The outlook centers on a 2026 industry trough followed by potential improvement, supported by spectrum, customer agreements, densification and new entrants. Management targets 200 bps of margin expansion from 2026 to 2030 and is testing edge-site monetization.

Cameron McVeigh
Analyst, Morgan Stanley

Thank you, everyone, for joining. My name's Cameron McVeigh. I cover communications infrastructure here at Morgan Stanley, and it is my pleasure to introduce Chris Hillabrant, CEO, and Sunit Patel, CFO of Crown Castle.

Chris Hillabrant
CEO, Crown Castle

Great to be here.

Sunit Patel
CFO, Crown Castle

Thanks.

Cameron McVeigh
Analyst, Morgan Stanley

Thank you both. All right, Chris, let's get started. You're a little over a year into the CEO role and about six months past the close of the small cell and fiber sale, which made Crown the only publicly traded pure-play U.S. tower company, as you're well aware. What has changed most in how you run the business? What's the strategic focus for Crown Castle going into 2027?

Chris Hillabrant
CEO, Crown Castle

Well, great, Cameron. Pleasure to be here again. Look, I think we're really proud of the progress that we've made with Crown since the transaction has been closed, as you mentioned, six months ago. Even before the transaction was closed, we went through a restructuring where we were able to deliver significant savings as part of rebooting this Crown 2.0. Our focus has really been about building strategic partnerships with our customers, as evidenced in the third quarter where we announced a transaction whereby we were able to purchase out a rev share agreement and kind of reset the relationship with one of our major customers.

We've been very focused in on cost reinvention and taking cost out of our business. And then importantly, as we focus in on organic growth, is about maximizing in what has been a trough year in the industry, and preparing for the potential growth of new entrants into the marketplace.

Cameron McVeigh
Analyst, Morgan Stanley

Great. To follow up on that point, you had mentioned 2026 as a trough growth year recently. What gives you confidence in that call, and how should we think about the building blocks into 2027 as we and investors approach the growth outlook and as Sprint churn runs off?

Chris Hillabrant
CEO, Crown Castle

Again, we see 2026 as a trough year in terms of the industry and expect that to improve into 2027. We are not here to provide guidance for 2027, but what I look at are the catalysts within the industry that will help to unlock the growth as we look into the future. First and foremost are the MLA agreements that we have with our customers, which provides an ability to understand the contracted growth that we would expect to see into the future. Second is around the agreement I mentioned a few minutes ago, whereby we have now reset the relationship with that customer, which will open up future growth opportunities. I think we are really excited by that transaction.

Third is the near-term catalyst of the spectrum that has recently been made available. A good example of that is the 600 MHz with AT&T, which albeit has been somewhat delayed, in no small part through our own efforts working with the FCC to ensure that there would be a trust fund set up for $2.4 billion to help pay DISH creditors as part of that transaction. That is now starting to finally move forward and moving into the engineering phase. It is the Verizon AWS-3 spectrum acquisition, and then obviously SpaceX and the 800 MHz transaction that was recently announced.

In addition to that, we think that the long-term growth for the industry, what will fuel the next 5- 10 years of growth as we start to look towards a 6G future, is really around the 800 MHz that the federal government has already identified for auction, the first 160 MHz of that, which will be made available starting next spring. We would expect to see quite a bit of action across the MNOs and potentially other entrants. Then maybe two other things.

One is our recent trial around edge compute and providing space where we have a combination of available space, power, and backhaul, and we are starting to see some pretty significant interest across multiple parties for these smaller data centers. Then maybe the final catalyst is around overall traffic growth. If you look at the last five years in the U.S., you have seen approximately a 30% CAGR in terms of the data rate growth in the U.S. That is expected to continue ultimately up to doubling again, despite the numbers getting very large here over the next five years. So it is a combination of all of these as catalysts that leads us to be confident into future growth opportunities.

Cameron McVeigh
Analyst, Morgan Stanley

That is great. That is very helpful. Before we touch on those points that you mentioned, I wanted to ask just on historical growth. We have received some questions on past leasing activity and how it has trailed peers this cycle. So I am just curious, anything structural in the portfolio that would drive a different growth rate, or is this function really of timing with the 5G cycle?

Chris Hillabrant
CEO, Crown Castle

If you think of 2G- 3G, to 4G- 5G, we do not see a particular change in demand profile of Crown versus the key competitors. If anything, because of the quality of our portfolio, 70% of our sites are within the top 100 markets. We have often been one of the first choices, and therefore disproportionately benefit in the front end of the cycle.

I think if you were to go back and look at this current generation of cycle, our performance has been, I think, similar to one, a competitor maybe slightly behind the other. So no real changes in terms of that, and it is purely where we are in the cycle, and based on the fact that we have disproportionately benefited in some of the front end of the cycle based on our site quality.

Cameron McVeigh
Analyst, Morgan Stanley

Got it. Let us talk about SpaceX. One of our favorite topics here. The story has moved quickly over the last few months, and it seems like every other day there's a new headline around this. Recently, you said investors can assume you are talking to all parties. Without commenting on any negotiation, how do you see the options for new entrants in terms of network design? Maybe can you contrast the traditional terrestrial network with the tower light approach, and what factors might a new entrant consider towards towers?

Chris Hillabrant
CEO, Crown Castle

Right. Let me just start with how dramatically the narrative has changed in the industry. If we were to dial back the time machine to six months ago, there was a perception that there was an existential crisis that a new entrant in the satellite realm would be able to somehow build a network that would be primarily composed of just satellite-based coverage, and then maybe femtocells. A femtocell, for those of you that aren't familiar with it, is a very small picocell that, powered over the internet through a VPN back to the core network, provides coverage in a small room.

In fact, as a point of reference, we were at an investor conference several months ago with each of the three CTOs of the U.S.-based MNOs, and the comment that was made there, they had done the math, was something like 1.5 billion femtocells to be able to approximate what a macro coverage network would be from each of the existing three MNOs in the U.S. Not very cost-effective when taken in the context of the cost of land, the cost of backhaul, the cost of energy at sites. There's a reason why, over the last 30+ years, the industry globally has embraced macro towers as the primary and best way to cover networks.

Again, what we see in the public, I can't speak on behalf of SpaceX, but what we see in the public is a change in the dialogue that has evolved in positions over time from that femto-based to a potential hybrid approach that would include the use of terrestrial towers as part of building that network. Again, if you assume that you're building, and I spent half my career on the MNO side at a Verizon predecessor and at T-Mobile, but knowing what it takes to design and build a network, is macro towers play a critical role in helping to enable that coverage.

Because at the end, a satellite signal is something like 10,000 times less powerful than a terrestrial network. If in building coverage, we all agree that that's critical in a mobility network, at the end of the day, you're fighting for people's share of wallet. You have to have a competitive network to be able to do that, and that would include terrestrial towers as part of that network design.

Cameron McVeigh
Analyst, Morgan Stanley

Great. That's helpful. Another topic that's come up a lot is DISH. They had 12,000+ installed towers, or sites on Crown towers. It sounds like with room up to go to 20,000. You'd recently called it an industry cheat code for speed to market. I guess as it stands today, how practical would it be for a new operator to use DISH's abandoned equipment? What might be the legal and commercial path to do so?

Chris Hillabrant
CEO, Crown Castle

Let me start by saying, I think we've been very pleased at interest expressed by multiple parties on the potential of the DISH RAD centers. Why I use those words, the industry cheat code, are primarily because, as you're going to build a network, you go through a series of very specific steps that involve identifying available assets, either tower or land where you would build a tower. You then go through a series of regulatory approvals that come with that in order to be able to build a site. What the advantage that the DISH RAD centers and the equipment on there represent to either an existing or new entrant is that you shave off a significant period of time that it would take to go through all those steps I just outlined.

If getting to market quickly is an imperative for a customer, you could shave off, my estimate, somewhere between one to two years of go-to-market time. The combination of the 12,000 towers of where we have currently DISH equipment that's fully entitled up there, whether a customer could use the existing equipment would depend on their spectrum portfolio and their plans for deployment. But it could just as easily be swapped out very quickly with a simple electrical permit that would significantly, again, speed the time to market for somebody looking at that. Again, based on the combination of the scale that Crown has with 40,000 assets, DISH had originally contracted up the rights to do 20,000 towers.

They built to 12,000. This represents a very attractive opportunity for somebody looking to build a network quickly, to be able to take advantage of the work that DISH put into actually entitling those sites. In terms of the sites themselves and the equipment that is up there, we believe that when DISH walked away from its obligations and stopped paying for the rents, and that they have made it abundantly clear after several outreaches asking them to remove the equipment, that they have effectively abandoned that equipment, and therefore it is available for reuse or decommissioning as a result. Ultimately, that will be borne out by the bankruptcy court, but this is our current understanding.

Cameron McVeigh
Analyst, Morgan Stanley

Great. We should hear more from the mediation process soon. Okay, and I guess just on that topic, on the contract structure with DISH, they walked away from a long-term MLA. If we think of a new entrant building a network today, have your preferences on contract structure changed at all given the DISH situation?

Chris Hillabrant
CEO, Crown Castle

I would say the answer is no. We are open to either MLAs or a site-by-site pricing based on the market conditions for pricing those individual assets. Again, the advantages of the type of MLA structure that we signed with DISH was it allowed them very rapidly to move through our internal processes. We built a machine that included a services wrapper that allowed them to very quickly go through the leasing and entitlement process, and it is something that at Crown, we are very proud of the services capability that we have to help enable a customer to move through rather quickly, based on the expertise that we have developed over the last 30 years in the industry. But no clear preference. I think we are open to either construct.

Cameron McVeigh
Analyst, Morgan Stanley

Good. If we think of a new entrant coming into the space, whether this is a satellite operator or someone else, how quickly could a large deployment turn into site rental revenue, just given the cycle times we are seeing today? In this scenario, could this show up in the 2027 outlook?

Chris Hillabrant
CEO, Crown Castle

Again, this really depends on customer strategy, their spectrum portfolio position, on how quickly they would be able to move through the process. Typically, after new spectrum has been made available, there is a one to two-year timing that is involved with spectrum clearing and actually going through the entitlement process that I described earlier. This is not something that I would characterize as imminent, but rather long-term, that ability to grow over time is really going to be dependent on the speed in which the customer chooses to deploy and whether they are satisfied with their current spectrum position.

Cameron McVeigh
Analyst, Morgan Stanley

Got it. Do you think it would make sense to see an uptick in the services business before any of the site rental revenue?

Chris Hillabrant
CEO, Crown Castle

One of the things that I think we announced earlier this year, where we kind of we called down some of our services growth, is that there is a disconnect in the services revenue with the organic leasing rate, and that is because oftentimes, a couple things. One is, in a competitive marketplace, we offer services, but we do not mandate that individual customers utilize our services. We have to compete for those services.

Oftentimes, they look for more of a turnkey approach, which would include construction management or even construction of sites, which we have offered previously, but has not necessarily resulted in the best margin portion of the services stack. In the end, the second thing to consider is that the cycle of where somebody prepares to build the site and then where it sits within their priority stack of capital investment, often there is a build ahead, and so there is not a perfect correlation between those two measures, at least of what we have seen historically.

Cameron McVeigh
Analyst, Morgan Stanley

Got it. Okay. Just on the last point on satellite, I know this topic has come up and has evolved, but as we think of the rise of direct-to-cell coverage, especially in the need for rural sites, do you think it reduces that need? Maybe just how do you think about the net effect of carrier network spend, if any change in rural site renewals tied to maybe satellite partnerships over time?

Chris Hillabrant
CEO, Crown Castle

We don't believe so. In fact, we've not seen any impact. Satellite direct-to-device technology is primarily a complementary service. You can imagine in the U.S., very rarely do I run out of coverage in my life, live, work, and play, even into remote areas. But occasionally, where you do run out, satellite is a great service as a lifeline to be able to communicate. I can text somebody. I can utilize WhatsApp. But as a 5G experience to actually be able to place a call in those areas, not so much, because I think the standards have yet to be fully baked and rolled out.

I think what's more, while from a fixed network perspective of providing broadband to somebody's very rural cabin, the satellite technology is a fantastic solution. But you run into the same challenge of, if you struggle to provide in-building coverage where you would need the femtocell to provide coverage in some of these cabin, the ability to place a call within your car, or within any local supermarket, any place you might go shopping, this does not replace the ability for a terrestrial network to reach in-building. Therefore, it seems very unlikely to us that we'll see any real impact to the industry as a result.

Cameron McVeigh
Analyst, Morgan Stanley

Makes sense. Okay. Chris, I want to move on to leasing. 3Q core leasing was maybe a little soft, and sounds like some of that might be the effect of timing. As you think of the new CEOs of Verizon and T-Mobile, curious what you're hearing around 2027 network priorities, and if you'd expect any sort of 2026 slippage to land in potentially the first half of 2027.

Chris Hillabrant
CEO, Crown Castle

I think anytime you have change at the top, there's a ripple effect as they go through putting their teams in place, setting the capital priorities for the company. Obviously, our customers aren't just wireless providers. They also have a landline business that they look after as well. I think that is now settled down in terms of the organizational structure changes, and the capabilities in those teams to continue to focus in on network investment. One of the things that we've been hearing recently, which I think is, again, something that's exciting as you think 6G is still pretty far away based on spectrum availability, based on the finalization of standards and the like, is that the traffic patterns that the operators are starting to see is changing.

What I mean by that is in traditional wireless telephony, 90% of the total network traffic is the download. It's the YouTube videos, it's the TikToks, it's the Netflix, and only 10% is the uplink. The future that we've heard espoused by really all three operators is that that traffic pattern will shift over time, particularly as AI inference cases, new wearables are being introduced into the networks. That balance will be much closer to a 50/50 mix. Now, there are a couple implications of that, one of which is because individual handset and devices are limited in the power output for uplink, it typically would say that you would need to start to really densify the network, right?

It makes a premium on low band in particular, but densifying the network is one impact of that. Then bringing to bear additional spectrum to handle the re-architected traffic. This is one of the possible outcomes of that, and it isn't something that is five years away from now, is that they're starting to actually see that shift in terms of traffic, starting even now on the 5G networks. So we look at that as a good omen for the industry in terms of unlocking network investment cycles into the future.

Cameron McVeigh
Analyst, Morgan Stanley

Got it. Every quarter, we do this tower survey, and this quarter, there was an uptick in respondents that were pushing back on lease terms. I'm curious if you're seeing any of that in your renewals or amendments, and maybe are carrier preferences shifting around contract structures between MLAs and pay-as-you-go?

Chris Hillabrant
CEO, Crown Castle

Yeah. Well, look, let me start by saying that overall churn, I think at 80 basis points, is at the lower end of the range that we provided, between 50 basis points and 150 basis points. We haven't necessarily seen that yet. Look, there's pressure always in the industry to find ways to drive cost. The network cost of rents is still a small portion of the overall spend of these operators. Again, based on the quality of the portfolio, I think we've been pleasantly surprised to see churn at that low end of the range.

Cameron McVeigh
Analyst, Morgan Stanley

Great. Makes sense. Okay. You had mentioned earlier the payment for a residual economic interest in a subset of towers. Maybe can you just walk through the economics of that transaction, and as you think through your portfolio, are there any other legacy portfolios with a similar structure where a deal like that could make sense?

Chris Hillabrant
CEO, Crown Castle

I think that I'll start and then hand it to Sunit here. In short, I think this is an outlier of a case. This was really in response to meeting a customer ask and is representative of how we are attempting to pivot from just being a vendor to more of a strategic partner and working to solve customer demand. But Sunit, I'll let you take this one.

Sunit Patel
CFO, Crown Castle

Yeah. So in this case, they were looking to monetize a revenue share interest they had from a portfolio of towers that we bought from them a long time ago. So we paid $275 million. It benefits us $16 million a year because that's all margin. Also, more importantly, they agreed to extend the term of these leases for this portfolio and agreed to limit the amount of churn they would do on these set of towers, which, as I said, they've been with us for a long period of time.

So that was very advantageous to us, and I think it created a win-win outcome for us and them. To Chris's point, it resolved something that wasn't an issue. It was a need by the customer that we figured out a way to work together and solve, which really improves our relationship with them.

Cameron McVeigh
Analyst, Morgan Stanley

Great. Thank you. I want to shift to 6G and spectrum broadly. The FCC is expected to auction roughly 160 MHz of the Upper C-band in July. Deployment seems like it's likely later in the decade. When do you expect it to show up in leasing, if you could guess? Do you expect 6G to follow that same shape in the colo-amendment mix over time?

Chris Hillabrant
CEO, Crown Castle

Two things. One is, typically, the lead time between the closing of a spectrum auction and then the availability and application of that spectrum is typically a one to two year cycle. I know if you were to read some of the announcements coming out of the FCC, based on the clearing of some of the spectrum, the Upper C-band in particular, there's some issues around the altimeters, which was very similar to the Lower C-band when it was auctioned off. What I've found in practicality over a 30-year career, particularly on the operator side, is where there's a will, there's a way.

Depending on how badly the spectrum is needed, and this is really great spectrum, mid-band spectrum that would be out there, is that typically they've found a way to accelerate the clearing of the spectrum over time through hard work and maybe throwing a little extra money around to incent the folks to exit the spectrum existing use. In terms of the amendment cycle, and this would be typically, I think, a six- to nine-month type cycle time that we'd normally see between application and having something that would be fully approved and entitled over to a customer.

Cameron McVeigh
Analyst, Morgan Stanley

Got it. Okay, makes sense. I want to also ask about edge computing which seems like a very interesting opportunity on the horizon. Recently, you had disclosed you have 100+ edge sites in trial. There is a 25-site assessment up to 100 MW of potential power within 9- 11 months. Within this context, if you think about AI inference really starting to proliferate across enterprises and the evolution of this technology, what would it take to scale edge computing to potentially thousands of sites, and how would the economics compare to the more traditional tower model?

Chris Hillabrant
CEO, Crown Castle

Yeah. Let me start by saying that we are excited by what we have seen so far in terms of demand for our sites, coming not just from one or two, but from a large number of different companies, from early-stage venture-backed startups to much larger data center players. It is being driven, I think, holistically in the U.S. market by this insatiable multi-year demand for data center growth that is confronting the reality of the current regulatory and political environment, whereby building new data centers, particularly large-scale data centers, has become highly problematic.

I use as an example, and we are based in Houston, it has been a very red state, but even the current governor had put a moratorium in place on the large-scale data centers. In the end, you saw a massive political shift in that state, again, one of the most business-friendly states, to suddenly starting to look at regulatory challenges similar to what is in New York and other states in the blue areas. The net impact of that is it is getting harder and harder to build those.

Many of the large publics announced, I think, $100 billion+ in orders booked, but yet to be actually delivered. So, in the environment where this insatiable demand is combined with 40,000 potential sites that are available to be developed as data centers, again, the scale is vastly different. We are talking about some 1 MW , kind of our sweet spot is between 0.2 MW and 0.5 MW, and this is based on available power, available space, and fiber backhaul to the site. So, we are talking fairly fast deployments.

Across 5,000 of our sites, we have existing shelters that we acquired through earlier acquisitions of tower portfolios. This is move-in ready rack space with power and cooling. But what we are finding very interesting is that in several cases, customers are coming back now and saying, "We would like more power. That is not fitting our profile and our business model. What else can you do?" So, based on those requests, we had gone back to these 25 sites, and what we found was availability of local power between 1 MW and 9 MW , depending on the location. But what was most intriguing to us was the time to deliver that power was less than a year, and that the capital investment by Crown was negligible.

So, it is the combination of actually discovering what it would take to bring power in. Again, 10% of our portfolio has more than an acre of land, so potentially more land to develop. This represents a really intriguing opportunity for us. We're calling this a trial because we're meant to learn from this. What we would look for in order to scale this is really an ability to go at a very large scale.

Signing a large-scale contract, not with tens or hundreds of sites, but thousands of sites, something that we could, in essence, really drive a new form of monetizing our sites, in addition to our vertical real estate, is taking advantage of what we already have as assets in place, but up to this point have not effectively marketed. This is exciting. This is something that we're looking at very closely, and I think we'll have more to discuss as we go through this learnings process.

Cameron McVeigh
Analyst, Morgan Stanley

Agreed. Especially, the data center industry is capital-intensive, so if you're able to capture that growth tailwind without having to deploy a lot of incremental capital.

Chris Hillabrant
CEO, Crown Castle

This is the key. We are a passive infrastructure provider. We are not building data centers to own data center structures or to fill them up with GPUs or CPUs. We're merely taking advantage of what we already have to offer as a new way to monetize those assets with an incremental customer.

Cameron McVeigh
Analyst, Morgan Stanley

Got it. Okay. That's great. Maybe let's shift to just on the margin side. You previously reiterated the target of 200 basis points margin expansion. Maybe just as we think about run rate savings and ground lease buyouts, and anything else you might envision, just what the path looks like for margin expansion from where we are today.

Chris Hillabrant
CEO, Crown Castle

I'll start, maybe, Sunit, you can jump in here as well. I think we're very pleased we were able to very early in the year execute on a restructuring that ended up in a $65 million run rate savings for the organization. We've increased another $20 million in savings this year. We continue to be very focused in on the largest drivers of cost in the business, starting with the ground lease buyouts. This was an area that when we had the fiber and small cell business, maybe we were less attentive to because we had competing uses for that capital.

But within our capital framework, we say we would spend between $150 million and $250 million. We were able to effectively double, more than double our year-over-year ground lease purchases, and at a very attractive return compared to our cost of capital. This is a focus, SG&A as well. We know what we can control. We can't control necessarily the timing of when customers decide to invest, but we can transform this business. In fact, we've launched a complete transformation program that is very much focused in on delivering the 200 basis points, and we're ahead of schedule.

Sunit Patel
CFO, Crown Castle

Yeah, I mean, the only thing I would add is, we said margins would expand 200 basis points from 2026 to 2030, and this year we've already added $20 more million compared to what we said at the beginning of the year, and still holding to being able to improve our margins by 200 basis points from 2026- 2030. It's a combination, it's a wide-spanning transformation program, but some of the critical elements are the ground lease buyouts, legacy IT systems that we're replacing with new systems, which takes down our IT costs, and thirdly, that catalyzes more efficiency and productivity in all our other functions, and allow us to take headcount costs down a little over the next years.

The net impact of that is in the ground lease situβ€” One other thing would be like, sites that might be unprofitable, for example, they don't have anyone on them. It's a lot of different things, but the way it shows up is that the ground leases, if we hadn't done anything about it, that expense grows at 3% a year. By increasing the pace of buyouts, you're slowing the growth, ultimately flattening, and then maybe even declining it over time. Similarly, on the headcount cost, and then on the non-headcount side, it's a whole slew of initiatives, as I said. What that means is that our operating leverage improves dramatically, and any revenue growth we see falls to the bottom line. That's why we think we're very confident about the 200 basis points expansion.

Cameron McVeigh
Analyst, Morgan Stanley

That's great. On that point, how would you rank buybacks, ground lease buyouts, debt paydown, and the dividends as you think about capital allocation?

Sunit Patel
CFO, Crown Castle

Yeah, so on the ground lease buyouts, this over the next number of years brings us closer to parity with our peers, and it's a structural cost disadvantage. We're very disciplined about it. If it's not above our weighted average cost of capital IRRs, we don't pursue those. Remember, out of 40,000 towers, on 70% of our towers, or 28,000, we have ground leases. Our competitors, close to 60% of their tower footprint has ground leases. So, I think that's just getting us to parity. Back to capital allocation in general, there are really several elements.

The dividend, $4.25, we're committed to that. We would grow the dividend when the payout ratio approaches 75%-80%. It's in the 90s this year, but as our EBITDA grows, and AFFO grows, the payout ratio should keep coming down, and then at some point allow us to grow our dividend. From a leverage perspective, our target is debt to EBITDA 6x-6.5x . In the third quarter, we were at 6.5x pro forma for this transaction that I talked about earlier, it's 6.3x . As EBITDA grows, we should be able to glide down from a debt to EBITDA.

The balance between share buybacks and debt-to-EBITDA, we feel like, again, even with some of the interest rate increases that have happened this year, we should be able to grow AFFO better than our revenue growth rate. I think if we can do that, then there's nothing wrong with the gliding down on the debt-to-EBITDA pathway. Depending on interest rate backdrops, we would continue to have degrees of freedom to look at both, just letting the debt-to-EBITDA go down, depending on the share price. If you wanted to do a share buyback, that flexibility also improves over the next couple of years.

Cameron McVeigh
Analyst, Morgan Stanley

Great. Makes a lot of sense. To close this out, if you think about your stock performance, what are investors potentially missing about the story and what might drive performance this next year?

Chris Hillabrant
CEO, Crown Castle

It starts with, this has been a transformation year for Crown. We have shifted from this heavily weighted fiber and small cell company now to a very simplified business focused in on becoming a best-in-class U.S. tower co. We think that is a very clean story for investors, and the combination of the growth catalysts that I talked about earlier that are moving the insatiable data demand, the spectrum that is being put into play, combined with the margin expansion activities that we have described here of where we are aggressively attacking our cost basis to get to a best-in-class.

We are catching up with where we are with our key competitors on things like the ground lease buyouts, makes for a great and compelling story. The risk-adjusted return that investors can expect of the combination of a dividend yield of, say, 4.5%-5%, depending on where the stock price is on any given day, combined with a growth in our AFFO beyond our revenue, it makes for a very nice return in the marketplace. And we are excited to bring that message to our potential European investors. Despite the fact that we are focusing as a U.S. business, we think that provides a very compelling investment opportunity.

Cameron McVeigh
Analyst, Morgan Stanley

Excellent. Chris, Sunit, thank you so much.

Chris Hillabrant
CEO, Crown Castle

Thank you.

Sunit Patel
CFO, Crown Castle

Thanks.