolas, do you have anything else that you're looking at to expand that platform?

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

At San Nicolas?

Tanya Jakusconek
Analyst, Scotiabank

San Mexico itself.

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

We are looking at opportunities to expand San Nicolas. Beyond that, Tanya, there's really nothing substantial that we're seeing as an opportunity in Mexico.

Tanya Jakusconek
Analyst, Scotiabank

Okay. Okay, thank you for that. My final question, Ammar, for you. It's always tragic to hear about fatalities for everybody in the mining industry. My question to you is from your tragic incident that you've had at your mine sites, what have you learned? What changes to procedures and processes have you put in place from these learnings?

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Well, thank you for asking, because it is very important, Tanya. Look, I think that we've learned what we already know, which is never, ever slow down in emphasizing the importance of safety. Sometimes it's really disappointing. It's the routine things, the things that people do every day, that they get too comfortable with. You know, that's human nature, and it is our job to really just push it. You know, what we did was, you know, we mandated a stand down, where we took every employee in at all of our sites, every- single one, and re-emphasized it. You know, we have a very sophisticated and comprehensive safety program like most of our peers.

you know, frankly, it's really devastating to have had those fatalities.

Tanya Jakusconek
Analyst, Scotiabank

Okay. It seems that it was just, you know, things of nothing that would have that you would have changed, I guess is what you're saying from procedures and processes?

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Well, I mean, I think that. Yeah, I don't wanna get into detail. There's a lot of work still ongoing. These weren't things that. Oh, actually, Carol, why don't you jump in? Sorry.

Carol Plummer
EVP Sustainability, People and Culture, Agnico Eagle Mines

Hi, Tanya and Amar. As you can understand that it's, you know, any loss of life is a tragic loss of life. In both of these instances, the in-depth investigations are still ongoing. The authorities are involved, and the regulatory authorities and so on are involved in these investigations as well. We can't share the results of these investigations yet, but certainly there are learnings around this. We're sharing to the degree possible, not just internally, but industry to industry peers where there has been something that we can start sharing immediately to make sure that these types of accidents couldn't happen elsewhere.

Really for us, we're really, you know, as Amar said, re-emphasizing just the importance of safe production, and making sure that we're following our procedures and always looking for the risks in the workplace and how we can mitigate those risks. To that end, we've been looking at major hazards, which are the hazards of things that could actually be a life-changing accident and putting in place critical controls. We're continuing down that road, and I think that's a really important step for us as we continue on that journey towards zero accidents.

Tanya Jakusconek
Analyst, Scotiabank

No, no. Thank you, Carol, for sure. All sharing for the mining industry are all beneficial. Thank you.

Operator

There are no further questions. I'll turn the call back over to Amar.

Ammar Al-Joundi
President and CEO, Agnico Eagle Mines

Thank you everyone for joining us. Everyone have a nice weekend. Thank you.

Operator

Ladies and gentlemen, this concludes today's conference call. Thank you for participating. You may now disconnect.