Nov 18, 2026

Summary

Growth guidance is 20%-30% by the early 2030s, led by Hope Bay, Upper Beaver and Detour Underground; further regional projects provide longer-term upside. Capital spending is expected above $3.5 billion in 2027, with skilled labor a key execution constraint.

Ammar Al-Joundi
President and CEO, Agnico Eagle

Well, good morning, everyone, and thank you for coming in. I know it has been a busy day, busy couple of days for a lot of you, and genuinely, we appreciate you coming here. We know you have got a lot on your plate. We are going to have some forward-looking statements, so please keep that in mind. We are having a little technical issue on. There we go. A lot of my colleagues are going to be doing all the work today. You are going to listen to a lot of smart people giving you a lot of numbers and telling you what you are doing. Because I sincerely appreciate you taking the time, I have put together a few notes to try to kind of guide what I think the real message is that we want to give today.

Really, the theme of today, and I asked Jean-Marie to put this up at the top there, it is about execution versus promise. Today, we are going to talk about execution, not promises. I have been in this business for pushing 28 years now. I have been to a lot of these Capital Markets Day. I have listened to a lot of them. I have heard some where they say, "Production is going to be doubled in five years." It did not happen. I have been to some where they said, "Costs," I remember this, "Costs are going down by $500 an ounce in three years." It did not happen. Everyone I have listened to, they seem to have the best discovery ever in the history of mankind that is going to double and triple and quadruple. It did not happen. I tend to come to these things a little suspicious.

Frankly, our job, my job, because you guys pay me, I work for you, our job is not to make promises. Our job is to make you money. The way we make you money is by converting ideas, opportunities, into cash flow above ground. From those first few drill holes that show potential to dollars when we sell production. That is how we generate value. That is what we get paid to do. That is why the theme today is really about execution. What I will want you to take away, there are two things I will want you to take away, but the first one is this concept of execution versus promises. By the way, executing on your promises is how you build trust, and the only reason anybody invests with anyone else is if they trust them. We know that. This is all about trust.

They say a picture is worth a thousand words. I do not have a picture on this, but I have a couple of examples I want to share, some personal examples, which will be helpful. I started in 1999 when I was a very young man, and I was not that young. I remember, I was sort of new to the industry because I had been in banking, and I remember two projects in particular. I remember Pebble and I remember Sukhoi Log. Each of them was about 100 million oz. Each of them were the best thing in the world, that they were imminently going to get developed. 28 years later, they are not developed. That is the difference between a promise and execution.

Then I actually had a very scary thought, which I wasn't planning to have, which is, imagine if the likely candidate, well, the likely candidate at the time was Barrick to build Sukhoi Log. Imagine if they had built that. It would be gone now, right? It would have been taken away. That's an example of a promise that didn't happen. Then I want to compare it to what we're going to talk about today, and that you guys should challenge us on. Let's take a look at very simply Detour and Malartic. We're going to talk more about them, but Detour and Malartic, let's put this into perspective. 50 million oz in the last 10 years added. There's nothing else in the world that's added 50 million oz in the last 10 years. These are projects that are going to be built.

They're 100% owned, and these are projects where the theme is, are these promises or can Agnico actually execute this? This is probably one of the most important things you want to take away today. Forget the waving of arms, et cetera. That's really the question. It's not what we're going to promise to do, but it's how do you do it? A drill hole is just the first part. Do you have the people? Do you have the construction capabilities? Do you have the First Nation agreements? Do you have electricity? Do you have logistics? Do you have contractors? Those are the right questions. What is interesting is if you look at this agenda, the very first thing after me is Natasha's going to come up and talk about workforce. She's not going to talk about the drill hole.

She's not going to talk about where we are on the ramp. She's going to talk about workforce. Do you guys know that Agnico Eagle, and we did this analysis a few years back, we're going to have to hire 10,000 people. Think of that challenge. That's the difference between a promise and actually executing. But we identified that challenge four years ago, and she'll talk about what we're doing, but I'll just jump to something. I'm kind of stealing her thunder. We've already hired a third of those people, 3,500 people roughly. That's not an accident. That's not just by putting an ad in the paper. That's taken, frankly, a hell of a lot of work.

The second thing we're going to talk about is going to be Daniel Seguin coming up and saying, "This is how we're going to build these things." Because nothing else matters if you don't have the people and you can't actually deliver. Again, it's about execution. We've talked, I'll go through this quickly. Most of you have seen this. Our strategy is different than most of our peers. Our peers will go anywhere in the world to build a mine. I get that. I understand that. But our strategy is more regionally focused. We'll go anywhere in the world, but we'll only go to regions that have the geologic potential for multiple mines over multiple decades, and the political stability to allow us to build multiple mines over multiple decades. You've heard that before.

But let me quickly translate why this approach equals the how do you go from a promise to execution. Because when you've been in the Abitibi for 70 years, you actually are the employer of choice. You have somewhere between half and a third the turnover rate of your peers. That's not by accident, that's by design. You know all the contractors, you know all the suppliers. All of you know that at any point in time, we've probably invested in between 30 and 50 junior companies so that we can look under the hood and learn about them. So when we make acquisitions and they turn out to be decent, people say, "Hey, you've got a great track record." That's not by accident. I'm not patting ourselves on the back. I'm saying we actually have a strategy that gives us a knowledge advantage.

And it's really important to understand that this strategy is all about giving us an operational and execution advantage versus our peers. I'm going to make a quick call out to my peers at Barrick and Newmont. I know a lot of you were there. They're very good in Nevada, and that's not by accident. Right? To be honest, they should continue to focus there, and they continue to find gold, just like we found 50 million oz in the last 10 years in projects that have been around for decades. So, we're putting this graph up, and it's kind of an interesting graph. By the way, there's a dip here, and I've offered three-to-one odds that somebody's going to fall into it at some point. But this is our growth over the last 20 years, and this is what we're guiding. So this is not impossible for us.

Actually, this is something we've been doing for a long time. And every single one of these, and you have the presentations, and you won't look at it now, but take a look at the bottom. Every one of those has been a combination of organic growth and acquiring things early, and then building them. We use the example of KittilÀ. We had an investment in KittilÀ for years, for years before we acquired KittilÀ. The owners actually didn't want to go to depth. We thought there was a potential at depth. The owners didn't know how to deal with the metallurgy. We had a view on it. So this is really, again, this has been systematically built over the last 20 years. Our company has been systematically built. And so that's the second key point to take away today that we'll reemphasize.

The first one being that it's about execution, not promises. Agnico, can you really do this? And if so, explain to me how you're going to do it. Don't tell me what you're going to do, tell me how. And the second one is, we want to explain that we do things a little bit differently and that we put a lot of effort, including you're going to hear it from both Natasha about how we're hiring people. You're going to hear it from Daniel Seguin, how we do construction. So that's the second key point is, we want to emphasize that we have a very specific, very focused, very pragmatic view on how we're building our business. And yes, you saw the previous chart. Yes, we've grown production by a factor of 14 over the last 20 years. That's great, that's wonderful, but you don't care.

What you care about is the next line, which is gold production per share, because this is actually what we get paid to do. We get paid to make you money, and in our business, how do you make money? You increase profitable gold production per share. Of course, you need to deliver what you promise. Of course, you need to control costs. But profitable production per share is not an easy thing to do. It's probably the hardest part in our business. It's about, do you have a competitive advantage for identifying opportunities? Guy will talk about what he does. I talked about how we make early investments.

The nice thing is, while we've been able to do that for 20 years, grow production per share, and while it's hard to grow production per share when you're at 200,000 oz, and hard at 500,000 oz, and hard at 1 million oz, what you're going to see is we have a plan to grow production per share for the next 10 years off of a base of over 3 million oz. Again, it's not a promise. We're going to actually tell you what we're doing, and you're going to see these things are happening. We are going to be adding between 1.3 and 1.5 million oz just on these four projects, then we're going to talk a little bit about other things we've got going on that we haven't even included in that. We're not doing this because we want to grow production.

We're doing it because we want to grow production per share, because our job is to make you money, not just to make promises. I said that the second theme is that we're deliberate about what we do. If you look at, let's say, the Detour and Malartic to start with, I talked about the 50 million oz. We did not stumble upon those 50 million oz. We've been looking at Detour since the day it got built. I used to work with Gerald Panneton. Their CFO, Jim Mavor, used to work for me. We'd been up to Detour probably 15x , helping them get started. One good thing about Agnico, and Sean and the team built this well before I got there, people trust Agnico, not just investors, but our peers. We'd been to Detour for years.

We had a very strong view about the potential at Detour. Why didn't we buy it before? Because Detour makes a hell of a lot more money at $1,800 gold than it made at $900 gold. It's as simple as that. When the opportunity came to acquire Detour, it wasn't a banker coming in and saying, "Hey, I got an idea." It was based on 10 years of methodical work that we'd done. It's the same thing with Malartic. Malartic's in our backyard. We've known about Malartic forever. We always wanted that asset. We couldn't afford all of it, so we bought half of it with Yamana, and we wanted the other half forever, but Yamana wanted a 40% premium for the entire company, and it didn't make sense for you, our owners.

When Gold Fields went to acquire Yamana, it was a bit of a fiasco, and the window opened, we moved quickly. It wasn't because, again, somebody told us, "Hey, this is for sale." It's because it became available, and we already had done all of our work. It was a methodical approach to it. The same with Hope Bay. We'd probably been to Hope Bay 10 x, trying to help those guys out at TMAC. Canadian government, I think, said no. I could be wrong on the dates, but I'm not far off. I think they said no to the other buyers. I think it was December 21, and I think on January 5, we announced that we'd bought it. You don't do a deal in, what, 15 days if you haven't done your homework. Again, same with Upper Beaver.

The two messages, and I'm already over my time allotment, but I'll finish, is that when you walk away, I think what we want you to walk away with, Agnico really does have a great pipeline, and they really are going to convert those promises into cash and make us money, make you money on a per-share basis. These are not just visions anymore. These are plans. Two, that our approach has been thoughtful, it's been considerate, it's been considered, and it's been focused on what do we need to do to be able to deliver on the best pipeline in the industry. With that, I will pass it over to Natasha. Thank you. Again, thank you for coming this morning.

Natasha Vaz
EVP and COO, Agnico Eagle

Thank you, Ammar, and good morning, everyone. For the rest of the morning, we're going to be sharing with you the process of how we build mines. Then right after that, we're going to start talking about our key value drivers and provide you with an update, specifically in the regions of Ontario, Mexico, and Australia, before we break for lunch. Before that, Dom and I thought it would be interesting to talk about three topics that are important to us because they're directly tied to our growth plan. We wanted to explain the strategy and the processes behind that so you can understand where we're coming from and why we believe in the targets that we have set for ourselves in terms of executing on our projects. The first topic that we're going to be talking about is the workforce strategy.

Ammar already mentioned that. We're going to talk to you about our process, the initiatives, and how we're managing our current and our future workforce needs. The second topic we want to touch on is the continuous improvement process. Now, it's taken a few years, but we've built what we believe is a very good approach. It's unique to us, but it works for us. Honestly, we've built a culture across our organization where continuous improvement is really embedded in our DNA. So we're going to talk to you about our process, and we're going to tell you a little bit about why we believe that it's sustainable. Then finally, we're going to talk to you about how we execute projects.

On a very high level, we are going to tell you the teams involved and how we move projects from an early exploration phase to advancing the studies to construction and then into commissioning. You will see that there is a lot of people in the room today that actually helps us with that process. Now, as Dom and I talk about these topics, I want you to keep in mind something. You will hear a reoccurring theme in our discussion, but also in the discussions with our presenters today. It is our focus on collaboration, it is our focus on teamwork, and it is our focus on alignment. I am not just talking about the alignment at site with different departments, aligning with different departments. I am talking about alignments across our organization, across the different operations. To me, I think that is a differentiator.

That ability for us to, from a regional perspective, operate in a decentralized manner so that the regions have ownership, they have that entrepreneurial spirit. But also, when it comes time to talking about main topics that impact our business as a whole, we can come together, we can collaborate, we can build a solution together, implement it, and share ideas and share best practices and share learnings. I think, to me, that is really the foundation of our success. It is the fact that we look to break down silos, but in our fact actually is preventing them from occurring in the first place. Okay. Moving on to workforce. All right. Ammar already stole my punchline, but that is okay. As you all know, we have an industry challenge, right? Looking for skilled labor.

Tanya, you asked us a number of questions at the last earnings call about it, so this slide is really for you. But bottom line is, there is a challenge, but honestly, over the last few years, we have seen success. As Ammar mentioned, this was not luck. This was done by design. There has been a lot of effort placed on this. There has been a lot of planning that has occurred. Ammar talked to you about our process. It was a few years back that we looked at this and did an assessment. We looked at our growth pipeline and what we need for labor. We looked at the retirement timelines. We looked at the average turnover for each of our regions, and we came up with a number. It was 10,000 employees. We had to hire 10,000 people in the next five years.

Two years into it, that bottom line that Ammar stole was 35%. We have achieved 3,500 hires in two years, which is really good. What that is telling us is that our strategy is working, our initiatives are working. I just wanted to tell you a little bit about those initiatives. There are some initiatives that you see here on the screen. I will not go through all the details, but I will touch on a few. The first one is the centralized recruitment hub, and I think that is a key factor for us in achieving what we have achieved. Two years ago, we established a recruitment hub. These are specialists. These are specialists in recruiting that came together and are helping all our sites, all our projects, hire the teams that we need.

The sites provide a forecast, they talk to the recruitment team, they build up a strategy, they build up a timeline, and then we monitor it and we track the progress. That is a game changer because it takes all that onerous work from the sites and gives it to a team that is skilled at doing this. The second one is in-house training. We have a number of initiatives across all of our operations on in-house training, but the one I wanted to talk to you about was the mining school at Macassa. The team at site built a mining program within the site in field. People that were interested in mining were hired. As long as they can complete that four-month program, they are hired as full-time basis. We trialed that for a year now. We started it a year ago.

We have brought on board 50 people, and our success rate is 92%. It is really good, and we are continuing on this effort. We also are focusing on a targeted immigration program. Some of you I have already told this story to, but La India mine, a couple years back, a few years back, was closing. It was at the end of its mine life in Mexico. Ontario noticed the number of experienced people that we have in Mexico. Our head of Ontario, Andre, and our head of Mexico, Ivan, worked together on an initiative where we decided to look at the opportunities for heavy-duty mechanics in Mexico. We found there was like 50 applicants from our sites, and we picked 12 employees. We relocated 12 employees and their families from beautiful, sunny, warm Mexico to beautiful, cold, crisp Kirkland Lake in February.

Andre reassured me that they got parkas and boots, so they were prepared for it. Joking aside, though, it has been two years now, and it has been very successful. Out of those 12 families, we have 11 still in Kirkland Lake, and the town and the team have really embraced them, and they have really integrated into the community. We are very happy with that, and we are continuing on this journey because Detour actually is trialing an immigration program very similar to that with heavy-duty mechanics. One final thing I wanted to touch on was our employment branding. We are reaching and we are expanding to new different locations, specifically in Western Canada, to see if we can attract additional workforce. From what we have seen, it is very exciting. I will not steal Chris's punchline because he has some really good stats on that, so I will leave it with him to explain.

Overall, our strategy is there. We have a number of initiatives, and we can talk about it some more over the break. It is working, and we believe that we can continue on this to meet our targets of 10,000 people. Okay. Moving on to continuous improvement. Continuous improvement, we have been on this journey for quite some time now, and we have established a very good approach to this. We see this as a three-layered integrated approach, and I will just quickly walk you through this. The first step is the mine-led initiatives. This is initiatives coming from the site, from different departments on ways of doing things better. How do we be more efficient? How do we be more cost-effective? Some examples of that is energy management, making sure that we have a non-idling program with our trucks to reduce their diesel consumption.

Increasing payloads on our trucks, swapping out truck boxes with lighter-weight truck boxes. Internalization of major contracts, like the maintenance contract at Detour. Also, technology advancements that Dom is going to talk about in a few minutes. Those are the kind of mine-led initiatives we are talking about. The second step is the third-party optimization. This is where we bring in a third party to look at our business practices and see what we can do better. Is there room for additional improvement? When I say we, I do not mean the corporate office. It is the sites. The sites are driving these initiatives. It is a pull from them. They want to look at opportunities to do better. They want to challenge themselves. They want to push themselves outside of their comfort zone. That is the second step. The third step is the corporate technical review.

This, to me, is very unique. This is subject matter experts that are inside of Agnico. They are focused in on mining or metallurgy, maintenance, permitting. They all come together and help the sites deliver on a number of initiatives, making sure our mine plans are robust for the next three to five years, making sure that we conform to general technical standards, making sure we share best practices and technology advancements. But one of the key things is also triple-checking our continuous improvement initiatives. What they do here is they do a technical limit assessment on our sites. So each site, they determine what does good look like, and then they determine where we sit in that profile, where that site sits. Then they also determine what those bottlenecks are that prevents us from getting to that what good look like.

They check to make sure that steps one and two, we have those continuous improvement initiatives in there. If not, we should be prioritizing them, because that is the ones that are going to move the needle. I think that that is a really cool idea. Unlike Dom, I have not been with Agnico for that long. I came through the merger of Kirkland Lake Gold, so it has been five years now. But from my past experience, I think this is a unique thing, to have that corporate technical internal bench strength with us, that they do not even feel like they are corporate. They feel like they are embedded into the sites, and the sites feel the same way too. That is impressive, and I think that is one of the areas that we are successful in.

With that, maybe I will pass it over to Dom to talk about digital transformation and some other initiatives.

Dominique Girard
EVP and COO, Agnico Eagle

One, two. Thanks, Nat. Technology. Maybe before getting into the transformation of technology, I will just start a bit, an anecdote on workforce. Last week, I was in Abitibi, visiting all the sites. We go there, our goal is to talk with employees, and we went to maintenance shop and milling and mining. During the visit, for the first time, I saw four or five retired people that are now working two days a week for us. Some of them was, "Oh, that's cold. It's boring. Nothing to do at home in the winter. I come back to work. I need to see my family. I need to see my friend." It is part of our internal way, in-house training. Now we have retired people coming back.

This is a good thing because it is also helping us on the culture to do that transfer, but it is also showing that people like the work. I do not know, Tanya, I do not need an answer, but are you coming back to work when you are going to retire two days a week to train the kids? That is what they are doing. Another interesting thing, in the same week, we had the retirees party. We do a Christmas party for our people retired. There were 400, let us say, with spouse, 400 people retired at the Christmas party. I told the story. I was there just to do the toast, and I told the story that I saw many retired.

I said, "And by the way, if you are looking for work, we might have something for you." Four came back to me in the evening telling me, "Hey, Dominique, I would like to work. I am going to come back." "Okay, well, talk to Joe, talk to David, talk to Chris, because maybe." Again, that is, I think, something that differentiates Agnico, the way we treat our people, the way we work. Now moving to, let us say, technology. Natasha nailed it. I think the way we do it makes a difference because bringing technology or a new idea, it is easy to say, but it is difficult to do. Why we are doing it with the mine, it is mine-led because the sites could be agile. This is developing people. This is, let us say, our entrepreneurs' way.

We try to do not do it as a corporate idea, but bring it to the site's idea, and then the corporate is there to enable and to scale it and to transfer it. That is our way of doing stuff. I will just bring you an example of that. LZ5. LZ5, it is LaRonde Zone 5. That is LZ5. That all start with the field-to-mill story. In 2016, LaRonde saw that LaRonde mill, LaRonde ore body was getting out, let us say, mined out, and we had a mill available. The LZ5 mill is the old LaRonde mill. Everything is done at LaRonde. At the time, they came to the table, and I recall, Ammar, you were there. I was on the budget life of mine team, and they came at the table to us and said, "Look, we have an idea.

We would like to go mining the old mine, mined by Barrick at the time, 1978, 1988, I think. We are going to do a project like that, but it is going to be a school of mine. So we are going to bring the technology, we are going to bring new technology, we are going to try to mine that more in automated mode. I recall, again, they were asking to buy, I think the equipment was like $600,000 at the time, but said, "We need to invest $200,000 more because we are going to have the possibility to do automation." Ammar bypassed all the system and he said, "Yeah, go ahead." He is the boss. Today, LZ5 is the most advanced underground automated mine in the world.

If you go in Tampere, in Finland, what they use as the environment to develop their technology, that is the LZ5 system, because that is the most complex. They are still beating records today. Now, where are we with this? Now, each mine that we start, like Odyssey or Detour Underground or Upper Beaver, they are going to be set up right up front. We just need to cut and paste. Already, it is going to be scaled up fast. This is a good example of being led by the site, then we scale it out to other thing. Another thing that today we see is, that was new from a couple of weeks ago, but now there is an IOC. What is IOC? Integrated operating center, sorry.

They are going to start to operate, or they are going to try to operate the gensets in Nunavut, so the powerhouse in Nunavut is going to be controlled there. Plus, they are going to try a scoop, to manage a scoop in the Nunavut from the IOC. So we are kind of- Where is the IOC? The IOC is close to LaRonde. Yeah, it is at the LZ5 deposit. So we have a control room there, maybe next visit we can go there. But we are pushing the limits to another, because we have the backbone to do it underground, because now we are working with SpaceX in Nunavut, it is giving us that possibility. I will not go into the detail, but all of the thing we are doing, it is mainly now better using of data.

Of course, AI, it is now having, you could have data, but you could have a thousand of metallurgists looking to data. That is how it works. So we do a partnership with Microsoft and other also, depending of the software we are using, to leverage AI. We have 70 currently initiative with AI coming from the sites, which it is mainly, I see it in different pocket, but one pocket is, let us say, everything we do, help on presentation and everything, but that is not moving the needle. What moves the needle is working with data at the mill, how could we better predict, improve recovery. With our maintenance equipment, how could we, instead of changing the motor at 3,000 hour, could we go at 5,000 hours, 6,000 hours? So helping on the CapEx, helping on productivity. It is also on the programming.

Those tools are very fast, very helpful to program. We start to see some sites doing stuff that a consultant could do, I do not know, it could have take six months before. They take a month, and they are able to bring a new way to control our stuff. We are at the early stage of it, but we already see some improvement. Maybe in the last part is the agent. Using agent instead of doing, let us say, non, let us say, added value work, for example, in procurement, now we are using agent. That is so they could go to tender, receive the tender, classify, and then the buyer can just look, okay, who is the winner, and do that work.

We are getting there, and this is helping a lot also on the workforce, back to the workforce, because we are more productive, and we could use our smart people to, let us say, to deal with new tools to add value. That is about it, about the digital transformation and technology. It is the more the way we do it, led by the site, and let us say, enabled by the corporate. Next slide. That is my last part before we get to the original. Okay, it is me controlling that, eh? On the project here, Ammar and Natasha touched on that. I will maybe summarize what we are doing. A mine is not discovered, a mine is made. It is not from a drill hole that you have a mine. It is really, let us say- Not a complex, but you need really to think and to build your mind.

This is something that we are strong and we are able to do. It is good to have, let us say, a strong exploration team, technical services, and construction and operation. But where we are good is to make them working together. I could give you example of that, where, and I think Olivier is going to talk about that, but between exploration and the study team, and we have Sam here in the study team, there is lots of discussion and interaction. Where are we going to start? Let us say, here is, I have 1 million oz, that grade, blah, blah. We are going to start with the reverse engineering. Okay, no. To make it economical, I need that amount of oz or that grade. Stop to do infield drilling.

Now you need to step out and to find more, because if you just find more of the same or we are just better with this, there is no project. There is a very good interaction between Guy's team and the study team and the operation team to define what the project could look like. That is a very important thing, to make sure that the money we invest is going to the project. Then when it moves to construction, having our construction team to make sure we do the good costs of that and the good schedule of that is very important. We are not coming back to you with the project before we are certain about that, which mean 60, let us say, between 30% and 60% of a detail engineering done. This is where we are, to be comfortable, this is what we need.

Again, it's back to the team working together. When you build a project, the operation always want to have the best thing, but we cannot do everything. So there's a good interaction in between the operation and the construction. I can see it now, for example, at Hope Bay, where they need to take decisions. But they need to take decisions not because of their ego or because of their team, it's because of the project. That what makes the difference why Agnico is able to deliver, and we do good project. Based on the 20%-30% growth, it's all of that. It start with a vision, then how we make it happen.

There's some vision, Chris is going to talk about that, but I recall in 2015 when Sean asked me to be VP in Nunavut, I said, "Okay, Sean, I'm in, and one day we're going to be at 1 million oz in Nunavut." I put it how it could looks like. At the time, the 1 million oz one is in 2028. I can show you that graph. So, I might miss it by a couple of year, but Martin Plante, he was VP Nunavut too, he worked on that, and now Chris is working on that. So, around 2030, 2031, we're going to be at 1 million oz. It all start with a story, with a vision. Now we have the same at Malartic. We have the 1 million oz at Malartic.

Yeah, there's still some piece of the puzzle we need to work with, but that's how we start. That's how we work together. On that, I'm going to introduce the leader of the construction team, Daniel Séguin, alias Crosby. Dan started with us as a student in 2006. I know Dan since that time, and we've built together, Meliadine, he was leading the engineering at the time, and he's going to present you how we do project and with team. Something also, Dan report to myself and Natasha. The construction team is shared. The way we do project, we look to do the same, and also it shows how it could work between Natasha and myself.

I know when we started with two COO into the company, some people have doubt how that could work, but it works because Natasha and I are able to collaborate, able to work together. On that, Dan, I will let you do your stuff.

Daniel Seguin
VP of Construction, Agnico Eagle

Thanks, Dominique, for the intro. If you see me jumping on an ice and play hockey one day, I am definitely not Sidney Crosby. I can guarantee that to you. I will jump right away into it, if I can switch the slide. There you go. We have been working, developing, and optimizing our way of building mine at Agnico for the last 20 years. We already been in the sequence where we built five mine in five year at our beginning. Starting in 2008, we built five mine in five years. The interesting part of that is that some of the people who works on those project are still with us in the company. I always use the same example of Jack Dutil, who started with us 29 years ago as an electrician underground at LaRonde. He then helped us building LaRonde 2.

He helped us build Lapa, went into Mexico to build the platform there, came back, work in Finland, work in Nunavut, and now Jack is the project director leading the Nunavut platform and also the Detour project. Those 20 years of project development also allowed us to develop our future leader. Two quick example, Bruno Roy, who started with us as an engineer for Meliadine, he is now leading Upper Beaver project as the project manager. We also have Marc-André Beaudette, started as a supervisor underground at Goldex on the Railveyor project, and he is now leading the Hope Bay project. I think that those two guys especially are going to help us for the next 20 years.

Hopefully, in future presentation, they will have many more mines added to that, and it is people like Marc-André and Bruno who are going to help us to move forward with that and continue to progress on the Agnico Way. Now, the best way for me to describe this famous Agnico Way is the three words in the blue box that you see on the screen there. The first one, ownership. We take control of our project. We do not give our project to third party. We want to have our hands on the steering wheel, and we are the one who are making the decision on our project. The second element, transparency. I am always using our change management process to explain our transparency.

When there is a change happening on the project, and there is always change in the project, that is part of the game, it is not only construction who take the decision and approve or not the change. It is the operation team, it is the construction team, and it is the management team together, and we tend to always take the best decision for the project, not only for one group, as Dominique mentioned. The mission of this integrated team, the operation, construction, and management, is to protect the scope, protect the budget, and protect the schedule of the project that we do. Visibility, best way to describe it, we have been developing tools for the last 20 years with our team, building our project. Those tools allow us to have visibility on the outcome of the project.

One good example, it allowed us to see the risk before they arise, but also the opportunities before it arise. Then we can adjust the project and make the right decision, again, for the project. This 20 years of project development allowed us to work on our people, but also on our design. Each of our projects start with a proven design. A couple of examples here. Processing plant, Meliadine, delivered in 2019. It is working well. It is making a good production. We are taking some of these area, some of these circuit that we have installed there, and we duplicate them for Upper Beaver. If ever we move forward with the project, there will be circuit that are going to be the same in Meliadine and Upper Beaver.

Another interesting aspect is for our surface complex, what we call multi-service building, or MSB, where there is a truck shop in there, the warehouse. There is often the mine dry and office to operate the mine. We have delivered our first MSB in 2018 for Meliadine with a company named Onco. Since then, we probably did around 20 more building with this company. We did the operational complex at Odyssey. We are working on the MSB at Hope. We are working on the MSB at Detour. If ever Upper Beaver move forward, it is going to be them who is going to do that. To work with the same contractor like that, it definitely accelerated the way we progress in our project. Now, in terms of partner, engineering firm who work with us and contractor who work with us, pretty much the same.

We are reusing the same company to accelerate how we develop our project. There will be discussion on the workforce, and Ammar, Dom, and Nat spoke about it a bit. I will go by region. In Quebec, Agnico, we are well recognized. We are the company to work with. So it is not that difficult for us when we have a project to partner with consultant and contractor because they want to work with us. They know how we work, they know what we expect, the quality, and all that. So again, we can accelerate how we do things. Pretty much the same thing in Ontario. With a mine like Detour that is recognized worldwide, it is easy to attract people to work on those site.

For Hope, we have been working on developing Western Canada, and I must admit that we are having good success right now, either with the staff that we hire to work in our team or even the contractor. We see that it is a good fit, and the mindset is quite the same. So for now, we are having success with the Western Canada. Now, if we scan our EPCM portfolio and what we have there, so mainly four team. So Odyssey, Hope, Detour, and Upper Beaver. We have a functional support team that have a kind of matricial approach to support and help all of those region to develop their project by providing tools, doing audit, and things like that. We kind of have a group of expert in there.

If we take as per example, the engineering line there, the center of gravity right now is much more on Odyssey and Hope, but it is going to move to Detour and Upper Beaver soon, because we are almost complete at those two site. What it allows us to do on my side is, because we are working all the same way, using the same tools. It is easy for me to take those resource that are working with us and to transfer them from project to project as we progress and how we sequence stuff. With this structure, with the team, with our future leader, I am quite confident that we are going to be able to deliver the project that we have in the pipeline right now, and I am quite confident that we are going to add 20 more years of project execution to our portfolio.

On that, I will introduce back Natasha to

Natasha Vaz
EVP and COO, Agnico Eagle

Right

Daniel Seguin
VP of Construction, Agnico Eagle

talk with you.

Natasha Vaz
EVP and COO, Agnico Eagle

Thank you very much, Daniel. Okay. With that, we will now kick off the discussion on the key value drivers for the regions of Ontario, Australia, and Mexico. The focus this morning will be more on the pipelines than the actual operations. We already talked about the optimization efforts at the operations, but our focus right now is on the pipeline of projects. I will come back and I will talk to you a little bit about the Mexican joint venture with San NicolĂĄs, but for the most part of the morning, we are going to be talking about two projects, and they are both in Ontario. The first one is taking the largest gold mine in Canada and expanding it to 1 million oz a year. The second one is leveraging the synergies that we have in the Kirkland Lake camp to build the Upper Beaver project.

Why is this so important to us? It is easy, because it is an opportunity for us to grow low-risk, profitable production in a very mining-friendly jurisdiction like Ontario. These two projects not only help us sustain the annual production profile in Ontario, but we are able to increase it. We have the potential to increase it by as much as 50% in the early 2030s. Andre is going to talk a little bit more about this, and he is also going to talk about some of the other opportunities that we have in Ontario. Hammond Reef is one of them. That is northwestern Ontario. He is also going to talk about further potential than what we have already outlined at Detour. I will quickly introduce Andre. Andre Leite is our VP of Ontario.

He has been with us since the merger with Kirkland Lake Gold, five years, and before that, he held senior leadership positions at Detour Gold since 2018, and before that, he was working at Vale on a number of continuous improvement and technology initiatives across Canada and Australia and New Caledonia. Fun fact with Andre, if you think any one of us actually uses our hands a lot when we talk, wait till you see him. Awesome.

Andre Leite
VP of Ontario Operations, Agnico Eagle

I know I have an Italian friend here in the audience that understands what we need to do. Anyways, it is good to see so many familiar faces. Again, I would like to start by saying, reinforcing the message that it is a very, very exciting time for us in Ontario, okay? To what Natasha was referring to, we have a very great business in Ontario. When we talk about business is we, right now, we have Detour, which is the largest gold mine in Canada, which is currently producing 700,000 oz a year. We have Macassa, which is one of the highest gold grade mines in the world, that has been in operation for over 90 years, and we see a lot of potential there to continue that for decades to come. Currently, we are generating significant amount of value for the company.

We are talking about the significant cash flow, free cash flow for the company. We successfully brought Detour from 600,000 oz - 700,000 oz. We successfully brought Macassa from 200,000 oz - 300,000 oz. What we are working towards, and from our point, the growing 50%, it is not just a broad statement. It is communicating our plan, what we are working towards. There is a lot of work in the past that we are there has been now, you are going to see some of the results that we are realizing these results of a lot of the work that was done in the last couple years. I am going to go back to what differentiates us, okay? When we look at this, first, these are not complex mines or projects. We are not talking about building a mine in a mountain range somewhere very far. These regions we know.

We have been operating these regions for decades now. I am going to go back to Daniel’s. He is a very modest person. He is a very good hockey player. It is not that that I want to reinforce here, is that he was part of the team that built all those mines. He lived the experience, and he learned the methodology of how building mines, how we build mines. We have a way of build these mines that is very unique. When I talk about, and Natasha gave me a bit of my background here, I was a bit of a nomad as a good miner. I had the opportunity to work and see some failures. Working for minor majors and things that did not work very well.

Having an internal EPCM company, which what actually we have with Daniel’s team, that have consistently used a certain methodology for decades to successfully build mines on time and on budget, is one of the major differentiating factors that I see that we have, that we have access to. 50% again, and I am going to reinforce this message over this conversation today. When it comes down to our potential here, everything we are discussing today is a snapshot in time. I am sorry, I am going to repeat this quite a lot for now and the future updates, and that is the feeling I have, especially related to the Detour, Upper Beaver, all of our assets. Why? Because we see a lot more potential here. When we are talking about 50%, that is what we are working currently on between Upper Beaver to bring about 200,000, Detour between 300 oz and 350 oz.

But on top of that, we see and we are working towards potentially increasing this by 80% if when we consider Hammond Reef. So if I look at Hammond Reef again, it is an asset that at current gold prices, it is very attractive. We are working on it to understand timing, and to Jamie’s, you know, other, as always sharing with us, we need to be very capital disciplined. So this is part of the equation as well, how we are going to build these mines. But all of this is part of our strategy. So when Ammar mentioned to us that there is intent on the way that we do things, that is what we are referring to. We are thinking about things decades ahead of us, and that is why we are able to achieve things like this.

Other point I want to emphasize here is the fact that this growth is not for the sake of growth. These are quality oz. That means that we are talking, for example, at Detour, and I am going to focus now at Detour moving towards 1 million oz. These are oz that will be able, very competitive cash cost, and this mine has the potential to be at current gold price around $4,000 an ounce, generate $2.5 billion a year free cash flow for several years. What other asset we can discuss? So, an asset like Detour is a company builder, is a company maker. It is a very unique asset, and I am going to reinforce the message, it is a snapshot in time.

Everything that I am going to discuss here today, we are still working towards realizing the full potential of Detour, and it is going to take time because again, going back to that disciplined approach. The image that you see here on the top, number one, is what the box cut looks like, and the bottom there, you can see in the schematics what that is. That is the conveyor ramp we are starting on the box cut, so that means that to remove the overburden. Number two is the exploration ramp. That is also our service ramp, and that is what we will be using to potentially access the early oz, in early 2028. The new optimizations, another piece of the puzzle for us to get to 1 million oz, it is working well. We got to 28 million tons a year.

We are working to get to 29 million tons a year. Just as a reminder, Detour, if you know the history of Detour, we started around 22 million tons a year, and we ramp up with not a lot of investment to that 28. Now we are optimizing to get to 29, but around 2030. There is a lot of optionality at Detour. This is a schematic that, just to give you a bit of color of what we are talking about. The current, I would say image, or the first scenario that we had that we communicated in 2024, this is what the mine looks like. But again, it is a snapshot in time. It does not fully capture the potential of Detour, and I will be talking about what that looks like.

This is to give you what we are working towards right now with the scenario that we have. In black, you see what we already achieve. We achieve already over a kilometer on the development we are working. We are achieving what we planned, so we are on schedule pretty much. Again, we are talking about that this view would be about 4 million oz. The next milestones will be mainly the permitting piece, and I will discuss this a little bit later. Now I am going to take you to the fastest tour to Detour you can ever have. Some of you already went there, so you saw it does not do justice, honestly, of the scale, but gives you a good understanding of the surface infrastructure so you can have, as I am talking, you can have a better understanding. Where the Agnico Eagle logo is where Detour is.

This is a kind of bird eye view, some of the main infrastructure that we have. The video is going to take us to discuss the first, the camp expansion. Currently, we are building another around 350 rooms in addition, in preparation for the growth that we have. This is the actual camp, how it looks like. That is the Sagimeo camp. We have two camps at Detour. This is the main camp that is being expanded. The other one is Little Hopper. That is the mill. Now we are flying to the tailings facility. That is cell two, that is in operation. To the right is the cell one, that is closure phase. Now we are going to move to This is future, so this is not built yet. This is the schematics of the future potential pace plant. That is exploration portal.

Now, this is the actual image of the portal, what it looks like. So our temporary facilities for maintenance and operations. Then we are, I believe this is the last stop we have, which is the conveyor portal, and it's going to give us the view of what looks like in actuality there. There we go. What looks like the conveyor box cut. So, now, Detour, what we have today, we have approval from the board to invest $300 million in the exploration phase. That will take us to mid-2027. Here, this graph, this image, gives us the, I would say, the path forward that we're working towards, assuming that the exploration, the bulk sample results will be positive. I personally believe we know this ore body well. I believe this is going to be the case. And this is the path forward to production, right?

We have the optionality here for early oz. Now, that wouldn't be the full mine, so this is oz that will be accessed by the service ramp, the exploration ramp, not the conveyor ramp. The main milestones that we have, bulk sample, then finishing the permitting by the end of 2028, and the consultation. And I will be talking about the reserve declaration by the end of 2027, and some of the limitations, because we had to permit this first phase, so we need to firm the design. So that's the logic here, that in parallel, we're going to be looking at all the optionality we have at Detour. With that, I would like to invite Guy to give us more color on the successful exploration we have.

Guy Gosselin
EVP of Exploration, Agnico Eagle

Thank you, Andre. Good morning, everybody. You'll see there's no specific exploration section in the presentation. We've, by purpose, decided to jump into every single asset of the portfolio, me and my colleague Olivier. But I say I want to use Detour as sort of an intro on our bigger, let's say, mindset around exploration. One thing that differentiates Agnico Eagle is how successful we've been creating value through the drill bit. And we've always been told that we are, I would say, more heavily reinvesting in our business than any other company, but that has been paying off. We've been quite successful at growing reserve resources over time, and even in time when times were tough, like in my first life when Agnico Eagle, back in 1990, when I was a young kid, we were not making much money.

But it's in the DNA of the company to reinvest a lot and to create value through the drill bit. And this is how, even in tough time, and still in good time, that we think that in terms of return to our investor, one of the good thing we can do is to reinvest heavily in exploration. And Detour is a great example. We always like to show that, say, what we bought, what we've got on the side, and Ammar mentioned about it, that we've been successful discovering 50 million oz. Takes a lot of drilling. The nature of our ore body takes a lot of drilling, but we've been good at it. Detour, when was acquired in 2020, was sitting about with a 20 million oz mineral inventory.

Now, if we look at what was mined since and what we've added, now Detour is, as we've been adding 27 million oz at Detour, and growing reserve and resources through a sustained commitment to exploration that was undertaken by Kirkland Lake Gold and carried on under us. Meaning that at the time, obviously, we started with the concept that, well, the deposit's still open at depth, let's keep focusing on it. Then during the time of the merger, saying, "Well, Detour used to be an underground mine back in the day." There are, within that large low-grade ore body, pocket of higher grade. For us, the best way to create, to leverage even further, optimize the throughput at the facility and optimize the head grade at the mill through a better blend of the higher grade.

We are currently selectively sending, processing the best out of the open pit. But by adding that underground component that Andre was describing, obviously, we see the potential of, in addition of carry on mining the pit at the same pace, go underground, bulk tonnage underground mining, basically like we do at Goldex, and selectively go back to mining underground, especially in the western portion of the deposit, and maybe even in the lower kind of iteration of the pit to accelerate, let's say, the mining. Because obviously, sitting on 40-something million oz at the pace we're contemplating, we're good for 40 years. So that's always been sort of our desire. Over the last five years, we've been successfully completing a ton of drilling. I think we're north of 1 million m drill over the last five years at Detour, adding those 40-something, 27 additional million oz.

Our discovery cost at Detour, like Malartic, is around at about $10 an ounce on the discovery aspect. Plus, obviously, after that, we have to do a ton of drilling. So you'll see Andre describe, let's say, one of the near-term opportunity of that underground is that area in dark blue west of the pit, where we see that cluster of red dot. This is an area where we both see kind of those wide interval of 100 m at 1 g , like in the pit, but within it, some 20- 30 m at 2 g, 3 g, 4 g that we can easily access by the exploration ramp. We're about to touch the ore. If not, we're already into the ore in the ramp in the west. Those are kind of the early oz.

The bigger picture is basically what Andre described, and how to optimize, let's say, the extraction and the deposit. I like to say it remains open now to the west, about 6 km W of where the mill is. There's still some intercept with 20 g, 25 g over 4 m, 5 m, 6 m at the kilometer below surface. So the story is still being written at Detour. It's going to continue to grow. We're going to continue to get to be busy, and it will be continuous sort of iteration on ways to optimize the site at its full potential. Back to Andre to discuss a bit those scenarios.

Andre Leite
VP of Ontario Operations, Agnico Eagle

Thanks, Guy. I want to, before we jump into this, I want to just highlight what Ammar shared with us earlier. That is pretty impressive to have grown the reserve and resource base by this much that Guy just shared with us. I think it is even more impressive that the fact that we see the potential growth is in further. Detour, again, is a kind of company maker asset. What we see on the top here, it is the image that you see on the June 2024, right? That is the public disclosed internal PEA level study. To advance the permitting, to advance the consultation piece, and to advance the drilling that would allow us to start production, okay, to start generating value for you as soon as possible, right, we had to firm a design.

That is what you are going to see in the mid-year update. We are going to be coming to you with the mid-year update, right, which would also be the reserve statement for us. We are working to have a PFS level study by the end of 2027 to support reserve declaration. On that study, you are going to see it, our range is between 4.5 million to 5.5 million oz. Again, the same concept and not fully capturing the potential of Detour. In parallel, as I mentioned before, we are looking at all the optionality that Detour has. There is a lot of optionality at Detour. We are looking at a higher mill capacity. We are looking at a potential larger open pit. We are looking at a larger underground, what that large underground should be. Here is a sneak peek, okay, of what that scenarios look like.

That what currently we have, and to Guy's point, as we continue drilling to the west, we continue successfully finding mineralization. We are talking about right now, our view here is going to be between 9 million and 10 million oz. Again, not fully capturing the potential of Detour. One thing that makes this, when we talk about Detour underground, we have been able to successfully accelerate value creation by tapping on another internal resource that Natasha made reference to, which was the technical capacity of Agnico. We also have internally a technical capacity that is able, we are able to tap, and it is quality capacity. When you talked about comparisons, okay, if I go to an engineering firm, there is the A team, the B team, the C team, right? It is not all the time you get the A team, right?

Especially in times like this that is very busy. We have A team, A+ team available to us, right? This is a major differentiating factor. We are able to accelerate these things. I am going to go into a bit the discussion of Upper Beaver. Kirkland Lake Complex, which is Macassa, Upper Beaver, and other assets that we have in the region, currently with Macassa, we produce around 300,000 oz. Upper Beaver would add about 210,000 oz and 4,000 tons of copper to that, so bringing the Kirkland Lake Complex to about 500,000 oz. We have been heavily leveraging the synergies that we see between Macassa and Upper Beaver, but as well with the LZ5 mill. For example, Macassa, when Upper Beaver, Upper Beaver is ahead of schedule in development of the ramp right now, okay? About 12%, 12%-15%. How we achieve that?

Well, we leverage Macassa. We brought people from Macassa. We brought equipment from Macassa, right. We tap on Daniel Seguin's team with Bruno Roy that is also helping Macassa. We are able to, for the shaft, we brought the same crew that was sinking number four shaft from Macassa. So the same person that was sinking, the same methodology. We are looking at, for example, the milling of Macassa ore going to LZ5, but in relation to Upper Beaver, we are looking at Goldex liners to understand and pumps and cyclones so that we optimize the mill of the potential mill at Upper Beaver so we can realize higher synergies between Macassa, Upper Beaver, and Goldex, for example, similar mills. Again, snapshot in time. This is similar to Detour. We have $300 million US approved to better understand the ore body. Our strategy is by mid-2027, that will be the envelope that was approved.

Here is a snapshot of what will look like with us having success with that. Again, we believe that is going to be the case, but we have to go through that process, being very disciplined in relation to capital allocation as well. So currently, the next major milestones is to take the bulk sample. The bulk sample at level 760, we are there right now at the shaft level 760. We are evaluating how we can optimize that, okay. How we can better optimize this. So this is part of the discussion, if we will take that sample at 760 or not, and where we will take it. But the next milestone will be the permitting and consultation as well by early 2028. So this is, again, snapshot considering we are going to be successful.

When we talk about full potential, similar to Detour, Upper Beaver still has potential, both at depth, because it is not fully drilled at depth. We do not have, from a drill location, we do not have the capacity to do it from surface. But we also have satellite deposits like Upper Beaver and Upper Canada and Anoki-McBean, that they are not small. They are relatively large potential contributors from oz that we are currently evaluating. We are developing in our process, we call the full potential model, which is the first pass in bringing something potentially into production. So we are doing this early next year, we will have that.

But to buy the optionality, we are also looking, as we design the mill at Upper Beaver, that we are looking at the option to design a mill that could go up to 8,000 tons a day instead of 5,000 tons a day, which allow us potentially to bring Upper Beaver production higher than 200,000 oz a year. Now, Hammond Reef. So there is a map. I do not expect you to know where Atikokan is, okay. But if you see the little map on the top there, you see it is close to Thunder Bay. Now, I am going to go back here. This is not a very complex ore body. It is a region where there is, from a workforce perspective, not a lot. We see it as an opportunity because there are some mines that are closing by the time that we believe we can be operating at Hammond Reef.

We already have been doing research on the market. Daniel and I, we are already discussing the project construction team. Going back to Ammar, all of this is not by chance, by luck. What we have been able to achieve to this point and what we are working towards achieving in the next couple years, in the next decade, is not because we are lucky. There is intent behind it. This just gives you a good, I would say, sample point on how we do things, right? Again, Hammond Reef is part of that next wave of growth for Ontario. There will be about 250,000- 300,000 oz a year. Here is just the schematics of what the current design of the mine is, the potential preliminary production profile in oz.

Again, not very complex mine in a region that we see a very natural or organic way to grow our businesses in Ontario. From a timeline perspective, what we are seeing here is from now, this year, into mid-next year, we are looking at advancing the permitting, the consultation, and we are updating our PFS, internal PFS level study from a cost perspective, doing some detail engineering as well. So that mid-next year, both for Detour, Upper Beaver, and Hammond Reef, we will give you an update what these projects, where are they, or how we see, how that would The kind of an update on our view on those three projects. The next, again, this is not approved, but this gives you a good view here of a potential path to production.

To finalize, I just want to reinforce the message that we are doing very good progress, both at Detour underground and Upper Beaver. Everything I shared with you today is a snapshot. It doesn't fully capture the potential that we have. We work as a team, and to Dom's point here is, a lot of it is getting best practice that we have in one place and applying to different, very similar to different other projects so that our cost is very competitive. Our probability that we are going to achieve what we say we are going to do is high, and that is what has been the secret sauce for Agnico, in my opinion, is this consistency in methodology, in people, and culture. With that, I will go back to Natasha to give us an update in Mexico and Australia.

Natasha Vaz
EVP and COO, Agnico Eagle

Thank you very much, Andre.

Andre Leite
VP of Ontario Operations, Agnico Eagle

Okay.

Natasha Vaz
EVP and COO, Agnico Eagle

Okay. I'll start by giving you a little bit of history on gold mining in the state of Victoria. I think most of you already know this, but in case you don't, one of the largest recorded gold rushes in the world was right here in the state of Victoria. About 80 million oz was mined in that central Victorian gold fields, and 20 million oz was actually mined in Bendigo. That's where Fosterville is. A lot of the gold that was mined there was used to build the city of Melbourne. So when gold was found or discovered in 1851, Melbourne had a population of about 23,000 people, and a few years after that, it grew to 500,000 people.

This central Victorian gold fields, it has very unique characteristics in the sense that it consistently yields very high-grade gold veins and reefs, similar to the characteristics that you see at Fosterville. We're very happy, very fortunate to have Fosterville in our portfolio for three reasons. The first one is the ability for our team to execute on what they said they were going to do. They have consistently met and exceeded their targets, consistently. They're constantly looking at ways of improving both the mine and the mill, optimizing it. And even though that they've finished mining the ultra-high-grade Swan Zone, and they're sitting at an average grade of about five and a half g, they're still yielding really healthy cash flows in the order of $1 million a day.

The second reason why we're happy to be in Australia, and specifically in Fosterville, is the unique infrastructure that that site has, specifically in the state of Victoria. It has the largest modern processing facility that can treat pretty much any type of gold ore in that area. And finally, it's the exploration potential in that area. You can see that purple area, that's our land package that we have there, and the gray area in the middle is where the mine is. So we have a lot of land to play with, and we see the potential of potentially another Swan 2.0 one day. If you recall, when we were mining in the Swan Zone at lower gold prices, we were generating in the order of $1 billion a year, just alone at Fosterville. So we do see the potential.

Also, interesting fact here, you see that green line running across that image? That is the Murray Basin sands that covers the outcrops of the rocks. So, to date, there's only been mining south of that line, and there has been virtually no modern exploration beyond that. The rocks and the gold traps are still going north of that. So it's really interesting, and also what's interesting is north of that is probably the most sparsely populated area in Bendigo. So I'm going to ask Guy to come up and talk to us a little bit about the regional exploration in Fosterville.

Guy Gosselin
EVP of Exploration, Agnico Eagle

Yeah, a few points to make on Fosterville precisely. You see the map over there, the long section of the deposit with where the Swan was used to be in the middle of the Lower Phoenix. You've heard us discuss recently about some positive reconciliation in a few of the last couple call, and, well, the reason behind is obviously we haven't yet stumbled into a second Swan Zone, but there is a smaller version of the Swan. Basically, just to keep it simple, there's two type of ore at Fosterville. There's a kind of a decent grade sulfide mineralization that could be five to 10 m thick at around 5 g, and within it, there is some load that were introduced, some high-grade vein with those spectacular grade that the Swan was.

The Swan was used to be a quite spectacular vein that was introduced within that first phase of mineralization. But in the Robbins Hill area to the south, we've encountered something smaller than the big Swan. Swan could have been up to three m thick, but in the Robbins Hill area, there is a similar kind of structure within the Robbins Hill that is anywhere between a few centimeter thick to a meter thick that could also run up to 1,000 g. That is somehow difficult to capture into a resources estimation, and this is why we've been fortunate at seeing it. So the package obviously is super fertile. We're at the right location, and it's like in real estate, it's all about location when you talk about geology. Do we have the original slide after? We're going to have to go back. We switched.

Okay. Obviously, we know what the deposit is like. We know what controls the mineralization. We know about We have all of the toolbox, the team over there. The team is intact, basically. It's been through several phases of ownership over there, but it's the same kind of thing. They know exactly what they're looking for. Those are kind of needle-shaped deposits, so super slick looking for a needle in a stack. But we know exactly where all the fault, where all the fault feature, so it was mostly about acquiring more ground around because we were almost getting to the boundary of our tenement. Through a tooth process, I would say, in 2020, there was sort of a lottery on tenement around the mine that we were successful getting three of the four tenement that we were looking for.

One of them slipped outside of our end, ended up into one of our neighbors or other There was another company named S2 Resources. We basically managed last year to acquire that tenement. This is basically surrounding the mining lease. We've also were granted all of the other tenement. We've also been successful at negotiating the agreement with the traditional landowner, getting all of the permit, and we're currently hitting the ground, regional scale, and we're starting to see some very positive sign. 20 km, 30 km, 40 km north, we're starting to drill. We're starting to see the similar kind of evidence. They're all of the right ingredients. We've seen some early sign of something that could be similar.

We have a lot of hope and faith because there are kind of massive north-south trending structure in the entire playground in gray, and that playground basically is a quarter million hectares. 120 km long, there is about three, four major north-south structure that can control mineralization. We have the best team. We know we have the tool. We know the signature of those thing, and we are going to continue to reinvest because the mine is making still a very decent amount of money at about $1 million a day in net free cash flow. We like Australia.

It has all of the right ingredients, and it is a pretty nice place to be, but not too close from Melbourne because it comes with some challenges to be close from Melbourne, but it is a very lovely environment, and we have a team that stays over there, very low turnover, and we have all of the expertise to leverage down there. That is all I had to say on this one. Passing it back to Natasha.

Natasha Vaz
EVP and COO, Agnico Eagle

Perfect. Thank you, Guy. Okay. Finally, before our break, we will talk about Mexico. Here, as you know, we do have an operating mine, Pinos Altos, in the state of Chihuahua. It has been in operation for the last 17 years. It was actually coming to an end in 2028, but the team has been really focused in on mine optimization, mill optimization, and also doing some exploration drilling in and around the existing areas. They have been able to extend their life by another three years now, albeit at a slightly elevated gold price, but still generating a stable, profitable production profile. Moving on to the project. We have San NicolĂĄs in the state of Zacatecas, very well-established mining state. We have a JV with Teck Resources, a 50/50 JV, on a very large VMS copper-zinc deposit. Here, the focus was really twofold.

One is the permitting process, the next was the technical evaluation. This year, we hit a milestone in July. We ended up getting the two major permits that we had, the MIA-R, which is the environmental impact assessment, and also the change of land use permit. The MIA came with a condition. It preferred us to limit the use of fresh water and instead look at alternative solutions. We were already looking at options because we wanted to de-risk the water source and make sure that we have a very stable, reliable water source for the life of mine. We had already started to undertake an assessment of using wastewater, which is 60 km away from the site.

Right now, we're doing the basic engineering for that, putting in an application by end of this year, early next, and then we should receive that in 12 months or so. The next thing that we wanted to de-risk was the power. We wanted to make sure that we had a stable source and reliable source of power for the life of mine. What we did there is we came up with a solution to generate power by ourselves on our site. We're tying into the natural gas line and building our power plant on site. This is not unusual for us. We do this all the time in Nunavut. With that, we need a secondary permit on power, which again, we're going to be applying by Q1 of next year, and it will take 12 months to do.

In the meantime, though, we're going to continue elevating our engineering from basic engineering to more detailed engineering, specifically on those two solutions. With that, I have a video for you. It's a schematic of what we envision San NicolĂĄs to look like, so I can start that, I think. Okay, so this is, San NicolĂĄs is 60 km south of Zacatecas, accessible by three airports, and it is accessible to three seaports. This is the footprint of San NicolĂĄs. You can see the main infrastructure here, and that is our processing facility, which includes crushing, grinding, flotation, regrind, and concentrate dewatering. Here is the resource that you see here. We have about over 100 million tons of ore there, and the copper grades and zinc grades are pretty good. This is the power plant that we're planning on building on site.

We're thinking of WÀrtsilÀ engines and something exactly, almost a replica of what we have in Nunavut. This is the water line that takes you to the wastewater treatment, 60 km away, and the power line. That's it. With that, we're coming to the end of the morning, and I don't know if we have time to take some questions before. Yeah.

Speaker 7

We have time for questions. We have about 15 minutes. I'll ask everybody to, if you have questions, to wait till you get a microphone, just for the webcast. I'll open the floor.

Anita Soni
Analyst, CIBC

Hey, Anita Soni from CIBC. I just wanted to ask on Detour, I was looking at the upgraded target, the 9 million-10 million oz that you were talking about in the underground. How much of that is underground, and how much is open pit? Is it all just underground? All underground.

Andre Leite
VP of Ontario Operations, Agnico Eagle

Because I don't know, like I'm better. All underground.

Anita Soni
Analyst, CIBC

All underground.

Andre Leite
VP of Ontario Operations, Agnico Eagle

All underground.

Anita Soni
Analyst, CIBC

And then, the grades that you were potentially looking at, is that any different? I think the original PEA, and I'm guessing

Andre Leite
VP of Ontario Operations, Agnico Eagle

Yeah, that will be a different design.

Anita Soni
Analyst, CIBC

Yeah.

Andre Leite
VP of Ontario Operations, Agnico Eagle

That will be a different cutoff strategy as well. We're looking at a lot of options right now. The grade itself, it's still to be defined, but I don't remember by heart the grade associated with that, but will be lower than what we had in the PEA.

Anita Soni
Analyst, CIBC

Yeah, I'm guessing, I think I'm running like near 2 g per ton for the underground.

Andre Leite
VP of Ontario Operations, Agnico Eagle

Yeah.

Anita Soni
Analyst, CIBC

That's the-

Andre Leite
VP of Ontario Operations, Agnico Eagle

Yeah.

Anita Soni
Analyst, CIBC

It'll be lower.

Andre Leite
VP of Ontario Operations, Agnico Eagle

It'll be around that. I don't remember by heart. I can get you that information later.

Anita Soni
Analyst, CIBC

Okay. That's it for now.

Tanya Jakusconek
Analyst, Scotiabank

Great. I'm Tanya Jakusconek from Scotiabank. I have two questions, if I could, and I'm just going to finish off from Anita Soni's question. On the PEA for Detour that's coming out in Q2 of 2027, and you're now looking at that 4.5 million-5.5 million oz, should we just be thinking that you're just adding more oz in the underground and not incorporating the potential early oz from the west extension zone?

Andre Leite
VP of Ontario Operations, Agnico Eagle

That incorporates the early oz.

Tanya Jakusconek
Analyst, Scotiabank

Okay. It's not only like an increase in the mine life, but it's also bringing oz forward.

Andre Leite
VP of Ontario Operations, Agnico Eagle

Yes.

Tanya Jakusconek
Analyst, Scotiabank

Okay.

Andre Leite
VP of Ontario Operations, Agnico Eagle

Because the first PEA didn't have the early oz.

Tanya Jakusconek
Analyst, Scotiabank

Yeah.

Andre Leite
VP of Ontario Operations, Agnico Eagle

Okay?

Tanya Jakusconek
Analyst, Scotiabank

Yeah.

Andre Leite
VP of Ontario Operations, Agnico Eagle

This one has the early oz in.

Tanya Jakusconek
Analyst, Scotiabank

Okay. So there'd be more development upfront that we should be thinking about

Andre Leite
VP of Ontario Operations, Agnico Eagle

Yes

Tanya Jakusconek
Analyst, Scotiabank

for that one. Okay, thank you for that. Then the second question, maybe it's to Natasha and Dominique. All of these optimization and automation and et cetera that's being done at the mine sites right now, number one, how do you measure them? Then number two, what percentage would you say is being incorporated into your assets today? As I look five years out, with all these new mines coming in, what is that percentage going to look like? Again, how do we measure them?

Natasha Vaz
EVP and COO, Agnico Eagle

Okay. When it comes to these continuous improvement initiatives, Tanya, if it requires investment, if it requires additional resources, we get the sites to develop a business case. So they tell us what the continuous improvement is, explains it, and puts together the benefit. So it could be making our mines safer. It could be ensuring that we're getting some monetary benefit, productivity improvements. Then once we implement it, we start to track it. Most of our continuous improvement efforts are successful. Some are not, but that's okay, because we are tracking it, and we want to be able to continually develop that continuous improvement culture. So it's a very safe culture. If we see the improvement, which we normally do, then we start to build it into our budgets and our life of mine plans.

We will quantify it based on what we are seeing. That helps. Okay. Yeah.

Tanya Jakusconek
Analyst, Scotiabank

It is just what percentage would you say

Natasha Vaz
EVP and COO, Agnico Eagle

I do not know.

Tanya Jakusconek
Analyst, Scotiabank

in your costs or production that you thought these are giving you?

Dominique Girard
EVP and COO, Agnico Eagle

Well-

Good question.

Tanya Jakusconek
Analyst, Scotiabank

Do they offset inflation? Do they offset inflation? It is just trying to benchmark, what would they be? If you did not have it, what would your production or costs have been impacted by?

Dominique Girard
EVP and COO, Agnico Eagle

It is not a game changer that we are going to reduce by 25% our costs. It is more, like you said, to be against inflation, and it is, let us say, productivity improvement that we keep. That is why I think overall Agnico is, I do not know, $200-$300 per ounce is less than our peers, because of that regional approach of being able to scale up those innovation fast and being there doing it. It is always tough when sometime I am going to get back when Ammar approved, okay, at LZ5, you are going to do automation. We are the first to do it, the first to implement the LTE network underground at the time. What was Devon, the cost of the LTE network? 2-3 million, if I recall. What is the payback on that? Sometimes you need, it is like a bit of exploration.

You need to guess on the It might end on something. I think the real answer is our overall costs and cash costs, how it is going. I do not know, Jamie, you have something to add?

Jamie Porter
EVP of Finance and CFO, Agnico Eagle

Yeah, it's Jamie here. Just want to make the comment. I've made this on conference calls in the past. If you look back over the past three years, inflation across our kind of global cost has been running 6%-7%. If you back out kind of external factors that we can't control, our cost guidance on average has been up about 3%-4%. You look every quarter, we report on the operational records that we achieve. I would say, at least over the past few years, it's offset maybe a third to a half of that gross cost inflation that we see.

Matt Murphy
Analyst, BMO

Hi, Matt Murphy from BMO. Maybe a question on the potential at Upper Beaver. What's the timeline to understand the Upper Canada and Anoki-McBean, and when do you have to make a decision on the mill upside scenario?

Andre Leite
VP of Ontario Operations, Agnico Eagle

Yeah, so we would leave the mill option open. So that would be the strategy right now. We wouldn't execute the option, but we leave it open. There may be some incremental cost, but I wouldn't say they are not going to be material. Okay? Now, in relation to the timeline, it's going to be based on success, right? So first stage is the full potential. Is it successful? Our priority right now is to deliver Upper Beaver and Detour Underground. In parallel, Detour Underground full potential, right? So we're prioritizing certain jobs to make sure that we deliver on them. The full potential of Upper Beaver, the timeline for next year will be the first step, the first, I would say, phase of a potential understanding that potential. Then after that will be a path that will, depending on the results.

Depending if it's really good, okay, we may accelerate. If it's not that great, then the gold price as well will play a bit of a factor on that as we're deciding. Capital allocation will be another discussion. So we need to understand all those pictures to give you a proper answer on the timeline there.

Ammar Al-Joundi
President and CEO, Agnico Eagle

Can you just, very high level, what does it mean to keep the option open to go from five to eight? Is it just more space in the mill?

Andre Leite
VP of Ontario Operations, Agnico Eagle

Yes. Yes. When we do the design, you do it in a way that gives you the option to increase.

Matt Murphy
Analyst, BMO

Okay, thank you. Could I just ask a follow-up on some of the hiring effort? A 10,000-person hiring goal. What is the net need? Because I guess there is retirements happening. How much is the workforce going to grow? Do you see retirements as kind of a linear phenomenon, or is there the, quote, unquote, "gray wave" that you are counteracting?

Ammar Al-Joundi
President and CEO, Agnico Eagle

He was looking at me when he said that.

Natasha Vaz
EVP and COO, Agnico Eagle

Actually, let me get back to you on this one. We don't have the actual numbers. I know our HR department does, but it's not as significant as the growth profile, but we do factor it in. I can't remember who mentioned it, but we are trialing a phased retirement program where people that are at that retirement phase are not necessarily fully retiring for themselves. It's beneficial if they stay on, even part-time, to help train the new people coming in, which is beneficial. But I don't have the percentage with me, but we can get back to you on that.

David Haughton
Analyst, Global Mining Research

David Haughton, Global Mining Research. We've got some interesting updates coming out mid-next year at Detour and also at Upper Beaver. How much detail should we expect to pull out of that? Would you be envisaging to put in not only your updated reserves and resources, but could we see potential mine plans, cost profiles, et cetera?

Andre Leite
VP of Ontario Operations, Agnico Eagle

Yeah. For the mid-year, we'll have for that cost, for that scenario, that will be part of the update for the first one. The scenario one, the big mine, wouldn't come with the cost. We wouldn't be in a position yet. Just to give you a bit of a sense, because Detour has so many options available to us right now, we're looking at which options make sense for us to investigate further, and that will not be in a, I'll say, an estimated level that would allow us to share with you, otherwise it may be misleading. But the general concept of what that could look like, we'll be in a position to share, but not cost.

David Haughton
Analyst, Global Mining Research

And at Upper Beaver?

Andre Leite
VP of Ontario Operations, Agnico Eagle

Upper Beaver in relation to the full potential, or the-

David Haughton
Analyst, Global Mining Research

As far as the-

Andre Leite
VP of Ontario Operations, Agnico Eagle

Oh, the same question, yeah. Upper Beaver will be the same logic. We will come back with a cost and the production that comes with that, plus the first, I would say, view on the full potential of what that could look like, but very high level on the full potential.

David Haughton
Analyst, Global Mining Research

And another question, if you don't mind. Looking at San NicolĂĄs.

Andre Leite
VP of Ontario Operations, Agnico Eagle

Okay.

David Haughton
Analyst, Global Mining Research

Is Teck as enthusiastic about this as you are? They're going through-

Natasha Vaz
EVP and COO, Agnico Eagle

No, sorry.

David Haughton
Analyst, Global Mining Research

Teck, your JV partner?

Natasha Vaz
EVP and COO, Agnico Eagle

Yeah. We actually had a meeting with them. Ammar and Jonathan had a meeting, an update meeting with them yesterday. But yeah, no concerns there at this time.

David Haughton
Analyst, Global Mining Research

All right. Thank you.

Natasha Vaz
EVP and COO, Agnico Eagle

Yeah.

Martin Pradier
Analyst, Veritas Investment Research

Yes. Martin Pradier from Veritas Investment Research. My question is a little bit about San NicolĂĄs. When do we think we'll have an investment decision and timing of production? What is your best estimate at this point?

Natasha Vaz
EVP and COO, Agnico Eagle

Yeah. Right now, we're working through the technical evaluation. As I mentioned, we're working through some of that basic engineering and moving it into detailed engineering. That's one part. But also, we would like to have the secondary permits in our hands as well. If we're on track to submit those applications in Q1 of next year, we're thinking in 12 months from then, we'll be in a position to get those permits, and we'll also have the detailed engineering completed beyond the 50%, and we'll be in a position to then sanction.

Martin Pradier
Analyst, Veritas Investment Research

More or less Q1 2028?

And then, in terms of the cost, because I hear there are some things that you are going to modify.

Will that change very much the cost and the NPV of the project?

Natasha Vaz
EVP and COO, Agnico Eagle

We are doing that evaluation right now, so don't have an answer yet, but we are working on it.

Martin Pradier
Analyst, Veritas Investment Research

Would you-

Natasha Vaz
EVP and COO, Agnico Eagle

Once we do sanction, we will be providing a summary of the technical evaluations and the initial CapEx and costs associated with it.

Martin Pradier
Analyst, Veritas Investment Research

Okay. So before the investment decision, we are not going to know exactly what's a preliminary evaluation in terms of cost and stuff like that?

Natasha Vaz
EVP and COO, Agnico Eagle

Probably not. Probably not, yeah.

Martin Pradier
Analyst, Veritas Investment Research

Okay. Probably at the same time.

Natasha Vaz
EVP and COO, Agnico Eagle

Yeah.

John Tumazos
Analyst, John Tumazos Very Independent Research

You reported 499-g m hole at Detour with the earnings report. I think it was in the western part of the open pit. Are you going to twin that hole? Was it an infill hole, a step-out hole? Should we be adding one or two years to the mine life of Detour for the success? Please elaborate.

Guy Gosselin
EVP of Exploration, Agnico Eagle

Now, we had those type of hole in the past, and what we see locally in the deposit, and it's a bit the unpredictable nature of the beast, even there's this It's part of the pocket that will make 4 g, 2 g, 3 g, 4 g, sort of higher grade pocket. There are locally within those broad intercept, you can get a couple of narrow vein with VG that produce those spectacular number. But we're very careful when doing our resources estimate because it's obviously there seems to be two population. The low-grade population that we like to process a certain way when doing the estimation parameter, and locally you get those super high grades. Those results were reported using a capping of 50 g. There may have been some assays. Locally, you can get a lot of VG, you get 600 g. We're keeping a conservative approach.

So far, we have that also in the pit, and our reconciliation in the pit is always within 2%, 3% of predicted. In the underground, we still convinced that although locally you'll see some pocket of maybe that can go up to 10 g, the underground should be in the neighborhood of 2- 2.5 g on average. But locally, there will be some spectacular smaller vein jewelry box.

John Tumazos
Analyst, John Tumazos Very Independent Research

The 499 is capped?

Guy Gosselin
EVP of Exploration, Agnico Eagle

Yep. I would believe so. Either, typically we do both. I don't recall exactly the one you're referring to.

John Tumazos
Analyst, John Tumazos Very Independent Research

You're treating it like it's an anomaly.

Guy Gosselin
EVP of Exploration, Agnico Eagle

Yeah, within the deposit.

John Tumazos
Analyst, John Tumazos Very Independent Research

You're not extrapolating anything.

Guy Gosselin
EVP of Exploration, Agnico Eagle

Exactly. Every 100 hole, we are going to get a hole like that that will be spectacular. But still, it is within a larger mass that is 2- 3 g.

Anita Soni
Analyst, CIBC

Yeah. Just back to Detour. On the underground, you mentioned a potentially lower grade. What is driving that lower grade cut-off?

Andre Leite
VP of Ontario Operations, Agnico Eagle

It is a cut-off optimization, right? So we are looking at different cut-offs, and then how we would bring more mature economically. There is a trade-off that is part of the study, is the cut-off drives the average grade. If you lower your cut-off, you automatically lower your average grade.

Anita Soni
Analyst, CIBC

Okay. Just moving to Hammond Reef. You got a sort of indicative mine plan. I think this might be the first time I have-

Andre Leite
VP of Ontario Operations, Agnico Eagle

Yeah

Anita Soni
Analyst, CIBC

seen something there. Could you give us some parameters around what you think, like what would be a good benchmark to costs if we were to try to

Andre Leite
VP of Ontario Operations, Agnico Eagle

No, that one, I think that is too early for us to share with you know. Again,

Anita Soni
Analyst, CIBC

It is pretty production profile, but no, nothing to

Andre Leite
VP of Ontario Operations, Agnico Eagle

I know. I know. We are working towards to give you a better update mid-next year.

Anita Soni
Analyst, CIBC

Okay.

Andre Leite
VP of Ontario Operations, Agnico Eagle

Okay.

Anita Soni
Analyst, CIBC

All right. I guess Jamie's probably going to finish up at the end, and you haven't even gotten to a couple of your bigger opportunities that are more near term. How do you think about capital allocation decisions? You mentioned that,

Andre Leite
VP of Ontario Operations, Agnico Eagle

Jamie, definitely.

Anita Soni
Analyst, CIBC

It's a lot of stuff happening and a lot of money coming in, but how do you decide what to do?

Jamie Porter
EVP of Finance and CFO, Agnico Eagle

Yeah. As you said, Anita, I'll touch on that at the end of the presentation today. Certainly, we're well-positioned to be able to fund, just from cash flow, everything that we've got before us that we're talking about that's leading to that 20%-30% production growth, let alone growth beyond that in the mid-2030s with Ikkari and Hammond Reef and some of these other projects that we're talking about. We look at each of our assets and assess the full potential. That's an incremental investment decision. Does it make sense to expand Detour Underground further? Does it make sense to extend the life at Meadowbank? We will look at the return profile of each of those opportunities and rank them and allocate capital accordingly.

Speaker 7

Maybe the last question. Sorry, two more.

Steve Green
Analyst, TD Securities

Thanks. Steve Green, TD Securities. Actually, Jamie, you kind of just answered part of my question, but just to confirm that the 20%-30% production growth to 2035, that is just based on the four main projects in Canada. That does not include Ikkari, Hammond Reef, San NicolĂĄs, et cetera?

Jamie Porter
EVP of Finance and CFO, Agnico Eagle

Yeah. We have talked about 20%-30% production growth over the next five to 10 years, so we have been purposefully vague about that. It is really the early 2030s. We are going to see Hope Bay come on in 2030, Upper Beaver come on in 2030, Detour Underground. All this growth from the key value driver projects will generate 20%-30% production growth. Beyond that, there is another stair-step increase, 2034- 2035, 2036, depending on when some of these other projects come in. Ikkari, Hammond Reef could potentially come in sooner, but we will be able to provide more clarity in the future on that second phase of growth.

Steve Green
Analyst, TD Securities

Okay. Even the second potential wave at Detour, that is not part of that 20%-30%?

Jamie Porter
EVP of Finance and CFO, Agnico Eagle

Correct. The 20%-30% is based on what we published in June of 2024, which is ramping up Detour to 1 million oz a year. What Andre presented and talked about is not only the upside potential to that, from 4 million- 5 - 5.5 million oz that we will update you on in Q2 of next year, but beyond that, the potential for the underground to expand to 9 - 10 million oz. That is in the future.

Steve Green
Analyst, TD Securities

Thanks.

Speaker 16

Maybe a question for Ammar. You guys are the biggest producer in Canada by far, a lot of growth ahead. Would you consider adding more assets in Canada, and is there such a thing as becoming too big in Canada?

Ammar Al-Joundi
President and CEO, Agnico Eagle

Well, I mean, our job is, I know it is going to sound flippant. Our job is just to make you money. In our business, a lot of CEOs do not talk about this, which is, a lot of us talk about operating and building. We do not actually talk about how do we position ourselves to find opportunities. We are always out looking. Part of that is our exploration program, which is extensive. Part of it is our relationships, and part of it is we will have investments in 30 or 40 companies at any point in time. To answer your question about would we consider getting bigger, of course, if it makes you money, but not if it does not. There are lots of things we could buy out there that frankly would make us bigger, but would be dilutive to your profitability.

We kind of joke. Every week, somebody says we are going to buy something. We look at a lot of stuff. We do not buy a lot of stuff. But we are always actively looking, and that is what we get paid to do. Can you get too big in Canada? Maybe, but we are a long way away from that. We still think Canada is possibly the best country in the world for mineral resource development.

Speaker 7

Last question, and then for any other question, it will be this afternoon.

George Eadie
Analyst, UBS

George Eadie at UBS. Can I just ask on the workforce piece again, and Jamie spoke on it earlier, but what is wage inflation going at? Second, is the bigger risk having the skilled people, or is it wage inflation and Saskatchewan, Alberta oil sands poaching guys from you?

Ammar Al-Joundi
President and CEO, Agnico Eagle

From what we see, it is not wage inflation. What we are looking at is somewhere in the order of, like, say, 3.5%. Same with our contractors. They follow the CPI, so we are not seeing anything major on that end. But for us, it is more the skill set more than anything else.

George Eadie
Analyst, UBS

Is it getting worse in the last 12 months, or is it unchanged versus two, three years ago?

Ammar Al-Joundi
President and CEO, Agnico Eagle

What do you think, Dom?

Natasha Vaz
EVP and COO, Agnico Eagle

In terms of the workforce, in terms of is it changing? I think as we are bringing in more and more people outside of the industry, we just need to ensure that not only are we building the team, but we're also focusing on investment into the team, whether it's training and engagement, whether it's leadership development. That's why we're bringing them in now for projects coming in a few years from now to make sure that we have that training and development in.

George Eadie
Analyst, UBS

Or more the availability of skilled people. Is that becoming a bigger challenge?

Dominique Girard
EVP and COO, Agnico Eagle

Yes, it is. You could get the one-year, two-year experience, but having kind of the five to 10 years experienced people, it is a challenge. One challenge that we see, people like to be living in big towns like Toronto, Montreal. We need to think outside of the box how we can help in that. It's easy when you're in Nunavut to attract those people because you're flying fly out, but it's different into the Abitibi. Other challenge that we have is housing, and Martin's going to talk about that. Even though you would like to attract people, you need to have a house, you need to have a daycare, you need to have services with hospital to raise your kids. That's a challenge that we're having in all mining business.

I think we have the advantage with the Agnico name because people like to work with Agnico. Plus having different sites, sometimes it helps too. For example, we have someone in Nunavut doing rotation, he's looking to have kids, then why not going to a mine in Abitibi and vice versa. With all our portfolio, it helps to move people, it helps to develop people. I think we have an advantage on that, but still we're facing a challenge as other business.

Ammar Al-Joundi
President and CEO, Agnico Eagle

Yeah, I would say that is going to be one of the biggest challenges for resource development in Canada, is skilled labor. I think the message that we're really trying to give you is exactly that. This is going to be a challenge, but we're on it. I think we're going to be better positioned. It's going to be a challenge for us as well, but I honestly think we're going to be better positioned than any of our peers because we've been working on this. I don't want to steal someone else's thunder, but we're looking at all aspects of dealing with it. It's not just me coming up and saying, "Hey, sorry guys, we couldn't get people." That's not a good answer for you. That means we haven't planned for it.

This gets the difference between, I'm promising you something and I've actually got a plan to deliver it. A lot of our plan has to do with people.

Speaker 7

I think on this, thank you all for the questions. We'll restart in about an hour for those online at 1:20 P.M. Until then, everybody will enjoy a nice lunch. Thank you.

Dominique Girard
EVP and COO, Agnico Eagle

So, good afternoon, everyone. Dominique again. I will be short, and I will not go into the detail that we have there because that is going to be the VP ops presenting to you. There are two things you need, I think the overall of what is coming out of what you are going to see. First is the quality of our guys. The people that running the regions, our VP, are people with certain expertise, experience, know well Agnico. Also, they have been selected because they collaborate together and because I trust them, and we trust each other. That makes a big difference, because as I mentioned, mines are not discovered, mines are built, mines are made, and those are the guys doing those plans. So, you are going to see the quality of the presenter. We are going to start with Martin, who is going to lead the Quebec, and Serge.

They are both going to talk to Quebec. Then it is going to be, I think, Chris, who is going to talk about Nunavut, and then Jani is going to talk about the Finland business. All of them, or part of that, you are going to see its full potential model, and we do not show you all our full potential model. It is on purpose because most of the time it is concept, and we do not want to give too much concept when it is not baked in. You are going to see also project, fill the mill, the vision, and also Ikkari, which is more the next leg to come. This is thing happening right now. So the 20%-30% growth, maybe back to the question, it is project that is already into the pipeline. Ikkari is not into that. So those are project happening now.

This is what you are going to be able to see through the picture, through the video. We need to stay humble, okay? Building project and developing a business, we are going to have bumps. It is going to be a bumpy road. But the message is, I am confident we are going to deliver, and I am ready to take a bumpy road with those guys, because they know how to develop their business. This is what you are going to see through their presentation. Also, it is just the beginning. It is a picture in time, and Andre talked about that. It is a picture in time because we need to put something on paper, but Olivier is going to be also part of the discussion.

Olivier and Guy's team is going to talk to you about the exploration potential and what we see, and what is coming to come into the future vision of developing those projects. So they have a very great land package to work into their region. They are looking to develop their people, to develop their business, and it is what you are going to hear in the coming presentation. So on that, I will pass it to Martin to start.

Martin Plante
VP of Quebec, Agnico Eagle

Thank you, Dominique, and good morning, everyone. Good afternoon, everyone. I joined Agnico about 10 years ago to work on the Meliadine construction with Daniel, actually. Today, I am going to talk about optimization and about execution, and what Daniel talked about this morning is really the recipe that we still see today when we go in each of our sites. I recently joined the Quebec team, and I am going to be presenting with Serge Blais, which has been a key leader from the region. Serge has been working for more than 20 years at all of our sites in Quebec, but he has been more specifically a key person to bring Malartic where it is today. As you know, we have been operating in Quebec for more than 50 years.

We have developed strong relationships, and I would say even good relation of trust with all of our partners, whether we talk about regulators, service providers, our stable and skilled base of employees that we have. That, along with the reliance on electricity and the fact that we own most of the territory along the Cadillac Fault, makes us in a very good position to grow our business in Quebec. The current asset that you know about, LaRonde and Goldex, those teams are working on scenarios to extend their life of mines. LaRonde is looking at deeper potential along LZ5, while Goldex is looking at potential scenarios with Casa underground and deeper portion, extending the Railveyor. All options that we think can help us be in the region and operate our current asset for longer. I will spend a bit more time on the Malartic camp.

Since it started operating about a little bit less than two decades ago, that site has produced already more than 9 million oz of gold. Currently, we have 9 million oz also in reserves, and honestly, that number can easily double in the coming years. We rely on a state-of-the-art processing facility, which has a capacity of 60,000 tons per day. As we deplete the Barnat Pit and go with higher-grade material from Odyssey, that frees up some extra capacity. All of the work that happened at Barnat since the wall event that we had, I am very proud of the team that been able to assess the situation, put mitigation in place as per plan. As of September, we were back into regular operations. Today, I am going to cover mostly the underground potential, the fill-the-mill strategy, reaching 1 million oz.

Before going into more details, I will let Guy talk about the mineral potential at Malartic.

Guy Gosselin
EVP of Exploration, Agnico Eagle

Yeah, I am going to go back a bit further in time on Malartic, because Malartic is a camp that has been around since the 1920s. In fact, the Gouldie brothers, which the new East Gouldie deposit, his name of was discovered in 1923. When looking at Malartic, it was used to be an underground camp. They mined from the 1930s to the late 1980s, about 5 million oz at 5 g underground. When gold price went back, when it started to go up in the early 2000, Osisko came to the concept of trying to redevelop that pit that you see at the top that we are still mining in the pit. Redeveloping the low-grade halo around those old workings, which translate into the definition of about 10 million oz in that pit next to surface.

What we had in the back of our mind, through the acquisition, this is a long history over there. In fact, I was born and raised, and I grew up not too far away from Malartic. In fact, right next to Laurent. We had a bit of history on the camp over there, especially at the East Malartic. At the East Malartic, that is basically what we see in orange now. If I go down the stair here, that thing, they were used to be mining more to the north here in the volcanic. Nobody knew that this was sitting down there, even did we. The concept we had at the time was, okay, we will make the best out of the pit, optimize the throughput. There was a little bit of upgrade on the grade.

Right after the acquisition in 2014, and you see the picture at that point in time, it was about 9 million oz of reserve, plus another 3 million oz in resources. Those 3 million oz of resources were a bit those old underground workings, the low-grade halo around the old workings that is in pale green over there. I quickly, when looking and putting people for about three years, from 2014- 2017, compiling all of the historical information from those underground workings, that they basically stopped mining in the late 1980s because of gold price. The deposit was still open below 1.5 km.

We came with a plan, let us say, okay, after compiling all of that, putting a budget together, and say, "We are going to shoot a couple of deep drill hole underneath the old workings to see if there is still gold, because most likely there is." We basically position our drill where we had option, the mineralization in the main volcanic here is dipping mostly to the south. We said, "Okay, let us poke a deep drill hole way back in, way far south, and poke a drill hole to drill underneath the old workings." What we didn't know is that those lenses that has never been touched by the old miners were there. Sometimes there is, you need a little bit of luck.

Alain, my former boss, would just say, "I don't want a good geologist, I want a lucky geologist." Sometimes you guys, you need a little bit of luck in your job. We ended up hitting those lenses to the south that happens to host something like 25 million oz, right in the shadow of the old workings. Now we're sitting with a much larger resources envelope. Since the acquisition, we've mined about eight. There's still 9 million oz in reserve with the remnant of the pit, the underground. Plus, there's that halo, the blue is basically, the orange is well drilled, already reserved. The dark blue is still lacking a little bit of infill drilling to reach reserve criteria. The light green around is still loosely drilled, but drill holes that are above potential economic cutoff grade.

We've been adding on and adding on, so all of a sudden, Malartic, which used to be an underground camp, we're going to go back to mine underground over there for the next 20, 30 years, and there's still potential laterally. Quite excited about the way that our vision on the exploration upside panned out over there. I'm going to hand back over to the project team to describe what we're going to do with that large and still growing resources.

Martin Plante
VP of Quebec, Agnico Eagle

Thank you, Guy. On this map, you can see the path toward our million oz strategy. Those are not only dream, it's really concrete elements that fills that strategy. The first bucket, of course, is the Odyssey first shaft, as we are currently building it, which will be in full production by 2029. The throughput from this first shaft is expected to be about 19,000 tons, which represents about 550,000 oz. Now, when we are adding the potential second shaft, it's another potentially 10,000 tons per day, 250,000 oz. Then we have Marban, which is in our backyard, another 15,000- 20,000 tons, 150,000 oz per year. Finally, the Wasamac project, which is closer to Rouyn, which is a higher grade deposit, lower tonnage, that can bring another 100,000 oz per year.

When you're adding all of those up, you can see that we can fill the current mill capacity, and we can fill also the pipeline to 1 million oz. The good news is that, again, along that strike, we can see that there's other potential for discoveries and resource additions. On the current tracking of the project, maybe just a reminder, Serge showed me the text message that he received on 25th of September, 2018. About eight years ago, it was the discovery hole in East Gouldie that made it all possible. Since then, the deposit has been drilled massively. We went into permitting, we developed the shaft, the ramp, and we put this project into production. Very impressive, all the work that has been done by the team to reach where we are today.

I am also pleased to say that when we look at the 2023 updated PEA, we are pretty much bang on all of the milestones that were expected to happen during this update. The team is currently mining the fifth stope, and there is going to be thousands of stopes in this deposit. Of course, there is the optimization phase. The team is working very hard, but so far it has been going quite well. The next biggest milestone is going to be the shaft beginning of production, which is expected by June 2027, and that will help increase the tonnage transported to surface. So, very good story there and in line to produce as targeted. Now, looking at the construction updates, you can see pictures here on the left part, the hoist pictures, the sheaves, the hoist motor.

This is one of the two 12,000 horsepower motors that we have for the hoist. Those pictures do not give credit to the scale of those assets. I was there last week with Dominique and the team, and it is really impressive to see what is happening there. The paste plant, which is another critical asset, is also in line to be producing when we need it. As part of the critical path to bring the production from the shaft, you can see the underground crusher picture. So, it is progressing very well, and the loading will be ready by mid-year. Finally, the booster stations will help bringing the tailings to the paste plant facility. So, overall, construction progress at 73%, in line with the target. Now, before I give the mic to Serge, just a quick update on shaft number two. We are currently advancing our concepts.

Currently, the concept is to have shaft number two close from shaft number one that will bring synergies. We are talking about a 6.7 m diameter shaft, 1,700 m deep, and ore potential, ore capacity of about 8,000-10,000 tons per day. So, the goal there with shaft number two is to formalize the location and freeze it in time, bring along our internal study in the first half of 2027, and then we are going to need a permit amendment, which will include the decree modification and the certificate of authorization. What we can see there with the construction period and the shaft sinking period, we could have that shaft into production by 2033. So, that would be a significant contributor to future production. Now, I will let Serge talk about the other components of the 1 million oz strategy.

Serge Blais
VP of the Canadian Malartic Complex, Agnico Eagle

Yes. Thank you very much, Martin. Good afternoon, everyone. Serge Blais, Vice President of the Canadian Malartic Complex. Sorry. So, I have been asked to discuss a little bit about myself, my background. So, I started more than 20 years ago with Agnico. I was the Assistant GM at the time at Goldex. So, we built Goldex. I was a GM at LaRonde. We built together with the help of the Agnico team, the Agnico Way. We were doing that also at the time. So, I was a GM at LaRonde, built it, and then the Assistant GM at LaRonde, developing the underground LaRonde 2 project at the time, for those who remember that project. Then after the Osisko acquisition, I have been asked to go at Malartic and manage the operation at Malartic. So, I have been the GM also there many, many years.

When I arrive also at Malartic, you need to remind also that we didn't have the permit to operate the Barnat Pit at the time. At the beginning, we had to finalize the studies. We went through the permitting, go through public hearings, then we built and developed the project. Also, we had to deviate to construct the Highway 117, which is a public infrastructure, so we went through that permitting also with success. Another thing also that we did at the time is to generate what we think also was the first neighborhood guide that we developed in Malartic. We have 97%-98% of the citizens of Malartic that every year they sign on that good neighborhood guide, even today. It's really good success from the team. I'm really proud of what they did at the operation.

Also, later on, maybe I'm double-linking the messaging a little bit, but the discovery hole for the East Gouldie zone also, so it's really huge discovery for us. We succeed within 30 months to generate a PEA. The discovery hole, September 25, 2018, 30 months later, we had a PEA approved, we're about to start. So we did the permitting, discovery studies within 30 months. It's really, really good also. If we go back on the actual, the next slide, on the Marban project. Marban project is really a really great project for us. Our vision for that project is really a satellite open pit. Our vision is to be between 25,000 - 20,000 tons a day. Why is it a really good project for us? It's because we have the room available at the mill.

We have the infrastructure also at Canadian Malartic, so we have all the workshop, the warehouse. We have the mobile equipment also that will be available. Our planning is to use the actual equipment that will be parked by the end of the operation at Canadian Malartic at the Barnat open pit. Most important part also, we have the knowledge, we have the team also to design a pit. When we do our studies right now, who's better than the mine manager or the maintenance manager at Canadian Malartic to deliver the numbers and put that in our studies? Everything is in line really for that project. Permitting, so we expect to have our permits by mid-2031, construction and pre-stripping, then the first ounce in 2033. If I go to the plan view here, it's a plan view.

You see the Marban open pit. Then you have in green here, you have the ore burden that we'll be using also as a noise reduction walls, also green walls, what we call. Then you have the waste stockpile. Then you see here the black line, that's a production road that we'll build, and we'll build two bridges, one over the CN Railway and one above Highway 117. Then the ore will be transported to the Canadian Malartic mill. Maybe two other things I need to mention on that. It's really for us and for me, those two bridges also will open all the playground also on the north of the Cadillac fault also. If we find a pit, find something else, I hope we'll do. Guy and Olivier, please find us something. The infrastructure will be already there.

Like Marban, the mill is there, it is available. We have the team, we have the tools, but the same thing also, any additional potential ore that we can find there, we will have already the infrastructure to travel that. Our vision, as already mentioned, we will use the permanent infrastructure already in place at Canadian Malartic. In that part, we plan to build a two-door workshop. We will do the minimal maintenance for our trucks and everything, but the main maintenance will be done at Canadian Malartic. The yellow-pink area right here, it is for the employees. We do not want the employees to go at Canadian Malartic and drive 12 km to start their shift. They will park here, modular temporary offices, and the employee will get on their equipment at the beginning of their shift. It will be really an efficient, keep it simple project.

Everything is in line to deliver for this one. We really like that project. The other one is Wasamac. It reminds me of the Lapa mine. I already mentioned I was the GM there. It is a satellite underground project, and the ore being milled somewhere else. At the time, Lapa, it was at LaRonde. We built the mill at LaRonde. For Wasamac, it is to transport by the Highway 117, the ore to the Canadian Malartic mill. Right now we are doing the studies. It is a 3,000 ton per day underground ramp operation. Instead of Lapa, we had a head frame to sink a shaft. At Wasamac, we need to do a portal, do the underground development. It is really compact site and really minimal restoration cost by the end. Right now, everything is online.

We expect to have our permits by mid-2030 and have the first ounce in 2030. What we already have in our pockets, we already have the permits to take a bulk sample, the exploration ramp, the dark blue that you see starting in 2029. We do on the field all our tests, but right now we have back pocket our permits, so we could start the ramp and the portal right now to be ahead of time a little bit on that schedule. It is included in that plan. If I look at the plan view, you see on the other side, here it is really a compact site. The admin building, temporary modular office will have the waste stockpile. 100% of the waste will be returned underground, like at Lapa, as a backfill, cemented rock fill.

Then you see the dark blue here, that is the ramp going underground. You see here the portal, the ramp going underground. The dark part is the previous Wasamac mine that was mined in the 1960s with a shaft at the time. You see the main area, so we will be mining the main area and area one and two. That is really compact and really also by the end, really low closure costs by the end. Everything is online for this one. Really, for my last slide, this really combine of the two projects also. It is something really important for us. I mentioned previously about the good neighborhood guide that we did at Malartic, but you can have a good projects with good IRR, but you need social acceptability. I can tell you that we have really a strong support from the community.

We do a lot of presentation. We did the Marban project presentation one month ago in Dubuisson in Val-d'Or. We will do Malartic next week. For this one, I am frontline. It is really important to discuss, explain our project, take questions also, take comments, take ideas also. Citizens have good ideas, so if we can include that to have the social support on that. Marc-André Lavergne and the Wasamac team are doing a great job also. We discuss a lot, consultation, information. We have monitoring committee, and we will have good neighborhood guides also. We have also a LaRonde already at Goldex also, but we will have good neighborhood guide also at Wasamac and Marban. A lot of discussions also with the First Nation information and negotiation also. Everything is in line. I really like those projects, and that is where we are.

It really, it is for us, it is studies, permitting, and execution, and that is what we do. On that, I will pass the mic to Chris.

Chris Adams
VP of Nunavut, Agnico Eagle

Thank you, Quebec team. Good afternoon, everyone. We talk about Nunavut. It is a platform that brings significant value to the organization. 25% of our production comes from Nunavut. Although we operate in a beautiful part of Canada, it does have its unique challenges. But keep in mind, we have been operating in Nunavut now for almost 20 years. I guess I should change the slide, eh? There we go. Workforce. We are growing, obviously, with the announcement of Hope Bay. Our current employee contractor base is around 4,200 employees. Natasha laid out our recruitment plan very well. For Hope Bay, obviously, we do not want to be competing with Quebec and Ontario. We are really focusing on the central western part of Canada.

With the assistance of our corporate affairs, corporate communication team, we are really trying to get the Agnico Eagle brand out in that part of Canada. I think we are having some great success. I will give you an example. Since the announcement of Hope Bay, we received approximately 3,200 resumes. Over those 3,200 resumes, 60% of those resumes are from outside of Quebec and Ontario. I think we are doing a good job on that front. I always say, as our employees at the site, they really promote what we are about, and they always bring their friends and families. We have a strong retention, 6%. That is great for a fly-in, fly-out operation. I mean, you cannot complain about that front. Again, why is that? We believe it is the culture that we built within the Nunavut platform for the last 20 years that we hold onto our employees.

When we talk about local procurement, 65% of our contracts are with registered Inuit firms. That's good. That equates to about $1 billion of local spend. Again, as a company, this represents a strong, long-lasting relationship that we've built in the Kivalliq region. Now, if you switch our focus to the map, we'll start with Hope Bay. We have three sites, different phases of their life of mine. We have Hope Bay project, going to be a steady state operation of approximately 400,000 oz- 435,000 oz at steady state, starting production in 2030. Then if we move down to Meliadine. Natasha and Dom did a really good job to talk about optimization, and they are right. It is in our DNA at the site level, definitely senior management and our employees. I'll give you an example with the processing plant at Meliadine.

For the last two and a half years since I've been Vice President of this platform, we went from 6,250- 6,500, and our budget next year is going to be 6,750. We're always looking to improve our productivities. When we talk about life of mine, we've done a lot of good work with Meliadine. We extended the mine life by four years, from 2032 - 2036. If you talk about our full potential model, we even see that going out to 2040. Now, we switch to Meadowbank. Again, Meadowbank is one of those mines that keep giving. We were able to extend the mine life from 2028 - 2030. I'll be talking about some full potential models on my next slide. Again, we're not giving up on Meadowbank just yet. When we talk about Meadowbank, we are applying our full potential mindset.

Again, this process has been driven by the site team. We're looking at all opportunities. They're very familiar what's up there, looking at the opportunities, looking at the challenges, and we're going to come up with a plan. Now, if you look at our ELOM, you'll see I talked about life of mine ending in 2030. The team has developed a plan to extend that to 2031. That's with the Whale Tail pushback and the extension of Amaruq Underground. That'll be incorporated into our budget for 2027, pending the budget approval, of course. Now, if you look at our FPM, we know Amaruq Underground alone doesn't generate enough value. However, what's interesting now, if we bring in Goose Underground, which is almost directly underneath our Goose Pit, it starts to get interesting, bringing in 1 million oz from 2030- 2035.

That's something we're looking at when we talk about capital allocation, like Jamie mentioned. We're building our business case to see, does this make sense for the business? Keeping in mind, we have the infrastructure, we have the workforce, and if we stay with a good gold price environment, deferring our closure costs, it may make sense. But that's what our teams are doing. We're pulling the business case together for that. We'll continue working on this, and probably in the second half of 2027, we'll provide an update on our full potential model for Meadowbank. Dominique alluded to this earlier. With the full potential model of Meadowbank, Nunavut potentially could reach very close to 1 million oz started in 2030 up to 2035, which is very interesting for the platform, and I have to acknowledge Dom for his He only was off by two years.

That's pretty good. All right. Hope Bay. We believe Hope Bay is our next multi-decade asset. Again, prior to pre-approval, we'd done a lot of work to de-risk our schedule. Some examples would be the jetty for the sealift. We knew that was one of our critical paths. We set that up to offload multiple barges. New camps for the workforce increase. When we did our detail engineering for our PEA, we were at 62%, which is why all these examples were very comfortable with our estimate of $2.4 billion USD and our schedule that we issued to date. Just to remind everyone, this is not our first mine that we built in Nunavut. You go back 15 years ago when we built Meadowbank, that was our first. It was lots of learnings. Then we built Amaruq, smaller scale.

If you look at Meliadine, that mine was on budget and ahead of schedule. When you heard from Dan earlier, I'll sum up Dan's presentation in a few words. We have the team, we have the experience, and again, we have that 20 years of experience up in the Arctic. Sorry, Dan, I got to sum up your whole presentation in three words. As I mentioned earlier, for Hope Bay, we see this as a multi-decade platform, and there's some significant upside to this platform. I'll let Olivier talk on that. He'll be coming up next after myself. I think now we're going to switch to a video. It's a two-minute video. For many of you that have visited Hope Bay, you'll see some progress, although the video's already outdated, but some of the photos I'll show later on shows more progress.

I'll try to walk through some of the details as best as I can. As you realize, logistics-wise, it takes approximately 10 to 14, or 11 to 14 days to get to Hope Bay. We fly up to Hope Bay from Edmonton. That's our hub. Here you see all the way out to Madrid and Patch. For those of you that remember, this is the jetty. We visited that when we were at the site. Now we're going to work our way over towards Doris. There's the Doris mine site, what it's going to look like at end state. This is already outdated, you'll see from the photos. Now, we're driving along to, you're going to see the wind farm location, which those of you that visited, we'll be talking about.

Working our way to Madrid, Suluk, which is here, which we did visit, and that's what the infrastructure's going to look like at end state. Here's a live shot. Now we're working our way out to Patch. When we had our board visit, we had taken the first round this summer. I believe that is it. Yes, perfect. For Hope Bay, again, we're on track for first production in 2030. Some of our key milestones. Kitchen and camp, middle of 2027. That'll allow us to ramp up to a more workforce for construction. We have our power plant, middle of 2028. Our process plant, which is on a critical path, the end of 2029. Then, of course, first production in the first half of 2030. Engineering progress, as of the end of September, was at 76%. Construction was at 13%.

Now, this 13% represents from project's announcement to now. That doesn't include all the pre-work that we did prior to the announcement. I also want to mention that our experience in the Arctic is also being recognized across different organization or different company officials. We signed an MOU with the Department of National Defence. Again, it's just sharing our experiences, sharing how we communicate and socialize with the communities, with the Inuit associations, talking about our procurement strategy. We're talking about our logistics. I was just in a two-day conference in Ottawa that the Department of Defense put on, and it was a very good panel. What I found interesting was we were the only private sector company that represented at these panels, which was very interesting.

As well, we have our peers that are reaching out to us to better understand how we build things up in the north. They want to come and do site visits, and they want us to understand, again, logistics, our procurement strategy. So, we're doing things right. Agnico is doing things right for sure. We'll move on to sealift. As I mentioned for Hope Bay, one of our critical challenge was the sealift because of the short season, something that's never done at Hope Bay, but the team done a phenomenal job of planning. I can't say it enough, planning and planning. We had a very successful sealift at Hope Bay. We had nine cargo ships, one fuel, and one wind turbine. If we look at the logistics as an organization, it was our biggest sealift ever for Agnico Eagle.

We had typically, the last five years, we moved about 300,000 cubes of material. Last year, we moved over 530 cubes of material. Phenomenal work from the team on that front. I can't say it enough, it all comes down to team, the collaboration, and the planning upfront to do this. So again, the sealift is a great example of our experience and our capabilities to operate up in the Arctic. My final comment on Hope Bay is we finalized a new framework agreement with the Kitikmeot Inuit Association. Again, that just shows our ability to build those relationships with a new Inuit organization, with the Kitikmeot, and we're very happy with the outcome on that front. Now, we move to some of the photos, like I mentioned, based on the video. You'll see with the camp space progressing very well.

By the middle of next year, we'll have full capacity to ramp up our workforce on the construction side. We have Roberts Bay Fuel Farm. The basis, it's ready. We'll continue construction next year. We have our power plant. Walls are going up. Walls will be completed by December 11, which it's a necessity when you're working up in the Arctic because you need to enclose things. I'm sure you all know, winters up there is not the same winters as in Toronto, so you have to acknowledge the team that's putting up these walls at this time of year. They're dedicated. The wind turbine, very interesting story. We're very happy with this partnership. This wind turbine, we formed a partnership with Kitikmeot Tugliq, and this partnership represents a different model. They're Inuit-owned, they're going to build, and we're going to purchase power from them, which is great.

Everyone knows, with the price of fuel today, one of these wind turbines could reduce 3 million L of fuel per year for one of these wind turbines, and it is very exciting to see this. What I am really excited about, what we are really excited about, it is opening up that renewable energy for Nunavut. One of these turbines could feed a community like Rankin Inlet or Cambridge Bay, and there is a lot of attention on these wind turbines when I was in Ottawa. It is going to be constructed in Q4 of next year, and then we look forward to seeing this taken off. Process plant, again, everything has been dismantled, packaged, sent down south. As you can see, we are starting the construction inside. Once again, critical path, but we are on schedule. Then finally, the airstrip. We are extending the airstrip.

Again, that is to bring in more larger planes for cargo and for the workforce going forward. In closing, before I hand it over to Olivier, just want to remember what I said at the beginning. Beautiful country, beautiful part of Canada, but it does have its challenges, but we have 20 years of experience up there. I read a slogan when I was at the airport, I saw it was Agnico, and it said, "But we make mining work." I thought, "That is true," but I will add two words to it. "We make mining work in Nunavut." Right? Again, we have the people, we have the experience, and we have the partnerships, which is great to see. Again, I look forward to updating everyone in the next update for Hope Bay in months to come. With that, I will pass it over to Olivier.

Olivier Grondin
VP of Exploration, Agnico Eagle

Thank you, Chris. Hope Bay Exploration. Let me take you back to 2021 when Agnico acquired TMAC Resources. The mine was operating, we put it on care and maintenance, turned the site into an advanced exploration site. The study team came to exploration and asked, "Okay, we need to find more of the same. We need a bigger mine, a bigger deposit. We know what it takes to make things work in Nunavut from our experience at Meadowbank and Meliadine." So, we did that mostly in the original Doris underground mine environment and at the Madrid and Suluk deposits to the left of this long section. But a few months went by, and the study team and the engineers came back to us and asked for more, but at better grade, and throw in another mining front. That is easier said than done.

But we were lucky enough that at the end of 2022, around this area here where the portal is actually going in, we hit something quite thick and high-grade, and that was an area that was never explored before by previous operators. Newmont did drill shallow holes there for an open pit, but never went deep. That was the first deep hole, and it hit thick, high-grade mineralization. It was the beginning of the Patch 7 discovery. Over four years of intense exploration, we added 3 million oz to the Patch 7 area. So, the graph that we see on the right, what we bought and what it is right now, already has 3 million more oz, and it is going to keep growing, because this was a blank page, all the Patch 7 area.

There was no indicated inferred resources or mineral inventory there, and we know it is still open to the south, to the right of this long section. We have holes there with indication of mineralization. We know the structure is still there, and we know there is Patch 14 and the Wolverine areas that are open to the south. The job is not done in the Madrid area, and it is going to keep growing. We also acquired Hope Bay for its regional exploration potential, which brings me to Boston. The Boston deposit is located 50 km south of the Madrid area that we just saw. It is the original Hope Bay discovery. It was discovered in 1992. It was heavily worked on by BHP. They put in a lot of drilling.

They put in an underground ramp, as you can see on the picture, and then went away because you are too far from the coast, and then the focus switched to the Doris and Madrid areas. We executed the first drill program since 2019 just this past summer at Boston. We gathered information, modern information on the grade, the thickness of the zones, the alteration, some geotechnical data to help with our studies. We confirmed all of that. If you read our Q3 news release, we had some pretty good results at Boston and also some good drill results on the fringes of inferred resources, so showing that the deposit is still open at depth. What is also of really good interest is the Domani area on the map, you can see on top. It is a reminder of what Patch 7 was. It sits to the south of Boston.

There are surface indications of mineralization, just a few shallow drill holes, and it is a blank space when you look at the long section to the bottom. In short, I think we could maybe repeat the Patch 7 story at Boston in the future, and there is also all the regional potential at Hope Bay and the rest of the belt. The main Hope Bay belt is 80 km long, and there is the Elu belt to the east. We will create a lot of value through the drill bit again at Hope Bay. The future looks bright. On that, I will pass it on to Jani to talk about our Finland platform.

Jani Lösönen
VP of Europe, Agnico Eagle

Thank you, Olivier, and good afternoon, all. This is actually my first Capital Markets Day presentation at Agnico, but I am not a newcomer. I joined Agnico in 2017, and since then, I have been leading Agnico's European business. You have already seen quite many presentations today, so I want to keep my presentation simple and easy to follow. Actually, there are only three points I would like to share with you regarding Agnico's Finland platform. First, KittilÀ Mine, it is a stable, long-life asset that generates substantial free cash flow. Second, Ikkari Gold Mine Project, it is our midterm growth opportunity that will double Agnico's gold production in Finland by mid-2030s. The third point is the consolidated land package, which will provide us with substantial exploration and growth opportunities for many, many decades to come. We are really building a multi-decade, multi-asset platform also in Finland.

Actually, Olivier will be back on the stage after my presentation, and he will focus on the consolidated land package and the exploration potential more in details. Agnico has been in Finland for more than 20 years, and based on that experience, we really know the local community. We know authorities, we know the expectations of our neighbors. We understand how mining industry works in Finland. Now, when we are in the growth phase, this local experience and local expertise is definitely a competitive advantage, which will help us to de-risk our growth plans in coming years and coming decades. Our first investment in Finland was, of course, KittilÀ Mine, but during last two decades, we have made several strategic investments in promising exploration and project development companies in Finland, gradually strengthening our strategic position in the region.

In April this year, based off years of work and very thorough analysis, the time was right for a more significant regional consolidation transaction. We acquired three companies, Rupert Resources, Aurion Resources, and the Fingold joint venture. As a result of these transactions, we gained a very strong position in Central Lapland Greenstone Belt, which we believe is one of the most prospective areas for gold exploration. In addition to the prospective land package, another key component of the transaction is the Ikkari Project, which is the most significant and the best gold discovery in Europe since KittilÀ Mine. I will come back to that in a minute. Let us come back to the roots and back to the KittilÀ mine for a moment. As you know, KittilÀ is the largest gold mine in Europe, and even after 17 years of operation, we still have substantial exploration potential.

At the time of acquisition, we had only 4 million oz in resources. To date, we have already mined 4 million oz, and we still have 6 million oz in different categories. The deposit is still open along the strike and also at depth, and I am very confident that we can continue mining at KittilÀ at least for next 20 years and maybe even further. Today, we are mining around at 800 m, but the deepest intercepts are close to 2 km or even beyond that. So there is a lot of potential still left in KittilÀ. Most recent investment program was completed in 2023, and since that, we have very much focused on the operational excellence, cost control, and productivity. I am pleased to say that results have been excellent

We talked about the operational excellence a little bit in the morning, but in case of KittilÀ, comparable unit costs, excluding mining tax and the royalties, has been flat or even slightly declining, which is a good accomplishment in a dynamic underground environment, and when we see the salary inflation and oil price increases and energy inflation as well. All in all, I think that the operation is stable, low risk, and as said, it generates very strong cash flow, which we then can invest in other things. Moving to Ikkari, then we made the first investment in Rupert Resources in 2020. Rupert was the previous project developer at Ikkari, and actually the investment was made just before Ikkari discovery, so the timing was quite good. Share price was like $0.80 or something at that point of time.

Since then, we've been monitoring the progress of the project very closely. Of course, over last years, Ikkari has proven its potential. It was like a six years of due diligence before we made the final investment decision. As I said, it's the best gold discovery in Finland, probably also in Europe since KittilÀ mine. We see an opportunity to double gold production in Finland by mid-2030s. Project is really on our backyard, only 50 km away from KittilÀ. By road, it's maybe 70-80 km, but still we can utilize partly the same technical expertise and project execution resources we have in KittilÀ. There are also some other synergies related to procurement and so on and so forth, which we can then gain during the project execution phase and also during the operation.

After acquisition of those three companies, we got rid of the property boundary challenge, and we can work on larger land packages, which provides us with more flexibility regarding the mine plan as well as the surface infrastructure layout. All that helps us to maximize the value of the project in coming years. We are still in the study phase, but we are working on the open pit only operation. That's slightly different compared to the previous operator. Rupert had also the underground component in the plan. We are really having the maximized open pit scenario in place. The first mill capacity will be around 10,000 tons per day. We do not know the exact production profile yet, but we see life of mine approximately at more than 15 years based on the current understanding.

We also see the exploration upside potential at Ikkari, but also in regional scale. Tailings options are still under evaluation. We have a good relationship with authorities, and we discuss with them also that what would be the preferred choice there based on our local expertise and experience. Authorities listen to us, our view, and our recommendations quite well. There will be water treatment facility and a discharge pipeline approximately 40 km, and we also want to preserve optionality for future underground operation and potential capacity expansion in coming years when the exploration keeps on delivering interesting results. Olivier will talk about the first indications in a minute. Regarding the schedule, we believe that we can see the first production by mid-2030s, and the schedule is heavily dependent on the permitting.

That's why next year's most important target is really to advance environmental impact assessment and technical studies that help us to produce the environmental impact assessment report. We also work on the land use planning together with municipality of SodankylÀ. We have very strong relationship with the municipality. 84% of SodankylÀ villagers are of the opinion that they need more mining in SodankylÀ, and that's extremely good news from our point of view. After closing the deal in June, we've been working on integration, and it's mostly completed now. Organizations are put together as well on systems like IT systems, HR, procurement, and so on and so forth. We have only one common plan for exploration and development, and also the organization structure was renewed so that we have one common Agnico Finland platform in place. We have invested in building relationship with the local community.

We have collaboration agreement in place with local reindeer herder association, and we are also working on the collaboration agreement with municipality of SodankylÀ. On top of that, we are also drilling. We have five rigs drilling at the moment, and there will be six rigs by end of the year. Olivier will talk about that more in details in a minute. I just repeat the key message. We really have a solid foundation. It's KittilÀ mine, it's generating strong cash flow, it's stable, it's low risk, well predictable operation, and we have a concrete growth opportunity. On top of that, we have the land package which will provide us with growth opportunities for many, many decades to come. With that, I hand over to Olivier.

Olivier Grondin
VP of Exploration, Agnico Eagle

Thank you, Jani. To support Jani's vision of doubling production in Finland, and probably go beyond that, I think with the excellent geological potential of the Central Lapland Greenstone Belt, we could do that. We now have access to 2,500 sq km of land in what is a very prospective area with the KittilÀ mine in the north and the Ikkari deposit located, like Jani mentioned, 50 km south. We achieved that thanks to a corporate development masterpiece of doing that three-way simultaneous acquisition. Thank you, Peter. He's at the back of the room. The key to this deal was removing property boundaries. It was hampering exploration and expansion plans of all parties involved in that area. Rupert couldn't drill deep underneath Ikkari. They couldn't drill west and expand the deposit. They had to cram their site layout in a very compact area.

To the west, you had the FinGold joint venture between Aurion Resources and B2Gold. They have the Helmi deposit, but they couldn't drill east because they were getting into Rupert ground. To the south, you had Aurion doing its thing, a junior company with limited capacity. Now, we have an open playing field to take advantage of all that geological potential. There's many targets. Of course, the little number one there, that's Ikkari. We want to extend the Ikkari west towards Helmi and beyond to the Kutuvuoma mineralized occurrence. That's a mineralized corridor. The number two, that's the Heina South, Heina Central, Mike targets that Rupert put limited drilling on. We know there's another mineralized corridor to the north. number three, to the south, that's the KaaresselkÀ occurrence that Aurion was focusing on. That's now accessible to us as well.

To the east, before talking about number four, there's the Pahtavaara past producing mine that we could take a look at and see if we can do something with that. The number four itself, interestingly, sits within rocks that are the same that host the Sakatti deposit. Sakatti is a major nickel, copper, cobalt, and platinum group element deposit owned by Anglo American plc. We have the same rocks hosting that deposit on the newly consolidated ground area. There's potential for gold and there's potential for critical minerals as well. If we zoom in a little bit, you have the Ikkari deposit there and Helmi to the west. We committed to hefty budget over the next three years in terms of exploration.

First idea is to drill west of Ikkari and east of Helmi, trying to join those two deposits along the Sirkka Shear Zone, which is the structure hosting these deposits. Eventually, we would like to join these two together. What we started first is the condemnation drilling. This is ongoing right now, and the condemnation drilling is focused mostly south of Ikkari, and it will provide Jani's team with the information to optimize the site layout of the Ikkari deposit, something again that Rupert couldn't do before. We also started drilling at Helmi. Because of land access, that's where we could drill first. It's a pretty swampy area, but it's getting frozen right now as we speak, so we're very eager to get going on a larger exploration program.

If you go back again to our Q3 news release, we published our first two holes at depth at Helmi, almost 1 g over 20 m and 3.7 g over 10 m. So, already showing that Helmi has potential to grow at depth. Really eager to get going on the greater Ikkari regional exploration drilling and do what we usually do, which is creating value through the drill bit in high geological potential area. On that, I will pass it on to our CFO, Jamie Porter, for concluding remarks and answering all of your questions.

Jamie Porter
EVP of Finance and CFO, Agnico Eagle

Thanks, Olivier. Thank you, Olivier, and good afternoon, everyone. I do want to make sure we leave some time for Q&A at the end of the session, so I will be brief. I'm going to touch on capital allocation before I close out the presentation, we get into Q&A. When we talk about capital allocation, I want to look back over the past several years and really look at the framework that we've employed and how it's worked to benefit the business. I think if you go back to the start of this most recent gold cycle, the uptick in the gold price from around $1,800 in early 2023, and look at what we've accomplished in that almost four-year period, it's pretty impressive. We've set up the company for tremendous growth and success going forward.

If you go back to early 2023, in that four-year period, we've generated about $20 billion of operating cash flow. Of that $20 billion, we've invested about 45% or $9 billion in sustaining our production, growing our production, and drilling and capitalized exploration. Our rate of capital spending has gone from about $1.5 billion in 2023 to over $3 billion this year, and over $3.5 billion likely next year. That is a good thing. The hardest part of our business is finding good opportunities to invest in, high-return projects that are going to deliver value per share. We've been able to do that. The second thing that we've been able to do with some of that operating cash flow is support our external M&A activities.

We've used $2 billion in the consolidation of Canadian Malartic back in 2023, in the acquisition of O3 Mining Inc. for the Marban satellite deposit, which is going to provide mill feed for the Canadian Malartic mill, and most recently in Q2, as Jani's discussed, for the consolidation in Finland that's going to basically double our platform in Northern Europe. If we shift gears and look at the balance sheet, over that four-year period, we've paid down $1.8 billion of debt. We've added $3.6 billion of cash to our balance sheet. We've attained a single-A credit rating. We've renegotiated our credit facility twice and expanded it twice, such that we now have access to $3 billion of available liquidity under that facility. We've done all of this while delivering record returns to shareholders.

We've returned $2.7 billion in dividends over the course of the past four years and over $1.5 billion via the share buyback. So we've dramatically strengthened the financial position of the company. We've invested in this growth pipeline, which we're talking about today, that's going to represent the future of the company. Despite what we've seen in the gold price today dropping down to $37.50, I'm not sure where it's at currently, we remain in a gold price environment where we can do it all. We can prioritize reinvestment in the business. We can continue to pay a sustainable dividend, which we have. We've paid a dividend now for 43 consecutive years. We will continue to return capital to shareholders, excess cash through the share buyback, and we'll look for opportunities to strengthen the balance sheet. So, we've employed a very balanced approach to capital allocation historically.

We're going to use the same approach going forward, and we're fortunate in that we have high-return growth opportunities to help drive that value per share creation. So, just in conclusion, I mean, we've heard a lot of presentations today. I want to talk about some of the common themes or focus areas that we've heard. You look at the history of Agnico and what's differentiated the company, I think it comes down to four things. The first being strategy. We have a focus on low political risk jurisdictions with high geologic potential so that we can add value through the drill bit. We can consolidate regionally, leverage infrastructure, optimize our costs, and keep our overall cost profile at hundreds of dollars below those of our peers. It's a strategy that's worked. It's proven. It's worked over decades.

Secondly, we heard, especially through Dom and Natasha's presentations, about what's unique about the Agnico culture. It's a culture of teamwork, of collaboration from the operations to exploration to our corporate head office. Everyone's swimming in the same direction and all focused on doing the right thing and benefiting all of our stakeholders. Beyond that, we have a reputation for operational excellence. We have a track record of doing what we say we're going to do, and I would argue that in the regions where we operate, we have the ability through our technical bench strength to gain a knowledge advantage, which really helps us in terms of making smart capital allocation decisions. Beyond that, and arguably most importantly, we have a focus on per-share value creation. Ammar touched on it in his opening remarks.

Over the past two decades, we've increased gold production by a factor of 14, but we've increased gold production per share by a factor of three, and we'll look to continue to do that as we move forward and develop this organic growth pipeline. We've talked today, a lot of the focus has been on our key value driver projects that are going to drive production growth of 20%-30% by the early 2030s. I referenced earlier in the Q&A, and there were some questions at lunch about the second step of that growth, and we've talked about it, some of those projects at the presentation today. Ikkari is not in the 20%-30%. Hammond Reef is not in the 20%-30%. Ramping up the Canadian Malartic mill to 1 million oz is not entirely in that 20%-30% production growth.

We do have the ability to not only increase production 2030, 2031 through Hope Bay, Detour Underground, and Upper Beaver. But beyond that, 2034, 2025, 2036. And that, we've talked about throughout the course of the day that everything that we're talking about now and presenting is at a point in time. We've had tremendous exploration success at many of our assets. 50 million oz discovered at Detour and Canadian Malartic. That's not going to stop anytime soon. And as we incorporate that exploration upside into our models, we anticipate being able to grow production even further.

If there's one key takeaway from the presentation discussion today, I would say that we have the best growth profile in the industry, and I would say we are best positioned to be able to execute on it and deliver continued growth and value per share in the decades ahead, as we have in the past. And with that, I'll end the formal presentation, and we'll open it up for Q&A.

Speaker 23

I don't know if anybody else noticed, but when Jani was up and he was talking about people we've got agreements with, he mentioned, "When we come to an agreement with the local reindeer." Workers. There was that delay between reindeer and workers. I thought that was

Jamie Porter
EVP of Finance and CFO, Agnico Eagle

I think I was the only guy who laughed, but

Richard Garchitorena
Analyst, Barclays

Yeah. Hi. Richard Garchitorena of Barclays. Thanks for the detailed update and presentation. My question is basically in terms of the, maybe touching on the conclusion that you gave, Jamie. With the next leg of growth beyond the first four key growth projects, you mentioned that CapEx next year should likely be around $3.5 billion. Is this a good run rate to think about as you develop the pipeline? Because you have not just four, but further upside potential with the additional projects that we talked about today.

Jamie Porter
EVP of Finance and CFO, Agnico Eagle

Yeah. I think my comment was that we'll be north of $3 billion this year and north of $3.5 billion next year. We haven't finalized our budgets and our capital allocation process and everything else, but I think we'll be three I think our guidance for this year is around 3.1. We'll be somewhere in there for 2026, and I think we'll be above $3.5 billion for 2027, and we'll likely stay at that rate through 2028, before some of the construction spending starts to come off as we see the production come online. But again, I like to point out, I think that's a good thing because we have these projects are Even at today's gold price, these are 25%-50% IRR projects. Those are very difficult to find.

If we can invest in projects like that with the cash flow that we're generating, the balance sheet that we have, we'll do so all day long.

Ralph Profiti
Analyst, Stifel Financial

Just along the same questions, this is Ralph Profiti from Stifel Financial. Jamie, if in this budget process for next year, if you were to stress test $3,500 an ounce, are there any tougher decisions that are going to have to be made on either to exploration or certain things that would get pushed back? Or what's the gold price where that actually starts to happen?

Jamie Porter
EVP of Finance and CFO, Agnico Eagle

Yeah. So, the comment I'd make is the projects that we're focused on today are the same projects that we were focused on when gold was $2,000 an ounce. These are projects that achieve a 15% IRR hurdle rate at way below where we are now. So, really nothing changes at $3,500 gold. I'd suggest nothing changes at $3,000 gold. That said, we do look at everything and where costs are going up and where it makes sense to perhaps curtail some spending, we're doing that. Guy, for example, in reviewing his exploration budget, we are seeing higher drilling costs across the board. So, there are some meters that we might postpone to future years because we're not willing to pay what the current elevated rates are.

Tanya Jakusconek
Analyst, Scotiabank

Don't go away, Jamie. Tanya from Scotiabank. Jamie, I was just trying to add up all of the growth capital that I could think of for that 20%-30% growth, and I appreciate not all of Canadian Malartic is in there. I don't know if the second shaft is in there at all in that. But, should I be thinking that this growth capital is in the $5 billion-$6 billion range for these ones that you've mentioned? I just don't remember where we are on Canadian Malartic, your spend and what's left to go.

Jamie Porter
EVP of Finance and CFO, Agnico Eagle

Yeah. So, and again, we talked today-

Tanya Jakusconek
Analyst, Scotiabank

Like, just high level. I'm just trying to. Sure.

Jamie Porter
EVP of Finance and CFO, Agnico Eagle

We provided catalysts for next year, right? We are going to provide a number of updated studies in Q2 of 2027, where we will update the capital on Upper Beaver, on Detour Underground, for example. But if you look at what we have in the pipeline currently, we announced the capital associated with Hope Bay in May of this year, $2.4 billion. Detour Underground and Upper Beaver are $1 billion each, if you round up. Beyond that, we have not yet disclosed the potential capital associated with the second shaft at Malartic. So, you have $4.4 billion for Detour Underground, for Upper Beaver, and for Hope Bay. Then obviously there would be capital associated with the full expansion of filling the mill at Canadian Malartic.

Tanya Jakusconek
Analyst, Scotiabank

Yeah.

Ammar Al-Joundi
President and CEO, Agnico Eagle

It is a natural question to ask about the capital spend. What I would say is another constraint that we have that is a real constraint is the human capital. We are already at a point, frankly, where we have accelerated these projects as much as we can. But there are things, additional things that we could be doing that we are not doing, and it is not because we are capital constrained, it is because we want to do it ourselves, we want to do it the Agnico Way. The actual restraint on some of that, and maybe going forward, is the human capital.

Tanya Jakusconek
Analyst, Scotiabank

Yeah, no, for sure. If I could ask Dominique, been on a few mine tours lately, and everyone is sinking shafts at different costs. But your shaft number two would be the same people sinking it as they did shaft number one, I am assuming?

Dominique Girard
EVP and COO, Agnico Eagle

Yeah.

Tanya Jakusconek
Analyst, Scotiabank

That 1.7 km shaft, like half a billion, is that fair?

Dominique Girard
EVP and COO, Agnico Eagle

I would say in Canadian, 700 plus maybe 100 for the handling crusher and everything, rough.

Tanya Jakusconek
Analyst, Scotiabank

So CAD 800 million?

Dominique Girard
EVP and COO, Agnico Eagle

Yeah.

Tanya Jakusconek
Analyst, Scotiabank

Something like that.

Dominique Girard
EVP and COO, Agnico Eagle

Yeah, for 1.7 km.

Tanya Jakusconek
Analyst, Scotiabank

Yep.

Dominique Girard
EVP and COO, Agnico Eagle

Again, we're still looking at that.

Tanya Jakusconek
Analyst, Scotiabank

Yeah, I mean, prices have gone up for a lot of things.

Dominique Girard
EVP and COO, Agnico Eagle

Yeah.

Tanya Jakusconek
Analyst, Scotiabank

Thank you.

Ammar Al-Joundi
President and CEO, Agnico Eagle

It is also, they told me I have to come up when it is also the size of the shaft and capacity and everything else.

Dominique Girard
EVP and COO, Agnico Eagle

This is a shaft for what size, Serge?

Serge Blais
VP of the Canadian Malartic Complex, Agnico Eagle

6.7 m diameter.

Dominique Girard
EVP and COO, Agnico Eagle

With the tons?

Serge Blais
VP of the Canadian Malartic Complex, Agnico Eagle

Right now.

Dominique Girard
EVP and COO, Agnico Eagle

Tons including waste.

Serge Blais
VP of the Canadian Malartic Complex, Agnico Eagle

We're dreaming about 20, with 10,000 of ore, and then an additional 10,000.

Dominique Girard
EVP and COO, Agnico Eagle

10,000 ore, let's say up to 20,000 tons per day.

Serge Blais
VP of the Canadian Malartic Complex, Agnico Eagle

Total material.

Dominique Girard
EVP and COO, Agnico Eagle

So, kind of the same shaft that we have right now. Martin talked about, we were there last week. When you look to the shaft in between the two boiler, that's big like this. If you're coming in, if we do something in September, I don't know if it's announced something, Jean-Marie, but it's impressive to see. That's going to be the biggest hoisting system in the world. It's impressive.

Speaker 7

Yeah. We are intending to do a visit in September with the opening of the shaft. Yep. Any other questions? Maybe, Ammar, maybe I ask you to conclude.

Dominique Girard
EVP and COO, Agnico Eagle

Oh, there's one more.

Anita Soni
Analyst, CIBC

Sorry. When you were talking about that, Anita Soni from CIBC. When you were talking about the capital of $3.5 billion, just to be clear, does that include a capitalized exploration, or is that a capitalized exploration on top? So includes it. Okay. All right. Thanks.

Jamie Porter
EVP of Finance and CFO, Agnico Eagle

Yeah. Just to clarify, we have not finalized our budgets for next year yet, but I believe capital, including capitalized exploration, will be north of $3.5 billion next year.

Anita Soni
Analyst, CIBC

Okay. But south of $4 billion? Hopefully.

Ammar Al-Joundi
President and CEO, Agnico Eagle

Well, look, I couldn't be happier about the team today. I think it's self-evident how proud we are of the people we have and how proud we are of what we're doing. I'll finish this very simply where we started. Our job is to make you money. We take that seriously. We know that you're trusting us with money that people have trusted you with. We think that is a solemn responsibility, and we appreciate your trust. With that, thank you, everybody.